Escolar Documentos
Profissional Documentos
Cultura Documentos
Alternativas 1
Rubros
Unidad
Cantidad
INFRAESTRUCTURA
Total
1,280,978.20
IMPLEMENTACION
248,970.00
CAPACITACION
62,000.00
COSTO DIRECTO
1,591,948.20
Expediente tecnico 1%
Global
1.00
35,000.0
Global
1.00
191,033.78
Supervision 4%
Global
Liquidacion 2%
Global
Gastos Administrativos 4%
Global
63,677.93
1.00
31,838.96
63,677.93
385,228.60
PRESUPUESTO TOTAL
1,977,176.80
Unidad
Cantidad
INFRAESTRUCTURA
Total
1,325,919.09
IMPLEMENTACION
248,970.00
CAPACITACION
62,000.00
COSTO DIRECTO
1,636,889.09
Expediente Tecnico
Global
1.00
35,000.00
Gastos Generales
Global
1.00
196,426.69
Supervision
Global
1.00
65,475.56
Liquidacin
Global
1.00
32,737.78
Gastos Administrativos
Global
1.00
COSTO INDIRECTO
COSTO TOTAL DE INVERSION (ALTERNATIVA
02)
Fuente: Elaboracin para el Proyecto
65,475.56
395,115.60
2,032,004.69
UNID.
PRECIOS PRIVADOS
ALT. 01
ALT.02
PRECIOS SOCIALES
ALT.01
ALT.02
INFRAESTRUCTURA
Global
1,280,978.20
1,325,919.09
1,270,098.24
1,293,760.82
IMPLEMENTACION
Global
248,970.00
248,970.00
210,991.53
210,991.53
CAPACITACION
Global
62,000.00
62,000.00
56,363.64
56,363.64
1,591,948.20
1,636,889.09
1,537,453.41
1,561,115.99
COSTO DIRECTO
Expediente tecnico 1%
Global
35,000.00
35,000.00
31,818.18
31,818.18
Global
191,033.78
196,426.69
167,722.19
170,303.56
Supervision 4%
Global
63,677.93
65,475.56
55,907.40
56,767.85
31,838.96
32,737.78
27,953.70
28,383.93
Liquidacion 2%
Gastos Administrativos 4%
Global
63,677.93
65,475.56
55,907.40
56,767.85
Global
385,228.60
395,115.60
339,308.87
344,041.37
1,977,176.80
2,032,004.69
1,876,762.28
1,905,157.36
PRESUPUESTO TOTAL
Fuente: Elaboracin para el Proyecto
0.9100
CONCEPTO
Periodo de
Pago
Cantidad
Costo Unitario
(S/.)
Costo Anual
(S/.)
A) Remuneraciones
Directora, Profesor aula inicial
mes
1,320.00
0.00
mes
1,200.00
0.00
mes
1,200.00
0.00
Auxiliar
mes
800.00
0.00
600.00
0.00
600.00
0.00
Escolaridad
300.00
0.00
Sub Total
0.00
B) Servicios Bsicos
Energa elctrica
mes
12
50.00
0.00
Agua y Desage
mes
12
30.00
0.00
Telfono
mes
12
Sub Total
0.00
0.00
80.00
0.00
C) Materiales
Materiales de escritorio
anual
1.00
0.00
0.00
Materiales de Limpieza
anual
1.00
0.00
0.00
TOTAL
0.00
Periodo de
Pago
Cantidad
Costo Unitario
(S/.)
Costo Anual
(S/.)
