Você está na página 1de 14

[1] Which of the following phase produces the executable

program?
Choice a

Design

Choice b

Testing

Choice c

Implementation

Choice d

Mentainence

[2] Which organisation conined or introduced the term Software


Engineering?
Choice a
Choice b

IEEE
NATO

Choice c

ISRO

Choice d

ISRO

[3] Which software developemnt phase produces a Functional


Specification Document?

Choice a
Choice b
Choice c
Choice d

Requirement phase
Design phase
Coding phase
Feasibility specification phase

[4] When does the Testing Phase start in the software


Development?

Choice a

Along with Requirment Pahse

Choice b

After Requirment Pahse

Choice c

After Design Pahse

Choice d

Along with Coding Pahse

[5] In Software engineering, which of the following provides an


automated support for the process and methods?
Choice a

Quality focus

Choice b

Process

Choice c

Methods

Choice d

Tools

[6] While describing the Software Process it said that software


process gives . . . . . . . . . . to organizational activity.

Choice a

structure and quality

Choice b

focuse and performance

Choice c

stability and control

Choice d

structure and control

[7] . . . . . . . . . . is taks of precisely describing the software to be


written possibly in regirous way.
A)
B)

B)
B)

Choice a

Specification

Choice b

Requirment gathering

Choice c

Requirment design

Choice d

Requirment processing

[8] Choose correct type of person responsible for managing the


project.

Choice a

Customer

Choice b

Sponsor

Choice c

Supplier

Choice d

Project manager

[9] The project Management framwork as identified by PMI as one


functional area as communicaion.

The communication Management includes


capturing. . . . . . . . . . ., . . . . . . . . . .

Choice a

Project related data and Project activities

Choice b

Project Quality and Risk.

Choice c

Project related data and Project Boundaries

Choice d

Projetct Scope and Budjet.

[10] Project Management framework is built on how many


knowledge functional areas as defined by PMI?

Choice a

FOUR

Choice b

SIX

Choice c
Choice d

NINE
TEN

[11] Initiating Process -. . . . . . . . . . . . . . . . the project.

Choice a

is started by Sponsors and Customers for

Choice b

is started by Suppliers and Developers for

Choice c

Starts and Defines

Choice d

Defines and Authorizes

[12] The Process is a set of . . . . . . . . . . . . . . . . . . that are


performed to achive a presepecified set of product, result or
services.

Choice a
Choice b

interdepender action on modules


interrelated actions and activities

Choice c

interdependent activities and functions

Choice d

implemented functions and modules

[13] The Monitering groups function is to . . . . . . . . . . . . . . . . .


project plan,

Choice a

measure and quality check

Choice b

monitor and develop

Choice c
Choice d

control and measure


measure and moniter

[14] While explaining metrics and measurment The Measurement


data is most reliable when it is generated as . . . . . . . . . .

A) .

B) C).

Choice a

D) .

byproduct of producing a product or service

Choice b

process generated product.

Choice c

direct product

Choice d

methoeds used specification

of process and design

[15] A metric is derived (calculated or composite) unit of


measurment that cannot be directly observed .

Choice a

but is to give one measured parameter result.

Choice b
measures.

but is created by combining or relating two or more

Choice c

by combining the two measuers like LOC and SIZE.

Choice d
by combining the three measuers like LOC, SIZE
and Function Point.

[16] In Function Point Analysis - How many characteristics are used


to calculate function point count?

Choice a

) FIVE

Choice b

SIX

Choice c

TWELVE

Choice d

FOURTEEN

17] In Preliminary estimates for the project we are required to


determine . . . . . . . . . of a project.

Choice a

Top-Down Estimation

Choice b

Expert Judgment

Choice c
Choice d

The feasibility
Project planning

[18] While measuring the software product during development


which TWO Direct measurment techniques can be used ?
A)
C)

B)
D)

Choice a

Function Point, Budgeting

Choice b

Size of code

Choice c

Module number size

Choice d

Process Measurment, Finction Point

[19] SCM maintains different . . . . . . . . . . . . . . . . . of the Software


system for the software developer.
Choice a

Plan

Choice b

Activity

Choice c
Choice d

Versions
Products

[20] SCM manages the versions along with change descriptions to .


