INDEX
1. GENERALITIES
1.1 Scope.
1.2 Objectives.
2. LEGAL REQUIREMENTS
3. POLICY OF THE INTEGRATED SYSTEM OF MANAGEMENT
3.1 Mission.
3.2 Vision.
3.3 Policy of the Integrated System of Management.
4. POLICIES OF WORK
4.1 Policy of Meetings and Training.
4.2 Policy of Use of Personal Protective Equipment (PPE).
4.3 Policy of Order and Cleaning (Housekeeping).
4.4 Policy of Health and Other Services.
4.5 Policy on Control of the Alcohol and Drugs.
4.6 Policy of Incentives and Disciplinary Measures.
5. RESPONSIBILITIES
5.1 Project Chief.
5.2 Project EH&S Manager.
5.3 Erection Supervisor.
5.4 Quality Supervisor.
5.5 Human Resources Administrator.
5.6 Planning.
5.7 Responsible for Warehouse.
5.8 Responsible for Maintenance.
5.9 Supervisors of Field.
5.10 Workers in general.
5.11 Subcontractors and third sides.
6. HAZARDS IDENTIFICATION AND RISKS ANALYSIS (HIRA)
7. INSPECTIONS
8. JOB SAFETY ANALYSIS
SHEET:
1 de 36
ISSUE:
30/04/08
REVISION:
HAUG - SP
Ingeniera
9. TRAINING
10. ACCIDENT/INCIDENTS
11. BEHAVIOR BASED SAFETY
12. SAFETY STANDARDS
12.1 Housekeeping.
12.2 Personal Protective Equipment.
12.3 Tools in General.
12.4 Electrical Aspects.
12.5 Scaffolds.
12.6 Ladders.
12.7 Material Handling and Storage.
12.8 Hazardous Materials.
12.9 Fire Prevention and Protection.
12.10 Welding and Cutting.
12.11 Unfired Pressure Vessels.
12.12 Steel Erection.
12.13 Fall Protection
12.14 Rigging & Lifting Operations and Equipment.
12.15 Motor Vehicles.
12.16 Confined Space.
12.17 Construction Nondestructive Testing.
12.18 Abrasive Blasting and Painting.
. 12.19 Signs, signals and barricades.
12.20 Excavations, trenching and shoring.
12.21 Sanitation.
12.22 First aid.
13. PROCEDURES OF CRITICAL WORKS
14. MEDICAL CARE FACILITIES
15. ENVIRONMENTAL ASPECTS
16. MANAGEMENT REVIEW AND CONTINUAL IMPROVEMENT
SHEET:
2 de 36
ISSUE:
30/04/08
REVISION:
HAUG - SP
Ingeniera
1.
SHEET:
3 de 36
ISSUE:
30/04/08
REVISION:
GENERALITIES
1.1 Scope
The Manual present contains elements and standards of strict fulfilment for the employees and workers of
our company. HOWEVER AGREE TO COMPLY WITH THE PROGRAMME, PROCEDURES AND
PRACTICES OF SAFETY, HEALTH AND ENVIRONMENT OF OUR CUSTOMER.
1.2 Objectives
The objectives of the present manual are:
Inform and norm the aspects Environmental, Health and Safety in the work for its respective execution.
Include an internal technical/normative instrument to carry out every task according to the practices and
disciplines of Safety and employment Health established by the laws, regulations and standards of our
client.
2.
LEGAL REQUIREMENTS
This Plan is based on the following documents:
Occupational Safety & Health Administration (OSHA) 29 CFR 1926 of the United Status of
NorthAmerica.
HAUG - SP
Ingeniera
3.
SHEET:
4 de 36
ISSUE:
30/04/08
REVISION:
3.1 Mission
"To provide Engineering, Construction and Installation services in the steel construction field with the
highest levels of safety, quality, compliance, profitability and social responsibility, while focusing on
achieving the complete satisfaction of our customers and the professional development of our personnel.
3.2 Vision
To be a highly reliable and competent company of the sector that guarantees their clients an
excellent service.
To reach the 100 years of services maintaining the leadership among the companies of the sector
and particularly in the speciality of Tanks.
HAUG - SP
Ingeniera
4.
