Procurement, Contract Management and Capacity Building Project
Table of contents
Part I-Pre-Procurement
1.
2.
3.
4.
5.
Procurement Process
Procurement Cycle
Procurement Planning
Differences in Procurement
Types and Methods of Procurement
4
7
9
14
16
Part II-Procurement
6. Procurement of Goods
7. Major Steps in Procurement of Goods
8. Methods of Procurement
9. ICB
10. Other Methods of Procurement
a. Limited International Bidding (LIB)
b. National Competitive Bidding (NCB)
c. Shopping/Small Procurement
d. Direct Purchase/Single Source
e. Force Account
21
23
34
QCBS
59
b.
c.
d.
e.
f.
g.
79
81
83
85
87
89
2
Procurement, Contract Management and Capacity Building Project
Part IV General
1.
2.
3.
4.
5.
6.
7.
8.
8.
9.
Incoterms
Fraud & Corruption
Review by IBRD/IDA (Donor)
Mis-Procurement
Conflict of Interest
Record Keeping
Guarantees
Contract Administration
Contract Close out
Test
93
95
97
104
106
109
123
125
127
Part V Exhibits/Annexure
3
Procurement, Contract Management and Capacity Building Project
4
Procurement, Contract Management and Capacity Building Project
Pre-Procurement
5
Procurement, Contract Management and Capacity Building Project
Procurement Process
6
Procurement, Contract Management and Capacity Building Project
Project Authority
Normally
Agrees
During
d
Appraisal
Bidder/
Contractor
Other Methods
Of
Procurement
Competitive Bidding
Prequalify
Bidders
NO
Reviews
YES
Prepare
Prequal Docs
Reviews
Advertise
Bidding
Docs.
Advertise
Issue
Prequal.
Docs.
Takes Out
Documents
Prepare
Bidding
Docs
Reviews
Evaluate,
Select
Qualified
Bidders
Reviews
Submits
Inform.
Takes Out
Bid. Docs
7
Reviews
Reviews
Project Authority
Contractor
Receives
Clarification
Requests
Prebid
Meeting
Issues
Clarification
ssues
Attends
Meeting
Or Requests
Receives
Clarification
Reviews
Receives Bids
& Evaluates
Submits
BID
Reviews
Makes
Award
Receives
Copy of
Contract
Formalizes,
Signs Contr.
Signs
Contract
CONTRACT
Issues Notice
To Proceed
Start
Work
WORK
Acknowledges
Award
8
Procurement, Contract Management and Capacity Building Project
Procurement Cycle
9
Procurement, Contract Management and Capacity Building Project
Planning
Gen. Proc. Notice (ICB)
Bid Doc. Prep.
(Prequalification)
Publicize
Receive Bids
For ICB:
Language,
currency
Provisions, Bank
Review, award to LEB
Open Bids
Evaluate Bids
Award contract
Perform Contract
Performance Eval. Report
Bank review:
Planning
Prequal
Doc. & Eval.
Bid
Doc.
Bid
Eval.
Contract
10
Procurement, Contract Management and Capacity Building Project
Procurement Planning
11
Procurement, Contract Management and Capacity Building Project
Procurement Planning
Separate for:
Services
Goods
Administrative
Manufacture
Delivery
Plan:
12
Procurement, Contract Management and Capacity Building Project
13
Procurement, Contract Management and Capacity Building Project
Procurement Activity:
Procurement Activity:
Est. cost:
Est. cost:
Est. cost:
Method of procurement:
Method of procurement:
Method of
procurement:
Actual
Dates
Planned
Dates
Actual
Dates
Planned
Dates
Actual
Dates
14
Procurement, Contract Management and Capacity Building Project
Procurement Steps
for Goods
Procurement Activity:
Procurement Activity:
Procurement Activity:
Est. Cost:
Est. Cost:
Estimated Cost:
Method of Procurement:
Method of Procurement:
Method of Procurement:
Planned Dates
Planned Dates
Planned
Dates
Actual Dates
Actual Dates
Actual Dates
Preparation of Bidding
Documents /
(Request for Quotations
in case of Shopping)
Banks No-Objection to
Bidding Documents
(for prior review cases)
Advertisement of
Invitation for Bids
Bid
Submission/Opening
Date
Completion of
Evaluation and
Recommendations
Banks No-objection to
Evaluation and contract
award
(for prior review cases
only)
Award of Contract
Copy of signed contract
sent to Bank
(for prior review cases)
Completion of Contract
15
Procurement, Contract Management and Capacity Building Project
Differences in Procurement
16
Procurement, Contract Management and Capacity Building Project
Differences in Procurements
GOODS
Red Guidelines
Product based
Open competition
Cost major factor
Specifications
Single stage procedure
Negotiations rare
Invitation of bids
Public bid opening
CONSULTING SERVICES
Green Guidelines
Knowledge based
Shortlist
Quality major factor
Terms of Reference
Two stage procedure
Negotiations usual
Request for proposals
Technical proposal opening
not public
Financial proposal opening
public
No Securities
Note: For further details please refer to the copies of the World Bank
Guidelines and Government of Pakistan Procurement Rules 2004 enclosed
in the training package.
