Você está na página 1de 36

TP / TCD / QP01-A04

2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Inter Distribution Transformer(IDT)


Date

Page no:

INDEX
Sl.No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36

Item
Transformer general data
Final checks after energization
Final checks prior to energization
Initial Checks (to be done prior to starting site testing)
Site processing details
Visual inspection
Insulation Resistance measurement of Transformer (Winding &core)
2kV test on core and clamping structure
Ratio and Vector group tests
Magnetizing current measurement
Winding Resistance measurement
Short circuit Impedance measurement
Measurement of Tan delta and Capacitance of Winding
Measurement of Tan delta and Capacitance of Bushings
Calibration of Temp. Indicators
Hot spot Gradient check of Winding Temperature indicators
Ratio check of CTs for winding temperature indicators
Measurement of transducer out put for Remote Temp. Indicator
On load Tap changer- Operation checks
Tap position indication check
Insulation resistance check of devices
Fan Motor check
Operation check of cooling equipments
Protective device wiring/operation check
Cable box inspection
Checks on AVR
Tap changer & cooler alarms / indications check
Tap Changer Parallel operation checks
Oil leak test
BDV test on insulating oil
Test results/properties of Insulating oil before filling in Transformer
Tests on transformer oil after complete site processing
DGA test on Transformer oil
Check on small wiring
Checks during Fire Deluge operation
Frequency response analysis

Checked By

Verified By

Format No.
DEWA/TP/TCD/IDT/ST/2
DEWA/TP/TCD/IDT/ST/3-A
DEWA/TP/TCD/IDT/ST/3-B
DEWA/TP/TCD/IDT/ST/4
DEWA/TP/TCD/IDT/ST/4
DEWA/TP/TCD/IDT/ST/5~7
DEWA/TP/TCD/IDT/ST/8
DEWA/TP/TCD/IDT/ST/8
DEWA/TP/TCD/IDT/ST/9
DEWA/TP/TCD/IDT/ST/10
DEWA/TP/TCD/IDT/ST/11
DEWA/TP/TCD/IDT/ST/12
DEWA/TP/TCD/IDT/ST/13
DEWA/TP/TCD/IDT/ST/13
DEWA/TP/TCD/IDT/ST/14
DEWA/TP/TCD/IDT/ST/15
DEWA/TP/TCD/IDT/ST/15
DEWA/TP/TCD/IDT/ST/16
DEWA/TP/TCD/IDT/ST/17
DEWA/TP/TCD/IDT/ST/18
DEWA/TP/TCD/IDT/ST/19
DEWA/TP/TCD/IDT/ST/20
DEWA/TP/TCD/IDT/ST/21
DEWA/TP/TCD/IDT/ST/22
DEWA/TP/TCD/IDT/ST/23
DEWA/TP/TCD/IDT/ST/24~25
DEWA/TP/TCD/IDT/ST/26
DEWA/TP/TCD/IDT/ST/27~28
DEWA/TP/TCD/IDT/ST/29
DEWA/TP/TCD/IDT/ST/30
DEWA/TP/TCD/IDT/ST/31
DEWA/TP/TCD/IDT/ST/32
DEWA/TP/TCD/IDT/ST/33
DEWA/TP/TCD/IDT/ST/34
DEWA/TP/TCD/IDT/ST/34
DEWA/TP/TCD/IDT/ST/35

Verified By

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/1

1 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Inter Distribution Transformer(IDT)


Date

Page no:

1.0 TRANSFORMER GENERAL DATA


HV
RATING ONAN / ONAF

LV

MVA

NOMINAL VOLTAGE

kV

FULL LOAD CURRENT (RATED TAP)

VECTOR GROUP
Max. Tap ( 1 )

Rated Tap (

Min. Tap (

SHORT CIRCUIT IMPEDANCE HV/LV


TYPE/FORM (given by manufacturer)
YEAR OF MANUFACTURE
ZERO SEQUENCE IMPEDANCE
NO OF TAPS
NO OF FANS
NO OF PUMPS
NO OF RADIATORS
TYPE OF OIL
TOTAL OIL QUANTITY
BREATHER TYPE
OLTC MAKE / MOTOR
OLTC TYPE / MOTOR
TOTAL WEIGHT
CONSERVATOR TYPE
NEUTRAL GROUNDING METHOD
TRAFO TYPE (ICT, IBT, IDT Etc.)
SUB STATION VOLTAGE
TYPE OF ROOF
OLTC COUNTER READING
COMMISSIONING DATE OF TRANSFORMER.

Checked By

Verified By

Verified By

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/2

2 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Page no:

Inter Distribution Transformer(IDT)


Date

2.0 FINAL CHECKS (To be carried out after energization)

Date:

1.

Check for any abnormal sound in the transformer after commissioning

2.

Check for any abnormality during OLTC tap operation

3.

Check/Ensure no persisting alarms at the AVR & HMI

4.

Oil Temperature Indicator reading

5.

HV Winding Temperature Indicator Reading

6.

LV Winding Temperature Indicator Reading

7.

Remote Winding Temperature Indicator Reading

2.1 FINAL CHECKS (To be carried out during Load Test)

Date:

1.

Load Test current in the Transformer

Amps

2.

HV WTI Ammeter Reading

Amps

3.

LV WTI Ammeter Reading

Amps

4.

RWTI Ammeter Reading

Amps

5.

HV WTI circuit current measurement using clamp meter

Amps

6.

LV WTI circuit current measurement using clamp meter

Amps

7.

RWTI circuit current measurement using clamp meter

Amps

8.

Oil Temperature Indicator reading

9.

HV Winding Temperature Indicator Reading

10.

LV Winding Temperature Indicator Reading

11.