SHEET:
5 de 36
ISSUE:
30/04/08
REVISION:
POLICIES OF WORK
HAUG - SP
Ingeniera
SHEET:
6 de 36
ISSUE:
30/04/08
REVISION:
Uniform: All personnel will use a hi viz vest during the permanence in the project. According to the
requests of the project or work the company will provide the personnel work uniforms. This should be
comfortable and tight of such form that cannot be stalled neither to be hooked in machines and equipments
of construction, structures, mobile parts, etc. Moreover, workers should not use shirts, pants or very wide
overalls or deform. Clothing of synthetic fibber will not be used.
Ear safety: All personnel will use protectors of ear in places where the noise surpass the 85 decibels dB,
such as: compressor, pneumatic hammers, blows of constant bulge, etc.; and in those places that apply
hand grinds , workshops where there are noises of machines and vehicle.
Safety of arms and hands: according to as correspond should be used protection for the hands and arms.
Previously an evaluation of risks will be made in order of determining the type of gloves to use.
Safety of the face will be used the adequate mask in works of chemical materials, welding, cutting,
brazzing or in those machines that throw shaving, dust or abrasive.
Respiratory protection: it will be provided to each worker respirators adequate for each work that imply
risk or excessive concentration of dust, smoke, gases, fog, vapors, toxic emanations or by deficiency of
oxygen in places confined. Before using the respirator, be assured that he has been trained about it.
Protection in works of height: Is obligatory the use of the safety harness in works of height, equal or
more than 1.20 mts. The infringement of this norm is motive of drastic sanction.
Inspection of the equipments: All the personal protective equipment will be inspected, codified and
repaired or placed out of service.
The order and cleaning is a very necessary and fundamental activity of individual responsibility of each
person.
The places of work, walkways, stairs and all the other areas should be maintained free of filth.
The ways, halls and other places where the personnel circulates should be maintained cleared of
obstructions and other materials that can cause any accident.
Every building material, cords, wires, electric cables they should be far away of the surface of circulation
of the personnel, these should be placed in high places over the surface in order not to cause damage
to personnel or equipment (or protected).
HAUG - SP
Ingeniera
SHEET:
7 de 36
ISSUE:
30/04/08
REVISION:
infections.
In every installation or work, the personnel should include adequate dining rooms and enclosures,
which they should be maintained always clean, free of wastes.
The personnel should maintain the good judgment and discipline in the dining rooms, sanitary services
and internal areas of Site project.
The portable chemical baths should be maintained clean, disinfected and in good conditions
Measures to take:
Carry out tests of alcohol tests to the people found involved in a serious accident.
The Supervisor will control the behaviour of his workers in alcohol consumption signs search and
drugs. Or in his defect he will be utilized instruments like the ALCOTEST for this purpose.
In case it has been proved that the worker has consumed alcohol or drugs, the coordinations for
respective analyses will be done.
The worker that is consuming drugs by medical prescription, will report this fact to Human Resources
Administrator.
All the workers of site projects, without exception, will comply with their responsibilities that are
indicated in our politics on the use of alcohol and drugs.
Personal will be sanctioned, any be its hierarchy yes infringes these norms, in agreement al item 4.6 of
the present document and legal devices in force.
HAUG - SP
Ingeniera
SHEET:
8 de 36
ISSUE:
30/04/08
REVISION:
Disciplinary Rules
All the rules, norms and procedures, contents in the present plan are of strict fulfillment by part the workers,
without restriction of charge or category.
In agreement with Internal Regulation of Personnel of HAUG and legal devices in force, that break the
dispositions given will apply the following sanctions:
Verbal Admonition.
Admonition written
Suspension
Dismissal
If the misdemeanour is serious, the worker will be fired not including the sanctions before described.
Serious misdemeanour in Safety is considered :
Cause serious wound or death, which makes the worker be under the disposal of the competent
authorities.
Cause damage to the installations, equipments or any properties of the company or third sides.
Appropriated of any property or value of the company or of third sides, or that anything under its
custody.
Destroy the natural resources.
The resistance to comply the regulations, norms, manual and dispositions of Safety and Environment of
the employer.
The Supervisor is responsible for the control of his personnel and he is in obligation to instruct them so
that they do not incur in the demeanours mentioned before.
HAUG - SP
Ingeniera
5.
SHEET:
9 de 36
ISSUE:
30/04/08
REVISION:
RESPONSIBILITIES
Is the direct head of all the operations in Project and therefore of the Safety, Health and Environment in
the place. Consequently, he must provide the resources and facilities needed to avoid any occurrence
of incidents, damage or waste of the resources of the business.
Will set a personal example and assist in the proactive promotion of EHS as a personal objective
Implement, comply and to make fulfill the EH&S policy, plan, objectives and designated goals in the
project.
