After fire detection system was in fault, the ship did not notify administration or recognized
organization.
Safety Equipment Certificate Form E section 2 items 5.1.2.3 and 5.2.2 are not properly filled.
17
SAFEQ certificate not properly filled.(FORE E 2.5.2.1 and 2.5.2.2 liferaft number and capacity wrong.
16
17
17
17
Vessel M/E failed twice (8th & 9th Nov), Vsl made cold move to re-berth, however no entry made in
engine log book, deck log book, official log book, bell book etc, safety management required entry to
be made.
17
17
30
ISMC expired.
30
01101
01101
01101
01101
01106
01106
01107
01107
01107
01107
01107
01107
01108
01108
011124
99
17
Page 1
17
30
17
01113
01114
01117
01117
01119
01119
01122
01122
01122
01122
01122
01123
01123
01123
01123
01123
01123
01123
01123
01123
01124
01124
01124
Minimum safe manning document must be re-issued because the vessel is not UMS according to the
class certificate.
18
Found certificate of fitness on board stating ship type 1,2 and 3. Ships type unclear.
17
Certificate does not indicate whether last survey was Annual or Intermediate.
17
New 15 PPM oil content meter installed onboard(Deckma Hamburg OMD-2005, Type approval cert.
No CBA 016). However the same not amended in the IOPP Certificate.
Interim international sewage pollution prevention certificate - not marked correctly.(port of registry
not changed)
Sewage holding tank (Fr.No.4 - 9, Cap. 84.6 m3) used onboard is not included in ISPP certificate.
(ISM)
Wrong informed ISSC. (Call sign in ship security certificate to be correct.).
15
17
30
ISPSC expired.
30
16
16
10
17
17
17
30
10
17
M/E filtering Marpol Annex VI R 13 requirement not recorded into supplement to IAPP cert.
47
Expired
30
Page 2
17
17
17
01124
18
Document of Compliance
Dangerous Goods
Special Purpose Ship Safety
INF Certificate of Fitness
Document of Compliance for the carriage of dangerous goods not available - loading UN3077, class 9
in bulk. (ISM)
Passage plan not updated to reflect actual passage of vessel.
The seafarer employment agreements for ship's 3rd Officer and 4th Engineer under the company were
not in accordance with relevant requirements by MLC 2006 A2.1 as stipulated in DMLC Part II.
17
18
01134
Other (certificates)
Ship was not possessing any valid document and /or certification to approve had compliance to the
provisions of AFS convention.
STCW book expired.
Class certificate copy only found onboard.
17
01134
International Anti-fouling-System
Certificate
International Anti-fouling-System
Certificate
Other (certificates)
01134
Other (certificates)
15
01134
Other (certificates)
01134
01134
01134
01134
01134
01134
01134
Other (certificates)
Other (certificates)
Other (certificates)
Other (certificates)
Other (certificates)
Other (certificates)
Other (certificates)
01134
01134
Other (certificates)
Other (certificates)
01134
Other (certificates)
99
01134
Other (certificates)
Last PSC carried out on 20 Oct., 2013 at BIK, Iran with six deficiency under code 15 & 17. All
deficiencies found still open.
Ship's certificates: Load lines, Construction, Equipment, Radio, Oil pollution prevention and
Classification-annual surveys range is expiring on the 04th of January 2014.No recognized
organization surveyor is nominated and expected on board during ship's stay at this port.
01137
30
01125
01126
01127
01130
01131
01131
Page 3
17
17
17
10
17
17
17
17
99
15
30
16
30
30
01137
01139
01139
01139
01139
01139
01139
01139
01140
01140
01140
01140
01140
01199
01199
01201
01201
01201
01201
01201
01201
01201
30
17
16
15
17
17
99
10
17
17
17
17
COC issued by Turkey expired 19-11-13.Panama endorsement dated 18-11-13 Flag state to be
advised / informed.
30
Page 4
17
17
30
16
17
17
16
16
01201
01201
01201
01201
01209
01209
01209
01209
01213
01214
01214
01214
01214
01214
01214
01214
01214
01214
01214
01214
01214
01214
01214
01214
01214
01214
01214
01214
01214
16
30
17
C/E and 2/E STCW in qualification /3 did not suffice the ship's minimum safe manning document
requirement (/2).
Undermanned by one AB and two OS against minimum safe manning doc. (ISM)
30
No person with contract for deck rating on board, as required by Minimum Safety Manning Certificate.
(ISM)
Chef engineer refused to continue working due non payment of wages for three months. Flag state to
be informed.
One No Saloon rating is not on board as per Safe Manning Documents.
30
17
30
15
30
30
30
30
30
17
30
30
10
17
17
30
30
30
17
Ship's flag state endorsements for ship's officers and engineers COC and /or GOC were not sighted on
board.
30
Page 5
30
30
30
17
30
01215
17
30
Application certificate if endorsement by flag for 3rd engineer not available on board.
17
C/E, 2/E, 3/E and other fourteen crews member have no seafarers with designed security duties
certificate or security awareness training certificate.
Certificate of receipt of application according STCW I/10 Paragraph 5 for SECOND OFFICER (officer
in charge of navigation watch) missing.
30
01216
Other (STCW)
Engineering watch keeping engineer is not the in charge of the Engine room watch keeping at port.
17
01216
Other (STCW)
The vessel could not provide evidence of security related familiarization training for crew personnel.
16
01216
Other (STCW)
Third Officer did not have security awareness endorsements required by STCW VI/6.
01217
99
01217
Evidence showing designed security officer comply with STCW/CVI/6 not be provided.
99
01218
01218
01218
01220
16
17
16
17
C/Officer does not have current seafarer employment agreement. O/S has contract extension to
more than 12 months.
Seafarer employment agreement with ITF collective agreement expired since 20 August 2014.
17
17
01223
Medical certificate
Medical certificate
Medical certificate
Seafarer' employment agreement
SEA
Seafarer' employment agreement
SEA
Seafarer' employment agreement
SEA
Seafarer' employment agreement
SEA
Security awareness training
17
01223
01299
Other (STCW)
01300
01301
01301
Certificate of proficiency for security as per STCW A/ VI/6 missing for 3/E, 4/E, electrician and
steward. (ISM)
Several crew members found without the required security awareness certificate, master instructed to
rectify the deficiency in 3 months (ISM).
Third officer does not hold ECDIS training (general familiarization) endorsement. ECDIS is sole means
of navigation.
Oilers keeping independent watch in E/R as per scheduled work hours in part.
Maintenance of cargo gear missing. (ISM)
Maintenance record of cargo securing devices was not correctly recorded.
01215
01215
01215
01215
01220
01220
01220
Page 6
10
30
99
17
17
47
99
01305
01305
17
17
01305
17
16
01305
16
01305
17
01305
Oil sludge retention was not regularly recorded into Oil Record Book on weekly basis as per
instruction Part- C.11.
There was no entry sighted in the ship`s garbage record book.
01305
Incineration of garbage onboard was recorded into oil record book under Part- C-2.3 instead of Part
- 0.7.8.9.
99
01305
Log-book / compulsory entries the weekly & monthly inspection of LSA not recorded in the navigation
log book.
17
01305
17
01305
01306
The weekly retention of oil sludge onboard was not recorded into O.R.B. consistory on weekly basis as
per book requirement.
The tanks being used for oil sludge retention onboard recorded into O.R.B. were not consistent with
the tank stated in IOPP from A.
Numerous instances (more than 20 over every month in last 3 months) of rest hours of several crew
members from deck, engine and catering department not in compliance with STCW requirements.
(ISM)
01306
17
17
17
17
17
Shipboard working arrangement table not in compliance with MLC Reg 2.3.
Watch-keepers hours of work and rest not in accordance STCW. (ISM)
Hours of rest records(October C/O 2/E) - not in compliance with STCW.
Three examples of officers not receiving minimum rest periods during September.
Records related to hours of rest not completed correctly (on call engineers).
17
17
17
17
17
01305
01306
01306
01306
01306
01307
01307
01307
01307
01307
Page 7
99
17
17
01307
17
01307
17
01307
Master unable to provide evidence how the first and subsequent watch keeper shall be sufficiently
rested after sailing from this port or has rested at sailing from previous ports.
Hours of rest for C/O and 1/E in Aug. 2-14 not in line with STCW requirements(10 hours not given).
01307
01307
17
17
01308
Records of rest
01308
01308
Records of rest
Records of rest
17
17
01308
01308
Records of rest
Records of rest
01308
01308
Records of rest
Records of rest
Record of rest hours for Master - Not recorded for Oct. and Nov. 2014.
Seafarer's record of work and rest do not reflect actual hours of work and rest. Emergency drills,
engine room rounds not recorded as working hour.
Hour of rest for Oct 2014 for C/E and 3/E not complying with STCW requirements.
Records of rest and work not reflect actual hours of rest and work, drill and bunking operation not
recorded as working hours.
Records incomplete.
Key crew members can't showed records of daily hours from October and November.
01308
Records of rest
17
01308
Records of rest
01308
01308
Records of rest
Records of rest
01308
Records of rest
01308
Records of rest
01308
01308
01308
01308
01308
01308
01308
01308
Records of rest
Records of rest
Records of rest
Records of rest
Records of rest
Records of rest
Records of rest
Records of rest
Hours of work and rest records do not accurately reflect time spent on berthing operations and
emergency drills. (ISM)
Records of daily hours of rest - not reflected actual rest hours, as evidenced by so many officers and
crew recorded rest during vessel monthly drill in nearly five months. (ISM)
Records of rest - Arrival Mobile 08/09/14 incorrect. (ISM)
Records of seafarers' daily hours of work or rest do not reflect actual hours of work or rest on
numerous occasions since June 2014.
Recorded hours of rest do not reflect actual hours worked by all navigation officers during month of
August.
Hours of rest recorded for engineers and able seamen not corresponding to real hours of work
(pilotage area and deck work).
Hours of rest not recorded completely on July 2014.
The records related to hours of rest not included Drill & Training time.
The rest hours record can not show rest hours per 7 days.
Hours of rest record in Aug 2014 for 3/O, Deck Cadet and Captain wrong. (ISM)
Record of rest hours doesn't correspond to ships log books.(ISM)
Rest/working hour records for Master not available.
Some short break for 2/E was calculated as rest hours.
Hours of rest records for all crews was not given a copy.
Page 8
99
99
99
17
17
30
30
17
17
17
17
99
99
99
17
30
30
17
17
01308
Records of rest
6) Daily hours of rest for each crews not recorded by themselves - Recorded by C/O & 1/E.
17
01308
01308
01308
Records of rest
Records of rest
Records of rest
7) Rest hour record not endorsed by appropriate person & sea farers for August.
8) Rest hour record on August made with false entry.
Hours of rest for watchkeepers - not recorded correctly on 13-09-2014.(two people 2/O, AB)
17
17
17
01308
Records of rest
17
01308
Records of rest
Work and rest hours recorded not according to actual condition due to drill time recorded as rest
time.
Record of hours of work/rest of key watch personnel not being maintained for 21 days. (ISM)
01308
Records of rest
Recorded work hours for master do not reflect actual hours worked on 4 occasions in June.
17
01308
01308
Records of rest
Records of rest
99
17
01308
Records of rest
Record of rest & work hours in 2014 not comply with the requirement of STCW.
Records not available before 23/06/14 and records for engineers on 10/06/14 not accurate when
compared with log book. (ISM)
Working hour records not verified by each crew member.
01308
Records of rest
The work and rest hours records for 3/O on 3 June 2014 not according to actual condition.
17
01308
01308
Records of rest
Records of rest
17
17
01308
Records of rest
30
01308
Records of rest
Nearly all records of master and crew are false for February & March 2014, records for four crew are
missing for March. (ISM)
Record of daily hours of rest for watchkeeping personnel.
-Not reflected actual hours worked/rested(evidenced by no record of engineers working during
bunkering).
01308
Records of rest
Records of rest for all deck and engineer officers do not reflect actual hours worked. (ISM)
17
01308
Records of rest
Records of rest hours for watchkeeping personnel do not reflect actual hours of rest.
17
01308
01308
01308
Records of rest
Records of rest
Records of rest
10
17
16
01309
16
01309
01309
Different type of fire extinguisher found to be posted at ship's official and approved fire plan for the
space of paint store forward.(ISM)
Fire main isolating valve missing.
Several stowage positions of safety equipment are not in compliance with the fire and safety plan.
Page 9
17
99
17
17
17
01310
01310
01311
01311
01311
01311
01313
01313
01313
01314
01314
01314
01314
01314
01314
01314
01314
01314
01314
01314
01314
01314
Ventilators, vent flaps, fire dampers and their actuators on ship's weather deck were not
conspicuously indicated with their location's identities.
SAE `equipment` to be indicated according to IMO regulation.
9. An up-to-date survey report file could not be presented on board.
The original 5-yearly survey report file for L/B - Unable to provided.
Necessary documents for E.S.P. Bulk Carrier was not provided to the vessel.
Latest class survey status not available onboard. Available Survey status reflects many pending items
as on date.
Some ship's plan such as SOPEP and Stability booklet are not approved by administration.
15
16
17
5. SOPEP Appendix II (List of port contacts) no entries made for last several ports.
16
15
Local contact numbers missing from the SOPEP as per section 2.4 of the plan.
10
17
15
17
17
10
SOPEP to be updated with relevant contact details for company approval page is unclear with
numerous changes to ships name, company, operator, etc.
Oil Spill Kit to be renewed according to SOPEP.
99
17
15
99
17
17
17
17
Page 10
17
01314
01315
01315
01315
01315
01315
01315
01315
01315
01315
01315
01315
01315
01315
01315
01315
01315
01315
01315
01315
01315
01315
01316
01314
01314
01314
01314
17
-
17
17
SOPEP did not contain List of Local Port Contacts as per Section 2.3.2 Appendix III. In addition,
SOPEP was missing Appendices and Appendices were not in consecutive order as per Table of
contents.
40
17
17
17
16
17
Page 11
17
17
17
15
99
17
17
17
30
17
17
17
17
17
30
15
01317
01320
01320
16
17
99
01320
01320
01320
01320
01320
01320
Garbage record book not properly completed (operation under Code E).
Use correction fluid for G.O.B.
Disposal of cooking oil recorded in oil record book. (ISM)
GRB not recorded properly on MAY 2014.
No category mentioned for incinerated garbage.
Garbage record book not correct (no code used and amounts landed are not recorded). (ISM)
16
17
17
17
99
17
01320
Long -term and short - term garbage storage station not identified in garbage management plan.
17
01320
01320
99
17
01320
01320
01320
01320
17
17
17
17
01320
01320
01320
01320
01322
01323
01323
01327
30
Above deficiencies are the objective evidence that Company SMS falls to satisfy ISMC/S7 element 7
of ISM code.
Various fire doors in accom gauged open with wooden wedges.
30
02101
02101
Closing devices/watertight doors Battening devices for the small hatch location on forecastle deck not as required.
17
02101
Closing devices/watertight doors Several watertight doors corroded with "knife blade edging".
17
01328
015106
Page 12
17
99
17
17
17
16
30
16
02101
Closing devices/watertight doors Bottom of door from steering gear room to main deck corroded.
16
02101
30
02101
Closing devices/watertight doors Several sounding pipes self closing device broken, incorrectly rigged. (ISM)
17
02101
Closing devices/watertight doors Self closing device of various sounding pipes found not working.
17
02102
02103
16
30
17
17
99
99
17
The stbd outside plating was damaged as follows due to collision - scratched and dented slightly.
(Fwd. side near FR No.92 and Aft side near FR No. 19-20)
Emergency Generator FO tank is leaking fuel from the lower valve canvas; ducting for supply air is
wasted and detached. (ISM)
Valves between Cargo Hold No.3 and 4 for heeling tank were rusted, stacked and not operable.
17
Manhole entrance No.1 port side TST found to be insulated with rope. Not appropriate gasket found.
(ISM)
Several D/B tanks self closing devices of sounding pipes - missing/not properly closing. (ISM)
30
02103
02105
02105
02105
02105
02105
02105
02105
02105
02105
02105
02105
02105
02106
02107
Steering gear
Steering gear
Steering gear
Steering gear
Steering gear
Steering gear
Steering gear
Steering gear
Steering gear
Hull damage impairing
seaworthiness
Hull damage impairing
seaworthiness
Hull damage impairing
seaworthiness
Ballast, fuel and other tanks
02107
02107
02107
02106
02106
Page 13
17
17
17
17
17
17
17
16
17
99
17
30
17
02107
02107
02108
02108
02108
02108
02108
02108
Several E/R double bottom tanks, means of self closing sounding caps with spring missing.
Sounding pipe of engine room void space seems not to be clear. To be investigated by RO.
7. ESB 100 V Earth meter defective.
Non-conducting mats under all high voltage electrical switchboards are not provided.
Some engine room lights cover is broken.
Emergency switchboard low insulation alarm activated. (ISM)
GMDSS batteries casing top cracked and electrode plates distorted.
UPP. deck junction box between No.3 & 4 C/H (P) has a crack at the base forward approximately
17inch. In length.
Some ceiling light in pain store and CO2 bottle room - Not worked.
Unable to supply electrical power to emergency switchboard from main switchboard (after E/G
automatic operation by crew).
220V feeder panel in emergency generator flat Ohmmeter disconnected and in alarm when
connected.
110V feeder panel in Engine Room indicating Low insulation.
Unbalance single phase insulation test of battery charger panel in elect. Room.
One phase grounding on battery charger panel in electric equipment room.
Continue monitoring of insulation test for 100V panel in electric equipment room out of order.
17
17
17
17
17
17
17
17
02108
02108
02108
02108
02108
02108
02108
02108
Ship`s boiler feed water pumps No.1 & No.2 starting buttons on control panel was not functioning
well.
Many unsafe situations due to open electrical boxes/ devices self made wire connections, broken
light, earth fault on switch board portable light etc. found also grinder in E/R workshop seized.
17
02108
02108
Many unsafe situation due to open electrical junction box, connection, devices, cable grans, self made
wire connection, broken lights, not properly tightened lamps, naked lights, search light, etc.
30
02108
02108
02108
02108
02108
02110
Insulation test equipment on No.1 & 2 DC 110v battery charger not working.
Indicating needle of megger on DC 110v battery charger panel out of order.
Protection cover of explosion proof light in paint store not fitted tightly.
Ventilation fan for Bosun store is in malfunction condition.
Vessel had exposed wires on a High Bilge Alarm.
Port side Frame 27-28 behind A/C in Engine Control Room is bent.
16
16
17
50
10
17
02111
Various stiffeners for bulwarks starboard aft, several for Lub oil vents wasted.
02112
02114
02117
Hull - corrosion
Bulkheads - corrosion
Decks - corrosion
17
17
99
Page 14
17
17
17
17
16
18
18
17
02117
Decks - corrosion
Outside decks are not maintained sufficiently, there is presence of corrosion and need general
maintenance. Master instructed to start and complete maintenance until 04/07/2014.
99
02117
02117
02119
Decks - corrosion
Decks - corrosion
Enhanced survey programme
(ESP)
Enhanced survey programme
(ESP)
Openings to cargo area, doors, . . .
Scuttles
16
99
17
No evidence of last annual inspection after 20.11.2012 of the ballast tanks, as required by condition
evaluation report. (ISM)
Engine room opening at B deck aft found not weather light.
17
02119
02122
02124
02128
02130
02131
02131
02132
02199
02199
02199
03101
03102
03102
03102
03102
Freeboard marks
03102
03102
Freeboard marks
Freeboard marks
02128
02128
02132
17
Marine chemist discovered a VOC concentration of 31.4PPM in the pump room. In addition, vessel
reported that their cargo pump room ventilation system failed on 19 June 2014.
30
17
17
Buzzer form water ingress alarm inhibited and the system inoperative.
30
17
17
17
FPT water ingress alarm indicating fault. (Alarm operational with tank empty)
Dewatering system of bosun store inoperational.
Air line between No.2 and No.3 Holds are leaking.
Stb'd side load line found completely submerged up to tropical fresh water mark.
Port freeboard marks incorrectly painted out.
Deck line of load line mark - Unpainted
Port load line not painted.
Load line mark
-Rusted.
Starboard mid-ships draft marks not painted.
Loadline marks on the hull fade out.
17
30
17
30
15
17
17
Page 15
17
17
17
17
16
03102
03103
03103
03103
03103
03103
03103
03103
03103
03103
03103
03103
03103
03103
03103
03104
03104
03104
03104
03104
03104
03104
03104
Freeboard marks
Railing, gangway, walkway and
means for safe passage
Railing, gangway, walkway and
means for safe passage
Railing, gangway, walkway and
means for safe passage
Railing, gangway, walkway and
means for safe passage
Railing, gangway, walkway and
means for safe passage
Railing, gangway, walkway and
means for safe passage
Railing, gangway, walkway and
means for safe passage
Railing, gangway, walkway and
means for safe passage
Railing, gangway, walkway and
means for safe passage
17
17
Deck stanchion sockets for erection of P & S lifelines in poor condition (distorted or heavily corroded).
17
17
17
17
Gangway holed.
16
External railing starboard side and portside and pilot gate cracked and corroded. (ISM)
30
17
Railing stanchion bracket sheared off starboard side next to hold three on lower deck.
Nearly all securing pins are missing at railing starboard main deck next to no. three hold, several
securing pins missing on port. (ISM)
17
10
17
99
17
17
17
17
Page 16
17
17
17
30
17
03105
11. Several crutches for quick acting cleats for various hatch cover defective or in poor condition.
Frames for rubber gasket channel for various hatch cover in poor or wasted condition. (ISM)
99
03105
15
Several crutches for quick acting cleats for securing cargo hold No 5,4, 2 and 1 defective or in poor
condition(Hold 5,4 and 2 more than 50%).
Hatch covers (especially No4,5,6) rubber gasket channels in deteriorating condition.
30
Coaming drains defective:2 on hold number 4 and 1 on hold number 3. (both port side)
17
99
19
10
Securing means for hatch covers (side and end cleats) defective (numerous places).
30
No.1 Cargo Hold forward access hatch cover found one securing device defective. (ISM)
17
30
03105
03105
03105
03105
03105
03105
03105
03105
03105
03105
03105
03105
03105
03105
03105
03105
03105
Cargo hold hatch cover - securing arrangement in door condition with an cleat tensioning
arrangement unfit for use.
Found tunnel hatch manhole forward against forecastle bulkhead, hatch holed. Class to investigate
and to report back to PSC Rotterdam before departure.
Two U brackets for quick acting cleats for No.2 Cargo Hold defective.
99
17
17
17
All hatch covers manual ventilation flaps 90% of the means securing closed are missing.
17
Nearly all compression rings on hatch cover securing cleats at hold two are heavily corroded/ wasted
and hold one starboard. (ISM)
Number 1 Port and Starboard hatch covers not sitting on hatch pads, No 4 Port has crack in way of
port vent.
