Você está na página 1de 5

CV of Qc Inspector E&I Inspectors, Testers, Sorters, Samplers, and Weighers Engineering Mining, Oil & Gas From

PAKISTAN (40259)

Job Seeker Details


Ref #
Year of birth
40259
1976
Current Location/Address
City or Town
Country
Abudhabi
United Arab Emirates
Permanent Location/Address
City or Town
Country
Saroba
United Arab Emirates
Languages
Primary Language
English

Secondary Language
Not available
Fluency
Read, write and speak fluently
Fluency
Not available
Nationalities
Nationalitiy
Pakistan
Experience Classification

Job Function
Inspectors, Testers,
Sorters, Samplers,
and Weighers
Job Industry

Years
Exper
ience
14
Years

Exper
ience
Not
specifi
ed.
14

Engineering
Mining, Oil & Gas
Qualifications
Highest Qualifications
HND/Diploma

Qualification
HND/Diploma

Subject
Asociate Engineer

Other Qualifications, Memberships, Certifications

Computer Skills and Software Used

Work Locations

Are you willing to move or relocate?

NO
Yes - I will travel internationally
Availability

Start Immediately?
Not available now.
Ideal Next Job
Middleast
Required Salary & Conditions
Minimum 5000USD PER MONTH
Employment History

Total Years of Work Experience


Commenced Full Time Work

Establishment/Country
Pakistan

Year
1995

20
1995
Last/Current Employer

Job Title
Duration
Qc Inspector E&I
From :12-Jan-2015
To: 12-Jan-2015
Summary

Work Experience

Objective
I wish to have a challenging position in an esteem organization where I could not only use but also enhance my professional
experience and technical knowledge and always work hard in an effective manner for the successful completion of the given
task/ target.
Education Background:
Diploma of associate Engineer in Instrumentation
Professional Experience:
Having a professional experience of approximately 11 Years (6 out of which is in Saudi Arabia and 5 in Pakistan), for
different International & Saudi Companies (EPC Contractors) in Oil & Gas, Petrochemical and Power Plants Projects, in the
field of Electrical & Instrumentation (Construction and QA/QC).
Duties and Responsibilities:
Preparation of Quality Control Plan to identify and establish objectives and requirement for continue implementation witness
(E & I) procedure, calibrations of instruments, cable laying, conducting, meggering and continuity testing, loop checking as
per SAES, QA/QC NEC and other related code standards.
Inspection and test surveillance for the material utilized in (E & I) for construction activities for the following system. Including
Hazardous (classified) location as per NEC with owner- Mechanical power distribution,MV& LV Switch gear, lighting and
small power pnal, grounding cable trays, conduits, LV & MV cables, impulse and signal tubing and Termination Materials.
Conducting surveillance for Construction Activities and site queries such as SDQ (Site Design Query) ECR (Engineering
Change Request) FCR (Field Change Request) and NCR (Non Conformance) Cables above mention, laying Report).
Preparation of instrumentation loop packages QCPs, ITPs and implements Quality Standard.
Inspection and test surveillance for the material utilized in cathodic protection system cross country pipelines and inside
plant e.g.
PROFESSIONAL SKILL
Electrical and Instrumentation Construction/Inspection Management skills.
Familiar with NEC, ISA, IEEE, PIP, NEMA and API Standards and Codes.
Familiar with SAES, SAMSS, SAEP, SAIP, SAED, SAIC and SATIP.
Site Acceptance Test, loop checks, Dry & Wet Function Test, commissioning and start-up of all Electrical and Instrumentation
control systems.
Inspection and verification of Electrical/Instrumentation Material as per Construction package.
Hands on experience with DCS systems, Safeguarding, Fire & Gas System, Condition Performance & Monitoring System
and Gas Turbine control systems.
Inspection of Cable Trays, Conduits, Instruments stands, Junction Box, Marshalling Cabinets, Pneumatic Tubing, Impulse
Lines and Pneumatic Air System.
Inspection of termination for Fields Instruments, Junction Boxes, and marshaling Panels.
Calibration, Loop Checking, Pre-commissioning and Commissioning of Conventional and Foundation Field bus Instruments.

Excellent Technical, Documentation and Communication skills.