It reviewed all the methods and procedures of work, verifying the compatibility with in EH&S Plan.
To make weekly EH&S meetings with all the workers of the Project.
Review and improve permanently the EH&S programs of project, in agreement with the updates of the
laws, standards and technologies in the matter.
To offer the EH&S induction training to all the new workers in the project
Inspect weekly all the areas of the project, review the results to identify EH&S issues and deficiencies
and to advise supervisors of findings.
To provide weekly reports of EH&S project a our client e internally to HAUG S.A.
Be fully conversant with our client EH&S Rules for Construction, standards and the project EH&S
requirements.
Evaluate the EH&S performance of all the areas e inform a Project Chief.
HAUG - SP
Ingeniera
SHEET:
10 de 36
ISSUE:
30/04/08
REVISION:
It planned and it implemented appropriate methods of agreed work with the safety standards.
Conduct EH&S inspections weekly in all areas of project with the goal to verify the fulfillment of the
standards and EH&S plan and to take the corrective measures in case that some norm is being
infringed. These inspections should be taken down in their respective formats.
To participate in the audits of Safety to order of the Project Chief or of the Client.
Arrange continuously the improvement of the working conditions to prevent accidents and employment
illnesses.
Verify that the Area of Maintenance comply with the preventive program of maintenance, in order to
assuring the operability of equipments and tools.
It planned and it implemented appropriate methods of agreed work with the safety standards,
specifically in the works that it corresponds to him.
Verify that every new worker enters to the business with the certification of pre medical exams
employment.
To offer each worker the services of social insurance ESSALUD and complementary insurance. In
every case these services should be maintained brought up to date.
To offer the facilities like feeding and others with he purpose of maintaining an atmosphere of healthy
and healthful work.
To transact the necessary documentation for the entrance of the workers to the project.
HAUG - SP
Ingeniera
SHEET:
11 de 36
ISSUE:
30/04/08
REVISION:
5.6 Planning
To make the planning of all the activities of the project contemplating the aspects of security, health and
environment during all the work.
Maintain the stock of personal protective equipment such as hardhats, protectors for ears, steel toed
work boots, gloves in their diverse uses, high-viz outer garment, facial protectors and safety glasses.
This stock should be compatible with the quantity of the scheduled personnel, in such a way that all
they include these requests.
Order that the warehouse includes enough fire extinguishers and to inspect them.
Order that every material or flammable product, chemical or hazardous materials be stored in other
different areas al warehouse of materials. To maintain a file with MSDS (Material Safety Data Sheet) of
existing dangerous products in the project
Every acquisition of equipment, implement or material of safety should include the review and approval
of the Project EH&S Manager. Similarly, it will be done with the dangerous materials and products.
Order that the warehouse carry a KARDEX everyday on the safety equipments delivery to the workers.
To inspect equipments, tools and other objects of warehouse, placing to the elements in good state the
tape of the color code corresponding to the trimester in course (yellow).
Comply the programs of preventive maintenance of machines, equipments, installations and electric
tools.
Comply with the requests of corrective maintenance that indicate the Supervisors of Safety or the users
of equipments and tools.
To inspect machines, equipments, installations and electric tools. to put the tape of color code to the
elements that are in good state
To give to the warehouse, to retire of use and to signalize the elements that are in badly been
HAUG - SP
Ingeniera
SHEET:
12 de 36
ISSUE:
30/04/08
REVISION:
Order the works of the personnel to its charge in sure form, according to the dispositions of Safety.
Not to allow the new workers carry out works unless they have received EH&S induction training as
much of HAUG S.A. of as our client.
Ensure that the work under their control has been planned and undertaken in such a way that
recognized hazards and residual risks are managed and controlled making use of all available tools
Ensure that EHS concerns are identified, communicated and understood by the workers under their
supervision.
Monitor and evaluate site personnel to identify workforce EHS performance issues for improvement,
To verify that each worker has a uniform and basic equipments of Safety, like hardhats, protective
lenses, protectors of ear, gloves, hi viz vest and steel toed boots.
To make sure that all the equipment, tools and other elements to be used in the work are in good state
Communicate the Project Chief or Project EH&S Manager in order to solve problems of Safety that do
not have an apparent solution
Keep the work area clean and maintain the conditions of Safety in the zone of work. As well as the
control of his workers under its charge.