A)Operacin
Alimentacion
mes
1,500.00
46,398.31
Energia electrica
mes
1,200.00
1,890.79
Agua y desague
mes
1,200.00
1,271.19
Internet
mes
800.00
1,016.95
Tv y cable
mes
800.00
661.02
Personal Administrativo
200.00
14,400.00
Limpieza
200.00
9,600.00
0.00
Sub Total
75,238.26
B) Mantenimiento
Mantenimiento de Infraestructuera
mes
12
80.00
30094.32
mes
12
50.00
2489.70
130.00
32584.02
0.00
Sub Total
C) Materiales
Materiales de escritorio
anual
0.00
1583.50
0.00
Materiales de Limpieza
anual
0.00
786.00
0.00
Sub Total
0.00
TOTAL
107,822.28
*** Planilla
0.86956522
UNIDAD
CANTIDAD
Plumon azul
Anual
Cajita
25.00
0.00
0.00
Plumon rojo
Anual
Cajita
25.00
0.00
0.00
Papel Carbn
Anual
Caja
35.00
0.00
0.00
Anual
Millar
32.00
0.00
0.00
File tamao A4
Anual
Unidad
1.00
0.00
0.00
Anual
Galn
10.00
0.00
0.00
Clips x 100
Anual
Unidad
3.50
0.00
0.00
Anual
Unidad
3.50
0.00
0.00
Anual
Unidad
2.00
0.00
0.00
Diskette 3.5 x 10
Anual
Caja
12.00
0.00
0.00
Anual
Unidad
8.00
0.00
0.00
Anual
Millar
45.00
0.00
0.00
Anual
Unidad
70.00
0.00
0.00
Anual
Unidad
60.00
0.00
0.00
Anual
Millar
38.00
0.00
0.00
Anual
Unidad
8.00
0.00
0.00
Anual
Unidad
9.00
0.00
0.00
0.00
0.00
CONCEPTO
C. UNITARIO
(S/.)
C. ANUAL PP
(S/.)
C. ANUAL PS
(S/.)
Material de Escritorio
Sub Total
Material de Limpieza
Pinesol
Anual
Litros
20.00
0.00
0.00
Kresso
Esponja scoth brite
Anual
Litros
6.00
0.00
0.00
Anual
Unidad
2.00
0.00
0.00
Franela
Anual
Metro
10.00
0.00
0.00
Cera al agua
Anual
Galn
35.00
0.00
0.00
Acido muritico
Anual
Litros
6.00
0.00
0.00
Anual
Unidad
6.00
0.00
0.00
Anual
Unidad
13.00
0.00
0.00
Sub Total
0.00
0.00
0.00
1800.00
UNIDAD
CANTIDAD
Plumon azul
Anual
Cajita
3.50
10.50
8.82
Plumon rojo
Anual
Cajita
5.50
11.00
9.24
Papel Carbn
Anual
Caja
35.00
70.00
58.82
Anual
Millar
32.00
64.00
53.78
Anual
Millar
34.00
68.00
57.14
File tamao A4
Anual
Unidad
100
1.00
100.00
84.03
CONCEPTO
C. UNITARIO
(S/.)
C. ANUAL PP
(S/.)
C. ANUAL PS
(S/.)