Several covers of sounding pipes of ballast missing or seized open connection from deck to ballast
tanks found also several covers of drains (coaming) missing.
Several hatches not closing properly hinges seized, butterfly knots missing. e.g. (forecastle rope hatch,
store hatch aft deck).
17
Page 17
17
17
30
03105
17
17
17
03107
03107
03107
17
16
30
03107
Doors
One of emergency escape door located on engine control room floor not opening & closing properly.
17
03107
03107
03107
03107
Doors
Doors
Doors
Doors
17
17
30
17
03107
Doors
17
03107
03108
03108
03108
Doors
Ventilators, air pipes, casings
Ventilators, air pipes, casings
Ventilators, air pipes, casings
03108
03108
03108
03108
03108
03108
03108
03108
03108
03108
03108
Several doors leading from exterior to accommodation (Glass), do not appear to be watertight. Class
to be consulted.
Weather tight door in main deck (PS): Un tight
F.O. Sludge tank ventilator (P) mesh found damaged.
CO2 room BHDs found corroded.
Auto closing devices of air vent pipe heads for TST, DBT, WBT and FPT
-Above parts were not normal condition.
Ventilator closing device of No.1 Cargo hold in position 1 - Broken.
Air vent pipes (P&S) for aft peak tank corroded and broken (starboard side) in way of steering gear
compartment.
Numerous air pipes on main deck for ballast tank corroded seriously.
Ventilators in F`cle found with excessive corrosion, also No.1 WBT(S) air escape (ventilator) found
broken. (ISM)
Numerous air vent pipe floats on upper deck (e.g. ballast tank, F.O. db tank)
- Not working properly.
Starboard chain locker sounding pipe cap missing.
Boiler DO air pipe corroded. (ISM)
Closing arrangement of No.1 cargo hold vent at fore castle deck -Not secured weather tightness due
to heavy corrosion flap.
Vent pipe of oil TK net not properly fixed.
No.1 Engine room vent fire-net broken.
Some sounding pipes located in E/R lower floor for FO DBT and Ballast tank missing cap and spring of
self-closing devices.
03105
03106
Page 18
30
17
99
17
30
17
17
30
17
17
17
30
17
17
17
03108
Ballast tank air vent closing devices defective. (Numerous places including critical locations) (ISM-1)
30
03108
03108
03108
03108
03108
17
99
17
17
17
03108
03108
30
17
17
17
03108
03108
03108
03108
03108
03108
03108
03108
03108
03108
03108
03108
03108
03108
03108
03108
03108
03108
03108
03108
03108
03108
Page 19
17
16
17
17
17
17
17
17
17
30
17
17
30
17
17
17
17
10
17
17
03108
03108
03109
03109
03109
03110
03110
03112
03113
03115
03115
03115
03115
03115
03115
03115
03115
03115
03115
03199
03199
04101
04102
04102
04102
04102
One hole on E/R ceiling for the purpose of passing through the cables was not provided with proper
sealing arrangement.
Starboard engine room ventilators top shell plate was found holed.
Emergency generator room, steering gear flat rope store bulkhead penetrations not closed, dogs
missing. (ISM)
Found ER workshop hatch not closing properly. From inside light visible when closed. Cleats
bended/not fitting properly. Class to investigate and to report back to PSC Rotterdam before
departure.
Sounding pipes of E/R D.B tank self closing arrangement missing in E/R.
Manhole duct keel missing in E/R. (ISM)
Bolt-up opening on Eng. casing Bhd on E deck (s)side near bunker station
-not installed numerous bolts, secured up by 2 bolts only.
One underwater overboard discharge valve is leaking sea water.
17
30
16
40
17
17
17
17
17
40
2.The output pressure of emergency fire pump found low and the cooling water pipe leaking.
17
3.The fuel oil control device of emergency fire pump found malfunction.
17
Page 20
17
17
17
17
17
17
30
17
17
17
17
17
30
30
04102
04102
04102
04102
04102
04102
04102
04102
04102
04102
04102
04102
04102
04102
04102
04102
04102
04102
04102
04102
30
Second means of access to emergency fire pump secured on inside and not as required by S74 Ch II2 R 10.2.2.3.2.2.
Emergency fire pump inoperative. (ISM).
17
Emergency fire pump space flooded 10 cm in depth due to left open priming line. (ISM)
17
Second means of access to emergency fire pump secured on inside (as per Security Plan) and not as
required by S74 Ch. II-2 R 10.2.2.3.2.2.
Emergency fire pump.
17
30
Emergency fire pump unable to pressurize fire line in acceptable period. (ISM)
17
30
16
30
17
30
30
Emergency fire pump suction penetrated E/R - Not be insulated perfectly by A-60 class insulation
materials.
Emergency fire pump not making suction & not building pressure.
30
17
30
Emergency fire pump not operated normally , not power for pumping sea water.
30
30
Page 21
30
30
30
04102
04102
04102
04102
04102
04102
04102
04102
04102
04103
04103
04103
04103
04103
04103
04103
04103
04103
04103
04103
Crew needed more than 30 minutes to bring emergency fire pump into operation.
17
Suction pipeline of Emergency Fire Pump corroded and leaking water. Emergency Fire Pump room full
of water in bottom area. Suction Gauge Pressure inoperative. (ISM)
Minor water leak observed from emergency fix P/P gland during operated.
16
30
The Emergency Fire Pump - Can`t delivered water pressure to fire main piping.
30
30
Emergency fire pump: Cant delivered water pressure to fire main piping.
30
Emergency fire pump not building pressure as per IMO Resolution, only building 1.5 kg/cm2 pressure
loads and inoperational.
Emergency fire pump priming device sluggish. I.e.. Not engaging without manual lever.
30
17
Emergency lights in lifeboats area and bridge deck found inoperative. (ISM)
30
Emergency generator
- unable to connect with emergency switchboard automatically.
Lighting system for CO2 room
- Not turned on.
Emergency switch board DC24V insulation low.
30
17
17
30
17
17
17
Page 22
17
15
16
30
04103
04103
04103
04103
04103
04103
04103
04103
04103
04103
04103
04103
04103
04103
04103
04103
04103
04103
04104
04106
17
17
17
17
17
30
17
17
17
17
17
17
17
17
17
17
17
17
17
17
Page 23
04107
17
04107
17
04107
17
04107
Emergency towing procedure not included in SMS, and Capt. & C/O not familial with Emergency
towing procedure.
Emergency towing booklet not kept at forward location.
04108
04108
04108
04108
04108
04108
Muster list
Muster list
Muster list
Muster list
Muster list
Muster list
Crew duty on muster list was not comply with the requirement of SOLAS convention.
Emergency lights - corroded.
Muster list not specified substitutes for key persons and officers in charge of LSA & FFA.
Muster List not as required. (ISM)
Muster list (Bridge and E.C.R.) - Not up dated.
Duties in case of abandon/fire posted in MUSTER LIST not understood by some crew members.
Duties are only in English language, and some crew members have difficulties to understand it (only
can understand instruction in Russian language). (ISM)
17
17
17
17
17
16
04108
04109
04109
04109
Muster list
Fire drills
Fire drills
Fire drills
17
17
17
30
04109
Fire drills
04109
Fire drills
Crew is not familiar with essential shipboard procedures relating to the safety of the ship. (Fire Drill)
The crew were unable to perform a satisfactory fire drill. (ISM)
30
04109
Fire drills
17
04109
04109
04109
Fire drills
Fire drills
Fire drills
04109
04109
Fire drills
Fire drills
No Master took place, No BA control, Leaking BA, Crew unfamiliar with low pressure warning whistle.
(ISM)
Crew is not familiar with essential shipboard procedures relating to the safety of the ship.
Outside bells (speaker) poor.
Fire drills for operation of CO2 system and water mist system, officers not familiar with the systems.
(ISM)
Fire drill was completely unsatisfactory. (ISM)
During the fire drill both the firemen forgot part of the equipment. ( axe, safe line and torches )(ISM)
04109
04109
04109
Fire drills
Fire drills
Fire drills
The crew were unable to demonstrate proficiently in performing a satisfactory fire drill.
Lifeboats not launched and maneuvered in the water within 3 months.
Crew not familiar with using fireman out fit and BA set's air cylinder low pressure found.
30
99
17
Page 24
17
17
30
17
30
30
17
04110
3. Lifeboats Port and Starboard not maneuvered in the water in last three months. (Last Aug 2014)
(ISM)
1. No evidence of free fall launching or simulation test on last 6 months. Free fall not maneuvered in
the water in last 3 months
In the last 3 months port and starboard lifeboats are not maneuvered in the water.
Free-fall lifeboat and Rescue boat not launched and maneuvered in the water since April 10th, 2014.
16
04110
04110
04110
04110
17
Abandon ship drill not carried out as per ship`s specific. (Only rescue boat launching and no evidence
of drill related to liferaft).
No evidence of emergency lighting being tested during abandon ship drill.
No evidence of last waterborne drill, more than 3 months. (ISM)
Port side lifeboat not launched and maneuvering within previous 3 months.
Last time port lifeboat was maneuvered during an abandon ship drill was 05/29/2014, longer than
required 3 months.
Evidence of free-fall lifeboat being maneuvered in water in last three months or of free-fall/ simulated
launch drill in last six months could not be presented on board.
Abandon drill record not have date.
Free fall life boat and rescue boat not maneuvered in the water in the last 3 months, last carried out
21 March 2014. (ISM)
Key procedures not included in abandon ship drill record completely.
Vessel was unable to provide record of maneuvering of lifeboats in the water within the last three
months.
Abandon ship drill emergency lighting not tested.
During the abandon ship drill the responsible, and their substitute, forgot to bring the lifeboats crew
lists. Nobody bring the Epirb.(ISM)
No.2 lifeboat not launched into the water in the latest 3 month.
P & S lifeboats overdue for quarterly launching and maneuvering in water (last done in August 2013).
04110
04110
04110
04110
04110
04110
04110
04110
04110
04110
04110
04110
04110
04110
04110
04113
04113
04113
Lifeboats (port and starboard ) not maneuverer in water in last three (3) months.
No evidence on board of abandon ship drill including freefall lifeboat launching. (ISM)
Water level indicator for cargo hold No.5 fall in alarm.
8. Water ingress alarm panel showing sensor fault.
Water ingress alarm for cargo hold No 1,2,3,4,5 defective(occurred after loading from previous port).
17
17
17
17
17
04113
04113
04113
The bosun store dewatering valve can not remote control on Bridge.
The operating instruction for water ingress detection system not provided.
Water ingress alarm on bridge, Indicating high level alarm condition in Cargo hold No.6. (ISM)
17
17
17
04114
17
Page 25
15
17
15
17
30
17
30
16
17
17
99
17
99
17
99
15
04114
04114
04114
04114
04114
04114
04114
04114
04114
04114
04114
04114
04114
04114
04114
04114
04114
04114
04114
04114
17
17
30
30
30
Emergency generator will not connect to emergency switchboard automatically after loss of power to
emergency switchboard.
When E/G running, it failed to supply electrical power to emergency fire pump.
30
Emergency Generator fails to start at initial attempt with both the starting source of batteries. (ISM)
17
17
E/G fails to start on black-out simulation and on manual electric start-batteries/charging system out of
order. (ISM)
Long time taken to demonstrate normal routine test of the Emergency Generator.
10
17
Emergency Generator does not start in automatic and manual mode. (ISM)
25
Emergency generator cannot automatically take load when main generators are taken off the board.
30
10
30
Hydraulic starter (secondary means of starting) of emergency generator not functioning due to oil
leakage unable to build up pressure.
Emergency generator defective. (24 volt solenoid valve for fuel governor faulty)
17
30
17
Page 26
30
17
30
04114
30
17
17
30
Ship's emergency generator was unable to be started during operational test at time of inspection.
17
10
17
04117
Forward bosun's store dewatering system not ready for remote use. Critical valves in closed position.
17
05101
30
05102
05102
05103
05105
16
17
30
17
05105
05105
05105
17
17
16
05105
05105
05105
05105
05105
05105
05105
05105
05105
05105
17
05105
MF/HF Radio/DSC Unit not working properly- ATU without RE Power (Error 430J). Copy of
technician's report to be sent to PSC Gibraltar).
MF/HF DSC were showing low battery.
04114
04114
04114
04114
04115
04116
Page 27
17
17
17
10
30
17
99
99
30
17
05106
05106
05107
Maintenance/duplication of
equipment
Maintenance/duplication of
equipment
Performance standards for radio
equipment
VHF radio installation
VHF radio installation
VHF radio installation
VHF radio installation
VHF radio installation
VHF radio installation
Facilities for reception of marine
safety information
Facilities for reception of marine
safety information
Facilities for reception of marine
safety information
Facilities for reception of marine
safety information
Facilities for reception of marine
safety information
Facilities for reception of marine
safety information
Facilities for reception of marine
safety information
Facilities for reception of marine
safety information
Facilities for reception of marine
safety information
Facilities for reception of marine
safety information
Facilities for reception of marine
safety information
Facilities for reception of marine
safety information
05107
05108
05109
05109
05109
05109
05109
05109
05110
05110
05110
05110
05110
05110
05110
05110
05110
05110
05110
05110
30
30
17
17
All three two-way portable VHF radio telephone - Out of power during inspection.
PS/SB VHF sets not receiving ship`s position. (ISM)
No alarm when OSC call on stbd side VHF.
Emergency spare batteries for L/B two way VHF had expired.
Part of VHF-DSC unit (PS) - not working, several soft keys inoperative. (ISM)
Two VHF radio telephone not in working condition.
NAVTEX not working.
17
10
16
17
17
17
30
Inmarsat C was not correctly set up for receiving Australian cost safety information.
17
NAVTEX information.
17
17
EGC not correctly configured to receive coastal navigation and wx. warning for area of current
operation. (ISM)
NAVTEX inoperative and not correctly programmed. (ISM)
17
17
17
INMARSAT-C not set to receive coastal MSI for current and next coastal voyage.
17
INMARSAT C EGC not set up correctly to receive coastal maritime safety information (Aus. Coast
warnings).
EGC not correctly configured to receive coastal maritime safety information.
17
17
Page 28
16
10
17
05111
17
05111
Satellite EPIRB 406 MHz/1.6 GHz EPIRB - a satisfactory test as per manual could not be
demonstrated.
Satellite EPIRB 406 MHz/1.6 GHz EPIRB cover cracked, antenna protection damaged.
05111
30
05111
30
05111
17
17
05111
Satellite EPIRB 406 MHz/1.6 GHz Key personnel not familiar with test function of EPIRB.
17
05111
30
05111
Satellite EPIRB 406 MHz/1.6 GHz EPIRB annual service ashore range is expiring on the 4th of January.
30
05112
05113
VHF EPIRB
Radar transponder
10
17
05111
17
05113
05113
05113
05114
05114
05114
05114
Radar transponder
Radar transponder
Radar transponder
Reserve source of energy
Reserve source of energy
Reserve source of energy
Reserve source of energy
05114
A manual for the battery charger was not found on board. (ISM)
17
05114
GMDSS radio batteries defective. MF/HF radio unit unable to be powered by DC power. (ISM)
30
05114
GMDSS and emergency battery boxes on Monkey island not weather tight and no PRC provided.
17
05114
05114
30
30
05114
05114
05115
30
30
17
Page 29
17
99
30
30
17
17
17
05115
05115
05115
05115
05115
05116
05116
GMDSS log book - not recorded at all since ship's flag was changed.
Details of service company in GMDSS radio log book.
DMDSS log records.
GMDSS log section `B` & `C` incomplete. Passage plan not signed by navigating officer.
MF/HF DSC external test - not carried since 29/12/2013.
Responsible person for testing GMDSS equipment is not nominated.
Insulation on MF/HF aerial chaffed through and internal wire resting non-insulated equipment.
17
17
17
30
17
17
17
05116
05116
05116
Operation/maintenance
Operation/maintenance
Operation/maintenance
17
17
15
05117
05117
05117
05117
05117
Other (radio)
Other (radio)
Other (radio)
Other (radio)
Other (radio)
05117
Other (radio)
05117
05117
Other (radio)
Other (radio)
05117
05117
05118
Other (radio)
Other (radio)
Operation of GMDSS equipment
17
17
17
05118
17
05118
CAPT. & 3/O (Bridge team in emergency drill) cannot operated GMDSS equipment properly.
30
05118
Navtex
- not received navtex message since May 4th 2014
- Master doesn't know how to use & test.(ISM)
17
05118
Ship's dedicated radio officer(2/O) failed to demonstrate MF/HF DSC transmission test and evidence
of past DSC test not submitted to PSCOs.(ISM)
17
05118
INMARSAT EGC not correctly set up for receiving coastal navigation warning in Australia.
17
05118
17
Page 30
17
16
16
17
16
17
17
17
05118
17
INMARSAT C not set correctly to receive coastal MSI for the current coastal navigation area as in
coastal area B and C.
Key personnel unable to demonstrate operation of MF/HF DSC on reserve source of energy.
05118
05118
EGC not configured to receive AUSCOAST marine safety information.(Rectified during inspection)
17
05118
Key officer not familiar with test MF/HF DSC reserve power.
17
05199
06101
06101
06104
06104
06105
06105
06105
06105
06107
06107
06107
Other(radio communication)
Cargo Securing Manual
Cargo Securing Manual
Lashing material
Lashing material
Other (cargo)
Other (cargo)
Other (cargo)
Other (cargo)
Cargo operation
Cargo operation
Cargo operation
17
30
17
17
17
17
17
17
17
30
30
99
06107
Cargo operation
17
06107
06107
06108
Cargo operation
Cargo operation
Cargo density declaration
Test status of safety relief valves observed not included in planned maintenance system. No ability to
cross reference serial numbers, test dates with certificates. (ISM)
Cargo loading operation manual not available on board.
Contact method with Terminal not established.(ISM)
No unloading plan according to SOLAS 2008 amend/Chapter VI/ Reg. 7.3 signed by master and
terminal available.
06109
Loading instrument
06199
Other (cargo)
Page 31
17
99
99
10
99
06199
06199
06199
07100
17
17
17
17
07101
Water Ingress System: No.9 Cargo hold, bilge alarm faulty not operational.
SWL not marked in contrasting color on provision crane.
Stores crane limit switch broken. (ISM)
Fire insulation on bulkhead of E/R near fire door access to E/R on upper deck in accommodation
space not continuous.
Fire prevention structural integrity Two cable penetrations in the navigation locker of the bridge are partly missing fire insulation putty.
07101
Fire prevention structural integrity Sounding pipe for fuel oil - Kept open by iron wire.
17
07101
Fire prevention structural integrity Un-approved opening found between E/R and funnel space.
30
07101
99
07101
Fire prevention structural integrity Emergency generator O.T. overflow pipe through Engine room directly, not isolated. Not comply with
fire prevention requirement.
Fire prevention structural integrity Part of insulation material on Nav. & Radio Locker bulkhead missing.
07101
Fire prevention structural integrity Hole used for control shutter of funnel too large.
17
07101
Fire prevention structural integrity Upper bridge deck cable trunk cable - penetration damaged.
17
07101
Fire prevention structural integrity Insulation (fire) patch missing in ECR Port FWD behind switchboard.
17
07101
Fire prevention structural integrity There are wooden made closets at the entrance of Engine Room Door at the upper deck and on the
corridor of second deck.
Fire prevention structural integrity 3 self-closing fire doors would not close due to fitted with latch & One fire door had been disable
and was unable to close at all.
Fire prevention structural integrity A-60 insulation (structural fire protection) in way of paint locker damaged.
17
07101
Fire prevention structural integrity Part of the insulation material on suction pipe for Em'cy fire pump in E/R missing.
17
07101
Fire prevention structural integrity Cable penetration between engine control room and E/R - Seal insulation material not be provided.
17
07101
Fire prevention structural integrity Fire integrity of bulk head between elect. Pipe duct & corridor on low bridge deck - destroyed.
30
07101
Fire prevention structural integrity Fire integrity of deck between bridge and pipe duct on Capt. Deck - destroyed seriously.
30
07101
Fire prevention structural integrity Fire integrity of bulk head between elect. Pipe duct and corridor on Capt. Deck - destroyed.
30
07101
Fire prevention structural integrity Fire integrity of bulk head between elect pipe duct and corridor on upper deck - destroyed.
30
07101
07101
Other (cargo)
Other (cargo)
Other (cargo)
Fire Safety
Page 32
17
17
17
99
07101
17
07101
Fire prevention structural integrity Fire door installed on bulkhead between Emcy fire pump room and provision locker. - Door fire
integrity not comply with SOLAS convention (A-0 Class installed).
Fire prevention structural integrity Fire doors at Main Deck and from staircase to the galley not closing properly.(ISM)
07101
Fire prevention structural integrity Practice of fire doors in stair case blocking open.
17
07101
Fire prevention structural integrity Fire door in steering gear room not properly closing.
17
07101
30
07101
Fire prevention structural integrity Terminations of sounding pipes located inside E/R for FO & DO tanks not fitted with the self-closing
control cock.
Fire prevention structural integrity Fire insulation on bulkhead in enclosure of E/R emergency escape trunk not continuous (about 5cm
gaps at bottom).
Fire prevention structural integrity Fire insulation on common bulkhead between E/R & S/G compartment not continuous.
07101
Fire prevention structural integrity Fire insulation A-60 in E/R part damaged.
17
07101
Fire prevention structural integrity Class "A" Doors throughout the House that are Self Closing are fitted with Hold-Back Hooks.
40
07101
Fire prevention structural integrity No.1, No.2, No.3 G/E area found much oil leakage.
17
07101
Fire prevention structural integrity Exhaust gas turbo charger pipe of No.3 G/E.
17
07103
Electric cable penetration on deck between wheel house (inside of console stand) and below space Not insulated properly.
Bulkhead between rating mess room and corridor on poop deck not stuffed insulation material.
17
17
A Class fire material in emergency pump room bulkhead found partly damaged.
17
A bunch of cable penetrate the bulkhead which between the corridor and captain's Cabin but did not
be sealed properly.
A bunch of cable penetrate the bulkhead which between the corridor and C-deck But did not be
sealed properly.
A bunch of cable penetrate the bulkhead which between the corridor and third officer cabin but did
not be sealed properly.
30
Cable penetrations in electric store room on bridge deck short of approved insulation material for
insulation.
17
07101
07103
07103
07103
07103
07103
07103
07103
Page 33
17
30
30
17
30
30
07103
07103
07103
07103
07103
07105
07105
07105
07105
07105
07105
07105
07105
07105
07105
07105
07105
07105
07105
07105
Thermal packing for steam heating pipelines for MFO DEEP TK broken.
16
16
Pipe penetration from E/R to fire station (A-60), some insulation material missing.
15
One cable pass through from bridge deck to accommodation , but the hole not blocked , about 5mm
8mm.
Cable penetration into CCR not closed.
30
Funnel top hatch left open without any remote means of closing.