Direct that be complied with the delivery of uniforms and equipments of personal protection to the
workers according to the tasks that carry out or those equipments of personal protection that indicates
the plan present.
Request special permission to the Project Chief on works of high risk, as: Raise critic with crane, works
in confined places, works in height, works in heat and others.
Request sanctions for the workers who infringe the norms of Safety in agreement to the procedure that
is established in this Plan.
HAUG - SP
Ingeniera
SHEET:
13 de 36
ISSUE:
30/04/08
REVISION:
The sub contractors are in the obligation to obey the norms of Safety, Health and Environment of
HAUG and of our client.
HAUG is in the obligation to instruct them and to reach them the pertinent documentation on these
aspects.
Likewise the suppliers will comply with the norms of Safety, Health and Environment of HAUG and our
client.
6.
HAUG - SP
Ingeniera
7.
SHEET:
14 de 36
ISSUE:
30/04/08
REVISION:
INSPECTIONS
Introduction
The inspection constitutes one of the main techniques used for the identification of substandard
conditions in the place of work and verification of the fulfilment of the appropriate standards of work.
Objectives
Identification of occupational risks in order to eliminate them or to treat them in the smaller possible
time and of the suitable way more.
Identification of defects or faults in the facilities, vehicles, equipment, machineries and tools.
Verification of the implementation of the remedial actions derived from them inspection.
General Procedure of the Inspection
Preparation
To make a list of the equipment, tools and materials to inspect.
To review the previous reports of inspection in search of critical aspects for the pursuit.
To prepare a route to have sufficient cover in all the area of inspection.
To compile the control lists to use during the inspection.
Inspection
To follow the route predetermined and to use a list of control previously prepared.
To describe in clear form, makes specific and concise the detected problem, contemplating its specific
location.
Analysis of the inspection
To analyze the causes that originated the presence of the detected substandard conditions.
Remedial actions
To give the recommendations that are necessary to correct the found deficiencies.
HAUG - SP
Ingeniera
8.
SHEET:
15 de 36
ISSUE:
30/04/08
REVISION:
The Job Safety Analysis will be registered in the respective and located format in the work place.
HAUG - SP
Ingeniera
9.
SHEET:
16 de 36
ISSUE:
30/04/08
REVISION:
TRAINING
Introduction
Based on the hazards, risks, occupations, equipment, machines, tools, conditions of work and other
elements, that is to say, previous to an analysis of qualification necessities, a Plan of Qualification will be
developed. The training is agreed to exposed in the Policy of Meetings and Training.
Objectives
To generate a high level of safety conscience in all our workers and employees.
To offer to our personnel an optimal level of knowledge in the aspect of Enviroment, Safety and
Health, facilitating this way the putting in practice of these
Training Plan
Induction to the New Personnel
All worker of HAUG S.A. will obligatorily receive a Course of Induction to the New Personnel, before
entering to toil in the Project. This course will be distributed by Project EH&S Manager on an appropriate
atmosphere.
Also all worker will obligatorily receive the Course of Induction offered by our client, before the beginning
of the workings in the project.
Daily Meetings of 5 minutes
They are offered to all the personnel of the project, being distributed by the Supervisor of area. In these
char them will touch to agreed subjects to the hazards and existing risks in the work area.
Weekly Meetings
It will be realized weekly during 30 minutes by the Project Chief altogether with the Project EH&S
Manager.
EH&S Courses
Workers will be received specify training in different subjects from safety, health and environment
Training to visitors, suppliers and third
Everything third, previous one to its entrance to the project, will receive EH&S training.
Training Procedure
In function to the occupational hazards and risks that they appear in the development of the workings
will choose the subject to char it it of 5 minutes, orienting to them on the safe work that they will carry
out.
HAUG - SP
Ingeniera
SHEET:
17 de 36
ISSUE:
30/04/08
REVISION:
It is necessary that the exhibitor previously reviews information related to the subject of selected it
char, being able to mention norms, histories and anecdotes, among others.
Later it will prepare the content of its exhibition and the form of teaching, in addition to some resources
to use (if outside the case) like audio-visual means, among others.
The exhibition of the subject will be made in an suitable atmosphere, initiating with a brief introduction
and specifying what it is going away to treat.
Later the subject will appear counting on the active participation of the workers by means of its
commentaries. Finally the message of the qualification will be indicated and what it looks for of the
workers.
Once finished the exhibition the participation of the workers by means of the formulation of questions
and the exhibition of problems, restlessness and suggestions will be asked for. In case some problem
appears that cannot be solved will be transferred this one to the Project Chief.