Material de Escritorio
Anual
Galn
10.00
10.00
8.40
Clips x 100
Cinta maskin taype 2"
Anual
Caja
3.50
17.50
14.71
Anual
Unidad
3.50
17.50
14.71
Anual
Unidad
2.00
10.00
8.40
CD-RW
Anual
cono
60.00
60.00
50.42
Anual
Unidad
8.00
40.00
33.61
Anual
Millar
15.00
15.00
12.61
Anual
Unidad
100.00
400.00
336.13
Anual
Unidad
80.00
640.00
537.82
Anual
Unidad
8.00
32.00
26.89
Anual
Unidad
9.00
18.00
15.13
1,583.50
1,330.67
Sub Total
Material de Limpieza
Pinesol
Anual
Galon
40.00
120.00
100.84
Kresso
Esponja scoth brite
Anual
Galon
30.00
120.00
100.84
Anual
Unidad
3.00
18.00
15.13
Franela
Anual
Metro
12.00
72.00
60.50
Cera al agua
Anual
Galn
35.00
210.00
176.47
Acido muritico
Anual
Litros
10.00
30.00
25.21
Anual
Unidad
10
12.00
120.00
100.84
Anual
Unidad
48.00
96.00
80.67
786.00
660.50
2,369.50
1,991.18
Sub Total
TOTAL Costos de Mantenimiento
0.8403
0.8953
0.8403
0.86956522
PRESUPUESTO DE ACTIVIDAD
ACTIVIDAD : MANTENIMIENTO CLUB DEL CENTRO EDUCATIVO INICIAL 347
UBICACIN : CHEN CHEN- MOQUEGUA
FECHA
: MARZO - 2014
N
DESCRIPCION
UND
PARCIAL
01
MANTENIMIENTO RUTINARIO
01.01
01.01.01
TRABAJOS PROVISIONALES
MOVILIZACION DE HERRAMIENTAS , MATERIALES Y EQUIPOS
GLB ###
01.01.02
MES ###
01.01.03
UND ###
02
02.01
MANTENIMIENTO PERIDICO
ACTIV. DE CONSERV. DE LA SUPERFICIE
02.01.01
PINTURA
02.01.01.01
02.01.01.02
M2 ###
02.01.01.04
M2
M2
02.01.01.05
M2 ###
02.01.01.06
02.01.01.07
M2
M2
02.01.02
CERRAJERIA
02.01.02.01
UND ###
02.01.02.02
UND ###
02.01.03
02.01.03.01
02.01.03.02
03
MANTENIMIENTO PUNTUAL
03.01
OBRAS CIVILES
03.01.01
03.01.01.01
DESMONTAJE Y DEMOLICIONES
DEMOLICION DE PISO DE CONCRETO
M2 ###
03.01.02
03.01.02.01
CONCRETO
VACIADO DE FALSO PISO 4" CONCRETO F'c 140 Kg/cm2
m2 ###
03.01.03
MUROS
03.01.03.04
03.03
INSTALACIONES SANITARIAS
03.03.01
PIE2
M2 ###
m ###
pto ###
03.03.02
pto ###
03.03.05
und
03.03.06
und
03.03.08
03.03.09
03.03.10
und
und
und
03.03.11
und
03.03.12
03.03.13
und
und
3.04
INSTALACIONES ELECTRICAS
03.04.01
03.04.03
PTO ###
UND ###
03.04.04
UND ###
03.04.05
PTO
03.04.06
PTO
* Factor de co0.8953
** Factor de 0.8470
CONCEPTO
C.ANUAL
Prec.Priv
CANTIDAD
A. Costos de operacin:
C.ANUAL
Prec.Social.
0.00
0.00
0.00
0.00
Servicios Bsicos
0.00
0.00
Materiales
0.00
0.00
B.Costos de mantenimiento:
0.00
0.00
TOTAL
0.00
0.00
Remuneraciones
CONCEPTO
C.ANUAL
Prec.Priv
CANTIDAD
A. Costos de operacin:
Remuneraciones
Servicios Bsicos
Materiales
C.ANUAL
Prec.Social.
