Você está na página 1de 24

Sr.No.

Description

Qty.

Unit

Rate
Rs.

I
Preliminary Preparations Work:
1
Scaffolding :Providing erecting dismantling & taking away all materials after the completion of proposed work, single / double bamboo Scaffolding to reach any place of
/ windows / M.S. grills and should not rest on parapet walls / external walls by making holes to them (only elevation area of building will be measured).
6000
Sq.Met.
2
Safety Nets:Providing, erecting, maintaining and removing temporary protective screens of Netlon Net with all necessary fixing arrangement to ensure that it remains in
L.S.
L.S.
3
Hassein Cloth:Providing, erecting, maintaining and removing temporary protective screens of Jute cloth with all necessary fixing arrangement to ensure that it remains in p
as required by the Consultants
L.S.
L.S.
4
Covering Glass Panes:Providing and covering glass panes of windows/ doors/ opening at all levels by 6mm thick plywood / tin sheets, to avoid damage to shutters and glass panes
flats / units etc. including removing the same after completion of work, cleaning and making good local damage if any.
L.S.
L.S.
5
Removal of Weather Shed:-

Carefully removing existing weather sheds provided over windows or other openings (stacking the materials neatly for reuse

30
Sq.Met.
6
Fixing of Weather Shed:Refixing existing weather sheds including repairs to
existing weather shed etc. complete as directed by the Consultant (Owner shall supply materials required for repair).
30
Sq.Met.
7
Removal of Vegetation:Removing all the vegetation from the external
faces of the building. All such vegetation growths must be first destroyed with the use of weed killing chemicals and then pro
L.S.
L.S.
Sr.No.
Description
Qty.
Unit
Rate
Rs.
8
Breaking of External Plaster:Carefully breaking loose / bad external plaster of
any thickness and at all levels of the building in patches or long stretches, including layers of guniting, weld/ chicken mesh e
2000
Sq.Met.
9
Breaking of Internal Plaster:Carefully breaking loose / bad internal plaster,
shifting of debris including required safety measures etc. complete as directed by the Consultant.
150
Sq.Met.
10
Chipping of RCC:Chipping of existing loose and damaged cover
concrete at specified locations (including non load bearing members) up to the concrete core with chisel & hammer, cleaning
450
Sq.Met.
11
Opening of Separation Cracks:Opening of separation gap between RCC members
and brick work /Block work with electric cutter and and brick work /Block work with electric cutter and removing all loose and
300
RMT
12
Breaking of Chajja/Balcony Top/Canopy Top W.P.
Carefully removing existing waterproofing layer
from chajja top / Balcony top / Canopy top etc. removing the scales, loose cement chunks, etc. cleaning the concrete surface
65
Sq.Met.
Breaking of Over Head Tank / Lift M/C. Room
13
Top/ Staircase Top W.P. :Carefully removing existing waterproofing layer

from Over head Tank top, lift M/c room top & Staircase top etc. removing the scales, loose cement chunks, etc. cleaning the
130
Sq.Met.
14
Carting of Debris :Removing all debris, spalls etc. outside the building
compound up to the municipal dump with all lead and lift complete or as directed by the Consultant.
25
Trucks
Sr.No.
Description
Qty.
Unit
Rate
Rs.
II
STRUCTURALREPAIR:
1
Rust Remover:Brushing with wire brush and removing all rust
scales from rebars & washing with water as required and providing and applying Rust Remover on existing exposed Reinforc
25
Lit.
2
Rust Inhibition Coats:Providing and applying Rust Inhibition Coats to exposed rebars and also new rebars etc. complete
as directed by the Consultant.
50
Kg.

3
Bond Coat:Providing and applying raw polymer Bond Coat to
all exposed concrete surface and rebars prior to polymer treatment complete or as directed by the Consultant.
300
Lit.
4
Polymer Modified Mortar (PMM):Providing and applying Polymer Modified Cement
Mortars of C:M 1:3 in specified ratio of polymer per bag of cement as per manufacturer specification
OR in 1:5:15 ratio to RCC surface duly treated as above with appropriate thickness.
800
Lit.
5
Non Polymer Treatment for RCC Elements:Providing and applying cement sand mortar 1:3
with small stone chips in layers over prepared RCC elements viz. chajjas / drop pardis/ fins etc. as directed up to old profile o
10
Sq.Met.
6
Grouting:Providing labour, materials and fixing sockets of 12
mm dia. of approved material & injecting with grouting pump the sockets, with cement slurry adding CONBEX or equivalent
directed by the Consultant, cutting the projected
socket portion & sealing the same etc, complete as directed.
7
Polymer Modified Slurry:Providing labour, tools, materials for applying
cement based polymer modified slurry for bonding between old & new surfaces as per manufacturers specification or as dir
50
Nos
QRO
Lit.
Sr.No.
Description
Qty.
Unit
Rate
Rs.
8
Steel Reinforcement:Providing, fabricating, placing in position new reinforcement including securing & anchoring and welding it at both ends by d
grout putty wherever necessary etc. all as directed
by the Consultants.
500
Kg.