Registry of training
All training will have to be registered in the respective format, which will be given to the EH&S Area for its
final register and its registry in the training statistics.
Evaluation
One will verify that the objectives of the training are obtained by means of written, oral tests, appropriate
observation and other means.
10.
ACCIDENTS/INCIDENTS
Objectives
Identification of the basic causes of the accidents and incidents of work.
Verification of the remedial actions derived from the respective investigation.
To avoid the repetition of the accidents and happened incidents.
Report of Accidents and Incidents
All accident and incident that happens will be communicated to the Project Chief and the client. Later one
will fill to a format of report of investigation of accident and incident, which will appear to the client before
passed the 24 hours subsequent to the fact.
HAUG - SP
Ingeniera
SHEET:
18 de 36
ISSUE:
30/04/08
REVISION:
HAUG - SP
Ingeniera
SHEET:
19 de 36
ISSUE:
30/04/08
REVISION:
Definition of the corrective measures, establishing concrete actions, responsible people to implement
them and dates of term.
Elaboration and diffusion of the learned lesson of the incident/accident.
Verification of the adopted remedial actions with the purpose of verifying its effectiveness. In case
some problem is stated will meet the Project Chief, Project EH&S Manager, Erection Supervisor and
Supervisor of field to position to evaluate the situation and to define the respective measures to adopt.
11.
HAUG - SP
Ingeniera
12.
SHEET:
20 de 36
ISSUE:
30/04/08
REVISION:
SAFETY STANDARDS
HAUG S.A. comply strictly standards of our client during a activities in the present project.
12.1 Housekeeping
The order and the cleaning constitute fundamental activities that they must be executed by all the workers
who toil in the project.
Good housekeeping is an important element of accident prevention.
Good housekeeping will be planned at the beginning of the job and be of a primary concern of all
supervisors and workers throughout the entire project. This will be a part of the daily routine and clean up
will be a continuous process.
Some basic rules to consider are:
The areas of work, passages, stairs and all the other areas will stay free of obstacles, equipment, and
materials.
In diverse sites appropriate containers for sweepings will be placed, which will be used for the
positioning of remainders.
The liquids (such as paintings, reliable, dissolvent, oils, and fats) and any other material or containers
that have contained chemical, will be rejected in agreement with the procedures and regulations
established for toxic wastes.
The storage areas will stay cleanings and the materials properly stored.
The electrical cords, wires, cables, hoses, and other temporary systems, will stay outside the surfaces
to walk and in a high position.
All the pieces of wood, rejected material and sweepings will have to be removed immediately of the
work area.
All the remainders of reliable, oily rags, and incendiary fuels, will stay in containers closed resistant to
the fire until they are retired of the work site.
All workers will be trained in the storage, use, cleaning and spare part of personal protective equipment.
HAUG - SP
Ingeniera
SHEET:
21 de 36
ISSUE:
30/04/08
REVISION:
It is obligatory the use of safety glasses, hardhats, hi viz vest, steel toed work boots of safety and uniform
of work at any moment in the work fronts and where risk against the security and health of the people
exists. In case of appearing additional risks the suitable implements will be used to control these.
All personal protective equipment to use in the project will fulfil the stipulations of the pertinent norms and
will count on the certification of respective quality.
Double eye protection is required for certain operations such as welding, cutting and brazing.
All the personnel will use auditory protective equipment in the designated areas that exceed 85 dB.
Fall protection is required for employees working above/below ground when not protected by an approved
scaffold or staging.
All respiratory protective equipment will count on the approval of the National Institute Occupational
Safety and Health of EE.UU.
The respiratory equipment will be used, stored and maintained in accordance with the requirements of the
manufacturer.
The respiratory equipment will be selected with base in the risks to which the worker will be exposed.
The use of steel toed work boots of safety is required during all the works in the project.
The equipment that has undergone any type of alteration and/or that is in inoperativo state will be retired
of use in immediate form.
HAUG - SP
Ingeniera
SHEET:
22 de 36
ISSUE:
30/04/08
REVISION:
Tools electrics
The welders of electric arch, turbines, drills, are electric tools that HAUG S.A. will utilize in the project.
Utilize both hands, to have good base, to utilize the tool according to the instructions that the Supervisor
has given.
Any failure of the tool should be communicated to the Supervisor or electrician.
Use always facial protector or lenses of Safety when you are operating machines or electric equipments.