Remote Winding Temperature Indicator Reading

Calibration Details
Checked By

Witnessed By

Witnessed By

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/3-A

3 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Page no:

Inter Distribution Transformer(IDT)


Date

3.0 FINAL CHECKS (To be carried out prior to energization)


Correctness of oil level in all bushings and oil filled chambers.
All air release plugs (including radiators)& Buchholz relays vented
Pressure relief diaphragm intact
All bushing connections & test tap tightness checked
Neutral & Transformer Earth connection satisfactory
Position of all switches in MK & MDU ON position.
All CT connections are through / shorted & CT test windings open
WTI Ammeter circuit link connections are correct *Link Open loop resistance:

*Link Closed Loop resistance:

No damage for insulators and clean


No oil leakage
Rating, diagram, Id plates fitted satisfactorily
Ensure that the silica gel is enviro gel type
Breathers satisfactory, oil level correct to the mark and pipe work joint is tight
All cabling and wiring visually satisfactory
All valves are in correct operational position with respect to valve schedule diagram (Ensure valves on both sides of
relay and to HV cable box are open).
All valves labeled & locked and blanking covers provided wherever necessary
All protective and cable box covers fitted.
All pre-commissioning tests (including oil tests) completed & results are satisfactory.
Condition of Gland earthing of all cables in MK & MDU shall be satisfactory.
Permanent Identification tags for all control cables on both ends
Availability of marked up drawing copy in MK , MDU & & Record room
All openings (cable entry) in to AVR panel, MK and HV/LV cable box shall be closed.
Availability of power socket for oil filtration unit.
LV cable box connections shall be ensured
Ensure control cable gland and wiring connection tightness at device junction boxes and MK.
Record room verified for availability of records.
Locking of protective B relay & PRD released and locks if any are removed
No persisting alarms at AVR panel/ SCS /SCC (except VT supply absent)
*To be ensured by opening any one link in the CT circuit and entire path shall be measured with link in open and closed condition. Ensure link is closed and tightened
after measurements.

Checked By

Witnessed By

Witnessed By

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/3-B

4 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Inter Distribution Transformer(IDT)


Date

4.0 Initial check (To be done prior to starting the test)


No Checks
Availability of safe receipt report from I & QA
1
Ensure safe transit based on shock recorder data
2
Ensure proper site processing
3
Positioning of anti vibration pad
4
Ensure uniform thickness of anti vibration pad
5
Availability of related Specification
6
Availability of approved drawings & installation manual
7
Availability of factory test reports
8
Maintaining site notes
9
10 Compliance of oil TC to DEWA reference oil (if TC is incomplete, test

Page no:

Remarks

shall be done at independent lab)


Verification of Minimum / maximum oil level alarm (shall be done
during oil filling by simulating actual condition)
a) Main conservator (MOLG/ Prismatic MIN/MAX alarm operation)
b) Quantity of oil needed to achieve MAX alarm(Ltrs)
c) Quantity of oil needed to be drained to achieve MIN alarm(Ltrs)
d) Quantity of oil needed to be drained from MIN position to initiate
MT Bucholz alarm (Ltrs) *
e)
OLTC conservator(MOLG/ Prismatic MIN/MAX alarm check)
5.0 Site processing Details ( Site processing shall be done as per the O&M Manual)
Make:
Capacity:
Equipment details
Sl No:
Last Date conditioning of purifier
5.1. Initial oil treatment (in storage tank) records
BDV
Water content
Tan delta
Oil TC from refinery
TC No.
5.2 Vacuum/ Treatment details
Degree of vacuum (min)
Duration (hrs)
Maintained:
Mfrs proposal:
Maintained:
Mfrs proposal:
5.3 Oil Circulation details of IDT & OLTC
Date
Time
Oil temp (C)
Vacuum (in
IR value of IDT.
Inlet
Out let
OTI
Ambient
purifier)

11

Attach separate sheet for balance recordings

* Ensure minimum 20 - 30 litres available

Tested By

Witnessed By

Witnessed by

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/4

5 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

6.0 Visual Inspection


No Check point
6.1 Transformer main body
01
Phase identification label
02
Rating & Valve Schedule plate
03

04

05
06

07

08
09
10

Accessories & Devices


a) Identification
b) Type form
Fan
a) Rating
b) Blades
c) Fan guards
d) Mounting of Fan

Inter Distribution Transformer(IDT)


Date

Criteria

Page no:

Remarks/Date

As per approved name plate


Thickness:
Material
(Enclose approved list showing
type/form)
As per GOA
As per GOA/ Approved

Galvanized steel/ Aluminum


Shall be available at both sides
Shall be independently mounted
with proper Anti vibration
arrangement
Free space under fan
750mm (min)
Valves
Size of valves shall be
a) Main Tank fill, filter & draining
50mm
b) Sampling valves (top, bottom & cable 15mm
box)
c) Cable box fill, filter & draining
25mm
d) OLTC fill, filter and & draining
25mm
e) Hydran valve
50 mm
Pressure relief device
Trafo
OLTC
Cable box
a) Make
b) Operating pressure
Bushing
a) Make
b) Rating
Neutral Earthing
a) Touch potential insulation
b) Size Earthing cable section
Core and clamp bushing
Verified By

HV

HVN

LV

N bar shall be insulated (1 kV)


300mm2 (min)
Shall be identified
Verified By

Verified By

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/5

6 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Inter Distribution Transformer(IDT)


Date

No

Check point

Criteria

11
12

Identification of devices MK & Enclosures


Accessibility of components and devices

13

Linking and De-linking of LV Bus bar

14

Earth connection between tank and cover

15
16
17

LV Bus bar, flexible Neutral terminal and


neutral bar
Thickness of cable box and covers
OTI&WTI capillary tubes

Shall be identified as per GOA


Easy access shall be available for
buchholz, Bladder rupture, oil level
indicators and MK components.
Easy accessibility shall be available
inside LV cable box
One connection shall be located near
to core/ clamp earthing
Shall be tin/ silver plated