17
Procurement, Contract Management and Capacity Building Project
18
Procurement, Contract Management and Capacity Building Project
Types
Generally the following types of procurement are to be processed / carried
out under the project: Procurement of Goods
Hiring/Contracting for Consultants Services (Firms and Individuals).
19
Procurement, Contract Management and Capacity Building Project
Methods of Procurement
For Goods:
Full and Open Competition within country, which is also called National
Competitive Bidding (NCB)
Force Account
For Services:
QCBS
SBCQ
QBS
Others like,
Fixed Budget
Single Source
Least Cost Selection
20
Procurement, Contract Management and Capacity Building Project
PROCUREMENT METHODS
There are various methods of procurement which are used in accordance with the
situation and requirements of the legal document, like:
For Goods
Procurement through Full and Open Competition under World Bank financed
procurement called International Competitive Bidding (ICB)
Competition within the country which is also Full and Open Competition but within the
country, and is usually called NCB
Shopping or Small Purchase
Under the legal documents of the Project, however, the following procurement methods
are to be used.
1.
Procurement of Goods
2.
Contracts amounting US$ 200,000 and above shall be procured using ICB
procedures.
Contracts amounting from US$ 30,000 to 200,000 shall be procured using
NCB procedures.
Contracts up to US$ 30,000 shall be procured using National Shopping
Procedures.(+)
Firms
Individuals
All Contracts will be achieved by using QBS Method.
Under this project, shopping procedures are not to be followed and
procurements of more than Rs. 40,000 must be achieved through open
competition inviting bids through advertisement.
21
Part II
Procurement of Goods
22
Procurement, Contract Management and Capacity Building Project
Procurement of Goods
Contracts upto US $ 2, 00,000 or less are competed through full and open
competition within the country (NCB).
Procurement of smaller value i.e. upto US. $ 30,000 are made through shopping
which does not require bidding through wide publicity but the competition must
be held, and at least three quotations should be obtained and compared.
Under this project, shopping procedures are not to be followed and procurements
of more than Rs. 40,000 must be achieved through open competition inviting bids
through advertisement.
23
Procurement, Contract Management and Capacity Building Project
Preparation of IFB/RFQ
Advertisement
Issuance of IFB/RFQ
Bid opening
Bid Evaluation
Award of contract
24
Procurement, Contract Management and Capacity Building Project
Adequate notification
Equal opportunity
Broad specifications
25
Procurement, Contract Management and Capacity Building Project
ICB steps
Notification advertising
(prequalification)
Submission of bids
Evaluation
Post qualification
Contract award
Contract performance
26
Procurement, Contract Management and Capacity Building Project
27
Procurement, Contract Management and Capacity Building Project
PROCUREMENT OF GOODS
I
B. Eligibility
The invitation for bid must be open to all bidders, as defined under the Banks
guidelines. Inviting bids only from pre-registered firms is unacceptable.
Foreign firms should also not be precluded from competing. As exceptions to the
foregoing:
a)
A firm which has been engaged by the government to provide consulting
services for the preparation or implementation of a project, and any of its
affiliates, shall be disqualified from subsequently providing goods or
works for the same project.
b)
Government owned enterprises in Pakistan may participate only if they
can establish that they are (i) legally and financially autonomous, and (ii)
operate under commercial law. No dependent agency of the government
shall be permitted to bid for the procurement of goods, works or
consultants services.
c)
A firm declared ineligible because of fraudulent or corrupt practices in
competing for or executing a Bank financed contract.
All goods, contractors equipment, and other related services to be
supplied under these contracts shall have their origin in the eligible
source countries, defined under the Banks guidelines. For the purpose of
this clause, origin means where the goods and related services are
manufactured and produced. The origin of goods and services is distinct
from the nationality of the bidder.
C. Steps To Follow In ICB Process
4.
5.
ii)
iii)
Bid Prices: In the case of goods, bid prices are delivered duty
paid (DDP), at the destination specified.
In case of civil works, bid prices must be invited based on each
item specified in the BOQ, and not on Composite Schedule of
Rates (CSR). Contractors should be made responsible for all
materials and equipment without having to rely on departmental
supplies.
6.
iv)
v)
Qualification Criteria: In all cases where bidders are not prequalified, explicit post qualification criteria should be specified
in the bidding documents. In case of civil works, minimum
qualifying criteria for physical out-turn and financial turnover
should be clearly set out.
Inspection and Tests: specify what tests are required, where they
will be conducted and who will conduct the tests.
ii)
iii)
iv)
30
Procurement, Contract Management and Capacity Building Project
Bidding documents must be made available for sale to all those who
intend to participate in the bidding, for a minimum period of 45 days.