All the machines and electric tools should be operated just for what they were designed; do not withdraw
the protector, guard or another element of Safety.
Do not used tools that have cables wore out or in bad conditions
The tools and electric machines should be connected to land.
The tools damaged or faulty should be retreats of the use and will be put them a placard that says DO
NOT USE
Remains prohibited repairing electric tools, this work concerns to the technical electrician
Tools of hand
The faulty tools should be returned to warehouse
They should be marked or to be identified of way such that the user or owner can recognize it.
Never use a hand tool to do lever. Neither forces its capacity.
HAUG - SP
Ingeniera
SHEET:
23 de 36
ISSUE:
30/04/08
REVISION:
12.5 Scaffolds
Will be established norms that guarantee that the scaffolds and work platforms systems be installed, they
inspect, use and be disarmed according to safe practices and the pertinent rules. Nobody, will modify,
alter or damage any scaffold. The modifications which are required will be performed only under
authorization. Scaffolds will only be erected, modified or dismantled by qualified scaffolders.
All scaffolds comply with standards of our client.
Every scaffold must be reinspected and certified for use every 7 days and will use a scafftag system.
The use of harness is obligatory when it works in scaffolds, which will have to be hooked to a safe point
outside the scaffold. Also the use of elastic chin straps of plastic is obligatory.
12.6 Ladders
All ladders comply with standards of our client.
The ladders will be reviewed before each use and periodically a authorized person will carry out
inspection, registering the results in the respective format.
The ladders that present deficiencies you would not used, being retired of use.
Tools will never be put, materials or objects upon the steps.
In same ladders it will not be able to work more than a person.
No Smoking and Warning signs as required for the stored products will be posted and maintained.
HAUG - SP
Ingeniera
SHEET:
24 de 36
ISSUE:
30/04/08
REVISION:
HAUG - SP
Ingeniera
SHEET:
25 de 36
ISSUE:
30/04/08
REVISION:
The damaged or defective machine must be retired of the use and a poster will be put to them that it
indicates NOT TO USE.
It is prohibited to repair electrical tools; this one work is incumbent on to him to the responsible for
maintenance.
The positioning of screens is necessary to protect to the rest of workers of the radiations caused by the
electrical arc.
Fully charged and operative fire extinguishers will be supplied in the work area.
Frames of electric welding machines operated from power circuits will be effectively grounded.
Electrode and ground cables will be supported to prevent interference with workers.
Defective cable shall be repaired or replaced.
An electrode holder shall be properly rated and insulated.
Electrodes shall be removed from the electrode holder when unattended.
The welders will use a necessary Personal Protective Equipment for the welding and cutting.
The bottles of oxygen and acetylene or other gas will be placed on vertical form, moored with chain upon
a cart in such a way that they do not fall to the floor.
HAUG - SP
Ingeniera
SHEET:
26 de 36
ISSUE:
30/04/08
REVISION:
Previous to the positioning of the regulators, you carefully open the valve of the cylinder to blow any
strange particle. After finishing installing the regulator, you get off to side of the measurer while it opens
the valve of the cylinder.
In the regulators (to the height of the exit) a valve backfire must settle, as much in the oxygen cylinder like
in acetylene or any inflammable one.
Before initiating the work and during the operation, the oxygener must verify that there is no lose of gas
by any union of hoses or pressure gauges.
It is obligatory the use of glasses type wins for the personnel who is due to use the weld.
In the environs of the equipment of oxicorte it must not be greasy, oil, gasoline or other fuels. These with
the combination or flight of oxygen can intensify the fire in chain and cause an explosion
This completely prohibited cleaning machines, motors of combustion, equipment and clothes with oxygen
of the cylinders. This action is considered serious offense.
In order to initiate the work, open slowly the valve of the cylinder, making sure that the second cover of
the regulator is closed before opening the valve of the cylinder
Also, to open to the valve of the inflammable gas cylinder (acetylene, propane gas, etc.) only a quarter of
return. Later to open totally the valves of the cylinders of oxygen.
When igniting the blowpipe or cane, opening the first valve of the combustible gas in the blowpipe, later
the one of oxygen. To use an approved spark gap to ignite the blowpipe.
When the day finishes, all the accessories and elements of the equipment must be disarmed. The
cylinders were left only with the respective hoods the blowpipe.
Before initiating the works of oxygen or weld is due to place to the flank, an fire extinguisher
Never cut o weld containers, cylinder or tank that has contained some inflammable previously material
without being washed and freedom of gas.