18

Labels

6.2 Marshalling Kiosk/ Motor Drive Unit


01
Contacts, components and other parts which
require periodic maintenance
02
Wiring
03
Spare terminals
04
CT terminals
05
Doors

06
Redundant supply
07
Labels
08
Anti vibration mounting
6.3 Remote Tap Changer Panel (AVR Panel)
01
AVR supporting arrangement
02
Contacts, components and other pats which
require periodic maintenance
03
Bottom terminal boards

Verified By

Page no:

Remarks/Date

4mm
Shall be dressed properly using
stainless steel ties and shall be
identified at both ends.
1) All external parts identification
label shall be stainless steel
2) Device label shall be stainless
steel
Accessibility shall be there for these
contacts
Shall be neatly arranged in trunking
Min 20% spare shall be available
Test barrels shall be available
. 1) Shall be lockable type
2) Front window shall be glass &
located such that view of indicators
are obtained
Shall be available
Shall be permanent engraved
Shall be used for mounting MK
Shall be as per drawing
Accessibility shall be there for these
contacts
Shall be above 200mm from cable
crutch of incoming multi core cable
Verified By

Verified By

Consultant

DEWA

Signature
Name
Organization

DEWA/TP/TCD/IDT/ST/6

7 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

No

Check point

Inter Distribution Transformer(IDT)


Date

Criteria

04
Wiring
05
Spare terminals
06
Labels
6.4 General
01
Oily water tank
02
Spillage oil & Fire water
03
04
05

Cobble stone
Level of water in oily water tank
Roof

06

IDT room Lighting

07

Record room

08

Maintenance access

09

Jacking facility

Verified By

Page no:

Remarks/Date

Shall be neatly arranged in trunking


Min 20% spare shall be available
Shall be permanent engraved
1) Shall be available at S/S
2) Shall be directed to oily water
tank
Size shall be 35 to 50mm
Shall be monitored
There shall be no gap at roofing
allowing bird entry
Availability of Essential/ Non
Essential/Emergency lightning shall
be confirmed.
Record shall be kept in lockable
exclusive with glass paneled
(Attach list of documents available
in room)
1) Accessibility shall be there at the
top of transformer
2) Safe Movement inside IDT room
shall not be obstructed by pipelines.
To facilitate safe jacking of IDT, the
jacking pads shall be inside the
plinth.

Verified By

Verified by

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/7

8 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Page no:

Inter Distribution Transformer(IDT)


Date

7.0 INSULATION RESISTANCE MEASUREMENT OF TRANSFORMER


(WINDING AND CORE & CLAMP)
7.1 INSULATION RESISTANCE - WINDING

Measured at 5000 Volts


Measured between

Oil temperature -

15 Seconds

60 Seconds

600 Seconds

P.I. value

(M. Ohms)

(M. Ohms)

(M. Ohms)

(R600/R60)

HV LV and EARTH
LV - HV and EARTH
HV LV
Remarks:- PI value shall be >1.5
7.2 INSULATION RESISTANCE - CORE & CLAMP

Measured at 500 volts


Measured between

Oil Temperature Before 2kv Test


(M.ohms)

After 2kv Test


(M.ohms)

Remarks

Core Earth
Clamps Earth
Core clamps
Note: Confirm that core and clamp are identified and having isolation

8.0 2kV test on Core and clamping structure


1. Applied 2kV, AC, between core & clamps connected together and tank for one minute
Leakage current mA
Result : Withstood / Failed
2. Applied 2kV, AC, between core and core clamps for one minute
Leakage current mA
Result : Withstood / Failed
Calibration Details

Tested By

Witnessed By

Witnessed by

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/8

9 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Page no:

Inter Distribution Transformer(IDT)


Date

9.0 RATIO AND VECTOR GROUP TESTS


9.1 Ratio Check
Tap
HV applied volts
U-N V-N W-N
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

LV measured Volts
u-v
v-w
w-u

Measured
ratio

Nominal
ratio

Error
(%)

Remarks

Voltage continuity check during tap changing operations - OK / Not OK


9.2 Vector group check
Connected terminals 1U& 2u together, Tap changer being
on rated tap. Applied 3-phase voltage on HV terminals.
Measured voltage:
U-V
V-W
W-U

V-v
W-w
U-N

Vector diagram

V-w
W-v

Remarks:
Calibration Details

Tested By

Witnessed By

Witnessed by

Consultant

DEWA

Signature
Name
Organization

DEWA/TP/TCD/IDT/ST/9

10 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Inter Distribution Transformer(IDT)


Date

Page no:

10.0 MAGNETIZING CURRENT MEASUREMENT


10.1 HV Winding
Tap No.

Applied voltage
(volt)

Measured exciting current (mA)


U phase
V phase
W phase

Remarks

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
10.2 LV Winding
Applied voltage
(volt)

Measured exciting current (mA)


U phase
V phase
W phase

Remarks

Calibration Details

Tested By

Witnessed By

Witnessed by

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/10

11 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Page no:

Inter Distribution Transformer(IDT)


Date

11.0 WINDING RESISTANCE MEASUREMENT


(Temp

11.1 HV WINDING
Tap
No.

Applied
current (A)
UN

Measured Resistance (Ohms)


Average resistance
VN
WN
@ t C
@ 75 C

C)

Factory
value at
75C()

Remarks

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
Note : Graph plotted ( Tap no on x-axis and R on y-axis) for all the three phases to be attached)
TAP No

U V ()

V - W ()

W U ()

(Temp

11.2 LV WINDING
uv/un
(Ohms)

Average @ t C ()

vw/vn
(Ohms)

wu/wn
(Ohms)