9.
10.
Bidders must be permitted to deposit their bids on any day during the
bidding period. Receipt of bids should not be restricted to a few days or
last ten days only. Bidders should be allowed to send their bids either by
post or in person on any day during the bidding period.
11.
12.
b)
c)
Opening of Bids
13.
The date and time for opening of bids should preferably be the same as
the deadline for submission of bids, however not more than one hour gap
is acceptable.
14.
15.
opening, except for late bids, which shall be returned unopened to the
bidder(s).
16.
Bids and modifications that are not opened and read out at bid opening
shall not be considered further for evaluation, irrespective of
circumstances. Withdrawn bids will be returned to the bidder unopened.
Evaluation of Bids
17.
18.
19
20
21
22
32
Procurement, Contract Management and Capacity Building Project
23
Bonus or additional credits for bid evaluation should not be given for
offered features that exceed the required standards or specifications, or
earlier delivery schedule than specified in the bidding documents.
24
25
26
27
Post-Qualification:
a)
b)
c)
Award of Contract
28
29
If the contract is being let on a Slice and Package basis the lowest
evaluated bid price (the combined cost of all the lots) will be determined
in conjunction with other contracts to be awarded concurrently taking
into account any discounts offered by the bidders for the award of more
than one contract.
31
32
33
34
Performance Security:
a)
b)
c)
34
Procurement, Contract Management and Capacity Building Project
Other Methods
35
Procurement, Contract Management and Capacity Building Project
Shopping
Direct purchase
Force account
Commercial practices
Community participation
UNICEF/ILO/WHO
Commodity markets
Procurement agents
Inspection agents
36
Procurement, Contract Management and Capacity Building Project
Appropriate when
-
Procedure
-
No public advertising
No domestic preference
37
Procurement, Contract Management and Capacity Building Project
Assure award to the lowest evaluated bidder whose bid has been
determined to be substantially responsive and meets the qualification
criteria
38
Procurement, Contract Management and Capacity Building Project
All bids are evaluated and compared on the basis of goods delivered duty
paid (DDP)
No domestic preference
39
Procurement, Contract Management and Capacity Building Project
40
Procurement, Contract Management and Capacity Building Project
The NCB procedures are appropriate when it is certain that foreign firms will not be
interested due to small values and nature of items
II
41
Procurement, Contract Management and Capacity Building Project
III
General
The legal agreement specifies the type of goods and woks and monetary limits
for such contracts, which can be procured following the NCB procedures. The
general considerations which guide NCB procedures are:
B.
Eligibility
The invitation for bid must be open to all bidders, as defined under the Banks
guidelines. Inviting bids only from pre-registered firms is unacceptable. Foreign
firms should also not be precluded from competing.
As exceptions to the foregoing:
A firm which has been engaged by the government to provide consulting services
for the preparation or implementation of a project, and any of its affiliates, shall
be disqualified from subsequently providing goods or works for the same project
Government-owned enterprises in Pakistan may participate only if they can
establish that they are (i) legally and financially autonomous, and (ii) operate
under commercial law. No dependant agency of the government shall be
permitted to bid for the procurement of goods, works.
A firm declared ineligible because of fraudulent or corrupt practices in competing
for or executing a bank financed contract. All goods, contractors equipment, and
other related services to be supplied under these contracts shall have their origin
in the eligible source countries, defined under the Banks guidelines. For the
purpose of this clause, origin means where the goods, and related services are
manufactures and produced. The origin of goods and services in distinct from the
nationality of the bidder.
C.
Opening of Bids
Evaluation of Bids
Award of Contract
A Procurement plan in the Banks suggested format indicating details for each
package must be compiled and sent to bank for review and clearance before
initiating action.
Packaging of goods and works
1.
5.
Some important provisions in the bidding conditions (Bid Data Sheet)
should be noted.
i)
ii)
iii)
iv)
v)
6.
Inspection and Tests: Specify what tests are required, where they
will be conducted in who will conduct the tests.
Liquidated Damages: Should not exceed 0. 1% per day (for
goods), and 0.05% per day (for civil works), of the contract
price, subject to a maximum of 10% of the contract value.
Price Adjustment: Should invariably be provided when the
stipulated period of completion is more than 18 months. The
adjustment formula is provided in the bidding documents.
Advance Payment: if any must be paid against the bank
guarantee.
Advertisement of IFB
7.
IFB must be advertised in at-least one national newspaper, and must
appear in all provincial capitals. Publications in other
newspapers
having
wide circulation in the country. And (in case of civil works) sending a copy of
the IFB to contractors Association
of Pakistan (CAP) are highly
recommended.
Sale of Bidding Documents and Receipt of Bids
8.
9.
10.
11.
