Construction of 1.

02 Million Liter Elevated Reservoir and Associated Works at Penang

SUMMARY OF TENDER
Bill No. Description

Page No.

Amount (RM)

DESIGN OPTION I
1f

Footing Works

FW/1

0.00

Provisional Sum

PS/1

40,000.00

40,000.00
Allow for and detail here (if required, for convinience in pricing)
items or expenditure not priced elsewhere in these bills of quantities
Consultation Fee

2,000.000

Total Estimated Cost

Bill No. Description

Page No.

42,000.00

Amount (RM)

DESIGN OPTION II
1p

Piling Works

PW/3

33,854.50

Provisional Sum

PS/1

20,000.00

53,854.50
Allow for and detail here (if required, for convinience in pricing)
items or expenditure not priced elsewhere in these bills of quantities
Consultation Fee

Total Estimated Cost

2,692.725

56,547.23

Construction of 1.02 Million Liter Elevated Reservoir and Associated Works at Penang

TOTAL COST IF CONSIDER SUM OPTION I AND OPTION II:

98,547.23

Construction of 1.02 Million Liter Elevated Reservoir and Associated Works at Penang

BILL NO.1 - FOOTING WORKS (ALL PROVISIONAL)


No

Description

Unit

Quantity

Rate

Amount

FOOTING WORKS
REINFORCED IN-SITU CONCRETE WORK
Reinforced concrete grade 40 as specified

Excavate and constructed pad footing using concrete


grade 40 as specified in foundations.

FW/3

m3

500

0.00

Construction of 1.02 Million Liter Elevated Reservoir and Associated Works at Penang
To Summary Of Tender:

FW/4

0.00

Construction of 1.02 Million Liter Elevated Reservoir and Associated Works at Penang

BILL NO. 2 - PROVISIONAL SUM FOR FOOTING WORK


No

Description

Unit

Quantity

Rate

Amount

PROVISIONAL SUMS
The following Provisional Sums provided shall be expended
as directed by the Superintending Officer or deducted
in whole or in part if not expended
CONTINGENCY FUND
A Allow a Provisional Sum of Ringgit Malaysia Twety Thousand
Only (RM 40,000.00) as a contigency fund

PS/5

40,000

Construction of 1.02 Million Liter Elevated Reservoir and Associated Works at Penang
To Summary Of Tender:

PS/6

40,000.00

Construction of 1.02 Million Liter Elevated Reservoir and Associated Works at Penang

BILL NO.1 - PILING WORKS (ALL PROVISIONAL)


No

Description

Unit

Quantity

Rate

Amount

PILING WORKS
GENERALLY
PILING
INFORMATION

A Allow for handling and maintaining piling frame,


plant, tools and ancillary equipments for the
proper execution of the whole piling works
including all necessary movement about the site
as often and whenever necessary staging,
platform and any idling and standing time, etc

Item

5,000.00

Piling Plants and Equipment


B Allow for the provision of transporting to the site,
handling, assembling, directing, dismanling and
removal off site after completion all necessary
piling frame, plant, tools and ancillary
equipments for the proper execution of piling
works

Item

20,000.00

PW/7

Construction of 1.02 Million Liter Elevated Reservoir and Associated Works at Penang
To Collection:

25,000.00

BILL NO.1 - PILING WORKS (ALL PROVISIONAL)


No

Description

Unit

Quantity

Rate

Amount

C 12m long Initial pile, complete with head and shoe

no

781.2

1,562.40

D Pile extension; exceeding 3.0m length

12

55.6

667.20

E Handle, transport, pitch and drive

36

10.0

360.00

no

28.6

57.20

G Cutting off tops to required levels and preparing heads


reinforcement for concrete plug

no

47.5

95.00

H Maintain Load Test on 300mm diameter


prestressed concrete spun pile as specified
OR
H Pile Driving Analysis Test on 300mm diameter
prestressed concrete spun pile as specified

no

no

1000

2,000.00

PILING
PRECAST PRESTRESSED CONCRETE SPUN
PILES FOR ELEVATED WATER TANK FOUNDATION
Precast prestressed concrete spun piles Grade 60
as specified, including all necessary formwork
reinforcement and lifting toggle
300mm diameter preliminary spun piles

Pile joints; fillet weld

0.00

300mm diameter working spun piles


I

12m long Initial pile, complete with head and shoe

no

781.2

2,343.60

Pile extension; exceeding 3.0m length

18

55.6

1,000.80

K Handle, transport, pitch and drive

54

10.0

540.00

no

28.6

85.80

M Cutting off tops to required levels and preparing heads


reinforcement for concrete plug

no

47.5

142.50

N MLT or PDA Test on 300mm diameter


prestressed concrete spun pile as specified

no

Pile joints; fillet weld

PW/8

0.00

Construction of 1.02 Million Liter Elevated Reservoir and Associated Works at Penang
O Excavate and constructed pile cap using concrete

m3

249.0

0.00

To Collection:

8,854.50

BILL NO.1 - PILING WORKS (ALL PROVISIONAL)


No

Amount
Collection
PILING WORKS

PW/9

PW/1

25,000.00

PW/2

8,854.50

Construction of 1.02 Million Liter Elevated Reservoir and Associated Works at Penang

To Summary Of Tender:

PW/10

33,854.50

Construction of 1.02 Million Liter Elevated Reservoir and Associated Works at Penang

BILL NO. 2 - PROVISIONAL SUM FOR PILING WORK


No

Description

Unit

Quantity

Rate

Amount

PROVISIONAL SUMS
The following Provisional Sums provided shall be expended
as directed by the Superintending Officer or deducted
in whole or in part if not expended
CONTINGENCY FUND
A Allow a Provisional Sum of Ringgit Malaysia Twety Thousand
Only (RM 20,000.00) as a contigency fund

PS/11

20,000

Construction of 1.02 Million Liter Elevated Reservoir and Associated Works at Penang
To Summary Of Tender:

PS/12

20,000.00