Average (Ohms)
@ t C
@ 75 C

C)

Factory value @ 75 C
(Ohms)

Calibration Details
Tested By

Witnessed By

Witnessed by

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/11

12 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Page no:

Inter Distribution Transformer(IDT)


Date

12 SHORT CIRCUIT IMPEDANCE MEASUREMENT


Tap Tap
No. I (A)

Measured voltage
on HV (volts)
UV

V W

W U

Measured HV
current (Amps)
U

Impedance (%)
at . MVA base
U

Average

Factory
value
(%)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
Impedance (%) = *Rated current x Measured voltage x 100
*Rated voltage x Measured current

(* At corresponding tap)

Calibration Details
Tested By

Witnessed By

Witnessed by

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/12

13 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Page no:

Inter Distribution Transformer(IDT)


Date

13.0 MEASUREMENT OF TAN DELTA & CAPACITANCE OF WINDING


Ambient temp.

Top oil temp.


CAPACITANCE (pF)

Sl.
No

APPLIED
VOLTAGE
(kV)

Measured
combination

Measured
Value

Factory Value

Difference
(%)

CURREN
T
(mA)

*Dissipation Factor
(TAN DELTA) (%)
Correction factor k=
@
C

@ 20C

1
2
3
4
5
6

14.0

MEASUREMENT OF TAN DELTA & CAPACITANCE OF BUSHINGS

Make and Type of bushings:


Sl
No

Applied
voltage
(kV)

Measured on (Sl
no. of bushings)

HV U

HV V

HV W

HV N

CAPACITANCE (pF)
Measured
value

Factory
value

Difference
%

Current
(mA)

*Dissipation Factor
(TAN DELTA) (%)
Correction factor k=

@ C

@ 20C

Note:1. Measured values of tan delta and capacitance shall be comparable to factory test report
2.Ensure test tap cap is put back & tight
Calibration Details
Tested By

Witnessed By

Witnessed by

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/13

14 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Inter Distribution Transformer(IDT)


Date

15.0

CALIBRATION OF TEMPERATURE INDICATORS

15.1

OIL TEMPERATURE INDICATOR

MAKE:

TYPE:

Page no:

SERIAL NO.

BATH TEMPERATURE ( C)
INDICATOR READING (0C)
ALARM CONTACT SETTING (0C)

OPERATION OF CONTACTS (0C)

TRIP CONTACT SETTING (0C)

OPERATION OF CONTACTS (0C)

COOLER START (0C)

COOLER STOP (0C)

Remarks:
15.2

WINDING TEMPERATURE INDICATOR (HV)

MAKE:

TYPE:

SERIAL NO.

BATH TEMPERATURE ( C)
INDICATIOR READING ( 0C)
ALARM CONTACT SETTING (0C)

OPERATION OF CONTACTS (0C)

TRIP CONTACT SETTING (0C)

OPERATION OF CONTACTS (0C)

COOLER START (0C)

COOLER STOP (0C)

Remarks: 15.3

WINDING TEMPERATURE INDICATOR (LV)

MAKE:

TYPE:

SERIAL NO.

TEST TEMPERATURE (0C)


INDICATIOR READING (0C)
ALARM CONTACT SETTING (0C)

OPERATION OF CONTACTS (0C)

TRIP CONTACT SETTING (0C)

OPERATION OF CONTACTS (0C)

COOLER START (0C)

COOLER STOP (0C)

Remarks: Note: a). Calibration of indicators shall be done simultaneously and the temperature reading between any two indicators
shall be less than 20C. b) Ensure that the red pointer is appropriately set.
Calibration Details
Tested By
Witnessed By
Witnessed by
Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/14

15 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

16.0

HOT SPOT GRADIENT CHECK OF WINDING TEMPERATURE INDICATORS

Local /
Remote
Local

Page no:

Inter Distribution Transformer(IDT)


Date

Indicator
Sl No.

HV-

Bath
Temp
( C)

Current injected
at WT terminal
(A)

WTI
reading
(C)

Hot spot gradient (C)


Measured =
(WTI reading
bath temp )

Required

Remarks

ONANONAF-

Local

1.2 puLV-

ONANONAF-

Remote

HV-

Remote

1.2 pu-

LV-

ONANONAF1.2 puONANONAF1.2 pu-

Note: Hot Spot Winding Gradient of WTI shall be set based on the maximum gradient obtained during heat run
test at ONAN or ONAF rating which ever is higher. Test at other ratings are for reference & subject to review.
Current shall be applied after attaining steady temperature reading of the indicator. Sufficient time
(approximately 40 minutes) shall be given for taking indicator reading, after current injection.

17.0 RATIO CHECK OF CTs FOR WINDING TEMPERATURE INDICATORS


CT location /
Identification
No.

Name plate
ratio

*Primary
applied current

Measured
secondary
current

Measured
ratio

* Secondary
winding resistance

* Measurement done at CT / MK terminals


Calibration Details
Tested By

Witnessed By

Witnessed by

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/15

16 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Inter Distribution Transformer(IDT)


Date

Page no:

18.0
MEASUREMENT OF TRANSDUCER OUTPUT FOR REMOTE TEMP.
INDICATOR
DETAILS OF DEVICES
ROTI

RWTI (HV) :
RWTI (LV) :
Device connected to SCS/SCC

Bath
temp.
(C)

OTI
OTI
reading

WTI (HV)

Transducer
output (mA)

WTI
reading

Transducer
output (mA)

WTI (LV)
WTI
reading

Transducer
output (mA)

Reading at
Remarks
SCS

SCC

40
50
60
70
80
90
100
110
120
130
140
150
Note: Reading at SCS/SCC shall be done at ambient temperature.