Bidding Documents must be made available for sale, to all those who
intend to participate in the bidding, for a minimum period of 30 days.
The Price of Bidding documents should be nominal, to cover
reproduction and mailing expenses only. Bidders should not be asked to
deposit bid security before submission of their bids.
Bidders must be permitted to deposit their bids on any day during the
bidding period. Receipt of bids should not be restricted to few days or
last ten days only. Bidders can send their bids either by post or in person
on any day during the bidding period.
A record of all bidders who purchase the bidding documents should be
maintained in an orderly manner.
44
12.
b.
c.
13.
14.
15.
16.
The date and time for opening of bids should preferably be the same as
deadline for submission of bids, however maximum of one hour
difference between these times is acceptable.
All bids received must be opened in presence of all bidders
representatives who choose to attend .Participants shall sign a register
evidencing their attendance.
The bidders name, bid prices, bid modifications or withdrawals,
discounts and presence or absence of the requisite bid security shall be
announced during the opening of the bids. The minutes of the bid
opening documenting the above must be prepared. No bid shall be
rejected at bid opening, except for late bids, which shall be returned to
the bidder.
Bids and modifications that are not opened and read out at the bid
opening shall not be considered further for evaluation, irrespective of
circumstances. Withdrawn bids will be returned to the bidder unopened.
Evaluation of Bids
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
29.
30.
31.
32.
33.
34.
47
Procurement, Contract Management and Capacity Building Project
Shopping
48
Procurement, Contract Management and Capacity Building Project
Shopping
International
National
- Appropriate
- Written Quotations
- International shopping
- National shopping
49
Procurement, Contract Management and Capacity Building Project
IMPORTANT NOTE
Please Consult the Legal Documents for Thresholds Fixed For Shopping
50
Procurement, Contract Management and Capacity Building Project
Reference Material
(Shopping)
51
Procurement, Contract Management and Capacity Building Project
General
1.
B.
Setting Thresholds
52
Procurement, Contract Management and Capacity Building Project
3.
Firms to be Invited
5.
The borrower exercises due diligence to satisfy itself that the firms
invited to quote are reputable, well established, and are suppliers of
the goods or services being purchased as part of their normal
business. In case the borrower receives unsolicited quotations, these
may be accepted after carrying out a similar due diligence
exercise
to
verify the nature and reputation of the firms.
53
Procurement, Contract Management and Capacity Building Project
F.
Form of Requests
6.
Submission of Quotations
8.
I.
Comparison of Quotations
9.
Quotations are compared after adding to the quoted price for
goods,
the estimated cost of inland transportation and insurance, if
any, to the final
54
Record of Award
10.
The client documents the award decision and its rationale and
keeps it
for review and audit by the Bank, as needed. The record contains also the list of
firms invited and the list and value of the
quotations
received
and
documents clearly that the award is based
on sound economic criteria.
K.
Currency of Payment
11.
L.
12.
55
Procurement, Contract Management and Capacity Building Project
Direct Purchase
Includes:
Standardization
Proprietary items
Rationale:
56
Procurement, Contract Management and Capacity Building Project
Part III
Hiring of Consultants
(Firms & Individual)
57
Procurement, Contract Management and Capacity Building Project
Part III
Hiring of Consultants
1. Methods used for selection of consultants (firms and individuals)
a) QCBS
i.
ii.
iii.
iv.
v.
vi.
vii.
viii.
b)
c)
d)
e)
f)
g)
Cost Estimates/TORs
Advertising for EOI
Short List preparation
Short List of consultants
Request for proposals (RFP)
QBCBS RFP
Receipt of proposals
Evaluation criteria
58
Procurement, Contract Management and Capacity Building Project
QCBS
SBCQ
QBS
FIXED BUDGET
LEAST COST
SINGLE SOURCE
OTHERS
MAJOR STEPS
Preparation of TORs
Expression of Interest
Pre-proposal conference
Award of contract
59
Procurement, Contract Management and Capacity Building Project
60
Procurement, Contract Management and Capacity Building Project
QCBS STEPS
61
Procurement, Contract Management and Capacity Building Project
TERMS OF REFERENCE
62
Procurement, Contract Management and Capacity Building Project
COST ESTIMATES
LOCAL CURRENCY
Staff Cost
Living Expenses
Education Costs
Travel
Office Costs
Other Reimbursables
Price Escalation/Contingencies
COST ESTIMATES
FOREIGN CURRENCY
Staff Cost
International Travel
Education Costs
Travel
Office Costs
Other Reimbursable/ Misc.