. . . . . . . . . . . between the versions.
A)

B)

C)

D)

Choice a
Choice b

help to match between the versions.


help to differentiate

Choice c

establish standard norms

Choice d

establish function maping

[21] What is another popular name for Software Configuration


Management ?

Choice a

Selection and control Model

Choice b

Configuration and Measrurment Process

Choice c
Choice d

Change Control Management


Software Setting Process

[22] SCA meas : . . . . . . . . . . . . . . . . .


Choice a
Choice b

Software Configuration Analysis


Software Configuration Audit

Choice c

Selected Configuration Analysis

Choice d

Software Control Audit

[23] Real Time software . . . . . . . . . . real world events as they


occure.

Choice a

Operates / Process / Manages

Choice b

Process / Controls

Choice c

Controls and Manages

Choice d

Moniters / Analyzes / Controls

24] Artificial Intelligence software makes use of . . . . . . . . . . . . . .


.to solve complex problems that are not amenable to computation
or straight forward analysis.

Choice a

Object Orineted Programs and Structured Analysis

Choice b

Object Orineted Programs and Structured Design

Choice c
Choice d

***Non Numerical Algorithms


Numerical Algorithms and Logic Programming

[25] Choose correction option by selecting correct group of


interacting in the software process.
i) Users and designers

ii) Customer and Users

iii) Designers and evolving tools

Choice a

i, ii, iii

Choice b

ii, iii, iv

Choice c

i, ii, iv

iv) Users and evolving tools

Choice d

*** i, iii, iv

26] Choose correction option by selecting correct process.


Software engineering comprises of . . . . . . . . . . . . . . . . .
i) Quality focus
Tools

ii) Process

Choice a

i, ii, iii, iv

Choice b

ii, iii, iv, v

Choice c
Choice d

iii) functions

iv) Methods

v)

i, ii, iv, v
i, ii, iii, v

[27] While describing the Five Maturity levels of CMM. The level 1 is
defined as :
The software process is characterized as . . . . . . . . ..

Choice a
Repeatable and estabilished process. Few processes are defined,
and success depends on individual effort and heroics.
Choice b

ad hoc, and occasionally even chaotic. Few processes are


defined, and success depends on individual effort and
heroics
Choice c
Key process are not defined and followed and and success depends
on individual effort and heroics.
Choice d
None of the above

[28] Choose correction option by selecting correct activities


required for Project managements application to meet project
requirements.
i) Knowledge
iv) Tools

Choice a

ii) Skills
v) Techniques

i, ii, iii, iv

iii) methodes
vi) process

Choice b

ii, iii, iv, vi

Choice c

i, ii, iv, v

Choice d

ii, iii, v, vi

[29] Choose correction option by selecting correct measutment


techniques give below :
Measurement can be used . . . . . . . . . . . . . . . . .
i) To Gauge The Status
management

ii) Effectiveness

iv) Customer Satisfaction


Processes

v) Product Quality

Choice a

iii) As tool for


vi) Efficiency Of

i, ii, iii, iv, v

Choice b

ii, iii, iv, v, vi

Choice c

i, ii, iv, v, vi

Choice d

ii, iii, iv, v, vi

[30] Choose correction option by selecting correct measutment


techniques give below :
The metrics and models are used to estimate
and . . . . . . . , . . . . . . . . . ., and . . . . . . . . . .
i) Predict product costs
iv) To measure productivity

ii) Modularization
v) Product Quality

iii) Schedules
vi) Cohesion

Choice a

i, ii, iii, iv

Choice b

ii, iii, iv, vi

Choice c
Choice d

i, iii, iv, v
ii, iii, v, vi

Você também pode gostar