Escolar Documentos
Profissional Documentos
Cultura Documentos
Lifting & transferring spools from deck of SEAMEC PRINCESS to bed sea beside SFNY#686.
Lift Category: Routine: Non-Routine: Yes
Weight Of Load: 20 Ton Actual / Assessed (delete as appropriate)
Lifting Equipment & Accessories To Be Used (specify type &SWL)
All Lifting Operations Require The Following To Be Considered But This List Is Not Exhaustive.
• Cultural, communication and language • Environmental conditions including weather and permissible
difficulties limits
• Weight, size, shape and center of gravity of load • Lighting in the pick-up and lay-down areas;
• Availability of approved lifting points on load • Proximity hazards, obstructions, path of load
• Method of slinging/attaching/detaching the load • Working under suspended loads
• Overturning/load integrity/need for tag lines • Access and emergency escape routes
• Suitability and condition of Lifting Equipment • Experience, competence and training of personnel
to be used
• Number of personnel required for task
Task Details (Step By Step)
• Tool box meeting with all whom share in operation to designated responsibility (Risk and control).
• Attach four webbing sling to the spool in equal distance.
• Connect four wire sling to four webbing sling, connect four shackles to wire slings.
• Attach four wire slings to shackles & then to the hook of crane.
• Attach two tag lines to spool from both sides.
• Down the spool slowly to sea bed.
• De rigging webbing , shackles & wire sling from spool in bed sea.
Steps Taken To Eliminate Danger To Personnel Involved and Others (including barriers where appropriate):-