Price Escalation/Contingencies
Contact embassies
Request DACON lists
SOURCES
Purchasers knowledge
Advertisement
Expressions of Interest
Associations
DACON
Banks Role
COMPOSITION:
64
Procurement, Contract Management and Capacity Building Project
QCBS-RFP
RECEIPT OF PROPOSALS
EVALUATION CRITERIA
Education
Annual turnover
EVALUATION CRITERIA
Basic Breakdown (EACH MARKED 0 100)
FIRMS EXPERIENCE
(Was considered in shortlist)
5-10
METHODOLOGY
(Depends on complexity)
20-50
30-60
TRANSFER OF KNOWLEDGE
0-10
PARTICIPATION BY NATIONALS
0-10
100
EVALUATION CRITERIA
-
TRANSFER OF KNOWLEDGE
Based upon specific measures of compliance, not generalities.
PARTICIPATION OF NATIONALS
Refers to nationals in the team; a foreign firm could score higher
than a local team.
Innovation
Level of detail
Understanding of assignment
30
30
40
100
66
Procurement, Contract Management and Capacity Building Project
General Education
Length of experience
Positions held
Time with the firm
Experience in Developing
Countries
5
5
10
10
10
Specific Education
Specific Training
Experiences in specific field
10
10
20
10
10
100
67
Procurement, Contract Management and Capacity Building Project
68
Procurement, Contract Management and Capacity Building Project
HIRING OF CONSULTANTS
The acquisition of consulting services is based on project requirements supported by the
administrative action and availability of funds for the implementation.
69
Procurement, Contract Management and Capacity Building Project
10 - 15 Points
25 - 35 Points
40 - 50 Points
10 - 30 Points
(In certain cases where work involved is of routine nature cost can be given up to
50 points.)
In case of Foreign Firms, the following may also be added to the criteria:
70
Procurement, Contract Management and Capacity Building Project
2.
Budget
A realistic budget, keeping in view the proposed activity, estimated time for
selection process, available funds and inflation prevailing in the country, shall be
prepared.
There are two main categories of the cost: "Fixed costs" like salaries, fee and
overhead; and "Reimbursable costs". Further break up of these categories is as
below.
Fixed costs:
Reimbursable Costs:
3.
Mobilization
Travel and transport
Per diem
Office including equipment/supplies
Communications
Reproduction, copying and printing charges
Contingencies
Advertising
Expression of interest /prequalification notice should be invited through wide
publicity.
A notice (expression of interest or prequalification notice) to invite qualified
firms in the required fields shall be advertised , in two major English and two
Urdu national Newspapers published from all major cities of the country. The
firms will be allowed generally 45 days or at least 30 days to submit their
qualification data/information after the publication of the Notice in the news
papers. Whenever the services of Foreign firms are required, an advertisement in
international magazine /newspaper/UN Business Development, in addition to
local national newspapers, shall also be placed.
The advertisement for expression of interest/prequalification shall contain the
following information:
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
m)
In some cases where time is short the pre-qualification notice in the news papers
may contain all the above information briefly as against preparing a separate prequalification questionnaire along with submission date/time, address etc..
4.
5.
Invitation Of Proposals
Once the list of short listed firms/consultants is approved, an invitation will be
issued to the "short listed" firms to submit their proposals.
Depending upon the complexity of the assignment reasonable time shall be given
/ allowed to firms to submit their proposals. As a general rule a period of 30- 45
days shall be allowed between obtaining the RFP and submission of proposals.
72
For large and complex contracts the time shall be 60 to 90 days, especially when
foreign firms are also expected to participate.
During the period between issuance of the RFP and 7 days before the receipt of
proposals, firms may ask for any clarification in writing and Client shall provide
these clarifications in writing and copy these to all firms who had obtained RFP.
The proposals once submitted and after the due date/time, firms will not be
allowed to make any changes. If both proposal i.e. Technical as well as Financial
are requested at the same time these shall be in separate sealed covers.
If short listing/prequalification method is not adopted:
Keeping in view the specific requirements of the project, the Client may invite
proposals from the open market. The pre-qualified firms may also participate in
the competition.
6.
Transmittal letter / Letter of Invitation shall list the documents included in the
RFP.
73
Procurement, Contract Management and Capacity Building Project
7.
8.
Information To Consultants/Firms
This section of the RFP shall include all necessary information which will help
the prospective offerors in preparing a responsive proposal/offer and shall bring
maximum transparency to the selection process by providing information on the
evaluation criteria and factors and their respective weights and the minimum
score to qualify for the job. This will include: a)
f)
g)
h)
i)
j)
k)
In case of foreign firms the currency in which the costs of services shall
be given/indicated in the proposal and compared and (in case of contract
awarded the payment mode should also be indicated).
An alert notice that the firm or its affiliates shall be disqualified from
providing services under the project if such activities constitute a conflict
of interest with the services provided under the present assignment. For
example if a contract for design and supervision of certain project is
likely to be awarded to a certain firm it should be mentioned in the RFP
that this firm would not be eligible to bid on construction contract.
Format of Technical and Financial proposal
An undertaking to maintain, without changes, the proposed key staff
members and hold rates and the total proposed cost during the validity
period of the proposal.