17
17
30
17
17
99
Self closing door for E/R not closed and secured properly. (ISM)
30
Boundary between duct space and corridor - Not insulated properly (A-0 class insulation required by
fire control plan).
Aft engine room fire door to steering room not closing.
17
Engine room door (aft deck) not able to close in event of fire due to security door. (ISM)
17
All galley self-closing fire doors held open. Engine room fire door does not close and latch. Galley fire
door corroded. (ISM)
Fire doors in the accommodation space (Boat Deck stairways) insulation not properly placed and
missing at some location.
Numerous fire doors not closing properly or kept mechanically opened.
17
30
Page 34
17
10
17
17
17
07105
07105
07105
07105
07105
07105
07105
07105
07105
07105
07105
07105
07105
07105
07105
07105
07105
07105
07105
Several self closing fire door do not close and latch. (ISM)
17
Two fire doors kept open due to lashed by steel ropes in E/R.
17
The self-close fire door access to E-deck from stairway - Unable to self-close.
17
17
17
Self-closing device of door between E/R & steering gear room malfunction.
17
Fire doors (2) from E/R to ST/R tied open and fire door to emergency escape on E/R lower platform
tied open. (ISM)
Self-closing fire doors from stairway to Deck C and from alleyway to galley do not close fully. (ISM)
17
99
Fire door deck 1 PS stairways. Not closing properly, lock in the door is broken.
17
Self-closing fire door to E/R on Upper deck P & S - unable to be closed fully.
17
17
16
Self-closing device of fire door from steering room to E/R not in good condition.
17
Forward door to ECR not latching, several fire doors held back with string or rope, egg port and
starboard from accommodation to engine room (ER), from ER to steering gear flat, door to steering
gear flat. (ISM)
17
17
17
Found Engine control rooms fire doors (both two) not as required. (In one door light is coming inside,
in the other ones miss the internal mechanism). Found upper deck ladders fire door damaged.
(Theres a hinge cracked).(ISM)
30
Page 35
17
30
07105
07105
07105
07105
07105
07105
07105
07105
07105
07105
07105
07105
07105
07105
07105
07105
07105
07105
07105
07105
Airlock doors between engine room and emergency fire pump space
-Kept open by rope.
Fire screen door from Steering gear room to pipe tunnel wedged opened.
17
The fire door of emergency escape route door in engine room was not fully closed.
17
17
17
17
16
17
Fire door between E/R & steering gear room not closing properly.
17
17
17
Impossible to close funnel entrance door from outside due to additionally fitted grating.
17
17
17
Captain deck and Mess Room fire door do not close and latch.
17
17
17
17
Page 36
17
16
17
07105
Fire door from E/R to steering gear room can not close tightly.
17
07106
07106
4.Fire detection and alarm system found in switch off situation during inspection.
The fire detection panel was switched off when we boarded the vessel and again at the end of our
inspection. De group 7 upper deck is alarm and activates constantly the fire alarm (ISM).
17
17
07106
07106
07106
Fire detection
Fire detection
Fire detection
17
17
16
07106
Fire detection
07106
07106
07106
Fire detection
Fire detection
Fire detection
07106
Fire detection
07106
07106
07106
07106
07106
07106
07106
Fire detection
Fire detection
Fire detection
Fire detection
Fire detection
Fire detection
Fire detection
Fire detection and alarm system not tested in accordance with the company SMS.
Fire alarm display indicating FAULT, FUNCTION DISABLED and PRE WARNING.
Crumbled paper is being lit on fire and placed in an old coffee can to produce smoke which is used to
test smoke detector on board.
Fire detection system was in fault and de-energized, rendering all detectors, and automated systems
inoperable in all spaces.
No manual call point of fire alarm for emergency generator room.
Cargo hold fire detection system indicating fault alarm. (ISM)
Manually operated call point not installed in control station. (Emergency Generator room)
Steering gear fire Alarm local push button switch is permanently protected with unbreakable acrylic
sheet.
The flame detector in the purifier room was covered with a cover and a rag. (ISM)
Fire alarm station earth, test.
Several fire detectors in E/R covered up. (ISM)
Fault indicating on fire detection and alarm panel in bridge.
Fire detector alarm control panel defective.
Fire detection system is not giving audible alarm.
Key personnel not familiar with operation and critical information displayed on fire control panel. Fire
alarms and local isolated.
07106
07106
07106
07106
07106
07106
07106
07106
Fire detection
Fire detection
Fire detection
Fire detection
Fire detection
Fire detection
Fire detection
Fire detection
07106
07106
07108
Fire detection and alarm system not kept power on during PSC inspection.
Cargo hold smoke detector not work. (trouble show on the panel)
Fire detector shown fault & be disabled.
Cargo hold fire detection system blower No.2 not working. Zero adjustment not working.
Proper working smoke detection of holds could not be demonstrated on the bridge.
Fire detection system inoperative.
Head detector for fixed fire detection & fire alarm system found damaged on bridge deck.
Fire alarm control panels in wheel house
-indicated "switch check" alarm due to switched off "trouble Alarm".
Fire detection
Smoke detecting cabinet at fixed CO2 room: Indicating fault alarm.
Fire detection
Fire detector at steering gear room: Out of work.
Readily availability of fire fighting The main fire pump is not able to start and stop from the bridge (ISM).
equipment
Page 37
30
30
17
17
17
17
17
17
17
30
30
17
99
30
17
30
17
30
30
17
17
30
16
07108
07108
07108
07108
07108
07108
07108
07108
07108
07108
07108
07108
07108
07108
07108
07108
07108
07108
07108
07109
17
Safety line and fire-man axe missing in designated fireman outfit location-fire control station.
17
17
Two fire extinguishers located at ship's paint store room (as it is shown in approved fire control plan)
were not found.(ISM)
All Self Contained Breathing Apparatus (4) defective. (ISM 9)
30
30
Fireman`s outfits are in poor condition and lacked sufficient coverage, torn and delaminated to the
extent.
Discharge valve on emergency fire pump closed.
30
17
17
Fire line leaks at few places #2 forward port, forward fire line forward (S) break of F`cle.
17
Fire control station overstowed with equipment, restricting access to fire control systems.
17
Forecastle Bosun store: Portable fire extinguisher not ready to use immediate.
17
General and E. F/P. are not able to supply water to the fire main line above No.7 CAR DK due to
excessive ice in the system.
Fire Fighting International Shore Connection is missing bolts. (Action taken: 10C)
30
30
Page 38
17
17
17
10
17
17
10
07109
07109
07109
07109
07109
07109
07109
07109
07109
07109
07109
07109
07109
07109
07109
17
The posted operating instructions for the fixed CO2 system state the CO2 cylinders marked with
starting cylinders should be opened, after opening all other CO2 cylinders, there is no cylinders
labeled starting cylinders for cargo holds.
16
Manual valve leading to fresh water pump (hypermist system) was in closed position.
30
Manual valve to freshwater pump in closed position leading to hyper mist F.E. system not available for
immediate use.
30
30
Water sprinkle system fitted on deck found with hole around 8cm at main supply line on port side.
Sprinkle system not able to deliver sufficient pressure due to leakage of water from pipe.
30
Fixed fire fighting system (Dry Chemical Powder) on deck fwd. of accommodation delivery hose
connection to actuator found with 2cm hole and not ready to use.
PSCO while inspecting fixed water spray mist system witnessed ships crew opening water supply
valve, when PSCO questioned C/E he stated valve was closed. PSCO observed water-mist control
panel for the system was turned off and not in remote. Expand examination revealed water-mist
operations manual gave clear instructions on proper set up and how system was supposed to be
maintained. Chief mate supplied record of maintenance conducted via engineering log book.
Maintenance was done on the system 3 days prior. Vessel have not automatic fixed extinguishing
capability for 3 days. Provide corrective action plan from company with concurrence from certificate
issuing authority attesting to crew familiarization with operation of vessel's fixed firefighting systems.
30
17
CO2 fixed fire fighting system for engine room in disable condition. Not readily available for operation.
(ISM-2)
Paint locker fixed fire system.
17
Main fire pump water pressure not enough. (only 1.4 kg/cm2)
30
Water supply valve (after the hyper mist pump & before the manifold) of hyper mist system in the E/R
was found closed.
Manual delivery valve on Hyper-mist fire fighting pump system in closed position. (ISM)
30
Hyper mist LP water F.F.S. for E/R is not ready for use, two nos normally open valve/cock found in
shut condition. (ISM)
Page 39
30
30
17
17
07109
07109
07109
07109
07109
07109
07109
07109
07109
07109
07109
07109
07109
07109
07109
07109
07109
07109
07109
07109
Control air line for quick closing valve of F.O. service tank - Not connected.
17
Found on aft deck container with CO2 bottles. Fixed CO2 system with release system inside.
Container doors were not easy to open.
17
Found deep fat frying installation in galley. Fixed extinguishing system not available.
17
Fresh water supply to the water mist system was in the closed position. Chief engineer stated he
closed valve to prevent accidental discharge of the system.
Foam liquid pump for engine room fixed fire extinguishing installation defective.
30
Access to fixed CO2 room not readily possible as door locked and key not readily available.
17
Short lengths suction piping of E.F.P. penetrated in the E/R not enclosed in a substantial steel casing
or insulated to A-60 class.
The releasing piping of released unit of fixed CO2 system in fire control station - penetrated E/R and
not be insulated by insulation materials to protect.
Several hydrants on deck are seized or very hard to move.
30
Sprinklers in paint locked are missing or blocked, release station could not be shown. (ISM)
17
Fixed fire-fighting systems for paint lockers not working due to wrong type of nozzle used (for
automatic sprinkler). (ISM)
Engine room fixed fire extinguishing foam system pump not operational. (rectified during inspection)
(ISM)
CO2 Rm refer lines and associated gauges to refrige flow in prop state. (Vent lines rusted + flow gauge
corroded)
Foam Liquid pump for fixed foam firefighting system for machinery spaces inoperative. Repeatedly
tripping on thermal overload.
Motor for CO2 room ventilation not provided.
30
Please control system of fixed CO2 system not comply with requirement.
30
Local fire fighting extinguishing system (water mist) out of work. (No indication on Brid. extension
panel & S/T room main panel)
CO2 bottles for Cargo space last hydro test certificate not available onboard.
30
Activation box of CO2 system - not accessible (door could not be opened.) (ISM)
17
30
Page 40
30
30
17
17
16
17
17
17
07109
07109
07109
07109
07109
07110
07110
07110
07110
07110
07110
07110
07110
07110
07110
07110
07110
07110
07110
17
10
E/R hyper LP local fire fighting system panel in bridge and fire station malfunction.
17
Fixed foam system in Ro-Ro space was inoperable due to the inability of supply water to the system
resulting ice in the line.
Low Pressure CO2 controller has not been working properly for approximately 2 months. Crew has
been manually controlling the system to keep it going. No notification has been make to the
Company recycling this matter. (ISM Code 9.1 & 10.2)
30
17
The crew purposely blocked open with bolts the remote operated quick closing emergency fuel
shutoff valves
on the No.1 & 2 G/E fuel supply valves.
30
17
17
16
17
Fire store is blocked from inside with steel bar (security against prates ) and no access to fire fighting
equipment.
Several fire nozzle are defective.
30
30
Fire hoses not provided with reels suitable for reaching any part of the boiler room.
17
17
17
30
Page 41
17
30
16
07110
07110
07110
07110
07110
07110
07110
07110
07110
07110
07110
07110
07110
07110
07110
07110
07110
07110
07110
07110
17
17
17
17
30
17
Fire Hydrants- Unable to open due to disc stuck(1pc.), Handle Broken(1pc.), Drain V/V Broken(1pc.)
(ISM)
Fire hose box door hinge broken.
17
Lack of portable fire extinguishers at designated place. All extinguishers located in one place at the
entrance to the ship.(ISM)
Fire hoses in E/R more than 15m (is 20m).
17
During the bunker action portable extinguisher from nearby always in use and not from spare.
17
Main fix line filling to top side tank inlet flange found leaking.
17
Air cylinder of SCBA set in SOPEP lockers found insufficient air pressure maintained and SCBA set in
D deck fire station found air leaked from regulator.
Ship was not provided with appropriate numbers of extra air cylinders for SCBA set for training
purpose.
The fire-fighter's outfits or sets of personal equipment not stored in widely separated positions.
17
17
17
17
Fire hydrant between No. 4 & 5 cargo hold (P): Leaking sea water.
17
16
Page 42
17
17
17
17
07110
30
07111
07111
Personal equipment for fire safety Some personnel not familiar with SCBA testing procedure.
17
07111
Personal equipment for fire safety E-deck locker, firefighters outfit safety lamp not working.
17
07111
Personal equipment for fire safety Cylinder on SCBA set found at less than half-full pressure. (ISM)
17
Personal equipment for fire safety One breathing apparatus cylinder empty.
17
07111
Personal equipment for fire safety EEBDs removed from position for survey 9/3/14.
10
07111
Personal equipment for fire safety Safety harness to be provided in E/R emergency escape.
10
07111
Personal equipment for fire safety Fireman's outfit not available in fire station.
17
07111
17
07111
Personal equipment for fire safety Several air bottles of air breathing apparatus with low pressure 150 instead of 200 bar found also one
pressure gauge not readable.
Personal equipment for fire safety Fire mans suit not heat insulation in fire control station.
07111
17
07111
17
07112
17
17
One EEBD unit in engine control room pressure gauge showing low pressure. (ISM)
17
17
17
17
Face mask for four sets of EEBD in E/R were found damaged and two of them found insufficient air
pressure maintained.
30
07111
07112
07112
07112
07112
07112
07112
Page 43
17
17
07112
17
2 Emergency escape breathing devices within machinery space (E/R) found low on air pressure. (ISM)
17
07113
07113
07113
17
17
17
07113
07113
07113
Fire valve between No.1 and No.2 Hold found leaking and broken opening devices. (ISM)
Emergency fire pump inoperative when prior testing.
No.1 and No.2 main fire pumps several packing leakage and suction pressure not enough. (ISM)
30
30
30
07113
07113
07113
30
17
17
07113
07113
07113
17
30
30
07113
07113
07113
Drain valve on main fire line between CH1 and CH2 leaking.
Emergency fire pump no delivery pressure.
Both general service fire pumps and emergency fire pump were unable to provide adequate pressure
to fire hoses.
Emergency fire pump can not discharge water.
The suction pipe penetrate E/R, but not enclosed by substantial steel casing.
Emergency fire pump is working with heavy grinding noise, no emergency fire pump remote start
provided.
No emergency fire pump remote start provided.
(ISM)
07113
07113
07113
07113
Delivery pressure of Em'cy fire pump only 0.2 MPa when outlet valve was closed.
Both fire pumps in ER leaking at spindle - Port pump leaking when not in operation.
Doubler welded on SW pipe in ER forward at cylinder station deck. (ISM)
The suction pipe of emergency fire pump penetration the machinery space, but not enclosed in a
substantial steel casing.(*)
Main fire line frozen.
Main fire line: corroded & cracked during testing emergency fire pump (ISM).
E/R fire pump gland badly leaking.
Emergency fire pump not taking suction. Priming unit not working.
Line of emergency fire pump leakage.
Emergency fire pump developing less press & water at hydrant very less.
Port and Starboard bilge well suction valve defective (Bosun store).
17
17
16
-
07112
07113
07113
07113
07113
07113
07113
07114
Page 44
30
30
17
30
30
17
30
17
30
15
07114
The fuel quick-closing valve for No.2 and No.3 A/E not in good condition.
17
07114
17
07114
17
07114
Air tank for operation of F.O. quick-shut off valve located in fire station
- Charge valve was closed.
17
07114
17
07114
All engine room self-closing gauge glass valve held open. (ISM)
10
07114
17
07114
Cut-off function for E/R ventilation not monthly test on June 2014. (ISM)
17
07114
17
The remote control of both main fire pumps on the bridge failed at the first attempt.
10
Air cylinder for emergency operation of remote engine room (SOS) valves found empty - No air
pressure. (ISM)
30
07114
07114
07114
The air cylinder to shut down the quick closing valves- Low pressure(6kg/cm2).
17
07114
30
Page 45
07114
30
07114
The control for remote operation of the valve for the emergency generator fuel tank not in a separate
location from the control for remote operation of the other valves for tanks located in machinery
spaces.
30
07114
17
07114
Remote control operation of valve for emergency G/E FO tank not in a separate location from controls
for quick close valve for tanks in machinery space.
30
07114
Air cylinder for remote close valve of fuel tank in E/R leakage seriously and only take one minute from
working pressure to zero bar.
30
07114
10
07114
Emergency generator room, F.O.T quickly closing valve seized can not operation during testing.
17
07114
Emergency quick closing system at fire control station: Less than required pressure as per the manual.
17
07115
07115
07115
07115
07115
07115
07115
07115
07115
Fire-dampers
Fire-dampers
Fire-dampers
Fire-dampers
Fire-dampers
Fire-dampers
Fire-dampers
Fire-dampers
Fire-dampers
17
30
17
30
30
17
30
30
30
07115
07115
07115
07115
07115
Fire-dampers
Fire-dampers
Fire-dampers
Fire-dampers
Fire-dampers
PSCO noted hole on the funnel plate while damper operation was conducted.
Engine room ventilators (both side) - Flap unable to close.
Engine room fan (Port) dumper
Fire dampers of E/R ventilator port and s/side - seized 8defective).
Engine room blower No.2 (Port side) fire damper defective.
Funnel damper not closing fully.
Funnel flaps - Not secured due to gaps.
No.1 engine room fire damper defective and not able to be closed.
Some fire dampers on deck not closing properly due to rusted, dent or wrong rubber and unsafe
access. (ISM)
Engine room fan fire dampers unable to be closed effectively. (ISM-1)
The fire damper of one vent to galley - unable to close during inspection.
One engine room ventilator fire damper closed difficulty.
Funnel dampers and port & starboard engine room fire dampers defective. (ISM)
Two fire damper on funnel not working.
Page 46
30
17
17
30
17
07115
07115
07115
07115
07115
Fire-dampers
Fire-dampers
Fire-dampers
Fire-dampers
Fire-dampers
Found on SB and PS forecastle deck goose neck ventilation pipes (each side 3 pieces) Flaps not
closing properly and several pipes deteriorated/holed. Class to investigate and report back to PSC
Rotterdam before departure.
Galley fire damper aft deck not closing in full.
Engine room fire dampers 1, 3 and 4 defective. (ISM)
Clearance about 2-3 cm detected on No.2 ventilator/fire pump damper.
Fire dampers tested and a number noted as not fully closing leaving too large gaps at louver plates.
(ISM)
Funnel damper unable to be closed fully.
Shutter of funnel can not closed effectively.
Engine room fire dampers, port side aft, not closing. (ISM)
Fire-damper for Engine room could not close.
Cargo space fan damper(No.46)
-Unable to close tightly.
Engine room ventilation dampers No.1, 2, 3 & 4 were not operable, i.e. stuck in open position and
unable to be closed.
No's. 1 & 2 Engine room fan fire dampers not operational. (rectified during inspection) (ISM)
17
17
30
16
17
07115
07115
07115
07115
07115
Fire-dampers
Fire-dampers
Fire-dampers
Fire-dampers
Fire-dampers
07115
Fire-dampers
07115
Fire-dampers
07115
07115
07115
07115
07115
07115
07115
07115
07115
Fire-dampers
Fire-dampers
Fire-dampers
Fire-dampers
Fire-dampers
Fire-dampers
Fire-dampers
Fire-dampers
Fire-dampers
99
17
17
30
30
17
99
30
30
07115
07116
07116
07116
07116
07116
07116
07116
07116
Fire-dampers
Ventilation
Ventilation
Ventilation
Ventilation
Ventilation
Ventilation
Ventilation
Ventilation
17
17
10
17
17
17
15
30
16
Page 47
16
17
30
30
17
30
17
07116
07116
07116
07116
07116
07116
07116
07116
07116
07116
Ventilation
Ventilation
Ventilation
Ventilation
Ventilation
Ventilation
Ventilation
Ventilation
Ventilation
Ventilation
30
30
17
17
17
17
16
30
30
17
17
17
07116
07117
Ventilation
Jacketed high pressure lines
30
17
07117
07117
07117
07117
07118
Two high pressure fuel oil pump for M/E oily leakage.
Fuel oil leakage alarm active on both running generators (1 & 3). Fuel pump cam follower covers
removed from No 1 Generator.
M/E one F.O. high pressure pipe screen (double wall pipes) not installed properly.(ISM)
Found Main Engine fuel oil leakage alarm in off scan mode/alarm. Collecting vessel full/drain pipe
stucked. (ISM)
Gasket damaged.
07118
17
16
17
16
17
17
30
17
17
07119
07119
07119
07119
07119
07119
07119
07119
07119
Insulation protection for diesel generator turbocharger deteriorated and partly missing. (ISM)
17
07119
16
07119
Page 48
17
17
17
16
07119
Due to the overflow of the waste oil tank, the collected oil is stored in open drums in the engine room
creating risk of fire. Also the engine room is polluted with oil in the bilges.
17
07119
Free floating oil and racks are present around the auxiliary engines and in the purifier room. (ISM)
17
07119
07119
07119
07119
07119
07119
07119
07119
07119
07119
07119
07119
17
17
16
17
17
17
17
16
17
17
17
17
07119
07119
07119
07119
07119
07119
07119
Several open cans In use to collect oil from several leakage of the main engine. (ISM)
Various self closing cocks/valves in engine room kept secured in open position.
No evidence of insulation mat in engine control room approved.
Fuel oil sample not stored as per requirements.
Fire & Ballast Pump pipe overboarded found temporary repaired by casting repair putty.
M/E returning pipe insulation wetted through oil.
Keeping of oily garbage in steering gear room.
Oil mist detector test button out of order.
Found few leakages in the Engine room. ( EG near main engine )(ISM)
Some waste receptacles in E/R constructed by combustible material.
Some garbage receptacles - Combustible material.
Emergency F/P not access from aft main deck weathertight door to S/T Rm due to secured by hook
from inside & turnbuckle.
Quick closing valve D.O tank inoperative.
Exhaust gas pipe insulation of auxiliary engines incomplete.
E/R blower flap (P&S) aft not working.
Multiple oil tank gauges open in E/R & Bosun store.
Combustible / oily items stored in E/R behind purifier room.
Large quantity of plastic rubbish stored in Bosun store.
IMO Symbols at equipment not labeled in the same way as mentioned in the fire control plan.
07119
99
07119
17
07120
Means of escape
07120
07120
07120
07120
07120
07120
07120
07120
Means of escape
Means of escape
Means of escape
Means of escape
Means of escape
Means of escape
Means of escape
Means of escape
Self closing valve for CYL. OIL MEASURE TK glass gauge in engine room.
-kept open by clamping device.
Emergency escape breathing device in the store flat area of the E/R was not charged and unable to be
used for its intended use.
Escape Route from boat deck to poop deck was blocked by oxygen cylinders.