III
CIVILWORKS:
1
Dash Coat:Providing labour, tools and tackles, materials and
laying one coat of cement plaster as dubbing/ leveling coat of 25mm thick wherever directed by the Consultant in C:M 1:3 in
200
Sq.Met.
2
Sand Faced Plaster:-

Providing labour, tools and tackles, materials and


Laying sand faced plaster in two coats up to 25mm thick in C:M 1:4 including finishing the surface by taking out grains, prov
2000
Sq.Met.
3
Sealing Separation Gaps:Providing and sealing separation cracks between
RCC members & brick work / block work by making good with hand packed cement, sand and metal mortar line pointing incl
300
RMT
4
Neeru Plaster:Providing labour, tools, materials and laying 15mm
thick smooth plaster with cement / Neeru finish of approved quality in C:M 1:4 to all heights and depths including providing a
150
Sq.Met.
5
Admixtures to Plaster:Procuring and adding plaster admixtures of
required quantity of approved brand to all cement mortar work during mixing of material prior to apply complete or as direct
120
Lit.
6
Watta Weather Shade:Providing and making Cement Mortar (1:4) watta
at the junction of weather shed and wall surface complete or as directed by the Consultant.
30
RMT
Sr.No.
Description
Qty.
Unit
Rate
Rs.
IV
WATERPROOFING:
1
Over Chajja/ Balcony /Canopy Top W. P.
Providing & Laying brick bat coba waterproofing
treatment on chajjas /canopy/balcony top with 65
mm average thickness with small brick finished with joint less waterproofing layer in CM 1:4 of average 25mm to 30mm thic
65
Sq.Met.
2
Overhead Tank/Lift Room & Stair Case Top W.P.:Providing & laying brick bat coba waterproofing
treatment on OHT top, Lift room & Stair case Top
etc. with 90mm average thickness with small brick finished with joint less waterproofing layer in CM
1:4 of average 25mm to 30 mm thick finished smooth with cement slurry, curing cleaning as directed etc. complete (Only ar
130
Sq.Met.
3
Over Head Tank W.P. Base and Side:A
Removing existing w.p. treatment of any thickness
from in side the O.H.W. Tank, roughening and cleaning the exposed concrete slab and side walls, treating cracks if any, provi
as bottom in 1:4 mix and laid to proper slopes, lines and levels including smooth finish, curing etc.(only profile area of w.p. s
not be paid extra) Work to be guaranteed for 10 years.
75
Sq.Met.
4
Crack Sealant Filing:Identifying cracks and making of V Groove along
with the existing cracks on the exterior walls surface by using Electric cutter machine, cleaning the groove with water jet and
1000
RMT
Sr.No.
Description
Qty.
Unit
Rate
Rs.
V
PLUMBINGDRAINAGEWORKS:
(All fittings / pipes to have ISI mark)
1
Providing Fixing G.I. Pipes:Removing the existing G. I. lines & providing and
fixing the new G.I. pipes, filling the joints with chemical complete, as per the technical specification or as directed by the Con
I
dia.
40
RMT
II
dia.
10
RMT III
1 dia

2
Providing and Fixing PVC Pipe:Providing and fixing new PVC pipes after removing
the existing plumbing lines, filling the joints with PVC Solvent with all fittings and Nails, cutting holes in walls complete as dir
I
4
dia.
40
RMT
II
3
dia.
30
RMT III
2
dia.
Providing & Fixing G .I. Clamp Brackets with U
3
Clamps:Providing and fixing Galvanized M.S. Clamps of
approved shape and design with U brackets which should be 0.2 away from the wall surfaces all compete or as directed b
A
for G. I. pipes
QRO
Nos.
B
for Drainage pipes
QRO
Nos.
4
G. I. Connectors with PVC Sleeves:Providing and fixing new G. I. Connector of
required sizes with all necessary fittings after removing the existing lines, filling the joints, providing PVC sleeves on top, cut
I
dia.
25
Nos.
II
1 dia.
QRO
Nos. III
2 dia.
VI
PAINTING WORKS :
Note: Rates for all items to include scaffolding
1
White Wash:Cleaning all surfaces and providing & applying
three coats of white / colour wash with approved binder.
2
M.S. Grill Oil Paint:Thoroughly scraping, cleaning and removing old
loose flakes of existing Oil paint in External M.S. grills, Railings, Doors, Gates etc. providing and applying one coat of primer
QRO
Sq.Met.
QRO
Sq.Met.
Sr.No.
Description
Qty.
Unit
Rate
Rs.
3
Oil Bound Distemper:
Thoroughly scraping and cleaning plastered
surfaces and removing old loose flakes of existing paint and apply over the same two coats of Oil Bound Distemper paint afte
850
Sq.Met.
4
Acrylic Paint:Thoroughly scraping, cleaning and removing old
loose flakes if any from the external wall and apply over the same one coat of cement paint as base coat and two coats of Ac
OR
One Coat of Cement Paint:Thoroughly cleaning the external surfaces with jet
spray watering, removing all the fungus / plantation and applying the required one coat of Water Proof Cement Paint all com
6000
Sq.Met.
6000
Sq.Met.

