Name of work:- The Proposed Construction of Rest House for Church of God at Haobam Marak Lourembam
Leikai,Imphal.
Item 1. Earth work in excavation in fdn.
a)Hard/Dense soil.
Footings
5x3=15Nosx1.50x1.50x1.80
Trenches
3x0.90 =2.70
9x3.00 =27.00
5x2.70 =13.50
5x1.50 =7.50
=50.70x0.45x0.60
Step
1x2.70x1.00x0.30
=60.75m3
=13.69m3
= 0.81
=75.25m3
=0.32
=0.54
=41.54m3
First floor
Roof beam Qnty. Same as above=11.62m3
Stair cases beam
-do=0.28m3
Landings
-do=0.28
Lintels
-do=0.90
Slab
-do=18.23
=31.31m3
Less for stair cases(-)
= 1.04
=30.27m3
2nd floor Roof beam Qnty. Same as above
=11.62m3
Lintels
-do=0.90
=12.52m3
Item 8. RCC work in columns,pillars,post 1:1.5:315Nosx0.30x0.30x3.00
=4.05m3
First floor
15Nosx0.30x0.30x3.00
=4.05m3
2nd floor
15Nosx0.30x0.30x3.00
=4.05m3
Item 9. RCC work in stair cases2x2.75x1.05x0.15
2x9x1.05x x0.25x0.15
Qnty. Same as above
=0.87m3
=0.35
=1.22m3
=1.22m3
=0.53m3
=0.53m3
=0.53m3
First floor
Bottoms
1x2.10x0.30
=0.63
=2.16
=77.49
=25.83
=1.89
=0.63
=14.46
=77.49
=25.83
=14.46
=429.93m2
e)Stair cases
2x2x2x2.75x0.15
=3.30m2
2x2x2.75x1.05
=11.55
2x2x9x1.05x0.15
=5.67
2x2x2x2.75x0.15
=3.30
=23.82m2
f)Chullah,hoods,weathers shade chajjas2x7x3x1.05x0.45
=19.85m2
2x7x3x1.05x0.08
=3.53
2x7x3x0.45x0.08
=1.51
=24.89m2
Item 13.Brick work in foundation and plinth 1:3Plinth
1x77.10x0.25x0.75
=14.46m3
Steps
2.70x1.00x0.30
=0.81
2.70x0.75x0.15
=0.30
2.70x0.50x0.15
=0.20
2.70x0.25x0.15
=0.10
=15.87m3
Item 14.Half brick masonary 1:31x2.10 =2.10
12x4.20=50.40
3x3.90 =11.70
4x2.70 =10.80
2x1.50 =3.00
2x2.75 =5.50
=83.50x3.00 =250.50m2
Less opening(-)
D1
5x1.05x2.10
=11.03
D2
1x0.75x2.10
=1.58
W
7x1.50x1.65
=17.33
V
1x0.50x0.60
=0.30
D
1x1.50x2.40
=3.60
=216.66m2
First floor Qnty. Same as above
=216.66m2
2nd floor
-do=216.66m2
Item 15.Providing wood work in frames of doors,windowsa)Uningthou wood.
D
2x2.40
=4.80
1x1.50
=1.50
D1
5x2x2.10
=21.00
5x1x1.05
=5.25
D2
2x2.10
=4.20
1x0.75
=0.75
W
7x4x1.65
=46.20
7x2x1.50
=21.00
V
2x0.60
=1.20
2x0.50
=1.00
=106.90x0.10x0.075=0.80m3x3Nos
=2.40m3
Plinth 2x(16.20+7.50)x0.75
Step 4x2.70x0.25
4x2.70x0.15
=35.55m2
=2.70
=1.62
2x1.00x0.15
2x0.75x0.15
2x0.50x0.15
2x0.25x0.15
= 0.30
=0.225
=0.15
=0.075
=40.62m2
Less(-)1x2.70x0.60
=1.62
=39.00m2
Item 33.Distempering with oil bound washableWalls 1x1299.96m2
=1299.96m2
Beams 3x3x16.20x0.30
=43.74
5x3x7.50x0.30
=33.75
2x5x3x7.50x0.45
=101.25
2x3x3x16.20x0.45
=131.22
Col.
4x3x0.30x3.00
=118.80
Under roof
2x16.20x7.50
=243.00
=1852.92m2
Item 34.Providing and applying plaster of paris putty of 2mm.
Qnty. Same as above =1852.92m2
Item 35.Applying ready mixed priming coat on steel workQnty. B.F. item No. 17 =102.85Rmx0.05
=5.14m2
Item 36.Painting two coats with white paintQnty. Same as above =5.14m2
Item 37.Varnishing(two or more coats) with copal varnishOpening Qnty. Same as item No. 16
=101.52m2x2sides
=203.04m2