Handles of two emergency escape doors broken.
Elevator trunk emergency means of escape door not free to operate.
Emergency escape hatch from E/R to Main deck not free.
The lighting in the emergency escape route was not working. (ISM)
The interior lock release was painted over prevention escape from the steering gear room.
Handrails for escape route in accommodation not provided.
Self-closing fire door for escape trunk in engine room - failed to close.
Page 49
30
30
30
17
17
17
17
17
17
10
17
17
17
17
30
17
07120
07120
07120
07120
Means of escape
Means of escape
Means of escape
Means of escape
07120
07120
07120
Means of escape
Means of escape
Means of escape
07120
07122
07122
Means of escape
Fire control plan
Fire control plan
07123
07123
07123
07123
07123
07123
07123
07123
07124
07124
07124
07124
07124
17
17
17
17
17
Engine-room Hyper Mist fire extinguishing system in manual mode. Fire main isolation valve to engineroom incorrectly marked and senior officers not familiar with its location.
Electric cables penetration on Engine room BHD not sealed properly and fails when CO2 flooding
done to E/R.
Engine-room fire extinguishing Hyper Mist system - Fresh Water Tank Low Level Alarm indicated.
17
Crew not familiar with purpose and operation of fire fighting systems and dampers in galley. Key
personnel not familiar with function of transit safety pins for CO2 cylinders for fixed fire fighting
systems. (ISM-2)
17
17
30
17
Some operating lights on high expansion foam operating station (steering gear room) not working.
(ISM)
Maintenance plan & records has no record of testing of fixed foam system or hyper mist pump
recommended by manufacturer.
No evidence/records available of maker's recommended maintenance being carried out for fixed fire
extinguishing installation.
Oil mist detector found not working during the test.(ISM)
17
Maintenance plan for fire protection system not included fire dampers and emergency shut - down for
fuel supply.
16
Page 50
17
17
17
40
17
99
17
17
99
16
30
07124
No evidence or record available for carrying out of maker's recommended maintenance for fixed foam
firefighting system.
Execution of drill very poor. (ISM)
16
17
Fire drill - SCBA not properly used, Fireman's jacket not worn properly, Not all lifejackets worn
properly, Crew did not use nearest access.(ISM)
Fire team unable to demonstrate. (ISM)
17
Lack of proper crew performance during galley fire and abandon drill: 1.-Fire alarm raised and crew
muster at embarkation station. 2.-Galley fire not properly confined: ventilation trunks and fire door
kept open. 3.-No abandon signal raised after fire drill. 4.-No LSA equipment carried to L/Boat(SARTSAT,EPIRB,GMDSS portable radios)by designated crew.
16
17
Two sets of A/E leaking oil seriously, excessive waste oil found in A/E bilge.
30
07126
Oil leakage observed from following areas such as transfer pump filter, purifier and generator.
17
07126
15
07126
No.3 diesel generator areas FO & LO purifiers areas in engine room were found large amounts of oil
accumulation.
Tank top port side aft in engine room, from fly wheel to aft covered in oil.
07126
Purifier area oily dirty, oily rags stowed in plastic bin, engine side.
30
07199
17
07199
07199
07199
07199
07199
07199
07199
07199
07199
07199
12. HFO Setting and Service Tank, Bilge Separating Oil Tank drain valves fitted with means of
permanent gagging.
6. HFO service tank some fittings(drain pipe)leaking and wrapped with rags soaked by oil.
Galley uptake greasy.
Auxiliary generator No1, 2 and 3 oily and dirty with rags soaked by oil. Main engine some heat
insulation in poor condition.
Emergency quick closing valve for No.2 AFO service tank not working.
Many empty paint drums and partially filled paint drums left open in paint locker.
Galley hot plate exhaust filter has oil accumulation.
Fire main isolating valve overstored.
Engine room watertight door, aft deck , cannot be closed due to security grill.
Oily rags and other garbage stored in 200 litters steel drums in steering compartment are fitted with
timber covers.
Galley range hood extraction fan ducting internal surfaces very oily.
07125
07125
07125
07125
07125
07126
07126
Page 51
30
17
17
17
17
17
30
17
17
17
17
17
17
07199
07199
17
17
07199
07199
07199
07199
07199
07199
17
17
17
16
17
10
08101
08102
08103
08103
08103
08103
08104
08104
08104
08107
08107
08107
General alarm
Emergency alarm
Fire alarm
Fire alarm
Fire alarm
Fire alarm
Steering-gear alarm
Steering-gear alarm
Steering-gear alarm
Machinery controls alarm
Machinery controls alarm
Machinery controls alarm
08107
08107
08107
08107
08108
08108
08108
UMS-alarms
16
08109
08109
Boiler-alarm
Boiler-alarm
UMS alarm not possible to select: engine room - chief engineer cabin - crew mess room. System not
comply with IMO Regulation for UMS vessels (ISM)
Auxiliary Boiler is being operated whilst the high level alarm is activated.
Glass water indicator of boiler leakage.
Page 52
30
17
17
17
30
17
30
30
17
30
30
17
17
17
17
17
30
30
99
17
08110
08111
08111
Other (alarms)
08111
Other (alarms)
08111
Other (alarms)
08111
08111
08111
09102
09102
09103
09103
09106
09106
09106
Other (alarms)
Other (alarms)
Other (alarms)
Dirty, parasites
Dirty, parasites
Ventilation (Accommodation)
Ventilation (Accommodation)
Sanitary facilities
Sanitary facilities
Sanitary facilities
09106
09106
09106
09106
Sanitary facilities
Sanitary facilities
Sanitary facilities
Sanitary facilities
09106
09106
09106
09107
09109
Sanitary facilities
Sanitary facilities
Sanitary facilities
Drainage
Pipes, wires (insulation)
09110
09110
09110
09111
09112
09112
09112
09112
Electrical devices
Electrical devices
Electrical devices
Sick bay
Medical equipment
Medical equipment
Medical equipment
Medical equipment
09112
Medical equipment
17
Drain valve for auxiliary engine FO leakage alarm tanks open whilst engine running.
BNWAS power failure.
The high level alarms from the HFO settling TK 2, HFO TK 2, FO drain TK, MDO settling TK, MDO
service TK and waste oil TK, are off scan (disabled) (ISM).
The bilge alarm from the pipe tunnel is activated. After checking the tunnel some water was found.
(ISM)
BNWAS battery check.
Alarm of Continuous insulation out of order.
Water ingress system alarm functional test not working.
Emergency generator room, oily dirty found on floor.
Parasites observed in galley during inspection.
A/C in accommodation not working. (ISM)
Goose neck & hatch type vent cover for accommodation & restricted area: Seized.
Sewage equipment has been patched on a pipe elbow and on the main body.
No toilet flash in AB cabin next to laundry.
Crew toilets & showers on the upper deck (P/S) with some toilets, shower taps, basins damaged and
floors dirty.
Hospital toilet flush defective.
Numerous broken tiles in common shower area.
Defective hot water tap in changing room.
Common lavatories and showers unhygienic, missing toilet lids, missing soap and paper towels.
17
17
17
17
16
99
17
Page 53
17
17
17
30
17
17
17
17
17
17
17
17
15
16
17
17
17
16
17
17
17
17
17
17
17
09113
09113
Access / Structure
Access / Structure
09113
Access / Structure
09113
09118
09119
09121
09121
Access / Structure
Clear head
Messroom (location)
Laundry
Laundry
09121
09122
09124
09124
09124
Laundry
Record of inspection
(Accommodation)
Galley, handling rooms
Galley, handling rooms
Galley, handling rooms
09124
09124
09124
09127
09127
09127
09127
09127
09127
09128
09128
09129
09130
09131
09131
09131
09132
09132
09132
Cleanliness
Provisions quantity
Provisions quantity
Provisions quality
Water, pipes, tanks
Cold rooms
Cold rooms
Cold rooms
Cold room temperature
Cold room temperature
Cold room temperature
16
17
17
99
17
17
17
17
17
10
17
17
10
10
17
Page 54
17
17
17
17
10
17
17
17
17
30
10
16
10
17
17
17
16
09133
09134
09198
10
17
16
09201
09201
09201
09203
09203
17
17
17
17
17
09203
09203
09203
09204
09204
09204
09205
17
17
16
17
17
99
17
09205
Safe means of access Shore - Ship Safety net for gangway broken.
17
09205
Safe means of access Shore - Ship Lower Platform of starboard accommodation ladder cracked.
17
09205
Safe means of access Shore - Ship Accommodation ladder on P/S - damaged/gangway (pilot passage) bent.
17
09206
Several securing bolts are missing for hatch covers of hold access openings, some securing dogs are
seized. (ISM)
Wooden gratings in steering gear room partly broken.
Oil drums (without lids) stored in forecastle store - deck made slippery due to oil.
17
09207
09207
09208
09209
09209
09209
09209
Protection machinery
Electrical
Electrical
Electrical
Electrical
17
30
99
17
10
09209
Electrical
09209
09209
09209
Electrical
Electrical
Electrical
Page 55
10
17
10
17
17
17
09209
Electrical
17
Switchboards in bosun store dismantled and kept open. Ventilation of paint locker and other
equipment isolated and not operational.
Bosun store: Mooring winch control panel not installed insulation mat.
Boiler water supply suction line from cascade tank leaking.
Centralized oxygen and acetylene gas bottle equipment on aft deck - high pressure oxygen hose outer
sheath broken and low pressure hoses securing clips badly corroded.
Found leakages on steam valve n.1 Central.(ISM).
09209
09210
09210
Electrical
Machinery
Machinery
09211
09211
16
09211
Temporary repair on steam pipe in engine room PS fwd. below floor plates.
30
09211
17
09213
Gas instruments
17
09213
09216
09216
09216
Gas instruments
Personal equipment
Personal equipment
Personal equipment
A mask for protection of the operator has been found with an expired filter (Jan. 2014) and control tub
also(2012).
Gas detector on board, no current calibration certificate could be presented on board.
Numerous officers working without safety shoes. (Slippers) (ISM)
Eye goggles and rubber gloves missing in batteries room. (ISM)
Calibration gas cylinder for oxygen analysis and gas defection equipment not available on board.
09216
Personal equipment
17
09217
09218
Warning notices
Protection machines/parts
Crew was not provided with sufficient personal protective equipment (PPE), such as protection for
hand, ear and eye.
Safety date sheets in chemical store incomplete.
Pressurized air valves on deck next to bay 1 and bay 25 leaking. Boiler air vent valve leaking.
09219
09219
09219
09220
09221
17
17
17
17
17
17
17
17
99
17
17
17
17
09222
09222
09222
09222
09222
09222
09222
09222
Page 56
17
17
17
17
17
17
10
17
17
15
09222
09223
17
99
09223
17
09223
Gangway, accommodation-ladder The safety net - Not covered the whole length of accom. Ladder.
99
09223
17
09223
17
09223
17
09223
Gangway, accommodation-ladder P & S gangway rollers at bottom landing in poor condition - corroded, deformed, seized or holed.
15
09223
17
09223
99
09224
09225
Stowage of cargo
Loading and unloading
equipment
Cargo holds not gas free with the fumigation upon berthing (ISM).
The Chief Engineer stated the annual pressure test of bunker line was conducted using air as test
medium
instead of liquid.
99
c
09226
09226
09226
17
17
17
09227
09227
09227
09227
09227
09227
09228
09228
09228
09228
09228
Anchoring devices
Anchoring devices
Anchoring devices
Page 57
10
17
17
17
17
17
17
10
16
17
16
09229
09229
09229
09229
09232
09232
09232
09232
09232
09232
09232
09232
09232
09232
09232
09232
09232
09232
09232
09232
09232
09233
09233
09233
09233
09235
09298
09298
09298
09299
Page 58
17
17
17
17
17
17
30
15
30
30
30
17
17
17
17
30
17
30
17
30
17
17
30
17
17
17
17
17
40
17
10101
10102
10102
10103
Radar
10103
10103
Radar
Radar
10103
10104
Radar
Gyro compass
10104
10104
10104
10104
10104
10104
10104
Gyro compass
Gyro compass
Gyro compass
Gyro compass
Gyro compass
Gyro compass
Gyro compass
10101
10101
10101
10101
10101
10101
10101
10101
10101
10101
16
17
Port and starboard side pilot ladder unsafe. Step broken, ropes.
17
Pilot ladder found insufficient condition with very old and worn joining roper's condition.(ISM)
30
30
17
17
17
17
17
17
17
17
Page 59
17
17
17
17
17
17
17
17
17
10
17
17
10104
10105
10105
10105
10105
10105
10105
10105
10105
10105
10105
10105
10105
10105
10105
10105
Gyro compass
Magnetic compass
Magnetic compass
Magnetic compass
Magnetic compass
Magnetic compass
Magnetic compass
Magnetic compass
Magnetic compass
Magnetic compass
Magnetic compass
Magnetic compass
Magnetic compass
Magnetic compass
Magnetic compass
Magnetic compass
10105
Magnetic compass
10105
Magnetic compass
10106
10106
10106
10106
10106
10106
10106
10106
10106
10107
10107
10108
10109
10109
10109
10109
10109
17
17
16
16
17
17
16
17
47
17
17
17
17
16
17
17
Spare magnetic compass not properly maintenance onboard vessel. i.e. Bubble (3cm) found in
compass.
Magnetic compass error not observed as per requirements of STCW.
Compass & radio log book no update.
Compass error verification frequency - Not as per STCW requirement. (ISM)
Frequency of compass error log not maintained as per STCW requirement.
Frequency of Compass correction log not maintained as per STCW requirement.
Magnetic compass is not being verified - Compass error book last entry Jan. 2014.
Compass error not check since 27 March 2014.
Compass Correction Log not filled up correctly.
Compass observations - not properly filed.
Port ARPA no speed t/w (tracking/wheel) input.
15
17
30
17
17
17
17
17
Page 60
17
17
17
16
17
15
99
15
17
17
17
10109
10109
10109
10109
10109
10109
10109
10109
10109
10109
10109
10109
10109
10109
10109
10109
10109
10109
10109
10109
10109
10109
10109
30
10
17
17
17
30
30
17
17
17
17
17
17
17
17
30
30
17
17
17
17
17
17
10109
10109
17
30
10109
10109
10109
10109
10109
10109
10109
10109
10109
10109
10109
Page 61
30
17
17
17
17
17
17
17
17
17
30
10110
10110
10110
10110
Signaling lamp
Signaling lamp
Signaling lamp
Signaling lamp
Independent power source for daylight signaling lamp - Could not be produced on request.
Batteries worn out and not useable. (ISM)
ALDIS - battery out of order.
Storage battery for daylight signaling lamp deteriorated.
17
17
17
17
10110
10110
10110
10110
10110
10111
10111
10111
Signaling lamp
Signaling lamp
Signaling lamp
Signaling lamp
Signaling lamp
Charts
Charts
Charts
17
17
17
17
17
17
17
17
10111
10111
10111
10111
10111
10111
10111
10111
10111
10111
Charts
Charts
Charts
Charts
Charts
Charts
Charts
Charts
Charts
Charts
10111
10111
10111
10111
10111
Charts
Charts
Charts
Charts
Charts
10111
Charts
30
10111
Charts
10111
10111
10111
10111
Charts
Charts
Charts
Charts
Voyage & intended voyage charts BA4127, 3026 small correction, T & P correction not updated for
year 2014.
Several charts used in previous voyage from Yokohama had been corrected using black and white
photocopies of corrections.
Chart AUS 134 old edition, not corrected.
Latest Notice to Mariner on-board is W22 29 May 2014.
AUS 802 not current edition, AUS 487 not corrected to date.
Largest scale chart (Aus. 244) not used for the previous voyage. (ISM)
Page 62
17
30
17
17
15
17
17
17
17
17
17
17
30
30
99
17
17
17
17
10111
10111
10111
10111
Charts
Charts
Charts
Charts
17
17
30
17
10111
10111
Charts
Charts
10111
10111
Charts
Charts
Several charts from the past and intended voyage not updated.
Navigation charts
- Not up-dated (NO.898,896,127)
- Pointed out by PSCO as same item(Feb.21th.2014).(ISM)
17
17
10111
10111
10111
10111
10111
10111
10111
10111
10111
Charts
Charts
Charts
Charts
Charts
Charts
Charts
Charts
Charts
60
17
17
17
17
30
30
30
17
10111
10111
10111
10111
10111
10111
Charts
Charts
Charts
Charts
Charts
Charts
10111
10111
Charts
Charts
10111
Charts
10111
Charts
All nautical charts are to be updated and current for the intended voyage.
Charts(BA2903, 3296) as included in for next voyage plan not on board.
Photo copy chart used for the inbound voyage to Dampier. (ISM)
Six photocopy charts intend to be used for next voyage to Darwin. (ISM)
Large scale charts for intended voyage AUS332, AUS 333, AUS 334 not available.
Several sea charts since longer time expired. (see also former PSC Reports) (ISM)
Several sea charts not properly corrected. (see also former PSC Reports) (ISM)
Chart corrections not written on chart. (ISM)
Several large scale charts not used for the voyage Esperance to Geraldton. Charts AUS 335 and 336
old edition used. (ISM)
Several stages of previous passage conducted on photo-copied charts. (ISM)
BA chart 2653 old edition.
Aus. Chart 24, 26, 28 and 722 used for the voyage are scanned and printed for copies.
Chart (BA 3697) - Not corrected up to date.
Charts(1603),(1604),(1605),(1620) old edition.
Nautical chart No.1483 (approaches to Venice and Marghera) and nautical chart No.1449 (port of
Marghera) missing. (ISM)
Chart 3318 missing.
Navigational charts onboard were not duly corrected and updated with T & P notices for vessel`s
intended sea passages.
Nautical charts and publications shall be adequate and up to date. Voyage charts are out dated
editions and have not been corrected.
Appropriate scale charts not used for navigation, INT4601 used for navigation in Bass Strait.
10111
Charts
17
10111
10111
Charts
Charts
Largest scale charts for last and next intended voyage not available on board. (AUS4635, 4643, or
815, 814, 813)(Next voyage AUS349, 357 & 4709) (ISM)
Largest scale charts for previous and intended passage not on board.
BA chart No.1602 , 1603 , 1604 and 1605 not updated edition.
Page 63
17
17
17
17
30
17
17
30
17
17
17
17
17
17
10111
10111
10111
Charts
Charts
Charts
10111
10111
Charts
Charts
10111
10111
10111
10111
10111
10111
10111
10111
10111
10111
10111
10111
Charts
Charts
Charts
Charts
Charts
Charts
Charts
Charts
Charts
Charts
Charts
Charts
10111
10112
10112
Charts
Electronic charts (ECDIS)
Electronic charts (ECDIS)
Automatic Identification System
(AIS)
Automatic Identification System
(AIS)
Automatic Identification System
(AIS)
Automatic Identification System
(AIS)
Voyage data recorder
(VDR)/Simplified Voyage date
recorder (S-VDR)
10113
10113
10113
10113
10114
10114
30
30
30
Several nautical charts for the intended voyage towards W-Africa are expired.
BA Chart 4119 for present voyage not up dated.
BA Chart No.933 & No.922 not yet Update.
Approach chart BA3466 not corrected.
Previous voyage completed without all appropriate large scale Charts AUS 250 on board.
Lianyungang port chart N/A on board.(Chart No.818 on board)
Lianyungang harbor chart old edition.
Part of passage line not be marked relative chart.
Voyage charts are not corrected for T&P notice. (None of chart)
Charts for the intended voyage Jp1061, Jp1062, Jp1081 and Jp1086 - not provided.
Incheon Harbor chart not on board.
Charts for the area of sailing , Incl approaching charts. Le, BA 2966,2333,3180,2238,2321 and 2307
are missing.
Charts : BA 3881, 3882 not available on board.
ECDIS alerts for PSSA areas set to ignore.
Electronic Charts (ECDIS) found in use onboard. Crew does not hold ECDIS qualifications.
17
17
17
30
17
17
17
17
30
17
17
30
50
16
17
50
17
17
Page 64
17
17
17
17
17
10114
Annual test of VDR expired. Certificate issued on March 17th, 2014 with 6 months validity.
99
10114
17
10114
VDR not operated in accordance with instructions as required during emergency - officers lackes
under stranding.
17
10114
17
10114
17
10114
17
50
17
VDR defective.
17
10114
10114
10114
10114
16
10114
48
10114
18
10114
17
Page 65
10114
17
10114
VDR operation panel unit shows alarm code 6013 not reported in the error code table. (ISM)
17
10114
VDR certificate of compliance not onboard but annual performance test carried out on 06.10.2013.
(ISM)
17
10114
17
10114
17
10114
16
10114
17
10114
The S-VDR - Can`t receive the signals of AIS of Radars, Speed log.
17
10114
17
10115
17
10116
10. ITU List IV old edition (2013). Handbook for Australian Seafarers (AHP 20) not on board. (ISM)
15
10116
Nautical publications
Latest edition of NPs, 281(1), 285, 283(1), 284, 286(8), 282, 77 and 38 are not available onboard.
17
10116
Nautical publications
17
10116
10116
Nautical publications
Nautical publications
10116
10116
Nautical publications
Nautical publications
Latest edition of ITU publication, 'Maritime Manual', 'List of ship stations` & `List of coast stations` are
not available onboard.
NP 281(2) & NP 79 not latest edition.
Missing nautical publications. (SOLAS 2014, GMDSS manual 2013 and notice to mariners to be
onboard).
Not updated in accordance with latest marine notice for voyage.
Admiralty Notice to Mariners not up do date.
Page 66
17
17
17
15
10116
10116
10116
Nautical publications
Nautical publications
Nautical publications
10116
Nautical publications
10116
10116
10116
10116
10116
Nautical publications
Nautical publications
Nautical publications
Nautical publications
Nautical publications
10116
10116
10116
Nautical publications
Nautical publications
Nautical publications
10116
10116
10116
10116
10116
10116
10116
10116
10116
10116
Nautical publications
Nautical publications
Nautical publications
Nautical publications
Nautical publications
Nautical publications
Nautical publications
Nautical publications
Nautical publications
Nautical publications
10116
Nautical publications
10116
Nautical publications
10116
Nautical publications
10116
Nautical publications
10116
10116
10116
Nautical publications
Nautical publications
Nautical publications
10116
10116
Nautical publications
Nautical publications
17
17
17
15
30
17
Page 67
17
17
15
17
15
17
17
17
17
17
17
17
17
17
10
10
17
17
17
17
17
17
17
17
17
10116
10116
10116
10116
10116
10116
10116
Nautical publications
Nautical publications
Nautical publications
Nautical publications
Nautical publications
Nautical publications
Nautical publications
10116
10116
10116
10116
10116
Nautical publications
Nautical publications
Nautical publications
Nautical publications
Nautical publications
10116
10116
10116
10116
10116
Nautical publications
Nautical publications
Nautical publications
Nautical publications
Nautical publications
10116
10116
10116
10116
10116
10116
10116
10116
10116
10117
10117
10117
10117
10117
10117
10117
10117
10118
Nautical publications
Nautical publications
Nautical publications
Nautical publications
Nautical publications
Nautical publications
Nautical publications
Nautical publications
Nautical publications
Echo-sounding device
Echo-sounding device
Echo-sounding device
Echo-sounding device
Echo-sounding device
Echo-sounding device
Echo-sounding device
Echo-sounding device
Speed and distance indicator
10118
Admiralty list of lights and fog signals (NP79& NP85) not updated edition.