The expected time frame for entire process and date on which successful
consultant/firm shall be expected to start work.
A statement on Tax liabilities of the firm and its proposed staff members
for the assignment.
In case of expatriate firm/consultants it should also include:
m)
n)
o)
p)
q)
r)
s)
9.
Format of Contract
For the information and guidance of the consultants/firms, a format of the
proposed contract shall be included in the RFP. The proposed contract must
cover at a minimum the following aspects.a)
Introductory clause/description of the parties
b)
Definitions
c)
Services to be performed including:(i)
Description of the Project/Scope of Work/terms of reference
(ii) Key Personnel/details of personnel to be provided and
75
d)
c)
f)
g)
h)
i)
j)
h)
k)
1)
m)
n)
0)
p)
q)
r)
s)
t)
u)
v)
w)
x)
y)
z)
10.
11.
c)
d)
e)
12.
Keeping the proposals under safe custody at the end of the day (usually TEC is
given a separate room where they evaluate the proposals and at the end of the
day hand over the proposals to the chair-person who keeps them under lock and
key).
Evaluation of Proposals
For the evaluation of proposals one of following two methods may he used. The
method to be used shall be determined in the very beginning and RFP shall
indicate which method is to be used for selection.
a)
b)
Evaluation Of Quality
Each technical proposal shall be evaluated on the basis of its
responsiveness to the SOW/TOR. If a proposal does not get a
minimum score mentioned in the RFP it would be rejected at this
stage. A detailed evaluation report describing the relative
strengths and weaknesses of each proposal shall be prepared by
the TEC. All records relating to the evaluation like individual
score sheets, rough notes etc. shall be retained upto the
completion of the assignment. The entire process of technical
evaluation shall be kept confidential.
The committee after completing the evaluation of all technical
proposals shall prepare a selection memorandum which shall
state the:
evaluation criteria;
77
ii)
Evaluation of Cost
As soon as the technical evaluation is completed, the firms
which are qualified shall be informed and notified the date and
time for opening of their financial proposals. The financial
proposals shall be opened publicly in the presence of
representatives of the firms who may choose to attend. The
technical score obtained and proposed cost of each firm with its
name will be announced. The minutes of such public opening
shall also be prepared and retained in the files.
The financial proposals then shall be checked for arithmetical
errors if any and corrected. To compare the proposals at equal
footing in case of foreign firms, costs proposed by all firms will
be converted into one currency.
The technically qualified proposal with the lowest cost shall get
full financial score indicated/given in the RFP and other
proposals shall be given financial score that are inversely
proportional to their cost.
(iii)
b)
14.
15.
79
Procurement, Contract Management and Capacity Building Project
80
Procurement, Contract Management and Capacity Building Project
81
Procurement, Contract Management and Capacity Building Project
82
Procurement, Contract Management and Capacity Building Project
83
Procurement, Contract Management and Capacity Building Project
84
Procurement, Contract Management and Capacity Building Project
Routine Assignments
Contract amounts not large
Threshold for quality
Selection of firm with lowest cost above threshold
85
Procurement, Contract Management and Capacity Building Project
SELECTION ON CONSULTANTS
QUALIFICATIONS
86
Procurement, Contract Management and Capacity Building Project
87
Procurement, Contract Management and Capacity Building Project
SELECTION OF PARTICULAR
TYPES OF CONSULTANTS
88
Procurement, Contract Management and Capacity Building Project
UN agencies
o Neutralize privileges
o Single Source threshold
NGOs
o No preference
Banks
o QCBS
o Retainer and success fee
o Higher weight for cost
Auditors
o QCBS (40-50%)
89
Procurement, Contract Management and Capacity Building Project
CONTRACTS
PROBLEM AREAS
90
Procurement, Contract Management and Capacity Building Project
PROBLEM AREAS
Omissions
Additional services
Staff substitution
Liability/Insurance
Taxation
Conflict of interest
Output/Input definition
Payment terms
Skills transfer
Disputes
Termination
91
Procurement, Contract Management and Capacity Building Project
Part IV
General
92
Procurement, Contract Management and Capacity Building Project
Table of contents
1. Incoterms
2. Fraud & Corruption
3. Review by IBRD/IDA (Donor)
4. Mis-Procurement
5. Conflict of Interest
6. Guarantees
7. Record Keeping
8. Contract Administration
9. Contract Close out
10. Test
93
Procurement, Contract Management and Capacity Building Project
INCOTERMS
94
Procurement, Contract Management and Capacity Building Project
EXW
FCA
FAS
FOB
C&F
CIF
CPT
CIP
DAF
DES
DEQ
DDU
DDP
95
Procurement, Contract Management and Capacity Building Project
96
Procurement, Contract Management and Capacity Building Project
97
Procurement, Contract Management and Capacity Building Project
REVIEW BY BANK
98
Procurement, Contract Management and Capacity Building Project
1)
2)
99
Procurement, Contract Management and Capacity Building Project
POST REVIEWS
100
Procurement, Contract Management and Capacity Building Project
SCOPE OF REVIEW
After the awarding of contracts, review of procurement actions is carried out on
sample basis
OR
PROCEDURE
If the review is carried out on documents sent to the Bank:
1)
2)
Bank Requirements
1)
2)
3)
4)
5)
101
Procurement, Contract Management and Capacity Building Project
FINDINGS
If the Bank determines that the award of the contract(s) or contract itself is not
consistent with the Loan Agreement, the Purchaser is informed accordingly.