107,822.28
93,758.50
75,238.26
65,424.57
32,584.02
28,333.93
0.00
0.00
B.Costos de mantenimiento:
0.00
0.00
TOTAL
107,822.28
93,758.50
*** Planilla
0.86956522
PROYECCIN DE LOS COSTOS TOTALES DE OPERACIN Y MANTENIMIENTO SIN PROYECTO A PRECIOS PRIVADOS Y PRECIOS SOCIALES
A PRECIOS PRIVADOS
CONCEPTO
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
A. Costos de
operacin:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
B.Costos de
mantenimiento:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
A PRECIOS SOCIALES
CONCEPTO
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
A. Costos de
operacin:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
B.Costos de
mantenimiento:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
PROYECCIN DE LOS COSTOS TOTALES DE OPERACIN Y MANTENIMIENTO CON PROYECTO A PRECIOS PRIVADOS Y PRECIOS SOCIALES
A PRECIOS PRIVADOS
CONCEPTO
A. Costos de
operacin:
2014
2016
2017
2018
2019
2020
2021
2022
2023
2024
107,822.28
107,822.28
107,822.28
107,822.28
107,822.28
107,822.28
107,822.28
107,822.28
107,822.28
107,822.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
107,822.28
107,822.28
107,822.28
107,822.28
107,822.28
107,822.28
107,822.28
107,822.28
107,822.28
107,822.28
107,822.28
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
93,758.50
93,758.50
93,758.50
93,758.50
93,758.50
93,758.50
93,758.50
93,758.50
93,758.50
93,758.50
93,758.50
B.Costos de
mantenimiento:
TOTAL
2015
107,822.28
A PRECIOS SOCIALES
CONCEPTO
A. Costos de
operacin:
B.Costos de
mantenimiento:
TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
93,758.50
93,758.50
93,758.50
93,758.50
93,758.50
93,758.50
93,758.50
93,758.50
93,758.50
93,758.50
93,758.50
Cuadro N 65
ALTERNATIVA N 1
COSTOS INCREMENTALES A PRECIOS PRIVADOS
DESCRIPCION
A) COSTO DE INVERSION
INFRAESTRUCTURA
PERIODO
0
10
107,822.28
107,822.28
0.00
107,822.28
0.91
98,020.25
107,822.28
107,822.28
0.00
107,822.28
0.83
89,109.32
107,822.28
107,822.28
0.00
107,822.28
0.75
81,008.47
107,822.28
107,822.28
0.00
107,822.28
0.68
73,644.07
107,822.28
107,822.28
0.00
107,822.28
0.62
66,949.15
107,822.28
107,822.28
0.00
107,822.28
0.56
60,862.87
107,822.28
107,822.28
0.00
107,822.28
0.51
55,329.88
107,822.28
107,822.28
0.00
107,822.28
0.47
50,299.89
107,822.28
107,822.28
0.00
107,822.28
0.42
45,727.17
107,822.28
107,822.28
0.00
107,822.28
0.39
41,570.16
1.00
2.00
0.09
S. 2,669,143.29
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
1,977,176.80
1,280,978.20
IMPLEMENTACION
248,970.00
CAPACITACION
62,000.00
35,000.00
191,033.78
Impuestos (18%)
63,677.93
G. de Supervisin Externa(7%)
31,838.96
63,677.93
0.00
1,977,176.80
0.00
1,977,176.80
1.00
1,977,176.80
0.00
COK. =
VACT =
Cuadro N 66
ALTERNATIVA N 1
COSTOS INCREMENTALES A PRECIOS SOCIALES
DESCRIPCION
A) COSTO DE INVERSION
INFRAESTRUCTURA
IMPLEMENTACION
CAPACITACION
Gastos Generales y Seguridad (12% )
Utilidades (8%)
PERIODO
0
10
1,270,098.24
210,991.53
56,363.64
31,818.18
167,722.19
Impuestos (18%)
55,907.40
G. de Supervisin Externa(7%)
27,953.70
55,907.40
1,876,762.28
0.00
1,876,762.28
0.00
1,876,762.28
1.00
1,876,762.28
0.00
COK. =
VACT =
93,758.50
93,758.50
0.00
93,758.50
0.91
85,235.00
93,758.50
93,758.50
0.00
93,758.50
0.83
77,486.37
93,758.50
93,758.50
0.00
93,758.50
0.75
70,442.15
93,758.50
93,758.50
0.00
93,758.50
0.68
64,038.32
93,758.50
93,758.50
0.00
93,758.50
0.62
58,216.65
93,758.50
93,758.50
0.00
93,758.50
0.56
52,924.23
93,758.50
93,758.50
0.00
93,758.50
0.51
48,112.94
93,758.50
93,758.50
0.00
93,758.50
0.47
43,739.03
93,758.50
93,758.50
0.00
93,758.50
0.42
39,762.76
93,758.50
93,758.50
0.00
93,758.50
0.39
36,147.96
1.00
2.00
0.09
S. 2,478,472.26
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
ALTERNATIVA N 2
COSTOS INCREMENTALES A PRECIOS PRIVADOS
DESCRIPCION
A) COSTO DE INVERSION
INFRAESTRUCTURA
IMPLEMENTACION
CAPACITACION
Gastos Generales y Seguridad (12% )
Utilidades (8%)
Impuestos (18%)
G. de Supervisin Externa(7%)
G. de Coordinacion de Supervicion (1%)
B) Costos de Operacin y Mantenimiento "Con Proy."
