SMPS Stands for ___Switched Mode Power Supply_____
VRLA batteries works in the principle of ____Oxygen Recombination ______ The end plate is _____negative plate_____ The input to UPS is ____both battery and AC supply_____ The standard we use in terms of discharge of battery is _______C10______ For the exchanges where less space is available ____spike____ earthing is recommended. 7. What is the power factor of input commercial AC power supply ______0.8_____. 8. After discharge the positive plate becomes _____PbSO4____ 9. All cells of the battery are connected in ____series_____ 10.Mainly used earthing system in Telecom industry is _____plate_____ 11.The device reduced the size of the power plant is _____SCR_____ 12.The SCR is _____fast switching_______ device 13.Meggar is used to measure _____low resistances____ 14.Unit which cuts the DC in to pulsated DC with a than 20 K Hz speed is ____chopper___ 15.Chopper is the circuit which cuts the DC into ____pulsated DC with of 20 K Hz_______ 16.The purpose of earth plates in earthing is ______to increase the area of contact______ 17.Power plant, batteries and load are connected in ___parallel____ 18.Battery terminals are terminated at ______power plant_____ 19.HRC stands for ___High Rupturing Capacity______ 20.In a cell to meet 4000 Ah, 4 nos of each 1000 Ah are connected in ____parallel____ 21.LVD stands for ____Low Voltage Disconnector____ 22.MCM stands for ____Monitoring and Control Module____ 23.LVD operates at _____44.4 V per battery or 1.75 V per cell____ 24.MCM consists of ___Micro Processor_____ 25.Instrument used to measure earth resistance is _____Meggar____ 26.Plate at which Oxygen gas releases during discharge is ______positive____ 27.Plate at which Hydrogen gas releases during discharge is _____negative____ 28.The batteries which we use in the exchanges are of type ____Secondary _____ 29.The Stage 1 in power plant is also called as ____LPU Lightning Protection Unit_____ 30.All switches and fuses are connected to _____negative path____ 31. The device which converts AC to AC is called as ______cyclo converter______ 32.Huge of size of conventional power plant is due to ____ transformes______ 33.The function of MCM is ____all of the above_____ a)output voltage monitoring b) load sharing c)extension of alarms d) logical operation 34.The device which disconnects the battery at 44.4 V is _____LVD____ 35. The stage 2 in power plant is also called as ______SPU Surge Protector Unit___ 36.The SPU protects the power plant from _____Surge voltages_____ 37.The LPU protects the power plant from ______Lightning voltages_____ 38.Earthing is compulsory in exchanges to divert _____leakage____ and _____faulty ____ currents. 39.Inverter is a device which converts _____DC to AC______ 40.Converter is a device which converts ____AC to DC___ 41.The standard cell voltage is _____2.23 V_____ 42.The electrolyte used in the cell is _____ Sulphuric Acid____ 43.Adding acid/distilled water to the electrolyte is called as____Topping up ____
44.The ____changeover time_____ is the advantage of online UPS over offline
UPS. 45.The heart of an exchange is _____power plant____
1. Air conditioning is designed to _____condition the air_____
a) Cool the air b) heat the air c) supply of air d) condition the air 2. Which class of extinguisher is to be used for electric fire ____Class C____ 3. The kinetic energy is stored in ______flywheel____ 4. TDC stands for _____top dead center_____ 5. BDC stands for _____bottom dead center_____ 6. This constitutes cooling unit in which the liquid refrigerant under a low pressure evaporates and in doing so picks up heat from the air thereby cooling the medium surrounding the cooling coil_____evaporator___ 7. In split AC system the distance between indoor and outdoor units should not be more than 8. AC from 11 KV to 440v is a step down transformer. 9. What are the alternative refrigerants for vapour compression system 10.CPCB stands for ___central pollution control board____ 11.Which is the moving part of E/A set___ 12.For uninterrupted and unmanned supply ______is provided in E/A sets. 13.Sensible heat ratio in precise AC is __________ 14.More number of stars, more energy saving will result from air-conditioners. 15.In air condition cycle, the refrigerant from compressor output is in _________
1. The space occupied by self supporting tower is ____less____ when compared
to the Guyed Tower 2. The mandatory requirement as per the civil aviation law is to keep ______aviation lamp____ on the top of the tower. 3. The floor of prefab shelter is designed to take a load of ____1000KG/Sq M___ 4. The roof of prefab shelter is designed to take a load of ____200KG/Sq M___ 5. The parameters to be taken care of while choosing site for BTS____all of the above___ a) Approach road availability b) no power line crossing c) no low laying area d)all of the above. 6. Verticality tolerance of tower upto 30 meter height ____H/1000 or +/- 20 mm whichever is less 7. Verticality tolerance of tower above 30 meter height ____H/1500 or +/- 25 mm whichever is less. 8. Lightning conductor shall be fixed to the top of the tower with ____teflon sleeve____ 9. Applying of first coat of enamel paint for the tower shall be done after _____48_____hours of applying the primer. 10. Applying of second coat of enamel paint for the tower shall be done after ____48_____hours of applying the first coat of enamel.