In case of major deviations, the Bank may take one or more of the following actions:
1.
2.
3.
102
Procurement, Contract Management and Capacity Building Project
Post Review
Carried out on contracts not subject to prior review after action has been
taken by the Purchaser
103
Procurement, Contract Management and Capacity Building Project
Bank review ensures that procurement documentation and actions are according
to Agreement.
Bank reviews, procurement plans, and documentation prior to and after awards
Requirements for mandatory reviews are specified in LA.
For prior review requirements, no objection must be obtained at each stage of the
procurement process.
For contracts below the prior review threshold, review is carried out on a sample
basis after the award of contracts
For reviews in the field, Purchaser must maintain all documents in order.
Bank will take action against major deviations observed in post review.
Post Review procedure requires evaluation report and copies of contract
104
Procurement, Contract Management and Capacity Building Project
Mis-Procurement
105
Procurement, Contract Management and Capacity Building Project
Mis-procurement
The Bank does not finance expenditures for goods which have not been procured
in accordance with the agreed procedures in the Loan Agreement, and it is the
policy of the Bank to cancel that portion of the loan allocated to the goods that
have been mis-procured. The bank may in addition exercise other remedies under
the Loan Agreement.
106
Procurement, Contract Management and Capacity Building Project
Conflict of Interest
107
Procurement, Contract Management and Capacity Building Project
Conflict of Interest
Bank policy requires that Consultants provide professional, objective, and impartial advice and at
all times hold the Clients interests paramount, strictly avoid conflicts with other assignments or
their own corporate interests and act without any consideration for future work.
Without limitation on the generality of the foregoing, Consultants, and any of their affiliates, shall
be considered to have a conflict of interest and shall not be recruited, under any of the
circumstances set forth below:
Conflicting activities
A firm that has been engaged by the Client to provide goods, works or services other than
consulting services for a project, and any of its affiliates, shall be disqualified from providing
consulting services related to those goods, works or services. Conversely, a firm hired to provide
consulting services for the preparation or implementation of a project, and any of its affiliates,
shall be disqualified from subsequently providing goods or works or services other than
consulting services resulting from or directly related to the firms consulting services for such
preparation or implementation. For the purpose of this paragraph, services other than consulting
services are defined as those leading to a measurable physical output, for example surveys,
exploratory drilling, aerial photography, and satellite imagery.
Conflicting assignments
A Consultant (including its Personnel and Sub-Consultants) or any of its affiliates shall not be
hired for any assignment that, by its nature, may be in conflict with another assignment of the
Consultant to be executed for the same or for another Client. For example, a Consultant hired to
prepare engineering design for an infrastructure project shall not be engaged to prepare an
independent environmental assessment for the same project, and a Consultant assisting a Client in
the privatization of public assets shall not purchase, nor advise purchasers of, such assets.
Similarly, a Consultant hired to prepare Terms of Reference for an assignment should not be hired
for the assignment in question.
Conflicting relationships
A Consultant (including its Personnel and Sub-Consultants) that has a business or family
relationship with a member of the Clients staff who is directly or indirectly involved in any part
of (i) the preparation of the Terms of Reference of the assignment, (ii) the selection process for
such assignment, or (iii) supervision of the Contract, may not be awarded a Contract, unless the
conflict stemming from this relationship has been resolved in a manner acceptable to the Bank
throughout the selection process and the execution of the Contract.
Consultants have an obligation to disclose any situation of actual or potential conflict that impacts
their capacity to serve the best interest of their Client, or that may reasonably be perceived as
having this effect. Failure to disclose said situations may lead to the disqualification of the
Consultant or the termination of its Contract.
No agency or current employees of the Client shall work as Consultants under their own
ministries, departments or agencies. Recruiting former government employees of the Client to
108
Procurement, Contract Management and Capacity Building Project
work for their former ministries, departments or agencies is acceptable provided no conflict of
interest exists. When the Consultant nominates any government employee as Personnel in their
technical proposal, such Personnel must have written certification from their government or
employer confirming that they are on leave without pay from their official position and allowed
to work full-time outside of their previous official position. Such certification shall be provided to
the Client by the Consultant as part of his technical proposal.