Quality control and Electrical and Instrumentation design review competence inclusive of engineering drawings, loops
drawing, junction box layouts, system configuration, Instrument cable schedule, Hook-up drawing, Plot & Piping plan and
P&ID drawings.
Design inadequacies and field troubleshooting of instrumentation Loops and Control Systems.
Competency to issue Non-conformance Reports with respect to instrument works to sub-contractor and/or Vendor Personal
for rectification and/or back charge.
Team leadership and supervisory work experience.
Supervising, training, and development of technicians and support personnel.
An effective communicator with excellent relationship management skills and strong analytical, problem solving &
organizational abilities.
MPH TECHNICAL SERVICES
ABU DHABI UAE
Company : Qatargas QG II Contractor : National Petroleum company ( Npcc)
Project : QG II Offshore Facilities
Duration : March 2008 to till date
Position : QC inspector Electrical and Instrumentation
DHUWAH CONTRACTING CORP SAUDI ARAB
Company : Saudi Arabian Engineering Company Contractor : SLSA (SNS Lavilan, Saipem Arabia JV)
Project : Saudi Aramco (Wips Facilities Water injection plant)
Duration : May 2007 to Feb 2008
Position : QC inspector Electrical and Instrumentation
Company : Bin Quraya Establishment Client : Direct Iron Reduction Company (AL TUWARIQE GROUP)
Project : Saudi Aramco (Sales Gas Supply pipeline)
Duration : Nov 2006 to May 2007
Position : QC inspector E&I
TAMIMI COMPANY CONSTRUCTION DIVISION SAUDI ARABIA
From May 2002 to April 2006
Company : Tekfen Construction and installation co Inc Contractor : Technicas Reunidas Gulf (TRG)
Project : Saudi Aramco (DHT Complex Yanbu Refinery)
Duration : June 2005 to April 2006
Position : QC inspector Electrical

Company : Faiysal Mohd Al Qahtani (FMQ)


Contractor : Technip Saudi Arabia Ltd. Project : Saudi Aramco (East West Pipe line PS No 4 -11)
Duration : Jan 2005 to June 2005
Position : QC inspector instrumentation
Company : Foaud Abdullah Foaud (FAFCO)
Contractor : Technip Saudi Arabia Ltd.
Project : Saudi Aramco (Berri Gas Plant)
Duration : Oct. 2004 Jan 2005
Position : QC Inspector Instrumentation
Company : SA KENT (MMG)
Contractor : Fluor Arabia Ltd.
Project : SABIC Jubail United Petrochemical Complex Jubail (JUPC)
Duration : Nov 2003 to October 2004
Position : QC Inspector Instrumentation
Company : Al Hammam
Project : Saudi Aramco (Riyadh Refinery)
Contractor : Technip Saudi Arabia Ltd.
Duration July2003 to Nov 2003
Position : QC Inspector Instrumentation

Company : Tamimi Construction Div.(TCCD)


Project : Saudi Aramco (Jubail industrial port/Berri Gas Plant)
Duration : May 2002 to July 2003
Position : QC inspector E&I
EXPERIENCE DETAILS IN PAKISTAN
Company : Prime Projects
Project : Up john pharmacy
Contractor : HI Tech Automation
Duration : Feb 2002 to May 2002
Position : Site In charge
DESCON ENGG LTD PAKISTAN
From Sep 1995 to Feb 2002
Project : ICI Soda Ash Company
Contractor : ABB Automation
Duration Nov 2000 to Feb 2002
Position : Foreman E&I
Project : Pak arab oil refinery (PARCO)
Contractor : JGC,Marubeni corporation Japan
Duration July 1999 to Nov 2000
Position : Foreman E&I
Project : Fauji Jorden Fertilizer Complex (FJFC)
Contractor : Klockner / krebs consortium Germany
Duration May 1998 to July 1999
Position : Foreman E&I
Project : Fuji Cement Company Ltd (FCCL
Contractor : Cement Plant Consltant (F.L.SMITH/CPC DENMARK)
Duration Dec 1996 to May 1998
Position : Foreman E&I
Project : Luckey Cement Factory
Duration : Sep 1995 to Nov 1996
Position : Foreman E&I
JOB RESPOSBILTIES
Coordinate & oversee the construction of E&I work of project.
Resolves issue at site to ensure minimum stoppage of construction activities.
Perform site supervision and monitor progress during construction phase.
Supervise & monitor site activities to meet and achieve required milestone.
Monitor E&I work to ensure it to deliver according to plan.
Ensure all E&I material & components are delivered according to plan.
Ensure all quality system record, test results and inspections required under the contract are obtained.
Supervise work in progress to ensure compliance with drawing, specification and applicable standard.
Review & request for change and submit recommended to project management.
Coordinate testing & pre commissioning activities.
Supervision /Installation of jbs marshalling racks and controlpanels.
Supervision/Installation of all types of instruments such as pressure,level,flow,temperature transmitter,switchs,
Loop checking and truble shooting of loops.
Calibration of transmitters,switches and control valves
Good understanding of P&ID,Hook up .Data sheet,Lay out ,Top view sheets,Laying and termination schedules.

Você também pode gostar