Admiralty tide tables (VOL.3) old edition.
Admiralty products and services catalogue (NP131) not corrected up -to date.
Cumulative list of NTM not up to date.
NP.283(2) 285 Vol5 286(4) 79 not up date.
ITU List and ITU GMDSS Manual are old edition on board.
Several publications found without up to date corrections / B.A.N 72 58A,131,84L,74A/To be
corrected.(ISM)
B.A.Publications N57A,55 missing.(ISM)
Chart Catalogue and Chart Correction Log not being maintained up to date.
Nautical publication NP284 not available.
Notices to Mariners not noticed last Notices to Mariners copy onboard week 52 (ISM).
Actual Nautical Publications were ordered by crew for last port but not delivered by company. Two
books expired from last voyage, two for next voyage expired too.
BA NP 131 expired.
Several Admiralty lists of Lights and Lists of Radio Stations expired. (ALL & ALRS).
Notice to Mariners weeks 46 up to 51 2013 are missing.
All nautical publication - not updated (ISM).
The Nautical publications NP:131, 283(2), 283(1), 286(7), 286(6)
- Out of date.
Sailing direction NP30 old edition.
IAMSAR manual volume not new edition.
Nautical publications- NP 131 out of date & NP 30, 32, 42B, 41 not corrected up to date.
Catalogue NP131 2013 edition
NP 131 charts & publications not be corrected.
NP 32 CHINA sailing direction not new edition.
Last notice to Mariner on board from October 2013.(ISM)
Sailing directions for the area of sailing 583 and 72 are missing.
Tide tables BA 202 is of old edition on board.
Echo sounder not adjusted to 0 line.
Unit switched off whilst vessel on passage in shallow waters.
Speed log not working.
Alarm of Echo Sounder switch off during inspection.
The echo sounder indicator - malfunction.
Echo sounder not properly work.
Echo sounder malfunction.
Echo sounder - wrong information (2 meters error) (ISM).
Defective speed log was reported to flag state but no evidence of reporting to port authority, pilot,
port state and to Class.
Incorrect indication.
Page 68
17
17
17
17
17
17
30
30
17
17
17
17
17
17
17
17
17
17
16
17
17
17
16
17
30
17
17
17
30
17
17
17
17
17
17
17
10118
10118
10118
10118
10119
10119
10119
10124
10126
17
17
17
17
16
17
17
17
30
10127
10127
10127
10127
10127
AU chart 328 and 329 for the intended voyage not on board.
Large scale charts AUS 281 & 270 not used during the previous voyage.
Voyage plan not prepared for berth to berth.
No parallel indexes, infrequent plotting of ships position, No continuous monitoring of ships position.
17
17
17
17
10127
10127
Largest scale chart (AUS 244) not used / included for the previous voyage.
Voyage plan from Laem Chabang to Brisbane and Brisbane to Port Kembla does not consider
environmental factors and does not meet the requirements of circ A893 with regard to frequency and
method of position fixing required.
17
17
10127
17
10127
10127
10127
10127
Company's voyage/passage planning form/procedure did not take into account of IMO guidelines for
voyage planning.
Several mentioned nautical charts and publications found expired and not updated.(ISM)
Voyage planning process not effective- following AUS charts required for intended voyage are not
available onboard 357, 806, 811, 812, 813, 814, 511.
Vessel position fixing for inbound voyage was not recorded as per passage plan. (ISM)
Passage plan has failed to ensure appropriate scale chart used for inbound passage to Australia.
Charts 4725 & AUS332 available but not used. AUS 329 not available. 4708 used for entire passage
from Indonesia to Fremantle including coastal navigation.
10127
10127
10127
10127
17
99
99
17
10127
10127
10127
AUS charts 828, 827, 256 for intended voyage not current editions.
The voyage plan not cover berth to berth.
No voyage plan of berth to berth on 12nd August 2014.
Fixing methods in voyage plan not available.
Passage plan not in compliance for incoming voyage to Dampier and outbound voyage to Darwin.
(ISM)
Voyage plan missing. (ISM)
Voyage or passage plan - missing. (ISM)
Page 69
17
17
17
17
17
17
10
17
10127
10127
10127
10127
10127
10127
10127
10127
10127
10127
10127
10127
10127
10127
10128
10128
10128
10129
10129
10129
10130
10130
10130
10130
10130
10130
10130
10130
10130
10130
10132
Previous passage plan Esperance to Geraldton not in compliance with SOLAS Ch.V R.34 and IMO Res.
A893(21). (ISM)
Passage plan from Fremantle pilot station to current berth not available.
Passage plan for previous passage failed to include largest scale charts in several coastal areas (charts
not onboard). (ISM)
Nautical chart BA918 for crossing Sunda Strait area not included in passage plan for next voyage.
17
Largest scale chart AUS 815 not intended to be used for the next voyage to Newcastle.
ISM procedure TK 08-302 for Passage Plan was not used for the incoming voyage.
Voyage plan from previous port to Venice not properly filed. (not berth to berth) (ISM)
Voyage plan not in accord with IMO Guidelines for voyage planning- all required voyage charts not
identified, Chart AUS357 not identified as critical navigation chart for Bass Strait.
17
17
99
17
Page 70
17
17
17
17
17
17
30
17
17
17
17
17
17
17
17
16
17
17
17
17
17
17
17
16
30
10
10133
Bridge operation
10133
10133
10133
Bridge operation
Bridge operation
Bridge operation
10133
10133
10135
10135
10135
10135
10135
10135
10135
10135
10135
10136
10136
10136
10136
10137
10137
Bridge operation
Bridge operation
Monitoring of voyage or passage
plan
Monitoring of voyage or passage
plan
Monitoring of voyage or passage
plan
Monitoring of voyage or passage
plan
Monitoring of voyage or passage
plan
Monitoring of voyage or passage
plan
Monitoring of voyage or passage
plan
Monitoring of voyage or passage
plan
Monitoring of voyage or passage
plan
Establishment of working
language on board
Establishment of working
language on board
Establishment of working
language on board
Establishment of working
language on board
Long-Range Identification and
Tracking system (LRIT)
Long-Range Identification and
Tracking system (LRIT)
Records show that during hours of darkness bridge is manned only by the officer of the watch during
sea passages on numerous occasions in August.
No lookout kept on the bridge in addition to the officer on bridge at sea. (ISM)
AIS destination information - not entered properly.
Passage plan (previous & present voyage) not as per BPG (i.e., No go area, PPI, w/o position not
marked).
Crew failed in proper bridge operation such as AIS, light and shapes, international code.
BNWAS was not protected so that access should be restricted to the master only.
Bridge officers have fixed the vessels position using only one GPS during pilotage passage to
Gladstone berth.
Bridge officers have used only one method of position fixing(GPS) for voyage from Laem Chabang to
Brisbane. Company requirements and STCW code require that multiple methods of position fixing are
used.
17
Vessel position while coastal and pilotage passage was not verified by alternate means of position
fixing as required by passage plan. (ISM)
Large scale chart included in the voyage plan, not used.
17
No evidence of position plotting and monitoring of passage whilst under pilotage. (ISM)
16
Monitoring of the passage plan for arrival at Fremantle whilst under pilotage not carried out.
15
Vessel incorrectly navigated through Bass Strait Traffic Separation Scheme, Inadequate position fixing
and voyage monitoring.
Under- keel clearance not being taken into account whilst planning passage.
17
Navigational voyage charts onboard were not duly corrected and updated with marine notices for
vessel's intended sea voyages.
Crew unable to communicate effectively in the execution of their duties - operational communication
not in working language. (ISM)
ISM manual doesn't establish which is working Language on board. (ISM)
17
17
17
16
16
Page 71
30
17
17
17
17
17
17
15
17
17
99
10137
LRIT and AIS noted are not giving out the same information - Name of vessel.
17
16
17
16
16
17
BNWAS operation key not controlled. (Key fund in place in console during inspection)
17
17
17
17
17
17
Operation modes, manual /automatic and unauthorized switching off of BNWAS not protected by a
key/password. (ISM)
Watch alarm system on board not comply with IMO Res. MSC 128 (75). BNWAS to be installed on
board according SOLAS and IMO Resolutions. (ISM)
BNWAS panel on bridge show malfunctioning & error.
17
10199
10199
11100
11100
11100
11101
11101
17
30
17
17
10
17
17
11101
11101
Lifeboats
Lifeboats
17
10137
10137
10137
10137
10138
10138
10138
10138
10138
10138
10138
10138
10138
10138
Page 72
16
17
11101
11101
Lifeboats
Lifeboats
11101
Lifeboats
11101
11101
11101
11101
11101
11101
Lifeboats
Lifeboats
Lifeboats
Lifeboats
Lifeboats
Lifeboats
11101
11101
11101
11101
11101
11101
11101
Lifeboats
Lifeboats
Lifeboats
Lifeboats
Lifeboats
Lifeboats
Lifeboats
11101
11101
Lifeboats
Lifeboats
11101
11101
Lifeboats
Lifeboats
11101
11101
11101
11101
11101
11101
11101
Lifeboats
Lifeboats
Lifeboats
Lifeboats
Lifeboats
Lifeboats
Lifeboats
11101
11101
11101
11101
11101
11101
Lifeboats
Lifeboats
Lifeboats
Lifeboats
Lifeboats
Lifeboats
17
17
17
16
30
30
16
17
40
Page 73
30
30
17
17
30
17
17
30
99
17
15
30
30
17
99
30
17
17
16
17
17
17
30
30
11101
Lifeboats
11101
Lifeboats
11101
11101
11101
11101
11101
11101
Lifeboats
Lifeboats
Lifeboats
Lifeboats
Lifeboats
Lifeboats
11101
11101
11101
11101
11101
11101
11101
11101
Lifeboats
Lifeboats
Lifeboats
Lifeboats
Lifeboats
Lifeboats
Lifeboats
Lifeboats
11101
Lifeboats
11101
Lifeboats
11101
11101
11101
Lifeboats
Lifeboats
Lifeboats
11101
11101
Lifeboats
Lifeboats
11101
11101
11101
11101
11101
Lifeboats
Lifeboats
Lifeboats
Lifeboats
Lifeboats
11101
Lifeboats
11101
Lifeboats
30
17
17
17
17
17
17
30
17
Forward fall hook of port lifeboat opened when boat was in final resting position and being secured.
Forward end of boat dropped, injured the BOSUN and is seriously damaged.
Painter line of lifeboat stbd side - weak.
Lifeboat window PS/STB side - crack.
Lifeboat (Port side) maneuvering in water record could not be shown as per SOLAS Reg.19.3,3.3.
Chap. .
Lifeline around the port side life boat (stbd. Side aft) is broken.(ISM)
Lifeboat - Bilge Rail(P&S) Heavily Corroded & Holed, Fractured(4pcs.), Rudder Tiller(S) Corroded &
Holed. (ISM)
Port side lifeboat grabline partly not connected.
One starboard side signaling light not work.
Port side lifeboat signaling light damaged, out of order.
Lifeboat davits swivel hooks maintenance.
Port and STBD L/B engine failed to start within the requested time at a temperature above -15 deg C.
PSCO witnessed the lifeboat starting in 1 hour & 8 min. respectively.
Stbd L/B not properly fitted with on-load releasing gear which in an emergency it would not allow the
vessel to be release from inside the L/B as designated.
Rudder blade on stb.side L/B - rusted seriously & broken.
30
Page 74
17
17
17
17
30
30
10
17
17
17
17
17
30
17
17
17
17
30
17
30
11101
11101
Lifeboats
Lifeboats
Stb.side L/B engine can not be started by No.1 & No.2 battery during inspection.
Unable to launch Port Lifeboat due launching appliance malfunction. One (Aft) arm sized on top
position. The lifeboat does not keep horizontal position.(ISM)
Freefall lifeboat - engine inoperative.(ISM)
The self-contained air supply system for starboard side lifeboat leaked seriously.
Engine of portside lifeboat unable to be started.
The manually control light on the top of starboard side lifeboat inoperative.
Lifeboats davits switch of limit not work.
Lifeboats exhaust line flaps not move, missed.
Lifeboats windows cracked.
STBD L/B engine not able to start by NO.2 battery set.
Free-fall lifeboat engine can only run in astern direction (anti-clockwise).
Free-fall lifeboat steering portholes opaque.
Freefall lifeboat engine - not ready for use, not starting. (emergency battery found empty.) (ISM)
30
30
11101
11101
11101
11101
11101
11101
11101
11101
11101
11101
11101
Lifeboats
Lifeboats
Lifeboats
Lifeboats
Lifeboats
Lifeboats
Lifeboats
Lifeboats
Lifeboats
Lifeboats
Lifeboats
11101
Lifeboats
30
Lifeboats
11101
11101
11101
11101
11101
11101
11101
Lifeboats
Lifeboats
Lifeboats
Lifeboats
Lifeboats
Lifeboats
Lifeboats
11101
11101
Lifeboats
Starboard lifeboat engine was unable to be started during operational test at time of inspection.
30
11101
Lifeboats
15
11101
11102
11102
11102
Lifeboats
Lifeboat inventory
Lifeboat inventory
Lifeboat inventory
11102
Lifeboat inventory
11102
11102
11102
Lifeboat inventory
Lifeboat inventory
Lifeboat inventory
Lifeboat port and stbd exhaust pipe not insulated against heat. i.e.. Heat protection lagging not
available on exhaust pipe.
Engine of lifeboats (both side) can not started over 30 minute.
Port side life boat search light defective.
Bilge pump did not connect with its pipe properly.
Lifeboats inventory. (compass air, etc.)
Both 25 person lifeboats contained less that 250,000 kj each due to expired and/or damaged food
rations.
No rain water collectors are found in both lifeboats.
Starboard side limit switch of lifeboat davit out of order.
Reflective tapes of lifeboat aged.
Page 75
30
30
30
17
17
17
17
30
30
15
17
17
30
16
17
30
16
30
30
30
17
17
17
15
17
17
17
11102
11102
11102
11102
11102
Lifeboat inventory
Lifeboat inventory
Lifeboat inventory
Lifeboat inventory
Lifeboat inventory
17
17
17
17
17
11102
Lifeboat inventory
17
11103
Fall preventer not approved and too long, starboard runner aft fixed at the davit at a worn out eye.
(ISM)
17
30
17
Lashings of both lifeboats are heavy corroded, spliced and damaged, need to be replaced.
16
17
11104
11104
Rescue boats
Rescue boats
11104
11104
11104
Rescue boats
Rescue boats
Rescue boats
11104
11104
11104
11104
11104
Rescue boats
Rescue boats
Rescue boats
Rescue boats
Rescue boats
Operation instruction and operating place for lifeboat on starboard side not under emergency
illumination.
2. Rescue boat not maneuvered in the water in last 3 months.
6.The rescue boat not ready to launch during inspection.
Rescue boar outboard engine is not working properly.
Rescue boat forward and aft hooks unable to be released simultaneously.
Crew was unable to start rescue boats engine and demonstrate proper operations given the allotted
time.
The rescue boat engine stops when accelerating (ISM related).
Operational test of the rescue boats engine, the crew was unable to start and demonstrate proper
operations given the allotted time.
Rescue boat has not been maneuvered in the water since May 2013.
Rescue boat took approx. 45 mins to start.
The ship's rescue boat outboard motor was unable to be started up for operation test at the time of
inspection (at least 10 attempts). (ISM)
Both fuel tanks from the rescue boat are half full.
Rescue boat delivery and suction rubber hoses broken.
Rescue boat remote release system ropes.
Ship name and R/B's dimension indicated on R/B's hull - peeled off.
Canopy Light and Link Stopper did not work properly.
99
11104
11104
11104
11104
11104
FW in lifeboats (P&S) was not sealed & were not marked date of packing, date of expiry and etc. in
accordance with LSA Code.
Crew was unfamiliar with procedures to lower lifeboat. (ISM)
11103
11103
11103
11103
11103
11103
Page 76
30
15
17
30
30
30
17
30
17
10
17
17
17
17
17
17
11104
11104
11104
11105
11105
11105
Rescue boats
Rescue boats
Rescue boats
Rescue boat inventory
Rescue boat inventory
Rescue boat inventory
17
17
16
17
17
17
11107
11107
11107
The rescue boat had the launchable life raft hook instead of the dedicated rescue boat hook in. (ISM)
10
11108
Inflatable liferafts
17
11108
11108
11108
11108
11108
11108
11108
Inflatable liferafts
Inflatable liferafts
Inflatable liferafts
Inflatable liferafts
Inflatable liferafts
Inflatable liferafts
Inflatable liferafts
16
16
17
30
17
30
17
17
30
11108
11108
11108
11108
11108
11108
11110
Port and starboard liferaft instruction are not posted under emergency lights.
Both port and starboard life rafts had none of the required markings.
Port side Liferaft hydrostatic release incorrectly fitted.
Inflatable lifraft - expired. (ISM)
Liferafts HRU fix.
S/S liferaft unable to transfer for launching on port side of the ship.
Both liferafts lashed to deck, starboard side liferaft release cradle seized and port side liferaft are
guarded/unsafe.
Inflatable liferafts
Annual inspection service for liferafts expired.
Inflatable liferafts
Inflatable liferafts (P & S) lashed improperly.
Inflatable liferafts
Starboard side fitted 2 numbers of liferaft H.R.U expired in 12/2013.
Inflatable liferafts
STBD side liferaft painter connect to ship without weak link.
Inflatable liferafts
One liferaft's painter at P/S secured to ship's body other than H.S.R device.
Inflatable liferafts
Liferafts on 2nd deck secured by extra tape, not ready for use during emergency.
Stowage and provision of liferafts Both sides liferafts hydrostatic release mechanism expired. (ISM)
11110
Stowage and provision of liferafts No hydraulic release units fitted on starboard life rafts.
17
11110
Stowage and provision of liferafts Liferaft not stowed as to permit manual release of one raft at a one time from securing arrangement.
17
11110
Stowage and provision of liferafts Port side liferaft weak-link broken by serious rusty.
30
11110
Stowage and provision of liferafts Fore embarkation ladder rope for forward liferaft launching deterioration and out of function.
17
Stowage and provision of liferafts Operating procedures for launching liferaft found damaged.
17
11110
Page 77
30
17
17
17
17
17
30
11110
Stowage and provision of liferafts The FWD 6 person liferaft not installed in position during PSC inspection.
17
11112
Shackle bolt securing pins missing on starboard lifeboat fore and aft fall blocks.
17
Port lifeboat - hook release maintenance pin in slot. Starboard lifeboat - hook release secured in
maintenance position. (ISM)
Both lifeboats lifting hooks release devices not in locking position (needs to be adjusted by qualified
technician) and positioning marks not as instructions.
Lifeboat (S) - pin for waterborne interlock lever not in correct position.
17
17
Operation of lifeboat davits Port & Stbd observed unsafe due to seized sheaves. 3-off sheaves on port
seized very poor general condition overall not maintained. (ISM)
30
Starboard lifeboat/rescue boat was unable to be launched from the stowed position.
30
17
16
17
The quick releasing handles of liferafts on ship`s boat deck were found sized up and unable to be
pulled using hands.
Broken handrails forward of port lifeboat davit arrangement.
17
30
16
17
17
17
11112
11112
11112
11112
11112
11112
11112
11112
11112
11112
11112
11112
11112
11112
11112
11112
11112
11112
Page 78
30
17
17
16
30
11113
11114
11116
Distress flares
11116
11117
Distress flares
Lifebuoys incl. provision and
disposition
Lifebuoys incl. provision and
disposition
Lifebuoys incl. provision and
disposition
Lifebuoys incl. provision and
disposition
Lifebuoys incl. provision and
disposition
Lifebuoys incl. provision and
disposition
11113
11113
11113
11113
11113
11113
11113
11113
11113
11113
11117
11117
11117
11117
11117
Rescue Boat davit unable to slew/operate under stored energy as required by LSA Code. (ISM)
30
17
17
17
Emergency operation unit for davit painted (difficult to move) on rescue boat deck.
17
Sign of emergency operation unit for davit on rescue boat deck blurred.
16
Ship staff unable to demonstrate emergency operation of rescue boat launching arrangements. (ISM)
17
16
16
Rescue boat davit under maintained, onload release device lashed not ready for immediate use. (ISM)
30
Rescue boat launching appliance depending on other means than gravity or stored mechanical power.
16
Vessel has been conducting helicopter landings but evidence of conducting drills as required by
vessel's Safety Management System could not be presented on board.
Lifeboat (S) rocket flares expired on 11/2013. Vessel sailing with expired rocket flares & company has
not taken corrective yet.
3 numbers of rocket flare on bridge found expired in 11/2013.
Some lifebuoys have faded coloring, reflective tape peeling.
17
17
17
Multiple lifebuoys were seized unavailable for immediate use as well as retro reflective material was
severely deteriorated.
The self-active smoke signals lighting - unlit.
30
30
Page 79
30
17
17
17
11117
11117
11117
11117
11117
11117
11117
11117
11117
11117
11117
11117
11118
11118
11118
11118
11118
30
30
The lifebuoys fitted with lights and lifelines in vicinity of embarkation area not be provided and also
not be approved for that of accommodation ladder area in life saving plan.
Ship name mark of one lifebuoy near emergency E/G room not clear.
17
The lifebuoy with lighting and smoke on port bridge wing - can't be released.
17
17
17
17
17
17
17
Life buoy at various locations not properly marked with ships name and flag of vessel. I.e.. Boat deck,
main deck, life buoy marking faded and not able to visible.
One life jacket light in engine room out of work.
15
The two life jackets located at engine control room found oily, dirty and insufficient condition. Master
took all appropriate action to supply the vessels with new life jackets before departure.(ISM)
30
Two lifejacket not marked with port name and ships name.
17
Found onboard a lot of old lifejackets. Presence of those Lifejacket in portside store under PS lifeboat
and engine control room. When asked the reason of the presence on board of those, crew members
said that those are old and that they dont use them. After Abandon ship drill, few members of the
crew reach the assembly station doing those old lifejackets.(ISM)
17
All lifejackets found on board get closed by knots only. This is impossible with the immersion suits on
board. Lifejackets are not according to LSA - should be fitted with clips.
17
Page 80
17
17
11118
11118
11119
11119
11122
11123
11123
11123
11123
11123
11124
11124
11124
11124
11124
11124
11124
11125
11127
11128
11129
11129
16
17
17
40
15
-
30
Hand held VHF radio emergency battery seal not intact. (ISM)
17
17
30
Port and Starboard lifeboat embarkation ladders have several wasted seizings.