C) Costos con Proyecto (A+B)
D) Costos de Operacin y Mantto. "Sin Proy."
E) Total de Costos Incrementales (C-D)
F) F.A. (9 %)
VACPP (E*F)
PERIODO
0
2,394,382.51
1,325,919.09
248,970.00
62,000.00
35,000.00
196,426.69
65,475.56
65,475.56
395,115.60
0.00
2,394,382.51
0.00
2,394,382.51
1.00
2,394,382.51
0.00
COK. =
VACT =
107,822.28
107,822.28
107,822.28
107,822.28
107,822.28
107,822.28
107,822.28
107,822.28
107,822.28
107,822.28
107,822.28
0.00
0.00
107,822.28
107,822.28
0.91
0.83
98,020.25
89,109.32
1.00
2.00
0.09
S. 3,086,348.99
107,822.28
0.00
107,822.28
0.75
81,008.47
3.00
107,822.28
0.00
107,822.28
0.68
73,644.07
4.00
107,822.28
0.00
107,822.28
0.62
66,949.15
5.00
107,822.28
0.00
107,822.28
0.56
60,862.87
6.00
107,822.28
0.00
107,822.28
0.51
55,329.88
7.00
107,822.28
0.00
107,822.28
0.47
50,299.89
8.00
107,822.28
0.00
107,822.28
0.42
45,727.17
9.00
ALTERNATIVA N 2
COSTOS INCREMENTALES A PRECIOS SOCIALES
DESCRIPCION
A) COSTO DE INVERSION
INFRAESTRUCTURA
IMPLEMENTACION
CAPACITACION
Gastos Generales y Seguridad (12% )
Utilidades (8%)
Impuestos (18%)
G. de Supervisin Externa(7%)
G. de Coordinacion de Supervicion (1%)
B) Costos de Operacin y Mantenimiento "Con Proy."
0
2,220,814.80
1,293,760.82
210,991.53
56,363.64
PERIODO
5
31,818.18
170,303.56
56,767.85
56,767.85
344,041.37
0.00
93,758.50
93,758.50
93,758.50
93,758.50
93,758.50
93,758.50
93,758.50
93,758.50
93,758.50
2,220,814.80
0.00
93,758.50
0.00
93,758.50
0.00
93,758.50
0.00
93,758.50
0.00
93,758.50
0.00
93,758.50
0.00
93,758.50
0.00
93,758.50
0.00
93,758.50
0.00
2,220,814.80
1.00
2,220,814.80
0.00
COK. =
VACT =
93,758.50
93,758.50
0.91
0.83
85,235.00
77,486.37
1.00
2.00
0.09
S. 2,822,524.79
93,758.50
0.75
70,442.15
3.00
93,758.50
0.68
64,038.32
4.00
93,758.50
0.62
58,216.65
5.00
93,758.50
0.56
52,924.23
6.00
93,758.50
0.51
48,112.94
7.00
93,758.50
0.47
43,739.03
8.00
93,758.50
0.42
39,762.76
9.00
10
107,822.28
107,822.28
0.00
107,822.28
0.39
41,570.16
10.00
10
93,758.50
93,758.50
0.00
93,758.50
0.39
36,147.96
10.00
Indicador
Descripcin
Poblaci
n
Alumno/Ao
1191
VACT
VAE
A Precios Sociales
Costo /
Objetivo
(C / E)
1/
2,669,143.29 331,130.93
2,241.09
VACT
2,478,472.26
VAE
1/
307,476.50
TOTAL ICE
Costo /
Objetivo
(C / E)
2,081.00
2,081.00
100
COK
9%
Factor
0.12405888
Descripcin
Poblaci
n
Alumno/Ao
1191
VACT
VAE
A Precios Sociales
Costo /
Objetivo
1/
3,086,348.99 382,889.01
2,591.39
TOTAL ICE
9%
VAE
1/
(C / E)
COK
VACT
Factor
0.12405888
Costo /
Objetivo
(C / E)
2,822,524.79
350,159.27
2,369.88
2,369.88
-30.00%
-20.00%
-10.00%
0.00%
10.00%
20.00%
30.00%
Componente
En la primera alternativa se propone la construccin de 03 aulas, 01 sala
de psicomotricidad/SUM, y ambientes administrativos con sistema
estructural de concreto armado, sobre relleno con material de cantera.