Before initiating the structures erection works, it is necessary to plan with procedures of Safety and step
work profiles by step (JSA) With the support of the erection supervisor, Project EH&S Manager,
supervisor of area and the user of the truck-crane.
HAUG - SP
Ingeniera
SHEET:
27 de 36
ISSUE:
30/04/08
REVISION:
All the workers will be a distance similar to the indicated one by the turning radius of the heavy equipment
The equipment located will be protected further down against dross and metal melted and electrodes in
operation.
Put protective blankets against fires under the operations to where said discovered flame operations be
carried out.
To build and to raise with cranes, the load will not free themselves of the hook of the feather until the
members be make sure that with at least two bolts, or their equivalent on one, in each connection and
tense themselves with adequate tools.
In heights of 1.20 meters or but, the works will be performed with harness according to the standards of
our client.
The use of the harness is obligatory, when working in equal heights or more than 1.20 meters, provided
that do not include protections, as fixed railings, retaining walls, etc. The Supervisors will evaluate all the
area of work by exposition to falls and they will plan for anticipated and will install the systems of
protection against necessary falls before assigning the workers.
Employ safety harnesses of entire body approved with absorption of blows to protect the workers against
falls where the primary systems of protection against falls be not adequate and the workers be exposed
to falls to different level.
HAUG - SP
Ingeniera
SHEET:
28 de 36
ISSUE:
30/04/08
REVISION:
The workers that displace or work in high areas at more than 1.20 meters on the level of the land or in an
adjacent surface and be exposed to falls, they will utilize secondary protection against falls to hitch in
every moment their safety harness to a structure, piola life preserver, or to a capable approved falls
detention device of bear 5000 pounds.
Employ equipment of protection against falls while the scaffolds are installed and the platforms of
provisional work, the structures they be built and the buildings, and other equal works be carried out.
Every element of protection against falls just as the lines of life, the safety harnesses, etc. they will be
inspected regularly by damages or deterioration. The faulty equipment will be put out of service and will
be destroyed
Every element of protection against falls that suffer loads of shake during the detention of falls they will be
rejected.
Any element and systems of protection against falls will be utilized with no another purpose that that of
safeguards the workers.
All the piolas should be of type SHOCK ABSORBER when they are used like protection against falls
The lines of life and the points of obsession of the piolas of protection against falls they should be capable
of bearing at least 5000 pounds. The lines of life will be able to be installed or well vertical or horizontally
and in general will try that they provide mobility al personnel working in high areas:
The lines of horizontal life should consist of metallic cable of average inch (1/2), properly borne to resist
at least 5000 pounds in any direction.
HAUG - SP
Ingeniera
SHEET:
29 de 36
ISSUE:
30/04/08
REVISION:
The lines of horizontal life will be summoned to court give form that points of connection to the height of
the shoulder be provided or more higher than the personnel that utilize them. The lines of life will be
utilized with no another purpose but protection against falls. The lines of horizontal life will be installed
and maintained by personnel qualified.
The lines of vertical life will be utilized to protect al personnel against falls when require vertical mobility
and they will consist of lines of static life manufactured of cord of synthetic fibber or cables equipped with
connection of cord approved or will also be able to consist of drum type life lines auto folding connected
directly to a safety harness.
HAUG - SP
Ingeniera
SHEET:
30 de 36
ISSUE:
30/04/08
REVISION:
In the project, the maximum velocity of circulation it will be the one that set the client
The conductor of the vehicle is responsible for any damage or wound that cause as a result of an
accident or incident in the public way or project.
Every conductor or passenger should use the seat belt that carries in the cabin.
He is prohibited to travel in the platform or hopper of the trucks, small trucks. Thus he is prohibited to
travel in the stirrups and bumper of the vehicles and heavy equipment.
The vehicles and heavy equipment should have their sonorous alarm of backward movement that be
audible besides the environmental noise. It is prohibited to use the alarm musical or another
unconventional sound.
In the Project the vehicles should stationed in the places and form that indicate the client
In the huts is obligatory the revision of the vehicle on the part of the Agents of Caution. Every material,
equipment or active that enter or leave should be revised in the huts with the corresponding guide of
remission. The conductor is the only head of any infringement to this norm.
HAUG - SP
Ingeniera
SHEET:
31 de 36
ISSUE:
30/04/08
REVISION:
HAUG - SP
Ingeniera
SHEET:
32 de 36
ISSUE:
30/04/08
REVISION:
In enclosed spaces, the atmosphere will be checked for oxygen deficiency and combustible gas before
starting work.