17
P & S lifeboat winch drums and wire rope fall stoppers shown signs of heavy corrosion and
unauthorized repair.
Starboard lifeboat embarkation ladder rope broken/shackles rusted and not connected. (ISM)
99
17
16
The side rope of port side embarkation ladder -In poor condition.
17
Side rope of embarkation ladder (port side) for lifeboat deteriorated seriously (It's foundation broken)
30
17
30
17
30
17
Page 81
30
11129
11129
11129
11129
11129
11129
11129
11129
11129
11129
11129
11129
11129
11130
11131
11131
11131
11131
11131
Operational readiness of
lifesaving appliances
Operational readiness of
lifesaving appliances
Operational readiness of
lifesaving appliances
Operational readiness of
lifesaving appliances
Operational readiness of
lifesaving appliances
Operational readiness of
lifesaving appliances
Operational readiness of
lifesaving appliances
Operational readiness of
lifesaving appliances
Operational readiness of
lifesaving appliances
Operational readiness of
lifesaving appliances
Operational readiness of
lifesaving appliances
The steering line of the launchable life raft was connected to a strong point (ISM).
10
The engine of the rescue boat was unable to start at the first two attempts (battery and by hand). The
crew was not aware of the closed fuel tank vent plug (ISM).
Davit-launched liferaft launching operation instructions not post in vicinity of emergency lights.
10
There is no record of lifeboat drill to comply with SOLAS 19.3.3.4 & 19.3.3.5.
17
30
3/O did not know how to use the rain hose and rain water tank in lifeboat.
17
17
30
Crew unfamiliar with procedure for using fall prevention system for lifeboats.(ISM)
17
Port Side Lifeboat: 2 cracks around lifeboat beam between the hull and inner seat in way of the
buoyancy chambers.
Man-overboard markers (port and starboard bridge wing) - lifebuoys not ready for immediate release.
30
Operational readiness of
lifesaving appliances
Operational readiness of
lifesaving appliances
Evaluation, testing and approval
30
Lifeboat Drills requirement as per SOLAS Chapter III Reg 19.3.3.3 not complied with.
17
As per ship's records, last ship's freefall lifeboat waterborne test was carried out on 29 January 2014
and ship's rescue boat waterborne test was carried out on 16 April 2014. Both were overdue. (ISM)
99
16
Key ship's officers not familiar with the emergency operation of the rescue boat davit. (ISM)
17
SOLAS training manual is non-ship specific and does not comply with the requirements of SOLAS 74
Ch. III Reg.35.3 nor II-2 Reg. 15.2.3
Life boat launching drill
-not carried out in proper period (last time: 03-08-2014)
Lifeboat maneuvering drill - Not carried out properly.
16
Page 82
17
17
17
17
11131
The drills schedule of the rescue boat indicates a frequency of 3 months instead of 1 month and the
launchable life raft drill is missing (ISM).
The Solas training manual onboard is not ship specific (ISM).
16
SOLAS training manual non ship specific and does not comply with the requirements of S74 ChIII R
35.3, nor S74 Ch. II-2 R 15.2.3.
Some instructions written only in Turkish or only in English. OWS instructions missing. (ISM)
16
Key personnel not familiar and unable to demonstrate emergency steering operation of Free fall
lifeboat. (ISM)
Training record of SEEMP N/A. (ISM)
17
17
Senior members of the crew unable to demonstrate rescue boat davit system using accumulator. (ISM)
17
17
17
SOLAS training manual does not contain instructions for starboard lifeboat hook release
arrangements.
Lifeboats have not been maneuvered for excess of 3 months.
17
16
17
16
Starboard side lifeboat boat not maneuverer into the water more than 3 months. (Rescue boat)
30
Port side lifeboat not maneuverer into the water more than 3 months.
15
11132
30
11132
11132
Lifeboats shall be turned out from stowed position monthly, last time the crew swung boat was
07/13/2014.
The manual bilge pump for rescue boat (P- SIDE) - Not in good condition.
Instruction for on-board maintenance - Not recorded properly.
11131
11131
11131
11131
11131
11131
11131
11131
11131
11131
11131
11131
11131
11131
11131
11131
Page 83
16
99
17
17
17
17
Weekly inspection for LSA not carried out according to SOLAS (latest inspection date is 31-May2014).
5-year service report for L/B - Not be showed.
No evidence was found who carried out the annual inspection for L/B was authorized by the
manufacturer or flag. (ISM)
Annual inspection report for liferafts, carried out on 09.09.2013 (MV SAFETY-BRAZIL) only copy. (ISM)
11132
11132
11132
11132
11132
11132
11132
17
17
99
11132
11133
11133
11133
17
17
17
16
11133
11133
11133
11133
11133
11134
17
Crew
-Didn't know how to assemble radar reflector of FF lifeboat.
Crew failed in proper L.S.A. operation.
17
Crew failed to demonstrate satisfactory familiarity with launching lifeboat. Master instructed to
provide necessary training. Launching of boat to be satisfactory undertaken in the presence of
attending Flag/RO surveyor prior to departure. Report to be sent to PSC Gibraltar.
17
11134
11134
11134
11134
Page 84
17
17
17
17
17
16
17
17
15
17
17
11134
Crew members
-not familiar with trying on immersion suit.
Duty officers
-not familiar with operation of rescue boat's equipment.
-could not identify equipment of rescue boat.
17
11135
Rescue boat davit not maintained in accordance with manufacturer's instructions. (ISM)
17
17
Maintenance record of L.S.A. in the ship's log book was not recorded correctly.
99
Lifeboat (P) lowering and maneuvering is wastes in last 3 months not carried out.
30
17
Conditions on which annual service of Life boat and rescue boat extension was granted by flag
administration expiring on 04th of January (See CSS Equipment).
Liferaft HRU expire 11/14.
Access to port liferaft overstored with bagged sand.
Retro reflective tape on lifeboats and multiple lifebuoys deteriorated. (ISM)
Forward ladder for 6 person liferaft shackle frozen. (ISM)
Segregation of DG container not complied with requirement of IMDG Code. (ISM)
30
17
17
17
10
Multiple oil leaks on purifiers, valves and flanges in the oil purifier room. (ISM)
30
13101
13101
Special requirements
Tank entry
Propulsion and Auxiliary
Machinery
Propulsion and Auxiliary
Machinery
Propulsion and Auxiliary
Machinery
Propulsion main engine
Propulsion main engine
17
30
13101
13101
13101
11135
11135
11135
11135
11135
11199
11199
11199
11199
12101
12107
12109
12110
13100
13100
13100
Page 85
16
17
17
17
30
17
17
99
13101
13101
13101
13101
13101
13101
13101
13101
13101
13101
13101
13101
13101
Pressure gauge for main engine A/C clean pump out of work.
Accumulation of oil on Main Engine cylinder.
Main engine indicator cock caps missing.
Numerous indicator lights on local M/E station not working. (ISM)
Oil leakage found from M/E.
Exhaust pipe for M/E No.6 cylinder leaking.
Main engine water leak.
Fuel oil leakage from booster and circulating pumps.
Min Engine oil mist detector box out of order.
Main Engine lubricators wires poor insulation.
Main engine covers heavy leak of cooling water.
Main Engine heavy leak of oil.
M/E No.2 - No.5 Cylinder H. P. Pump leaking oil and some fittings also leaking wasted oil found on
cylinder cover level.
Main Engine Turbocharger cooling system heavy rusted/leaking and Main Engine control system
found disconnected. (ISM)
-Oil Mist Detector- Calibration/Alarm and ready status to be checked.
16
16
17
17
17
17
30
17
17
17
17
17
30
13101
13101
13101
13101
17
17
99
13101
13101
13101
13101
13101
13101
17
30
30
30
17
17
13101
13101
13101
30
17
17
13101
13101
13101
13102
13102
30
17
17
30
17
Page 86
48
13102
13102
13102
13102
Auxiliary engine
Auxiliary engine
Auxiliary engine
Auxiliary engine
17
17
17
99
13102
13102
13102
13102
13102
13102
13102
13102
13102
13102
Auxiliary engine
Auxiliary engine
Auxiliary engine
Auxiliary engine
Auxiliary engine
Auxiliary engine
Auxiliary engine
Auxiliary engine
Auxiliary engine
Auxiliary engine
17
16
30
17
16
30
17
17
16
30
13102
13102
13102
13102
13102
13102
13102
13102
13102
13102
13102
Auxiliary engine
Auxiliary engine
Auxiliary engine
Auxiliary engine
Auxiliary engine
Auxiliary engine
Auxiliary engine
Auxiliary engine
Auxiliary engine
Auxiliary engine
Auxiliary engine
13102
13102
13102
13102
13102
13102
13102
13102
13102
13102
13102
13102
Auxiliary engine
Auxiliary engine
Auxiliary engine
Auxiliary engine
Auxiliary engine
Auxiliary engine
Auxiliary engine
Auxiliary engine
Auxiliary engine
Auxiliary engine
Auxiliary engine
Auxiliary engine
17
17
17
17
30
17
17
17
17
30
17
17
Page 87
17
17
17
17
17
17
17
17
30
48
13102
13102
13102
13102
13102
Auxiliary engine
Auxiliary engine
Auxiliary engine
Auxiliary engine
Auxiliary engine
16
16
17
30
30
13102
13102
13102
13102
Auxiliary engine
Auxiliary engine
Auxiliary engine
Auxiliary engine
17
17
17
30
13102
13103
13103
13103
13103
13103
13103
13103
13103
13103
13103
13103
13103
13103
13103
13103
13103
13103
13103
13103
13103
Auxiliary engine
Gauges, thermometers, etc.
Gauges, thermometers, etc.
Gauges, thermometers, etc.
Gauges, thermometers, etc.
Gauges, thermometers, etc.
Gauges, thermometers, etc.
Gauges, thermometers, etc.
Gauges, thermometers, etc.
Gauges, thermometers, etc.
Gauges, thermometers, etc.
Gauges, thermometers, etc.
Gauges, thermometers, etc.
Gauges, thermometers, etc.
Gauges, thermometers, etc.
Gauges, thermometers, etc.
Gauges, thermometers, etc.
Gauges, thermometers, etc.
Gauges, thermometers, etc.
Gauges, thermometers, etc.
Gauges, thermometers, etc.
Auxiliary engine No2 & 3 start interlock with turning bar found inoperational.
Cooling sea water pressure gauge for No.1 A/E - malfunction.
Lub. Oil pressure gauge for No.2 A/E - malfunction.
Generators No.1 and No.2 turbocharger thermometers are out of order.
Generator No.2 fuel out pressure gauge is not available.
Steam pipe for F.O.TK (P) in poor condition.
Pressure gauge for F.O. Purifier in poor condition.
Gauges of generator not in good condition.
Boiler water level is inoperative.
Two pcs FW. Pressure gauge of A/E No.1 and 2 defective.
Pressure gauge and vacuum gauge of emergency fire pump -malfunction.
Press. gauge of L.O. for No.1 G/E broken.
Wasted oil tank level sensor inoperative.
Oil leakage and some manometers out of order in Generator No.1.
Several pressure gauges in engine room inoperative.
A pressure gauge in front of the main engine is out of order (ISM).
Number of pressure & temperature gauges missing on several equipment in the E/R area.
Damaged boiler feed water level gauges (2nos).
Suction gauge of No.1 main fresh cooling water pump broken.
Suction gauge of emergency fire pump out of work.
Discharge pressure gauge of oil pump for mooring winch at steering gear room: Malfunctioned.
16
17
17
17
17
99
16
17
17
17
17
17
16
15
17
17
17
17
17
17
17
13103
13104
13104
13104
13104
17
15
17
16
17
13104
Oil level gauge of aft mooring station at steering gear room: Not able to read the level.
Cargo hold bilge suction valve for No.6 hold operating wheel missing.
Packing of Ref. mach. COOL.SW. pump found leaking water heavily.
Ejector cooling water pump discharge line - corroded through.
Engine room emergency bilge suction not available for emergency use. (Chain locked with pad lock no
key readily available) (ISM)
Main bilge pump has a lot of leakage at the bottom of the ship (ISM).
Page 88
17
13106
13106
13106
13106
13106
13107
13107
13107
13107
13107
13107
13107
13107
13107
16
17
17
30
17
16
16
17
17
16
30
30
17
17
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
13107
Other (machinery)
13107
Other (machinery)
13107
13107
13107
13107
13107
13107
13107
13107
13107
13107
13107
13107
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
13107
13107
13107
13107
13107
13107
13107
13107
Other (machinery)
17
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Page 89
17
17
17
17
17
17
17
16
17
17
17
17
17
17
17
16
17
17
17
30
30
13107
13107
13107
13107
13107
13107
13107
13107
13107
13107
13107
13107
13107
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
17
16
17
17
17
17
17
16
30
17
17
17
17
13107
Other (machinery)
The defective SW Pipes were found in Engine Room. Set out Recommendations for all 6 items.
1. Mechanical and Soft Patches on Main Cooling Sea Water Line between #2 & #3 CSW Pumps.
2. Soft Patch on CSW Line to Air-Con, etc.
17
13108
13108
13108
Operation of machinery
Operation of machinery
Operation of machinery
17
16
17
13109
13109
Engine room lines, valves and sounding pipes are not marked.
Cooling water pipe for the refrigeration machinery blocked.
Crew not familiar with the operation of main air compressor No.1 as emergency use in dead ship
condition.
Emergency operation instruction for M/E missing.
The training manual shall contain instructions and information required in Paragraph 2.3.4 in easily
understand terms. Vessel's Fire Fighting Training Manual does not follow the Table of Contents, used
in the Manual.
13199
13199
13199
Other (machinery)
Other (machinery)
Other (machinery)
2 self closing cocks on lower level engine room aft oil tank sounding pipes defective. (ISM)
Temporary repairs to sea water pipe work to be assessed by classification society. (ISM)
Main engine jacket cooler sea water pipe was leaking and Two patches on fresh water line on C deck
storage locker.
17
17
17
13199
13199
13199
13199
13199
13199
13199
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
17
15
15
17
30
30
17
Page 90
17
40
13199
13199
13199
13199
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
13199
Other (machinery)
13199
13199
13199
13199
13199
13199
13199
13199
13199
13199
14100
14101
14102
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Other (machinery)
Pollution prevention MARPOL ANNEX I
Control of discharge of oil
Retention of oil on board
14102
14102
14102
14102
14102
17
17
17
17
17
17
30
16
99
99
30
99
17
17
17
17
16
17
30
30
E/R bilges on aft part found with heavy signs of fuel leaks/dirty (black). (ISM)
There is a lot of FO mixed with sea water at the bottom of the ship (ISM).
Bilge tank quant. Declaration is recorded along with weekly sludge declare. Wrong code used for
bilge tank quantity declares is ORB.
Oily water separator alarm was out of order.
The oil discharge solenoid valve for O.F.E. malfunction.
Lower solenoid valve of oily water separator
Not possible to test the O.W.S. Nobody can show that O.W.S. working in good conditions. (ISM)
10
17
17
14104
14104
14104
14104
14104
Oily Water Separator: 2 electric switches are in place. First one prevents the pump shut-down in the
event of the alarm (the pump does not stop). Second one prevents the 15PP alarm from working (ISM
related).
17
14104
17
Page 91
30
30
17
30
14104
14104
14104
14104
14104
14104
14104
14104
14104
14104
14104
14104
14104
14104
14104
14104
14104
14104
14105
14105
14105
14107
14107
14107
14107
14107
30
17
30
17
17
30
30
17
30
17
17
30
17
17
Pipe diagram for operating Oil filtering equipment not posted on scene.
17
40
Ships crew unable to demonstrate the operation of the oily water separator.
30
30
17
30
Page 92
17
30
17
30
30
30
14107
14108
14108
14108
14108
14108
14108
Oil content meter not approved by classification society and no type approved certificate on board.
30
14108
14108
14108
14108
14109
14109
14116
Power switch of bilge alarm panel for Oil filtering equipment out of order.
Power supply for oil content meter of oil filtering equipment - malfunction.
Oil Water Separator Alarm defective.
15 PPM alarm DNST monitor screen defect.
Oil/water interface low level detector of oil/water separator failure.
Oil content meter leakage.
Oil record - Not recorded properly on July 27
(Quantity discharged).
Incident was not reported immediately and not correct format used as SOPEP required. (ISM)
17
30
30
17
30
17
17
Larger amount of oil in bilge water holding tank and primary tank. To be discharged.
Deck save-alls under winches (aft) defective.
Cleanliness of Main deck and board.
Insulation to be provided on OWS system valve and pipe.
All hydraulic jacks for hatch cover lifting are oil leaking.
Leaking oil drums in Bosun store.
On manhole of bilge sludge tank found pipe going through the manhole cover. Pipe to be removed
and opening temporary closed by blind flanges. Final repair according to class discretion.
17
15
17
16
30
17
10
Other (MARPOL/Annex I)
Other (MARPOL/Annex I)
Other (MARPOL/Annex I)
Draining pipe of exhaust gas pipe from emergency generator draining directly on deck.
Glass level gauge push button of Emergency Generator Engine fuel tank stuck.
New bilge pump (in addition to the original installation) was being carried out during the course of
inspection. However no approved plan sighted onboard.
17
17
16
14107
14107
14116
14118
14118
14118
14118
14118
14118
14118
14118
14118
14118
30
Calibration report for oil content meter of O.W.S - Expired from 4 Nov. 2011.
17
30
The discharging record on 18-AUG-2014 unable to be recalled in monitor Of 15PPM bilge alarm
system.
15 ppm oil content monitor defective/out of function.
Automatic stop of oily water separator bilge pump (when effluent is above 15ppm) is fitted with
manual override switch.
Oily water separator 15ppm alarm in operational.
Oil content meter defective. Meter failed on voyage from Yokohama to Brisbane.
Spare has arrived onboard. Spare is of a type approved under MEPC 107(49)previous meter was
approved under MEPC 60(33).
17
Page 93
30
99
30
99
30
14119
17
30
A valve on the pipe connected to the HFO bunker filter was found leaking with oil.
15
17
Oil spill tray for vent pipe of FO and DO tanks found plugs missing.
17
Overflow from F.O. Tank, Bunker Tank to the sea while vessel sailing. (ISM)
Pollution during bunkering operation.
30
30
14209
14400
14402
17
14206
30
14402
14402
14402
14402
14402
14402
14402
14402
14402
13. Sewage treatment plant defective. Treatment plant is dry and vessel has been in GBRMP waters
since 6 December.
Sewage treatment plant body temporary repair.
Sewage treatment plant inoperational
Sewage treatment plant
-defective due to d discharge pump not working
-level
prove
broken untreated sewage on St. Eustatius Road.
The
ship
discharged
Sewage treatment plant was out of order.
Sewage treatment plant valve found shut and blower not running.
Sewage treatment plant blower not operational. i.e. faulty pulley / belt.
Sewage treatment plant not in use.
Sewage discharged overboard directly in port with 3-way valve bypass the sewage treatment plant.
14402
Sewage treatment plant out of order, not treated sewage directly discharged into sea in port.
30
14119
14119
14119
14119
14121
14123
14199
14202
14205
Each nonmetallic transfer hose must not burst, bulge, leak or abnormally distort under static liquid
pressure at least 1 1/2 times the maximum allowable working pressure. C/E provided rest records
from 2010. Provide documentation attesting of transfer pipe system before conducting bunkering
operations in U.S. water.
Page 94
17
16
17
17
30
17
10
30
30
17
17
17
14402
14402
14402
14402
14402
14402
14402
14402
14402
14402
14402
14402
14402
14402
14402
14402
14402
14402
14403
14404
14405
14405
14405
14405
14405
14499
14403
30
17
17
17
30
30
30
17
30
Sewage treatment plant air blower found switched off on starting air blower tripped and unable to
start S.T.P is in operative.
The bolt of 3-way V/V for sewage plant broken.
Both change over board V/V for sewage treatment plan inlet pipe malfunction, pin broken and can not
sure V/V in open or close. Position.
Both sewage treatment plant normal close outlet V/V in open position during PSC inspection.
30
On arrival crew on board (27) is above maximum capacity of sewage treatment plant. (ISM)
Sewage discharge rate table missing. (ISM)
30
17
Untreated sewage discharged directly to overboard due to drain valve for Bio-filter tank and stop valve
were open when sewage treatment plant was in operation.
Sewage plant pump discharge line to shore reception / O/B pipe line having unauthorized pipe
connection with valve & flexible hose discharging to unknown place.
Untreated sewage discharge rate are not as required. Pump capacity exceed Drmax maximum. (ISM)
30
17
Sewage discharged directly to overboard during navigate inside the territorial sea on 25-Feb.-2014.
(ISM)
Sewage discharged directly to overboard during Ningbo port.
Sewage overboard valve is open. So sewage discharge to overboard directly in Port. (ISM)
Page 95
17
17
17
16
15
30
30
30
17
99
30
-
14499
14499
14500
14501
14501
14501
14501
14501
14501
14501
14501
Garbage
Garbage
Garbage
14501
Garbage
14501
Garbage
17
17
17
17
17
17
17
17
17
17
16
16
17
30
17
c
10
17
14501
Garbage
14501
14501
14501
14501
14501
Garbage
Garbage
Garbage
Garbage
Garbage
14501
Garbage
14502
14502
14502
Placards
Placards
Placards
14503
14503
14503
Excessive garbage retained and stored on board in unsafe and not compliant manner. (ISM)
Due to bad weather condition two garbage bins lost their covers.
Garbage must be disposed ashore.
Short of waste cooking oil collection in galley.
The amount discharged to reception facility in Taizhou on 09 Jan. 2014 not entered into garbage
record book.
Garbage not segregated according to the markings on the bins, Garbages classes as per MARPOL V
found made up.
Garbage placard in tally office not up to date.
Garbage placards display on board not latest edition.
Garbage segregation information placards and information action displayed as per did old and new
Marpol V Regulations at the same place.
Garbage management plan does not indicate disposal of cooking oil.
Some crew member not have enough training / familiarization necessary to garbage management
plan.
No ship-specific garbage management plan on board.
14503
Operation instructions for control of cooking oil not described on garbage management plan properly.
17
14503
14503
Collection of garbage - not carried out in accordance with garbage management plan.
Garbage management plan does not include procedures to manage garbage (not ship specific).
17
16
Page 96
17
10
17
17
10
99
17
17
14503
14503
14503
14503
14503
14503
14503
14504
14504
14504
14504
14599
14600
14601
14602
14602
14602
14602
14608
14608
14608
14608
14608
14608
14610
14611
14612
14612
14614
17
17
17
99
30
17
1.-Garbage disposal requirements table not posted in the galley. 2.-Not proper garbage segregation
(domestic wastes can full of cans and cartoons).
E/R oil rag garbage drums without lids.
Garbage not separated properly.