Calibration Details
Tested By

Witnessed By

Witnessed by

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/16

17 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Inter Distribution Transformer(IDT)


Date

Page no:

19.0 ON LOAD TAP CHANGER OPERATION CHECKS


Tap changer details
Make
Type/Model Sl. No.
MDU Type Year of Mfg. Sl.No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

Tap Changer Motor


Make
Motor Type Rating (KW) Voltage
Rated current -

Description of check
Local operation possible when selector s/w in local position
Handle interlock
End limit switches in extreme taps
Step by step operation
Tap position indication in MDU & Divertor switch
No of rotations for one step operation
Local operation is not possible when selector s/w in Remote position
Over travel in operation is within limits
Starting current of motor
Running current of motor
Phase discrepancy in operation (if separate poles for each phases)
Time for one tap changing Normal tap
Time for one tap changing run through tap (where applicable)
Contacts for all alarm/indication circuits
Over load tripping of motor (Setting of MPR)
IR value of motor and wiring with 500volts Megger
Lighting and heater controls (operation of door switch, thermostat etc.)
Setting made for voltage monitoring relay (UV/ OV .. )
OLTC counter operation

Tested By

Witnessed By

Remarks

Witnessed by

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/17

18 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

20.0

Inter Distribution Transformer(IDT)


Date

Page no:

TAP POSITION INDICATION CHECK:

Tap
Positi
on
MDU

Input to
Transducer
()

Transducer
output for
TPI (mA) at
MDU

Transducer
(AVR Panel)
Output
(mA)

Tap
Position
at AVR
Panel

Tap
Position
at SCS

Tap
Position
at SCC

Remarks

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

Tested By

Witnessed By

Witnessed by

Consultant

DEWA

Signature
Name
Organization

DEWA/TP/TCD/IDT/ST/18

19 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Inter Distribution Transformer(IDT)


Date

Page no:

21.0 INSULATION RESISTANCE CHECK OF DEVICES


Sl.
No.

Details of devices
Device/Component
HV bushing test tap

Serial No

Make

Test
voltage

Ambient
Temp.

Terminal
numbers in
MK

IR value
(M)

(U)
(V)
(W)

HV-N bushing test tap

Buchholz relay(MT)

4
5
6
7

Buchholz relay(CB)
Oil level gauge (MT)
Oil level gauge (OLTC)
Rubber bag failure relay

PRD (MT)

PRD (OLTC)

10

PRD (CB U)

11

PRD (CB V)

12

PRD (CB W)

13

OLTC surge relay

14

OTI

12
13

WTI HV
WTI LV

14

Heater HV cable box

15

Heater LV cable box

16

Heater Marsh. Kiosk

17

Heater MDU

18

LV cable box supporting


insulators

Tested By

Witnessed By

Witnessed by

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/19

20 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Inter Distribution Transformer(IDT)


Date

Page no:

22.0 FAN MOTOR CHECK


Make

Rating

Type /
Model

Rated
current

KW/HP

FAN NO.
SERIAL NO.
CHECK for DIRECTION OF
ROTATION
STARTING CURRENT (A)
RUNNING
CURRENT (Amps)

U
V

OVER LOAD DEVICE

W
OVER LOAD
SETTING (Amps)
TRIP OPERATION
TIME
(Sec)
BLOCKED ROTOR
CURRENT (A)
(Random test 10% only)
ALARM CONTACT
(OK/Not OK)

IR VALUE AT 500 V (M )
48 HR RUNNING TEST (No
abnormality during test)
CHECK FAN RUNNING STARTS WHEN ONE PHASE IS DISCONNECTED RUNNING / NOT RUNNING

Calibration Details

Tested By

Witnessed By

Witnessed by

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/20

21 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

23.0

Inter Distribution Transformer(IDT)


Date

Page no:

OPERATION CHECK OF COOLING EQUIPMENTS

MANUAL OPERATION
DIRECTION OF FANS / PUMPS
AUTO CONTROL FROM HV W. T. I
AUTO CONTROL FROM LV W. T. I
AUTO CONTROL FROM O T. I

AS PER DRAWING

FAN START (C) FAN STOP. .(C)

ACTUAL OPERATION

FAN START (C) FAN STOP. .(C)

AS PER DRAWING

FAN START (C) FAN STOP. .(C)

ACTUAL OPERATION

FAN START (C) FAN STOP. .(C)

AS PER DRAWING

FAN START (C) FAN STOP. .(C)

ACTUAL OPERATION

FAN START (C) FAN STOP. .(C)

CHECK INTERLOCKING OF COOLING FANS WITH FPS


OPERATION
UNDER VOLTAGE RELAY OPERATION AND ALARM
CONTACT
MAIN CONTROL MCB TRIP
FAN CONTROL SWITCH TRIP
PUMP / FAN ON INDICATION
PUMP / FAN FAILURE INDICATIONS
CHECK FOR STAGGERED STARTING OF COOLER
FANS/PUMPS
WIRING CHECKS (T. B NO, FERRULES, GROUPING OF
ALARM CONTACTS ETC. AS PER DRAWINGS)

Tested By

Witnessed By

Witnessed by

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/21

22 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Inter Distribution Transformer(IDT)


Date

Page no:

24. PROTECTIVE DEVICES WIRING/OPERATION CHECK


Sl.
No.

Description

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Initiated
from

Terminal No.
in MK

Terminal
/Ferrule
No.in LCC

Remarks/
Results
SCS/SCC(To be
ensured at the
device end)

---------------------------------------------------------------------------------------------------------------

Buchholz Alarm (MT)


Buchholz Alarm(CB)
Oil temp. high
Wind. Temp. high( HV)
Wind. Temp. high (LV)
Rubber bag fail
Oil level high(MT)
Oil level low (MT)
Oil level high (OLTC)
Oil level low (OLTC)
Cooling system faulty
Dissolved gas alarm
Heating / Lighting
supply failure (MK & CB)
Cooling fan running

Transformer Trips
1
2
3
4
5
6
7
8
9
10
11

--------------------------------------------------------------------------------------------------------------------------

Buchholz relay (MT)


Buchholz relay (CB)
Surge Relay (OLTC)
Oil temp. high
Wind. Temp. high (HV)
Wind. Temp. high (LV)
PRD (MT)
PRD (OLTC)
PRD (CB U )
PRD (CB V )
PRD (CB W )
Buchholz Relay alarm contact operation check by N2 injection

Tested By

Witnessed By

Witnessed by

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/22

23 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

25.0 CABLE BOX INSPECTION


Sl.No Check points

Verified by

23.1

HV Cable box prior to HV test of cables

1
2
3
4
5
6
7
8
9
10
23.2
1
2

Ensure Cleanliness
Ensure Earthing of HV and LV terminations
Ensure that link is removed &Check test tap cap threads/ tightness
Ensure absence of floating parts in cable box
Ensure tightness of shield connection
Ensure filling of oil
Oil test report traceability
Ensure the BDV, water content & Tan of filling oil is satisfactory
Ensure the BDV, water content of filled oil is satisfactory
Ensure body earthing
HV Cable box after HV test of cables
Tightness of shield connection
Ensure that link is fitted and connections locked as per cable box
drawing
Ensure proper insulation of link as per drawing
Ensure cleanliness
Ensure that temporary earth link ( provided for HV test) is removed
Ensure absence of floating parts
Ensure tightness Terminal connections and shield

3
4
5
6
7
8

Page no:

Inter Distribution Transformer(IDT)


Date

Value of applied torque for the connection of links( as per


manufacturers recommendation ------ Nm Bolt Size ---- mm)

9
10
23.3
1
2
3

Ensure BDV, tan delta & water content of filling oil is satisfactory
Ensure the BDV ,water content of filled oil is satisfactory
LV Cable box (after cable termination)
Ensure plating of LV bus bar
Ensure terminal connector tightness
Measured LV bus bar connection torque (Torque value -- ------Nm
Bolt size ------- mm)

4
5
6
7

Ensure connections are locked after torque checking


Ensure that no load is transferred to bushing
Ensure min. elect. Clearance as required by drawing.
Ensure cable sheath is floating and kept away from earth.

Tested By

Witnessed By

Witnessed by

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/23

24 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Page no:

Inter Distribution Transformer(IDT)


Date

26.1. CHECK ON AUTOMATIC VOLTAGE REGULATOR (AVR)


Details of AVR
Make
:
Sl.No.
:
Band width %
: (
volts)
Under voltage
:
blocking (%)
Over voltage setting (%)
:
VT sec. voltage
:
a). SOFTWARE CONFIGURATION DETAILS
Firmware version
Background Program Version
b). HARDWARE CONFIGURATION DETAILS

:
:

i) AVR System Number (If applicable)

ii)Article No/Sl No of AVR components/cards


Sl.no. Description of Components / Cards

c). AVAILABILITY OF BACKUP CDs FOR


i) Updated background programme (If applicable)
ii) Firmware

Art. No. / Sl. No.

Remarks

:
:

d). AVAILABILITY OF MANUAL FOR ALL HARDWARE


COMPONENTS / CARDS
:
e). AVAILABILITY OF SPARE COMMUNICATION
CABLES
:
(For communication b/w PC and AVR system)
f). TYPE OF COMMUNICATION PORT

g). ENGRAVED LABELS PROVIDED FOR ALL


INDICATIONS AT AVR

Tested By

Witnessed By

Witnessed by

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/24

25 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

26.2

Check Points

Sl.No
25.2.1
1.1

Status description

Check point

Result

Remarks

Operation

1.2

AVR in Auto mode

1.3
1.4

AVR in manual mode

1.5
1.6
1.7
1.8
1.9
1.10
1.11
1.12
1.13
1.14
25.2.2
2.1
2.2
2.3
2.4
2.5
2.6

Page no:

Inter Distribution Transformer(IDT)


Date

MDU in local position


MDU & AVR in remote
position
MDU in remote & AVR in
Supervisory

No manual operation possible from MDU, SCS,


SCC and AVR
Auto operations with the variations in PT sec.
Voltage. Tap Raise command when PT sec.
Voltage reduced and vice versa
Auto operations not possible
Manual operations possible from AVR
Manual operations possible from SCS & SCC
Operation possible from MDU
Operation not possible from AVR & SCC/SCS
Operation not possible from MDU&SCC/ SCS
Operation possible from AVR
Operations not possible from MDU & AVR
Operation possible from SCC/ SCS only
No operations possible
LED indication
Supervisory/ remote selection of AVR
Auto / Manual selection of AVR

Under voltage blocking


Over voltage setting
Selection from SCS/SCC
Selection from SCS/ SCC
AVR Display
Voltage
Current
Tap No
Frequency
Master/Follower/Independent mode
Paragramar functions (Breaker status indication)

Tested By

Witnessed By

Witnessed by

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/25

26 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

27.

Page no:

TAP CHANGER & COOLER ALARMS / INDICATIONS CHECK

Sl.No.

Alarm description

27.1.

ALARMS

1
2
3
4
5
6

Inter Distribution Transformer(IDT)


Date

Initiated
at

AVR

DCS

SCADA

-------------------

----------------------

Remarks

TC out of step
TC incomplete
TC motor supply faulty
TC control supply faulty
AVR faulty
VT supply faulty

27.2.
1
2
3
4
5
6
7
8
9
10
11

INDICATIONS
AVR in Remote
AVR in Supervisory
AVR in Auto
AVR in Manual
TC in progress
AVR in Independent mode
AVR in Master/follower mode
TC Extreme tap positions (Raise / Lower)
Over Voltage
(only at AVR)
Under Voltage
(only at AVR)
AVR healthy Status (only at AVR)

Tested By

Witnessed By

Witnessed by

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/26

27 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

28.

Page no:

Inter Distribution Transformer(IDT)


Date

TAP CHANGER PARALLEL OPERATION CHECKS

28.1 PARALLEL MANUAL MODE


RESULT / REMARKS

MASTER/ FOLLOWER/ INDEPENDENT


Sl.
No
.

OLTC OPERATION

SWITCH SELECTIONS
MDU

AVR

Operated from

TR
1

TR
2

TR
3

TR 1

TR 2

TR 3

R/S*

OPERATE AS
MASTER

OPERATE AS
FOLLOWER

OPERATE AS
FOLLOWER

R/S*

OPERATE AS
FOLLOWER

OPERATE AS
MASTER

OPERATE AS
FOLLOWER

R/S*

OPERATE AS
FOLLOWER

OPERATE AS
FOLLOWER

OPERATE AS
MASTER

R/S*

OPERATE AS
MASTER

OPERATE AS
FOLLOWER

OPERATE AS
INDEPENDENT

R/S*

OPERATE AS
MASTER

OPERATE AS
INDEPENDENT

OPERATE AS
FOLLOWER

R/S*

OPERATE AS
INDEPENDENT

OPERATE AS
MASTER

OPERATE AS
FOLLOWER

R/S*

OPERATION SHALL BE NOT POSSIBLE OR


OPERATE AS MFF MODE

R/S*

OPERATION SHALL BE NOT POSSIBLE OR OPERATE


AS INDEPENDED MODE

R/S*

OPERATE AS
INDEPENDENT

OPERATE AS
INDEPENDENT

OPERATE AS
INDEPENDENT

10

R/S*

OPERATE AS
INDEPENDENT

OPERATE AS
INDEPENDENT

OPERATE AS
INDEPENDENT

11

R/S*

OPERATE AS
INDEPENDENT

OPERATE AS
INDEPENDENT

OPERATE AS
INDEPENDENT

12

R/S*

OPERATE AS
INDEPENDENT

OPERATE AS
INDEPENDENT

OPERATE AS
INDEPENDENT

AVR
panel

SCS

SCC

M Master F Follower I Independent. S*-- Supervisory for SCS & SCC


R Remote
A Auto
H Hand (manual)
Tested By

Witnessed By

Witnessed by

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/27

28 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

SITE TEST REPORT

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT


CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Check for Breaker status indications before test

28.2 PARALLEL AUTO MODE


SELECTIONS
Sl.No
MDU

AVR

*AVR (REMOTE Supervisory)


OPERATION CHECKED
FROM

Mode of AVR (Automatic


change over)

SWITCH GEAR STATUS


HV BREAKERS
IDT1
IDT2
IDT3

Page no:

Inter Distribution Transformer(IDT)


Date

LV INCOMER / BUS SECTION


IDT1
BS1
IDT2
BS2
IDT3

AVR1

AVR2

AVR3

OPERATES AS
IDT

IDT2

IDT3

R*

R*

3
4
5
6
7
8
9
10
11

R
R
R
R
R
R
R
R
R

H
H
H
H
H
H
H
H
H

R*
R*
R*
R*
R*
R*
R*
R*
R*

C
C
C
C
O
C
C
O
C

C
C
C
C
C
O
C
O
C

C
C
C
C
C
C
O
C
C

C
C
O
C
C
C
C
C

C
C
C
O
C
C
C
C
C

C
C
C
C
C
C
C
C
C

O
C
C
C
C
C
C
C
C

M
M
I
I
I
M
M
I
I

F
I
M
M
M
I
F
I
I

I
F
F
F
F
F
I
I
I

M
M
I
I
I
M
M
I
I

F
I
M
M
M
I
F
I
I

I
F
F
F
F
F
I
I
I

C
C
C

O
C

C
C
C

I
I
I

I
I
I

I
I
I

I
I
I

I
I
I

I
I
I

12
R
H R*
C
C
C
13
R
H R*
C
C
C
14
R
H R*
C
C
C
C.AUTO OPERATION CHECK USING AVR

O
C
C
C
C
C
C
O
O
C
O

O
O

AVR

DCS

REMARKS

SCADA

Repeat the above operations in AVR Auto mode (changing AVR selection as Auto instead of H) and by varying the PT secondary voltages.
Result/Remarks Remote

H Hand (Manual) M Master

DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

F Follower

I Independent

C Close

O Open

29 of 36

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Inter Distribution Transformer(IDT)


Date

Page no:

29.0 OIL LEAK TEST


Hourly Reading/ details:
Date

Time

Ambient
Temp.
( C)

Tr. OTI
reading
(C)

Pressure
at Top (Bar)

Pressure at
Transformer
Bottom (Bar)

Result /
observation

Remarks

Before the application


of Pressure

-----

PRD locking shall be released after completion of pressure test :

Calibration Details
Tested By

Witnessed By

Witnessed by

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/29

30 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Inter Distribution Transformer(IDT)


Date

Page no:

30.0 BDV TEST ON INSULATING OIL


Sl.No

Test no

Test no: 1

Test no: 2

Test no: 3

Test no: 4

Test no: 5

Test no: 6

BDV of Main tank oil

BDV of OLTC oil

Average
BDV of Cable box oil
1

Test no: 1

Test no: 2

Test no: 3

Test no: 4

Test no: 5

Test no: 6

Before HV test
V

After HV test
V

Average
Sampling done from:
1

Test no: 1

Test no: 2

Test no: 3

Test no: 4

Test no: 5

Test no: 6

Average

Prepared By

Verified by

Verified by

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/30

31 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Inter Distribution Transformer(IDT)


Date

Page no:

31.0 TEST RESULTS / PROPERTIES OF INSULATING OIL BEFORE FILLING

Type of oil :
Property

Make:
Unit

Kinematic viscosity at a) 400C


b) -300C

Requirement
12
1 800

mm2 / S

Flash Point

140

Pour Point

- 40

-----------

Dissipation factor @ 90 C [40 ~ 60Hz]


Appearance

------------

Density at 200C

mN/m

40

mg KOH/gm

0.01

---------

Non corrosive

< 0.15

mg/kg

< 30

0.08- 0.4

mgKOH/gm
%
%

0.3
0.05
0.050
0.15

kV

70/ 30

mg/kg

0.1

<3

Corrosive Sulphur
Total Sulphur content
Water Content
Antioxidant additives
DBPC
Oxidation stability
a) Total acidity
b) Sludge
c) Dissipation factor @ 900C
d) Total sulphur content

suspended matter

0.895

Interfacial tension at 25 C
Neutralization Value

0.005
Clear free from sediment and

g/ml
0

Breakdown Voltage (Treated/ delivered)


2- Furfural content
PCA content
PCB content

Country of origin:
Test Results
Remarks

Not detectable

DBDS (IEC 62535)


(Copy of Test certificate from oil manufacturer is attached)

Prepared By

Verified by

Verified by

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/31

32 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Inter Distribution Transformer(IDT)


Date

Page no:

32.0 TEST ON TRANSFORMER OIL AFTER COMPLETE SITE PROCESSING


Type of oil:
Make:
Country of origin:
Sl. No.
Property
Unit
Requirement
Test
Remarks
as per Spec.
Result
1
Color
Number
2 (max)
2

Appearance

---------

Breakdown Voltage OLTC

Main tank
Water Content

OLTC
Main tank

kV

70

mg/kg

Dissipation Factor at 900C.

Clean, free
from
sediment and
suspended
matter

---------

< 10
0.015

Resistivity at 90 C.

Gm

Neutralization Value

mgKOH/gm 0.03

Interfacial Tension

mN/m

35

Oxidation Stability (Test


duration 500h)
Total acidity
Sludge
DDF @ 90C
Total sulphur content

mgKOH/gm
%
--%

0.3
0.05
0.05
0.15

0.08- 0.4

10

Antioxidant additives DBPC

11

Flash Point

12

Total PCB content

mg/kg

13

Corrosive Sulphur

14

DBDS(IEC 62535)

60

140
---------

<2 (total)
Non corrosive

(Test certificate from independent test laboratory shall be attached)

Prepared By

Verified by

Verified by

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/32

33 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Inter Distribution Transformer(IDT)


Date

Page no:

33.0 DGA TEST ON TRANSFORMER OIL


Date of Sampling

Oil Temperature

Sampled by

Sampling Point

Sample identification :
Tests carried out by

Test report reference :


Test Results
Sl.No.

Dissolved gas

Concentration (ppm)

Hydrogen (H2)

Methane (CH4)

Ethane (C2H6)

Ethylene (C2H4)

Acetylene (C2H2)

Carbon Monoxide (CO)

Carbon Dioxide (CO2)

Oxygen (O2)

Nitrogen (N2)

10

TDCG (ppm / %)

11

CO2 / CO

Prepared By

Verified by

Remarks

Verified by

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/33

34 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Inter Distribution Transformer(IDT)


Date

Page no:

34.0 CHECK ON SMALL WIRING


No
1

Check points
Alarm/ Trip terminals
a) Disconnection
b) Identification
Alarm
Trip
c) Termination

2
3
4

d) Looping
CT terminals
Plug socket
Contact operation check
Door switch of MK
Heaters
Thermostat (set @.)
Hygrostat (set @.)

Requirement

Result

Facility shall be available


Ferrule shall have Alarm or L
marking
Red ferrule with Trip or T in white
shall be provided
Stranded wires shall be with crimped
terminals.
Looping shall be through shorting link
Shall be with shorting link
Shall be wired
Performance shall be satisfactory

35.0 CHECK DURING FIRE DELUGE OPERATION


No
1
2.

Check point
Condition of fan
Entry of water in closed cabinets of
(LV cable box, MK, MDU) &
terminal boxes of MOLG, CTs,
Fans, PRDs, protective relays &
all other device terminal boxes)
Ensure that the cabinets are closed
and tightened prior to deluge
operation)
Drainage inside transformer room

Tested By

Requirement
Running fan shall trip on deluge operation
Shall be watertight.

Drainage system should be satisfactory

Witnessed By

Witnessed by

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/34

35 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

TP / TCD / QP01-A04
2012 Revision

T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT

SITE TEST REPORT

CONTRACT NO:

NAME OF SUB STATION:

Main Contractor

Name of Bay:

Consultant:

Equipment:
SCADA No:

Manufacturer

Inter Distribution Transformer(IDT)


Date

Page no:

36.0 FREQUENCY RESPONSE ANALYSIS (FRA)


Test shall be done in the following conditions.
A. With neutral earthed (through the test equipment) and LV open
1. Applied on HV U phase
2. Applied on HV V phase
3. Applied on HV W phase
B. With neutral earthed (through the test equipment) and LV short circuited
1. Applied on HV U phase
2. Applied on HV V phase
3. Applied on HV W phase
C. With HV open
1. Applied on LV U phase
2. Applied on LV V phase
3. Applied on LV W phase

(Attach the FRA plots to this sheet)

Calibration Details

Tested By

Witnessed By

Witnessed by

Signature
Name
Organization

Consultant

DEWA
DEWA/TP/TCD/IDT/ST/35

36 of 36
DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0