Amount
Rs.

mboo Scaffolding to reach any place of work on external facade of building including approaches, extensions, anchorages etc. Scaffold is not to be supported to plumbing li
rea of building will be measured).

rangement to ensure that it remains in position for the entire work duration as required by the Consultant.

angement to ensure that it remains in position for the entire work duration

id damage to shutters and glass panes and to prevent dust entering into

the materials neatly for reuse etc. complete as directed by the Consultant.

als required for repair).

d killing chemicals and then properly grouted after removing all the roots embedded deep in to the structure etc. complete as directed by
Amount
Rs.

guniting, weld/ chicken mesh etc. up to the brick wall without damaging plaster, brickwork or concrete in the vicinity taking safety measu

with chisel & hammer, cleaning the surface with wire brush and washing concrete surface with water etc. complete as directed by the Co

tter and removing all loose and deteriorated mortar between the same all complete as directed by the Consultant.

. cleaning the concrete surface with water complete.

ment chunks, etc. cleaning the concrete surface with water complete.

Amount
Rs.

r on existing exposed Reinforcement bars complete as directed by the Consultant.

y the Consultant.

. as directed up to old profile of concrete including curing, etc. complete up to 40 mm thick.

adding CONBEX or equivalent chemical as per manufacturers specification wherever

acturers specification or as directed by the Consultant ( other than used for Polymer Mortars).

Amount
Rs.

nd welding it at both ends by drilling holes, inserting the ends and grouting with non shrink

by the Consultant in C:M 1:3 including racking of joints, cleaning the surface, making up the level as original surface, keeping the surface

face by taking out grains, providing grooves, drip moulds etc. curing complete as directed.

metal mortar line pointing including cleaning, watering, applying Cement slurry, curing etc. complete as directed.

nd depths including providing and dismantling required scaffolding, racking out joints etc.

to apply complete or as directed by the Consultant.

Amount
Rs.

f average 25mm to 30mm thick finished smooth with cement slurry squares with 150 mm watta on the wall with curing, cleaning as dire

directed etc. complete (Only area in plan will be measured and paid for)

ls, treating cracks if any, providing single coat plaster with w.p. compound then laying 40 mm thick screed concrete at bottom. Then pro
etc.(only profile area of w.p. shall be measured, wata will

g the groove with water jet and filling the same with approved polymer base ready mix crack sealing compound complete as per the tec
Amount
Rs.

ation or as directed by the Consultant.

MT III

dia

15

RMT IV

1 dia.

g holes in walls complete as directed by the Consultant.

RMT III

dia.

RMT IV

QRO

dia. R.W.

ces all compete or as directed by the Consultant.

viding PVC sleeves on top, cutting holes in external walls in to inside flats complete as directed by the Consultant.

III

dia.

QRO

Nos.

d applying one coat of primer and two coats of Oil Paint as directed by the Consultant.

Amount
Rs.

Oil Bound Distemper paint after primer coat as directed to the walls of common staircase area etc, complete as directed.

s base coat and two coats of Acrylic Paint of approved brand as directed complete to the entire external surface with OHT, terrace head r

ter Proof Cement Paint all complete as directed by the Consultant.

is not to be supported to plumbing lines

re etc. complete as directed by the Consultant.

he vicinity taking safety measures so that broken plaster piece do not damage anything in the area or do not injured any body lowering d

complete as directed by the Consultant.

al surface, keeping the surface rough to receive further coat, including embedding smallbrick pieces, curing etc. complete as directed.

ll with curing, cleaning as directed etc. complete. (Only area in plan will be measured and paid for). will be measured and paid for).

concrete at bottom. Then providing second coat plaster with w.p. compound on walls as well

pound complete as per the technical specification or as directed by the Consultants.

1 dia.

QRO

RMT V

1 dia.

dia. R.W.

10

RMT

ete as directed.

rface with OHT, terrace head room, pump room, parapet wall etc. as directed by the Consultant.

ot injured any body lowering down the debris, including removal of tar layers if any and cleaning etc.complete as directed by the Consul

g etc. complete as directed.

measured and paid for).

QRO

RMT VI

dia.

ete as directed by the Consultant. Note:- In case of patch plaster only mechanical cutters shall be used for making grooves initially.

QRO

RMT

making grooves initially.