Crewmembers could not located SEEMP(Ship Energy Efficiency Management Plan)
Crewmembers not familiar with SEEMP.
EIAPP certificate and Engine Technical File not issued by Ship Class.
16
17
Parameter record book for M/E not record from Feb 2007.
17
Parameter record book for G/E not record from Feb 2007.
17
99
16
17
17
16
16
17
17
30
17
17
30
Page 97
17
17
99
17
17
17
17
14614
14614
Sulphur oxides
Sulphur oxides
17
30
14699
14806
15100
ISM
15100
ISM
Deficiency nos. 1 to 12 are objective evidence that the vessels Safety Management System fails to
adequately ensure the requirements of elements 7,8 and 10 of the ISM Code are met.
30
15100
ISM
Based on the items listed above, Captain of the Port of San Francisco questions the adequacy of the
implementation of vessel's SMS under the ISM Code. An External Audit is recommended to be
conducted by Flag or RO.
50
15101
10
15101
Vessel does not have a Bio-Fouling Management Plan and is not properly documenting sediment
procedures.
2) Key crew not on board Capt, C/O, C/E, 2/E not on board & 2/O joined just before one hour.
15101
18
15101
15101
NK Class to carry out ISM Audit within 90 days since staff unaware of emergency procedures.
18
15101
A ballast management plan has been developed specifically for the vessel. Crew has a plan, but they
are not using the correct ballast water handling log forms. They are not recording Sediment as per
Ballast Plan or Bio-fouling Plan. Ship has Bio-fouling Plan, but it has not been filled out and training
and understanding by crew was questionable.
10
15101
40
15101
Vessel currently is not following Ballast Water Management Plan. Ballast Water Handling Logs not
documented.
Transfer Procedures do not meet requirements for Vapor Line identification and other items.
15102
The SMS has not ensured that failure of critical equipment are reported as required by SOLAS74 Ch. I
Reg.11 nor as required by vessel's SMS Doc S-03.00.00 Sec 6.3. Objective evidence - Deficiency of
No.1 main air comp.
18
15102
Vessel's lack of SMS documentation of the PSC examination were not documented for any NC, near
miss or etc. according to SMS.
30
Page 98
10
99
30
17
10
15102
According to above mentioned for crew`s licenses, it is suspected that ship`s / company`s SMS
unable to keep crew`s competency.
According to the vessel SMS bridge and deck navigation procedures, the anchor watch shall plot a
swing circle, utilize the GPS anchor watch alarm and the anchor watch checklist. PSCO determined
the anchor watchman failed to follow any of these vessel SMS procedures. The company/vessel also
failed provide/update nautical charts and publications required on the current voyage as per SMS
bridge and deck procedures. PSCO determined the vessel reported No.2 radar equipment failure to
the company in Oct. 2013 and the company failed to ensure the vessel had properly functioning
radars onboard. Objective evidence was discovered in an expand ISM examination after vessel
dragged anchor and grounded in the vicinity of Deepwater. The company/vessel failed to fully
implement the requirement of the Safety Management System. An external audit is recommended.
18
15102
Safety Management audit by the Administration is required before departure of the ship. Deficiencies
marked ISM are objective evidence of a serious failure or lack of effectiveness of the implementation
of the ISM Code.
30
15103
15104
Designated person(s)
Masters responsibility and
authority
Masters responsibility and
authority
Masters responsibility and
authority
Masters responsibility and
authority
Masters responsibility and
authority
50
18
The main control printer for the noon time report has been inoperable since July.
40
18
Master did not report to the company about the port side guard rail bending.
10
During the exam., PSCO was informed that a party was held onboard the night prior and there was
drinking involved. After waiting one hour for the Master to show up, PSCO was able to verify the smell
of alcohol in his breath. Upon further investigation by the Vast Guard, the Master provided a breath
analysis reading of 0.051%, a reading in excess of the US rules in 33CFR95 (0.04%). In addition,
ship's ISM procedure of "Responsibility of Personnel" state that intoxication means contents of alcohol
in blood standards 0.04%, i.e. more in weight and subsequent Form where Master signed that he was
aware of Company's alcohol policy. PSCO believes there is objective evidence that the Master is not
aware of US rules enforcing company policy in regards to alcohol onboard the vessel. It is requested
that an additional ISM Audit be conducted by SMC issuing authority prior departure.
30
The safety management system fails to ensure critical operations are performed as evidenced by
deficiencies No.1, 2.
The Captain did not report to the Company about above Sea Water leaks.
30
15102
15104
15104
15104
15104
15104
15104
Page 99
30
17
15105
30
SMS implementation on board - not effective due to item marked (ISM), additional audit to be carried
out.
Senior officers were not aware of their tasks, duties or responsibilities as evident by deficiency marked
(ISM) in fire drill.
C/O can not calculated ship's stability.
Crew member not familiar with shipboard operational procedure related to DSC transmission.
15105
15105
15105
15105
15105
15105
Crew member not familiar with shipboard operational procedure relating to LRIT.
Crew member not familiar with antenna of LRIT equipment location position.
Crew member not familiar with shipboard operational procedure relating to alarm of Echo Sounder.
99
99
30
15105
Implementation relevant to maintaining the safety management system and key persons competency
of shipboard operation, reports of non-conformity action taken not being controlled properly as
evidenced Deficiency (s) marked (ISM).
17
15105
Non-conformity reporting and implementation of improvement plan for PSC inspection deficiencies
not comply with ship management system properly.(ISM)
The deficiencies marked (ISM) are objective evidence of a failure or ineffectiveness of implementation
of the ISM.
Captain and 2/O not familiar with operation of NUC light.
Crew members - not familiar with DC supply to S-VDR operational procedures.
Crew members - not familiar with essential shipboard operational procedures relating to LRIT.
18
17
18
15105
15105
15105
15105
15105
15105
30
30
30
18
17
99
99
15105
4/E - not familiar with the operation of the emergency fire pump.
Resource and personnel Some officer not familiar with their tasks and responsibilities as evidenced by
deficiencies No.2, 13.
Responsible officer not familiar with essential operational procedures relating to insulation test.
15105
15105
15105
15105
All crew members not familiar with essential operational procedures relating to S-VDR.
Responsible officer not familiar with shore station setting of NAVTEX.
Responsible officer not familiar with LRIT antenna location.
All crew members not familiar with essential shipboard operational procedures relating to LRIT.
30
99
99
99
15105
15105
18
18
15105
15105
15105
15105
Deck officer not familiar with suitable cargo for cargo oil tank on board.
Safety management system needs to ensure the procedure to be manned with appropriate seafarer as
evidenced by #11.
Senior officers were not aware of their tasks, duties and responsibilities evident.
Management company does not comprehend the necessity of manning of crew.
Officer are not familiarized with MF/HF NBDP operation test.
Crew member not familiar with operation procedure relating to LRIT.
Page 100
30
30
18
30
17
15105
Resources and personnel ;the company - not ensure that this ship is not manned with qualified
seafarers in accordance with national and international requirements as evidenced by Def.No.1.
18
15106
The deficiencies marked (ISM) are objective evidence of a failure or ineffectiveness of implementation
of the ISM.
SMS IMPLEMENTATION ON BOARD NOT EFFECTIVE DUE TO THE KEY SHIPBOARD SMS
implementation onboard - not effective due to the key shipboard operations concerning Sewage
Operation as evidenced by deficiency marked by (ISM) . Additional audit to be carried out.
30
Entry into cargo hold not flowed the procedures for entry into dangerous spaces of vessel's SMS
18
SMS as implemented failed to ensure watch keepers are rested as per STCW requirements as evident
by deficiency marked (ISM). ISMC/S7
S.M.S does not ensure statutory requirements are met STCW as evidenced by def.2
30
SMS as implemented does not ensure that critical shipboard operations are implemented effectively
as evidenced by deficiencies 1.2.3.4. and 5.
Safety Management System as implemented on board failed to ensure watch keeping rest hours are
recorded correctly as evident by deficiency no.1 Master unable to ensure watch-keepers are rested as
per STCW requirement as evident by deficiency no.2 & no.6.
18
30
The safety management system as implemented on board has failed to ensure safe navigation
operation of the vessel as evidenced by deficiency 3.
The above deficiencies are objective evidence of failure of the SMS in regards to Safety of Navigation.
30
30
Sewage disposal operation not meet the requirement of SMS as evidenced by deficiency No.3.
17
Maintenance plan did not include visual inspection of the fireman`s outfits.
50
The deficiencies marked (ISM) are objective evidence of a failure or ineffectiveness of implementation
of the ISM.
SMS implementation on board not effective for key board concerning rest & work hours required by
STCW, as evidenced by deficiency No.6 and additional audit to be carried out.
Operation manual for ventilation system in RO-RO cargo space not available.
30
15106
15106
15106
15106
15106
15106
15106
15106
15106
15106
15106
15106
15106
15106
15106
15106
Page 101
18
30
30
18
17
18
15106
18
18
The SMS indicated the valve should be checked monthly and the last monthly inspection of the
system was 23 May 2014.
Deficiencies marked (ISM) is the objective evidence that the SMS as implemented on board fails to
satisfy of ISM code.
The SMS, as implemented, fails to ensure the safe operation of the vessel as evidenced by deficiencies
marked (ISM).
The safety management system on board does not take into account of possible risks in carrying out
hazardous tasks.
Numerous past passage plans are not signed by Master and the watch keeping officers.
50
SMS did not ensure supply of appropriate chart for the intended voyage.
30
SMS implementation on board not effective for key shipboard operations concerning environment
protection required by MARPOL 73/78 as evidenced by deficiency No.4 additional audit to be carried
out.
30
15106
99
15106
30
SMS, as implemented, does not ensure that procedures for critical shipboard operations are effective,
or that the ship and equipment is maintained in accord with requirements, as evidenced by
deficiencies Nos 1,2,3,6,7,8,15,16,18,19,20.
30
15106
The ships SMS fails to ensure effective implementation of procedures and instructions for key
shipboard operations concerning safety of personnel, ship and environment as evidenced by
deficiencies marked (ISM).
30
15106
SMS not ensure effective implementation of procedure for key shipboard operations concerning
environment protection required by MARPOL 73/78 Anx.IV, as evidenced by deficiency marked (ISM),
additional audit should be carried out.
15106
30
SMS does not ensure effective implementation of procedure for key shipboard operations concerning
environment protection required by MARPOL 73/78 An. IV, as evidence by deficiency No.1, Additional
audit should be carried out.
30
SMS fails to ensure that critical means were maintained as evidenced by these deficiencies.
30
15106
15106
15106
15106
15106
15106
15106
15106
15106
15106
15106
Page 102
30
30
18
18
15106
The transfer procedures required by 33CFR155.720 must contain either by list or by use of cross
reference index page. Vessel's Transfer Procedures were not in accordance with 33CFR 155. 720.
10
15107
Emergency preparedness
18
15107
15107
Emergency preparedness
Emergency preparedness
The SMS does not ensure the vessel can (effectively) respond to hazards, accidents and emergency
situations, as evidenced by Deficiencies 3, 4, 5 and 6.
As per contingency plan check list 14.1 (Sec 12 of Plan) not complied with.
Dep. Check list required risk assessment, however main engine failure not covered in risk assessment.
15107
Emergency preparedness
Implementation of proper maintenance for emergency used equipments not carried out well as
evidenced by deficiency item 1, 2, 3, 4 and 10 (Absence for emergency preparedness)
Deficiency Action Code: 18 (rectify deficiency within 3 months).
18
15107
Emergency preparedness
30
15107
Emergency preparedness
15107
15107
15107
15107
Emergency preparedness
Emergency preparedness
Emergency preparedness
Emergency preparedness
15107
Emergency preparedness
The deficiencies marked (ISM) are objective evidence of a failure or ineffectiveness of implementation
of the ISM.
PSCO witnessed several unsafe fire-fighting procedures being used, including allowing personnel into
fire location.
Vessel has no record of fire-fighting system and appliance training since 2012.
Training manual is not ship specific.
1) Ships not take action on Emcy situation.
The SMS does not ensure the vessel can (effectively) respond to hazards, accidents and emergency
situations, as evidenced by deficiencies 1,2,5,7,8 and 9.
The safety management system does not ensure effective maintenance of critical equipment as
evidenced by deficiencies 2, 3, 4, 8 marked (ISM-1) and that the vessel can effectively respond to
emergency situation as evidenced by deficiencies 1, 5, 6, and 7 marked (ISM-2).
15107
Emergency preparedness
30
15107
Emergency preparedness
15108
The deficiencies marked (ISM) are objective evidence of a failure or ineffectiveness of implementation
of the ISM.
Evidence of life boat(P&S) launching carried out by ship's crew not kept on board and there was no
record on bridge log book & ship's education record.
Duty Engineer did not inform about the trouble of Sewage treatment plant(deficiency No.11) to
Master according to SMS
15108
18
15108
MF/HF equipment not functional since 13 Aug 2014, same not reported to flag state or port state
authorities.
18
15108
Several deficiencies pointed out repeatedly at this inspection. (Def.' no.1 no.8 & no.11)(ISM)
17
Page 103
17
17
30
30
17
17
18
30
17
18
15108
Master and crew are not submitting reports and analysis of non-conformities as required.
50
15108
Master reported oily water separator defective before inspection this time.
99
15108
30
15108
18
15109
The deficiencies marked (ISM) are objective evidence of a failure or ineffectiveness of implementation
of the ISM.
8.The SMS as implemented can not insure the maintenance of ships critical equipment's in good
condition as evidence by deficiency codes 10114, 04102, 11104 and 07106.
All above deficiencies show inadequate implementation of ISM code onboard- RO to verify. (RO: LR)
18
A larger number of deficiencies regarding air bent head and non-return valves shows inefficiency of
vessel's SMS.
SMS, as implemented, fails to ensure the maintenance of the ship and equipment to regulation as
evidenced by deficiencies 2-16.
Vessel not maintained in accordance with relative conventions , as evidence all above deficiencies.
18
C/E is unfamiliar with proper testing procedures for quick closing valves and stated if bolts are
removed. C/O
was unfamiliar with operation fixed CO2 firefighting system for cargo holds.
30
Master or crew are not familiar with hypermist system and SMS does not identify testing
procedure/intervals of the system.
On board Safety Management System does not identify testing procedures and intervals of hyper mist
F.E system.
Ship hull rusty.
30
SMS with regards to the maintenance and record keeping of the ship has failed. (ISM)
40
18
SMS as implemented does not ensure that the vessel is maintained to the required standard as
evidenced by deficiencies 2,5 and 7.
18
15109
15109
15109
15109
15109
15109
15109
15109
15109
15109
15109
15109
Page 104
18
17
18
17
30
70
15109
17
With reference to Deficiencies No.1, 2, 3 and 12 marked (ISM), it was found that the company's
shipboard planned maintenance procedures as per safety management system procedure manual was
not effectively carried out onboard. (Act Code 99: Ship's RO to verify)
18
15109
above deficiency are the objective evidence that the vessels Safety Management System as
implemented, fails to ensure the requirements of the ISM Code -Section 7 and 10- are met.
18
15109
Safety management system with respect to maintenance equipment ineffective. Objective evidence
def. No.3-9 (ISM).
Maintenance of fire safety equipment
-Not proper.
18
18
17
18
Due to above deficiencies marked (ISM), ship`s SMS is not following ISM Code Part A 10.
17
SMS as implemented does not ensure that critical operations are implemented effectively and that the
vessel is prepared for an emergency as evidenced by deficiencies 1, 2, 7 ,8 and 10.
18
15109
15109
15109
15109
15109
15109
15109
15109
15109
15109
15109
15109
Expired food rations that were in lifeboats and been expired up to 4 month with no indications new
provisions were ordered.
The objective evidence that the SMS as implemented on board failed to satisfy the requirements of
ISM Code elements 7 and 10.
Maintenance of ship and equipment - not properly implemented as evidenced by deficiencies No.
1,9,11.
Maintenance of the ship & Equipment did not follow on board as evidence on No.1 problem (No.1 A/E
not operating) .
Upon entering steering gear room, PSCO discovered that hyper mist supply valve had been secured.
Upon further expansion, it was discovered in the vessel's log that maintenance had been last done on
10 Apr. 2014, The vessel's SMS procedures referred to manufacturer's instructions which clearly
specified that all outlet valves were required to be opened after maintenance was completed.
Attending lag inspector was notified of the issue and issued a detention under the authority of the flag
state requiring an ISM Audit by the certificate issuing authority and provide further guidance in
regards to the maintenance of the hyper mist system.
Page 105
18
16
30
18
99
10
15109
Responsible officer did not inject & test ship's critical equipments as follows
- Emergency fire pump : no inspection since 07-02-20-14
- Emergency generator : no inspection weekly since 14-02-2014
18
15109
Deficiencies 2, 3, 5, 7, 8, 10, 11, 12, 14, 16 to are objective evidence that the Vessel Safety
Management System, as implemented, does not ensure effective maintenance of the Ship and its
equipment.
30
15109
SMS does not ensure effective maintenance of critical emergency equipment as evidenced by these
deficiencies.
ISM has not ensured maintenance of ship and equipment as evidence by deficiencies No.1 to No.6.
30
Maintenance of ship and equipment not implemented effectively as evidenced by deficiencies No.19,11.
SMS as implemented does not ensure that the ship & equipment is maintained in accord with
requirements, as evidenced by these deficiencies.
18
Internal safety audit and corrective action is required within 3 months. Deficiencies markedISM) are
objective evidence of a failure, or lack of effectiveness, of the implementation of the ISM Code.
18
18
15110
Documentation - ISM
18
15110
15110
15110
15110
Documentation - ISM
Documentation - ISM
Documentation - ISM
Documentation - ISM
Procedures for control of SMS documentation and crew certificate not established by company, as
evidence above deficiencies.
ISM Code book 2014.
Enclosed space entry permit's form of check list is not as required.
Familiarization for master and AB not available on board.
Several inconsistencies between oil record book, tank sounding Log and oil content ,meter.
15110
15110
Documentation - ISM
Documentation - ISM
15109
15109
15109
15109
15109
15109
15109
15110
15111
15111
No tank sounding log book, SMS requires sounding be taken twice a day, only once a day.
Section 10.16.1 in ship's ISM document not up -to -date after MARPOL Annex V 2011 amendment
enter into force.
Documentation - ISM
Ship's Certificate: Not arranged properly.
Company verification, review and The vessel failed to implement all applicable requirements of the SMS by master not verifying required
evaluation
items observed.
Company verification, review and Original internal audit report of ISM - no shown.
evaluation
Page 106
30
30
17
17
17
18
17
30
30
18
17
30
15
15111
Internal audit report for SMS out of date.(latest audit 1st Oct 2012)
16
The company has failed to follow its SMS after they have instructed the master to sail out with not
operating No. 1 A/E.
Internal audit report for ISM: Not be provided.
30
18
In view of no of deficiencies during this inspection , indicates complete failure of SMS. Recommending
Additional SMC Audit within three months.
BNWAS operation key found in system during inspection and equipment able to Off/On by duty
officer. Note-company instruction/procedure not available onboard for control of BNWAS key control.
18
15113
Other (ISM)
17
15113
15113
Other (ISM)
Other (ISM)
15150
ISM
15150
ISM
C/OFF rest hrs. record shown the rest was not given in consecutive days from 20/3 to 31/3/2014 as
per STCW Chap. VIII/1.
ISM of ship uncontrolled.
The master or owner didn't report ships defect on generator engines to Incheon Port State during
staying in port.
The number and nature of operational and hardware deficiencies indicate a serious failure of the
onboard SMS.
Internal safety audit and corrective action is required within 3 months. Deficiencies marked (ISM) are
objective evidence of a failure, or lack of effectiveness, of the implementation of the ISM Code.
15150
15150
ISM
ISM
30
18
15150
15150
ISM
ISM
15150
ISM
15150
ISM
15150
ISM
15150
ISM
15150
ISM
Internal audit for ISM expired. (In last one on board in 10/2013).
Deficiencies marked (ISM) are objective evidence of a failure or lack of effectiveness of the
implementation of the ISM code. Internal audit requested.
Audit to focus on navigation aspects and bridge team management.
The deficiencies marked (ISM) are objective evidence of a failure or ineffectiveness of implementation
of the ISM.
All deficiencies are objective evidence that the Company's SMS is not effective in safe operation and
maintenance of the vessel.
The deficiencies marked (ISM) are objective evidence of a failure or ineffectiveness of implementation
of the ISM.
Safety management audit by administration before departure.
Deficiencies marked (ISM) are objective evidence of a serious failure of the ISM code.
Deficiency marked(ISM) is objective evidence of a failure, or lack of effectiveness, of the
implementation of the ISM Code.
The deficiencies marked (ISM) are objective evidence of a failure or ineffectiveness of implementation
of the ISM Code.
15111
15111
15112
15112
15112
Page 107
30
16
18
30
30
18
30
30
30
17
18
18
30
15150
ISM
Internal safety audit and corrective action is required within 3 months. Deficiencies marked ISM are
objective evidence of a failure, or lack of effectiveness, of the implementation of the ISM Code.
18
15150
ISM
30
15150
ISM
15150
ISM
15150
ISM
15150
ISM
The deficiencies marked (ISM) are objective evidence of a failure or ineffectiveness of implementation
of the ISM.
The deficiencies marked (ISM) are objective evidence of a failure or ineffectiveness of implementation
of the ISM.
Deficiency(s) marked ISM is (are)objective evidence of a serious failure or lack of effectiveness of
implementation of the ISM Code.
The deficiencies marked (ISM) are objective evidence of a failure or ineffectiveness of implementation
of the ISM.
1)Safety management system as implemented, does not ensure: 1) that adequate and up to date
nautical charts are used for navigation, 2) that deficiencies are analyzed and effective corrective
action taken as shown by repeated PSC deficiencies for chart and passage planning, 3) that periodical
review and evaluation of management system is conducted - no evidence of Master review or internal
audit reports onboard.
15150
ISM
SMS as implemented fails to ensure that the navigation officers are given proper familiarization with
their duties related to safe navigation as evidenced by deficiencies marked (ISM) and that the vessel is
prepared for an emergency as evidenced by deficiency marked (ISM 8)
30
15150
ISM
ISM-internal safety audit & corrective action is required within (3) months. Deficiencies marked "ISM"
are objective evidence of a failure or lack of effectiveness or lack of implementation of the ISM Code.
N/A
15150
ISM
30
15150
ISM
Deficiencies marked as (ISM) are an objective failure or lack of effectiveness of the implementation of
the ISM Code.
Internal safety audit and corrective action is required within 3 months. Deficiency marked ISM is
objective evidence of a failure, or lack of effectiveness, of the implementation of the ISM Code.
15150
ISM
18
15150
ISM
The deficiencies marked (ISM) are objective evidence of a failure or ineffectiveness of implementation
of the ISM.