97.75 m2 de cobertura metlica con policarbonato.
Adquisicin de Mobiliario y equipos y materiales educativos segn los
estndares
normativos
del nivel inicial.
En la primera alternativa
se propone
la construccin
de 03 aulas, 01 sala
de psicomotricidad/SUM, y ambientes administrativos con sistema
estructural de concreto armado, sobre relleno con material de cantera.
97.75 m2 de cobertura metlica con policarbonato.
Adquisicin de Mobiliario y equipos y materiales educativos segn los
En la primera alternativa
se propone
la construccin
de 03 aulas, 01 sala
estndares
normativos
del nivel inicial.
de psicomotricidad/SUM, y ambientes administrativos con sistema
estructural de concreto armado, sobre relleno con material de cantera.
97.75 m2 de cobertura metlica con policarbonato.
Adquisicin de Mobiliario y equipos y materiales educativos segn los
En la primera alternativa
se propone
la construccin
de 03 aulas, 01 sala
estndares
normativos
del nivel inicial.
de psicomotricidad/SUM, y ambientes administrativos con sistema
estructural de concreto armado, sobre relleno con material de cantera.
97.75 m2 de cobertura metlica con policarbonato.
Adquisicin de Mobiliario y equipos y materiales educativos segn los
En la primera alternativa
se propone
la construccin
de 03 aulas, 01 sala
estndares
normativos
del nivel inicial.
de psicomotricidad/SUM, y ambientes administrativos con sistema
estructural de concreto armado, sobre relleno con material de cantera.
97.75 m2 de cobertura metlica con policarbonato.
Adquisicin de Mobiliario y equipos y materiales educativos segn los
En la primera alternativa
se propone
la construccin
de 03 aulas, 01 sala
estndares
normativos
del nivel inicial.
de psicomotricidad/SUM, y ambientes administrativos con sistema
estructural de concreto armado, sobre relleno con material de cantera.
97.75 m2 de cobertura metlica con policarbonato.
Adquisicin de Mobiliario y equipos y materiales educativos segn los
estndares
normativos
del nivel inicial.
En la primera alternativa
se propone
la construccin
de 03 aulas, 01 sala
de psicomotricidad/SUM, y ambientes administrativos con sistema
estructural de concreto armado, sobre relleno con material de cantera.
97.75 m2 de cobertura metlica con policarbonato.
Adquisicin de Mobiliario y equipos y materiales educativos segn los
estndares normativos del nivel inicial.