Unfair Advantage
If a shortlisted Consultant could derive a competitive advantage from having provided consulting
services related to the assignment in question, the Client shall make available to all shortlisted
Consultants together with this RFP all information that would in that respect give such Consultant
any competitive advantage over competing Consultants.
109
Procurement, Contract Management and Capacity Building Project
Record Keeping
110
Procurement, Contract Management and Capacity Building Project
RECORD KEEPING
CONTRACT ROSTER
CONTRACT/ PROCUREMENT FILE
CONTRACT REGISTER
FORMAT OF REPORTING OF CONTRACTS
111
Procurement, Contract Management and Capacity Building Project
IFB
Ref
No.
Mode of
Procurement
Type of
Bank
Review
Credit No.
Works/Goods
Description
Estimated
costs
Complete
d
(Date)
Sent
to
Bank
(Date)
Bank
Clarification
(if any)
(Date)
Banks
No
Objection
Tender
Notice
Advertised
On
(Date)
(Date)
112
Procurement, Contract Management and Capacity Building Project
Bid
Docs.
Made
available
On
(Date)
Sent to
Bank
On
Sent to
Bidders
on
Original
(Date)
(Date)
(Date)
(Date)
No. of
Bids
Received
(Date)
Minutes of
bid opening
send to
bank on
(Date)
Original
Extended
(list all
extension
s
if any)
(Date)
Ext. Request
Sent for
Banks prior
Concurrence
(Date)
Banks
Clarificatio
ns
(if any)
Banks
NoObjection
(Date)
(Date)
(Date)
113
Procurement, Contract Management and Capacity Building Project
Sent to
Bank
on
Bank
Clarifi
cation
(if any)
Banks
NoObjection
No.
Signed
on
Send
to
Bank
on
Stipulated
Actual
Contract
or/
Supplier
Name &
Country
Contract
Value
114
Procurement, Contract Management and Capacity Building Project
Final
paymen
t To
Contrac
tor/
supplier
Delay
in
Payme
nts
(if any)
115
Procurement, Contract Management and Capacity Building Project
Description
of services
Estimated
Cost
Credit No.
Type of
Bank
Review
Methods of
Selection
TOR Prepared
(Date)
Expreission of Interest
Advertised
(Date)
Closing
Date
(Date)
No. of
Responses
116
Procurement, Contract Management and Capacity Building Project
No. of Firms
Short listed
RFPshrt-list
sent to
bank
RFP Issued
to Firms
Proposal
Submitted/
Closing
(Date)
Evaluation
Completed
Sent to
Bank
Financial Proposal
Banks No
Object
Opened Publicity
Evaluation
Completed
Final (Combined
Cost & Quality
Evaluation
Completed
117
Procurement, Contract Management and Capacity Building Project
Sent to
Bank on
Banks No Object
Negotiations
Negotiatio
ns
Complete
Draft
contract sent
to Bank
Banks NOC
Award
Contract
Awarded
(Date)
Contract No.
Contract
Signed on
(Date)
118
Procurement, Contract Management and Capacity Building Project
Sent to
Bank
Contract Completion
Stipulated
Actual
Information
Name of
Consultant
Contract
Value
119
Procurement, Contract Management and Capacity Building Project
Vol. II
Approved Specifications/SOW/TORs with Procurement Method and Evaluation Criteria
EOI/Advertisement
Clipping (Copy of the advertisement) from at least one Newspaper with Date
List of approved/short listed Firms along with approval letter from the approving
authority/donor
121
Procurement, Contract Management and Capacity Building Project
CONTRACT REGISTER
ESSENTIAL ENTRIES OF CONTRACT REGISTER
(When any contract is executed both parties should also sign this register)
S.N.
Contract
Number
Description of
Services/Supplies
Amount
Effective
Date
Completion Date
Date of Signing
Signature
Received by &
Signature
122
Procurement, Contract Management and Capacity Building Project
Description of
Services/Supplies
Est.Cost
USD
Proc.Method
ICB,NCB,
Shopping/Small
Pur.,QCBS,
QBS
Banks Review
required (Prior or
Ex-Post)
Name of
Contractor/
Consultant
Value of Contract
PKR
123
Procurement, Contract Management and Capacity Building Project
Remarks
GUARANTEES
124
Procurement, Contract Management and Capacity Building Project
125
Procurement, Contract Management and Capacity Building Project
Contract Administration
126
Procurement, Contract Management and Capacity Building Project
Contract Administration
After the signing of the contract, day to day its, administration is also part of procurement
responsibilities procurement office must oversee and, actions other than technical issues.
Any action increasing/decreasing total contract amount, level of effort, contract period
must be addressed in accordance with the contract clauses and with the mutual agreement
of both parties except if contract is being terminated for default.
127
Procurement, Contract Management and Capacity Building Project
128
Procurement, Contract Management and Capacity Building Project
129
Procurement, Contract Management and Capacity Building Project