Internal safety audit and corrective action is required within 3 months. Deficiency (s) marked ISM is
(are) objective evidence of a failure, or lack of effectiveness, of the implementation of the ISM Code.
15150
ISM
The deficiencies marked (ISM) are objective evidence of a serious failure of implementation of the
ISM Code. Safety management audit by the Administration is required before departure of the ship.
Remark - Previous overdue PSC and class remark not rectified.
30
15150
ISM
Safety management audit by the Administration is required before ship's departure. Deficiencies
marked (ISM) are objective evidence of a serious failure or lack of effectiveness of the implementation
of the ISM Code.
30
Page 108
30
30
18
30
18
18
15150
ISM
15150
ISM
15150
ISM
15150
ISM
15150
ISM
15150
ISM
15150
ISM
Safety management audit by Administration is required before departure of the ship. Deficiencies
marked (ISM) are objective evidence of failure, or lack effectiveness, of implementation of the ISM
Code.
30
15150
ISM
Safety management audit by the Administration is required before departure of the ship. Deficiencies
marked (ISM) are objective evidence of a serious failure, or lack of effectiveness, of implementation of
the ISM Code.
30
15150
ISM
Internal safety audit and corrective action is required within 3 months. Deficiency(s) marked ISM is
(are) objective evidence of a failure, or lack of effectiveness of the implementation of the ISM Code.
18
15150
ISM
15150
ISM
The deficiencies marked (ISM) are objective evidence of a failure or ineffectiveness of implementation
of the ISM.
Senior officers were not aware of their tasks, duties and responsibilities as evident by deficiency item
No.1.
Safety Audit management carried out by Administration or RO is required before departure.
30
The deficiencies marked (ISM) are objective evidence of a failure or ineffectiveness of implementation
of the ISM.
Deficiencies marked (ISM) are objective evidence of a serious failure, or lack of effectiveness, of
implementation of the ISM. Code.
Safety management audit by administration is required before departure of ship. Deficiencies marked
(ISM) are objective evidence of a serious failure or lack of effectiveness of implementation of the ISM
Code.
30
30
30
30
30
The deficiencies marked (ISM) are objective evidence of a failure or ineffectiveness of implementation
of the ISM.
Deficiencies marked (ISM) are to be objective of serious failure or lack of effectiveness of the
implementation of the ISM Code.
Deficiencies marked (ISM) are objective evidence of a serious failure or lack of effectiveness of the
implementation of ISM.
Safety management audit by the administration is required before departure of ship. Deficiencies
marked (ISM) are objective evidence of a serious failure, or lack of effectiveness, of implementation of
the ISM Code.
30
18
15150
ISM
15150
ISM
15150
ISM
Safety management audit by the Administration is required before departure of the ship. Deficiencies
marked ISM are objective evidence of a failure, or lack of effectiveness, of the implementation of the
ISM Code.
30
15150
ISM
30
15150
ISM
15150
ISM
Deficiencies marked ISM are objective evidence of a serious failure or lack of effectiveness of
implementation of the ISM Code.
Deficiencies marked (ISM) are objective evidence of a serious failure, lack of effectiveness of
implementation of the ISM Code.
Deficiencies marked (ISM) are objective evidence of a serious failure or lack of effectiveness of
implementation of ISM Code.
Page 109
30
30
30
30
15150
ISM
Deficiencies marked ISM are objective evidence of a failure of the implementation of ISM code.(ISM)
18
15150
ISM
Marked "ISM" are objective evidence of a serious failure, or lack of effectiveness of the
implementation of ISM Code, Internal safety audit & corrective action is required within 3 months.
30
15150
ISM
18
15150
ISM
15150
ISM
Deficiencies marked (ISM) are objective evidence of a failure, or lack of effectiveness, of the
implementation of the ISM Code. An internal audit within 3 months.
SMS audit by the RO is required before departure of the ship. Deficiencies marked ISM are objective
evidence of the ISM Code.
SMS audit by the carried out on 04 Feb 2014 (18 NCs raised). External SMS audit by Administration
required within 3 months. Deficiency marked ISM is objective evidence of a serious failure or lack of
effectiveness of implementation of the ISM Code.
15150
ISM
INTERNAL SAFETY AUDIT and corrective action is required within three (3.-) months. Deficiencies
marked (ISM) are objective evidence of a failure, or lack of effectiveness, of the implementation of the
ISM Code.
18
15150
ISM
18
15150
15150
ISM
ISM
30
18
15150
ISM
15150
ISM
15150
ISM
15150
15150
ISM
ISM
15150
ISM
15199
Other (ISM)
30
30
30
18
Marked as ISM are objective evidence of a failure of lack of effectiveness of the implementation of the
ISM code. External audit required.
Deficiencies marked ISM are evidence of a lack of implementation of ISM code.
Safety management system audit by the administration is required before departure. Deficiencies
marked (ISM) are objective evidence of a serious failure or lack of effectiveness of the implementation
of the ISM system.
30
ISM System does not ensure that Garbage record, hrs. of rest record, statutory requirements are no
met STCW95. (Def. 1 & 3)
The deficiencies marked (ISM) are objective evidence of a failure or ineffectiveness of implementation
of the ISM Code 8, 9 & 10.
30
Page 110
18
30
30
15199
Other (ISM)
2. The SMS has not ensured the vessel is supplied with appropriate official navigation charts for its
previous voyage as evidenced by Def. No.1. The SMS does not ensure the vessel can (effectively)
respond to hazards, accidents and emergency situations as evidenced by Def. No.3, 4, 11. The SMS
does not ensure that NCNs, accidents and hazardous situations are reported, investigated and
analyzed to improve safety as evidenced by recurrence of deficiencies 1, 2, 6, 10 from inspection of 1
May 2014.
30
15199
Other (ISM)
30
15199
Other (ISM)
15199
Other (ISM)
15199
15199
Other (ISM)
Other (ISM)
13. Deficiencies No 9,10,11 and 12 are the objective evidence that the SMS as implemented on
board fails to satisfy element 7 and 10 of ISM code.
SMS, as implemented, fails to ensure bridge watch keepers are rested as per STCW requirements as
evidenced by deficiency marked (ISM).
SMS as implemented on board does not ensure the emergency preparedness and shipboard
operation and maintenance of ship.
Rest hour records not filled properly/ 7 days rest entry not available for verification.
SMS as implemented does not ensure compliance with procedures for critical shipboard operations,
or ensure effective maintenance of ship and equipment to requirements as evidenced by deficiencies
No. 1,2,3,5,6,9.
15199
Other (ISM)
Deficiencies marked (ISM) are objective evidence of a failure in the implementation if ISM Code.
18
15199
Other (ISM)
30
15199
Other (ISM)
16101
16101
16101
16101
16101
16101
16101
16101
16101
16101
16101
16101
16101
16101
16102
The SMS, as implemented, does not ensure compliance with ISM element 7 and the MLC convention
as evidenced by deficiencies 1-6.
There is no objective evidence regarding bridge preparation for departure and arrival as per SMS
procedure since last three port.(Even-not prepared plastic plate)
Document for captain as SSO designated by Company N/A.
Some visitor's luggage or ID card not be checked when embarking.
Captain not be familiar with procedure of declaration of security.
Visitor's luggage not be effectively checked when embarking as per ISPS Code.
Captain not be familiar with procedure of declaration of security.
One stowaway search on board were not properly carried-out by crew members - was not enough
before departure.
Original internal audit report of ISPS - no shown.
Confidential information of SSAS posted in bridge, where is public space.
Access control to ship. ( Sea side ladder at sea)
Internal audit report for ISPS - Expired from 18th December 2013.
Company cannot produce record of ever conducting a security exercise.
ISPS code not conducted not visitor card given.
Some of restricted areas not be effectively controlled.
PSCO identity not requested and verified.
Activated SSAS time indicating 25/Jun/2013 in drill record on Jun/2013. But actively sending log as
06/Jun/2013.
Page 111
30
30
17
18
17
17
17
17
17
17
17
15
17
17
30
16
17
17
17
17
16102
Ship's crew include master cannot explain and return to normal condition the SSAS button. The
Inmarsat-c activated alarm continuously "Please return the SSAS button in to off-state".(ISM)
17
16104
16104
16104
16105
16105
30
17
30
17
17
16105
16105
16105
16105
16105
16105
16105
16105
16105
16105
16105
16105
99
17
30
16105
16105
16105
16105
16106
16106
99
99
40
16106
16106
16106
Security drills
Security drills
Security drills
Page 112
17
30
16
99
99
30
99
99
30
17
17
17
99
30
16107
17
16107
17
16107
16107
16107
During the fire drills, the gangway watch left the gangway to participate in the drill, the gangway
unattended for over 20 min.
Crew do not follow the procedure about fill record - gangway log book - the agent identification
correct boarding at last port - according ISPS manual.
Ship has not been informed in respect of Port facility transition on Security level 2 ship is at Level 1 on
PSCO arrival no Port-Ship ISPS Declaration available.
USCG Code 3050, The following Security items were observed. 1. No ID check taken. 2, Gangway
watch left unattended. 3. Key on Bridge. No identified. 4. Hock on Cargo hold #10 forward left open.
5. No key available to enter Accommodation.
17100
Other
Numerous bonding straps on deck cargo piping wasted and not providing adequate protection.
40
17100
Other
10
17100
Other
Master and crew could not produce a VGP and did not appear aware of the requirements outlined in
the VGP.
Ballast water tanks must maintain ballast water management plan developed specifically for vessel.
17100
Other
The ships incinerator door closing mechanisms were fitted with chains to prevent opening when in
operation.
Safety pin for chain stopper of windlass missing.
Brake lever fwd. cracked for chain stopper of windlass.
No pilot signature in pilot information card.
Hydrometer No.11446052 was tested 03.11.2011. To be calibrated or replaced.
Self closing device door at 2nd deck and 3rd deck defective.
Garbage management plan and Emergency towing booklet issued by previous managers.
Ballast water management plan not approved by class. 2.-Ballast water record book missing.
40
17
99
10
40
17101
17101
17101
17101
17101
17101
17101
17101
16
17101
17101
17
17
17101
17101
Ship anti-fouling system out of work. (power turn off and spare N/A onboard)
Erratic maneuvering reported by Spanish navy according to ship's Log book. The vessel has been
drifting within Spanish territorial waters on day 22 January breaking the right of innocent passage.
16
99
Page 113
16
99
16
17
17
16
16
17101
17101
17102
17102
17102
17102
17102
17102
17103
17197
17197
17197
17197
17197
17197
17197
17198
17198
17198
17198
18103
18104
18199
18201
The condition of the vessel found to be unsafe and un sea worthy owing to numerous deficiencies
risking fire.
Ships name marking on Fwd. (Port) not clearly marked and faded on board vessel.
Crew were unable to demonstrate proficiency in performing in a satisfactory rescue boat drill.
17
The emergency fire pump suction pipe and No.5 center fuel oil tank have been improperly repaired
with cement patches.
The crew were unable to demonstrate proficiently in performing a satisfactory rescue boat drill.
17
Reactive maintenance carried out by ship staff and pretty officers (electrician). Unreliable record of
preventive maintenance on board (LSA and FF equipment).
Familiarity of crew members with SOLAS TRAINING MANUAL + FIRE SAFETY OPERATIONAL
BOOKLET have to improve. (ISM) Evidence: Signature of crew members about familiarization list not
updated.
16
17
15
17
17
17
Bridge officer unfamiliar with operation ECDIS. Bridge officer was unable to change over to second
GPS system when primary GPS system was switched off. Officer set vessel position fixing method to
dead reckoning mode.
17
30
40
17
Non watch-keepers hours of work and rest not in accordance with MLC.
17
Medical fitness
Recruitment and placement
service
Other (Minimum requirements)
Fitness for duty- work and rest
hours
Page 114
16
17
30
16
17
17
16
16
99
16
18201
Bridge watchkeepers regularly do not have a 6 hours unbroken rest in 24 hour period.
17
Several violations according to min. resting times. On July 2014 for all engineers not enough resting
time on some days. (ISM)
Insufficient rest hours achieved for Master at Nantong 2 August 2014.
17
17
18203
18203
18203
Missing.
Ratings paid below minimum ILO rate wages are retained until end of voyage. (ISM)
Crew wages not paid monthly in accordance with MLC 2.2 and DMLC II 14(b). (February 2014 pay not
paid as at 12/03/2014, January onboard allotment not paid until 12/03/2014)
30
17
30
18203
18204
18204
Wages
Calculation and payment
Calculation and payment
16
30
17
18299
18302
Sanitary facilities
18302
Sanitary facilities
1 x Able seaman onboard vessel since 03 Feb 2013, this exceeds maximum 12 month period allowed
by Philippine Overseas Employment Administration (POEA).
Wash basin in Ratings toilet
-broken
Shower head in Ratings Shower room
-broken
Stevedore toilet located on main deck dirty. Hot water tap for officers toilet on Captain deck defective.
99
18302
Other (Conditions of
employment)
Other (Conditions of
employment)
Other (Conditions of
employment)
Other (Conditions of
employment)
Sanitary facilities
18302
18302
18302
18302
Sanitary facilities
Sanitary facilities
Sanitary facilities
Sanitary facilities
16
17
17
17
18302
Sanitary facilities
18302
Sanitary facilities
18201
18201
18201
18299
18299
18299
Page 115
17
17
17
99
16
16
17
17
30
18302
18302
18302
Sanitary facilities
Sanitary facilities
Sanitary facilities
18302
18302
18302
Sanitary facilities
Sanitary facilities
Sanitary facilities
18302
18302
18302
18302
18302
18302
18302
18303
18303
Sanitary facilities
Sanitary facilities
Sanitary facilities
Sanitary facilities
Sanitary facilities
Sanitary facilities
Sanitary facilities
Drainage
Drainage
18304
18304
18304
18305
Lighting (Accommodation)
Lighting (Accommodation)
Lighting (Accommodation)
Hospital accommodation
(Sickbay)
Hospital accommodation
(Sickbay)
Hospital accommodation
(Sickbay)
Sleeping room, additional spaces
18305
18305
18306
18306
18308
18308
18308
18311
18311
Found in crew cabins flagged floor dent, so openings between the tailings. (ISM)
The sanitary flushes are out of order in many places.
Fresh water generator evaporator's capacity found reduced and toilets manually flushed system was
out of order.
Defective urinal in crew common bathroom.
Discolored hot water in Bosun cabin and several other taps in accommodation.
MLC 2006, not effectively implemented onboard, as evidenced by deficiencies No 9, 10, 11, 13, 14,
17.
Urinal missing in main deck communal toilet.
Unable to flush in several public toilets.(ISM)
Most of toilets in operative could not be flushed.
Oil drums stored in front of urinals in crew shower / toilet.
Urinals defective in crew shower / toilet.
Crew showers dirty.
Two defective showers, one shower cubical used for storage.
4. AB cabin C tap of cold water defective.
Monthly wages, including war risk allowance for several crew not pay in full in accordance with
seafarer employment agreement.
Lighting protective cover found missing in an AB cabin during random check.
Several lights in crew cabins & sanitary facilities broken without cover of not working.
Numerous accommodation lights unlit.
Hospital toilet found very poor condition.
30
17
30
Hospital wash basin- water coming out brown and only on small quantities, the same it choosing hot
or cold. (ISM)
No warm water in the hospital. The sanitary device is out of order.
17
17
17
30
17
17
30
17
17
17
17
15
17
17
17
17
30
17
In cabin washing rooms big amounts of mauled in corners and spare room between washbasin and
wall full of mauled. (ISM)
Sleeping room, additional spaces Crew cabins unsafe electrical installations, broken lamp covers, also in shower room. (ISM)
17
Furnishings
Furnishings
Furnishings
Mess room and recreational
facilities
Mess room and recreational
facilities
15
17
16
17
Insufficient recreational facilities provided on board. Television in crew and officers' recreation room
unable to receive local television signal. No DVD movies, magazines, books etc. supplied.
15
Page 116
17
18311
Treadmill defective.
17
17
No hot water in kitchen sink and no running water in sink of common toilet No.2.
17
15
17
17
30
30
17
17
17
17
Poor quality of fresh vegetable onboard is evidenced by moldy and delaying vegetable being prepared
in the galley at this time (no fresh vegetable supplied to the vessel since 24/8/2014).
17
17
17
18316
18316
18316
18316
18316
No.1 fresh water pump and portable water service pump found leaking. (ISM)
Hot water dirty.
Lamps for UV-Sterilizer overdue to be changed. (ISM)
In cabin AB2 fresh water valve found to be joined with cement in handwasher.(ISM)
Several cabins without flushing (hot) water (low pressure) (officers and crew cabins to be checked).
30
17
17
16
17
18318
Food temperature
16
18318
18318
Food temperature
Food temperature
The fridge (two sets) in provision room temperature not able to monitor for function as per require &
set temperature due to defective gauge.
Refrigerator / freezer in galley, officers and crew pantries defective.
Temperature of meat/ fish room not sufficient cleanliness of provision stores in general insufficient.
18318
18318
18319
Food temperature
Food temperature
Food segregation
17
17
17
18311
18312
18312
18313
18313
18313
18313
18313
18313
18314
18315
18315
18315
18315
Page 117
17
17
18324
17
18324
Cold room, cold room cleanliness, Fish room, door sealing defective.
cold room temperature
16
18324
Cold room, cold room cleanliness, Fish room temperature only -10C, locked in alarm not working. (ISM)
cold room temperature
17
18324
Cold room, cold room cleanliness, Excessive ice formation on evaporator in meat room. (ISM-1)
cold room temperature
17
18324
Cold room, cold room cleanliness, Vegetable Room - Rotten vegetables found in vegetable room and cleanliness insufficient. (ISM)
cold room temperature
30
18324
Cold room, cold room cleanliness, 1.-Fish cold room inoperative. 2.-Meat cold room temperature high(-7C).
cold room temperature
16
18324
Cold room, cold room cleanliness, Provision compressor constantly switching of on low suction pressure indicates lack of sufficient
cold room temperature
refrigerant in the cooling system.
17
18324
Cold room, cold room cleanliness, Refrigerating Plant of cold room out of order since a month ago. (ISM)
cold room temperature
30
18326
18326
18326
18326
18326
18326
18399
15
17
17
16
17
17
17
17
Starboard gangway winch base and upper platform support pins shown distortion and unauthorized
temporary repair.
In cabins AB2 and AB3 the bed layers found worn and not adequate for the beds.(ISM)
99
99
18399
18399
18399
18399
Page 118
16
18399
Floor damaged in many places: Hospital (floor tiles), pilot cabin, galley (floor tiles), main deck
alleyway, several cabins. (ISM)
Officers TV not able to receive transmissions.
99
17
16
17
17
30
10
17
18407
18407
18407
18407
18407
18407
18408
18408
Other (Accommodation,
recreational facilities)
Other (Accommodation,
recreational facilities)
Other (Accommodation,
recreational facilities)
Medical Equipment, medical
chest, medical guide
Medical Equipment, medical
chest, medical guide
Medical Equipment, medical
chest, medical guide
Medical Equipment, medical
chest, medical guide
Medical Equipment, medical
chest, medical guide
Medical Equipment, medical
chest, medical guide
Lighting (Working spaces)
Lighting (Working spaces)
Lighting (Working spaces)
Lighting (Working spaces)
Lighting (Working spaces)
Lighting (Working spaces)
Electrical
Electrical
17
17
17
17
17
17
17
17
18408
18408
18408
18408
Electrical
Electrical
Electrical
Electrical
30
17
16
17
18409
18410
18410
18412
18414
18414
Dangerous areas
Gas instruments
Gas instruments
Personal equipment
Protection machines/ parts
Protection machines/ parts
Found nearly the whole deck/catwalk area slippery (due to cargo palm oil).
8. Vessel loading coal, the multi-gas detector defective.
Acetylene & oxygen hoses in E/R workshop in substandard condition.
Personnel working at height do not use protective equipment.
Locks hatches not in safe position. (cargo hold number 4 and 5 starboard side)
Numerous safety valves on heaters in E/R room missing release drain lines + several are blocked by
cap.
17
17
17
17
17
17
18399
18399
18401
18401
18401
18401
18401
18401
Page 119
17
18415
18415
18416
18416
18416
18416
18416
18416
18416
18416
18416
18416
18417
18417
18417
18417
18417
18418
18418
18418
18418
18418
Anchoring devices
Anchoring devices
Winches and capstans
Winches and capstans
Winches and capstans
Winches and capstans
Winches and capstans
18418
18420
18420
18421
18421
18423
18424
18425
Railing and platform on forward mast found heavy corroded and unsafe to use.
Enclosed space entry procedure is not in accordance with IMO Res. A.1050(21). (ISM)
Aft mooring station, 2 breast lines in poor condition.
Mooring rope insufficient onboard.
Mooring ropes some of poor.
Three fairleads at forward port side mooring ropes handing space found temporary repaired and in a
insufficient working condition.(ISM)
Some of stern mooring ropes poor.
Some of mooring ropes poor condition.
Mooring ropes forward 2 pcs and aft 2 pcs are in poor condition, spliced. (ISM)
Mooring ropes kept permanently on capstans instead of bollards in unsafe manner.(ISM)
Two spliced mooring ropes in use.
Barge Alongside moored in an inappropriate location.
Anchoring devices found corroded and port drum need repair. (ISM)
Port side anchor to be release from steel wire.
Crew standing platform found dangerous for crew. It's panel deck missing temporary woods found
placed in a insufficient condition.(ISM)
Anchor devices leak.
Anchor devices heavy leak of oil.
Winches(Aft) - not secured by the pins.
Fore and aft mooring winch brake drums showing signs of heavy corrosion.
Mooring ropes warped on drums, safety pins not in position.
Found hydraulic oil leakage on winch PS forward/catwalk position.
Forward port winch side plate wasted. Stbd Gangway outboard plate closed to lifting bracket wasted.
Significant reduction in thickness of plates around Stbd gangway anchoring pins on deck.
30
17
15
17
17
17
Mooring/anchor winch on forecastle leaking with hydraulic oil found also heavily leaking hydro packs
of cargo hatches.
Floor of the E/R found oily and slippery. Also bilges dirty and covered with oil. M/E and A/E covered
partly with oil. (ISM)
Bilge wells found with adequate quality of oily mixtures.
Engine room emergency escape hatch not fenced on deck 3.
17
17
16
99
99
Page 120
17
17
17
17
17
17
17
17
30
16
17
17
99
17
17
99
30
18
17
18425
15
18425
17
18425
17
18425
Exit door on C-deck (Port) in accommodation unable to be opened from inside lock defective.
17
18425
17
18425
17
18425
17
18425
17
18429
17
18499
Grating for passage way between No.5 C/H aft and accommodation on upper deck.
-Not maintained well due to heavily corrosion it.
Manhole cover lagging on waste oil settling tank defective.
17
Steam pipe lagging for F.O. settling tank heating arrangement defective.
17
17
17
Aft spring rope located above the access to the gangway. Unsafe.