A Precios Privados
Costo /
Objetivo
(C / E)
A Precios Sociales
Costo /
Objetivo
(C / E)
Unidad
Valor
Alumno/Ao
1191
1,868,400.30
1568.7660
1,734,930.58
1456.70
Alumno/Ao
1191
2,135,314.63
1792.8754
1,982,777.81
1664.80
Alumno/Ao
1191
2,402,228.96
2016.9849
2,230,625.04
1872.90
Alumno/Ao
1191
2,669,143.29
2241.0943
2,478,472.26
2081.00
Alumno/Ao
1191
2,936,057.62
2465.2037
2,726,319.49
2289.10
Alumno/Ao
1191
3,202,971.95
2689.3131
2,974,166.72
2497.20
Alumno/Ao
1191
3,469,886.28
2913.4226
3,222,013.94
2705.30
VACT
VACT
-30.00%
-20.00%
-10.00%
0.00%
10.00%
20.00%
30.00%
Componente
En la primera alternativa se propone la construccin de 03 aulas, 01 sala
de psicomotricidad/SUM, y ambientes administrativos con sistema
estructural de concreto armado, sobre relleno con material de cantera.
97.75 m2 de cobertura metlica con policarbonato.
Adquisicin de Mobiliario y equipos y materiales educativos segn los
En la primera alternativa
se propone
la construccin
de 03 aulas, 01 sala
estndares
normativos
del nivel inicial.
de psicomotricidad/SUM, y ambientes administrativos con sistema
estructural de concreto armado, sobre relleno con material de cantera.
97.75 m2 de cobertura metlica con policarbonato.
Adquisicin de Mobiliario y equipos y materiales educativos segn los
En la primera alternativa
se propone
la construccin
de 03 aulas, 01 sala
estndares
normativos
del nivel inicial.
de psicomotricidad/SUM, y ambientes administrativos con sistema
estructural de concreto armado, sobre relleno con material de cantera.
97.75 m2 de cobertura metlica con policarbonato.
Adquisicin de Mobiliario y equipos y materiales educativos segn los
En la primera alternativa
se propone
la construccin
de 03 aulas, 01 sala
estndares
normativos
del nivel inicial.
de psicomotricidad/SUM, y ambientes administrativos con sistema
estructural de concreto armado, sobre relleno con material de cantera.
97.75 m2 de cobertura metlica con policarbonato.
Adquisicin de Mobiliario y equipos y materiales educativos segn los
En la primera alternativa
se propone
la construccin
de 03 aulas, 01 sala
estndares
normativos
del nivel inicial.
de psicomotricidad/SUM, y ambientes administrativos con sistema
estructural de concreto armado, sobre relleno con material de cantera.
97.75 m2 de cobertura metlica con policarbonato.
Adquisicin de Mobiliario y equipos y materiales educativos segn los
estndares
normativos
del nivel inicial.
En la primera alternativa
se propone
la construccin
de 03 aulas, 01 sala
de psicomotricidad/SUM, y ambientes administrativos con sistema
estructural de concreto armado, sobre relleno con material de cantera.
97.75 m2 de cobertura metlica con policarbonato.
Adquisicin de Mobiliario y equipos y materiales educativos segn los
estndares normativos del nivel inicial.
En la primera alternativa se propone la construccin de 03 aulas, 01 sala
de psicomotricidad/SUM, y ambientes administrativos con sistema
estructural de concreto armado, sobre relleno con material de cantera.
97.75 m2 de cobertura metlica con policarbonato.
Adquisicin de Mobiliario y equipos y materiales educativos segn los
estndares normativos del nivel inicial.
A Precios Privados
Costo /
Objetivo
(C / E)
A Precios Sociales
Costo /
Objetivo
(C / E)
Unidad
Valor
Alumno/Ao
1191
2,160,444.30
1813.9751
1,975,767.35
1658.91
Alumno/Ao
1191
2,469,079.19
2073.1144
2,258,019.83
1895.90
Alumno/Ao
1191
2,777,714.09
2332.2536
2,540,272.31
2132.89
Alumno/Ao
1191
3,086,348.99
2591.3929
2,822,524.79
2369.88
Alumno/Ao
1191
3,394,983.89
2591.3929
3,104,777.27
2606.87
Alumno/Ao
1191
3,703,618.79
3109.6715
2,822,524.79
2369.88
Alumno/Ao
1191
4,012,253.69
3368.8108
3,669,282.23
3080.84
VACT
VACT