Signs will be posted specifying no smoking, fires, or open lights within 20 meters of solvent handling
areas.
Extinguishers against fires in the zone of work will place.
The Paint Superintendent will inspect the job site no less that weekly.
HAUG - SP
Ingeniera
SHEET:
33 de 36
ISSUE:
30/04/08
REVISION:
Support systems are to be planned and designed by a qualified person when excavation is in excess of 5
meters in depth, adjacent to structures or improvements, or subject to vibration or ground water.
Materials used for sheeting, sheet piling, cribbing, bracing, shoring, and underpinning will be in good
serviceable condition.
Except in hard rock, excavations below the level of the base of footing of any foundation or retaining wall
is not permitted unless the wall is underpinned and all other precautions are taken to assure the stability
of the adjacent walls for the protection of employees involved in excavation work.
Precautions are to be taken to assure sidewalls are supported if heavy equipment is to be located near
the edge.
Where oxygen deficiency or gaseous conditions are possible, the atmosphere in an excavation is to be
tested. Where adverse atmospheric conditions may be present, emergency rescue equipment will be
provided.
Shoring and/or bracing will be placed in every trench over 1 meter in depth regardless of soil type, except
solid rock, unless banks are sloped to the angle of repose in accordance to soil types as based on
recognized tables, e.g., OSHA regulations.
Shoring and bracing are carried down the trench.
All excavated material will be placed a minimum of 1/2 meter back from the trench edge.
Adequate means of exit will be provided for every 5 meters of lateral travel in trenches more than 1 meter
in depth.
Where bracing of shoring trenches is not practical or economical due to unstable ground, moveable steel
trench shields may be used.
12.21 Sanitation
Proper sanitation on the jobsite and adequate facilities are required to prevent unsafe drinking water and
inadequate or disease prone sanitary facilities.
HAUG - SP
Ingeniera
13.
SHEET:
34 de 36
ISSUE:
30/04/08
REVISION:
.
14.
15.
ENVIRONMENTAL ASPECTS
HAUG S.A. will comply with General Environmental Law, applicable regulations including WORLD BANK
INTERNATIONAL and standards /procedures of our client.
ENVIRONMENTAL AUDITS
The Project EH&S Manager will realize environmental audits monthly, in which the fulfillment will happen
of exposed in the Plan of Environmental Managing. Later a report will be sent to the Project Chief of
HAUG S.A. by copy to the client, indicating not conformities (if they had) and the necessary corrective
policies (including persons in charge and period) for the respective raising.
HAUG - SP
Ingeniera
SHEET:
35 de 36
ISSUE:
30/04/08
REVISION:
Storage of Materials in Stores Our materials will be located in strategic, due surrounded and put up
signs places. Additional fire-extinguishers will be located against fires and first aid kit of the first aids
in the place.
Managing of Dangerous Materials The employment of dangerous materials in the labors of the
Project does that one presents a risk for the environment, the safety and labour health. Every
chemical product will possess(rely on) a safety leaf called leaf(sheet) MSDS (Material Safety Data
Sheet), which details the characteristics, risks and measures of contingency in case of emergencies.
One will take an inventory of the dangerous materials, as well as of the consumption.
His managing will be realized expiring with the dispositions of the manufacturer; in case of his
storage they will install systems of containment if it was the case. As for his final disposition it will
separate of the remaining types of residues.
The files and files of the safety leaves of dangerous materials they will be located in the Office and
store of Work, as well as in the work camp.
Managing and disposal of Solid residues: The labours of the project will generate solid residues, for
ende one will possess(rely on) a Plan of Managing of Solid Residues, which will meditate that the
generated residues are withdrawn and arranged in due covered cylinders and / or bags(stock
exchanges) of colors for his movement and final disposition.
Are considered to be systems of containment to containers, trays, puddles of plastic, etc. That are
impermeable, in sizes and dimensions adapted to prevent them the content of the engines, tanks
and cylinders being from spilt on the soil and for ende to prevent the possible spillages or
escapes(fugues) from managing to strike to the environment and the health.
One will possess(rely on) a kit of emergency consisting of spades, beaks(peaks), absorbent rags
and black markets to face to any contingency.
16.
HAUG - SP
Ingeniera
SHEET:
36 de 36
ISSUE:
30/04/08
REVISION: