Escolar Documentos
Profissional Documentos
Cultura Documentos
Aft
Forward
Bridge
Stem
Midships
Bow
Length overall
Port side
Astem
Ahead
Starboard side
Min freeboard
Moulded depth
Draf scantling
= max draft
Keel
Width or Beam
Cargo units
flexible.
combination of
the ship.
* Permanent conueying systems.
* Finger piers & offshore installations
land.
Container terminal
Ro / Ro
to keep
c)
dischage or loading
The calculation method requires
Study of productivity.
of service provided
No.TEU/year
=
% 40'
100
No. of 40 Boxes
No. of 20 Boxes
Length Berth
= LoA + 20 m
100
= Round up
Available time/berth
52
Requiredberth time
Available time per berth
Requiredberth time
= Roundup
Available time per berth
Quay Length
365
No of cont through one storage unit =
Dwiil time (Cont. days in CY)
CY Capacity inTEU
Total CY area
100
Depth CY Empty
Quay length
C=
Qt
375
Vol =
Loading Capacity
= Q.sf
ton
year
Surface =
Vol
h
For Ro / Ro :
Starting from; No. of caps N
N x Sf
Surface( m3 / car)
( m3 / car)
Loading Capacity; C =
N.t car
365 year
GOVERNING /
DETERMINATION
INFLUENCE ON PORT
FACILITIES
Minimum storage
requirement for full ship
load
Handing rate
MOORING EQUIPMENT
(ROPES & WIRES)
MANOEUVRABILITY AT LOW
SPEED