Petroleum Marine Services Co.

‫شركة خدمات البترول البحرية‬


S. A. E ‫ م‬. ‫ م‬. ‫ش‬
Private Free Zone ‫منطقة حـرة خـاصة‬

LIFTING OPERATION PLAN PAGE 1 of 2


Location: SFNY 686 Area: SFNY Field
Permit Number: Risk Assessment Number :
Generic Lifting Plan No: Method Statement Number : # Lifting Procedure
Is Diagram/Sketch Of Lifting Operation Enclosed? YES / NO
Description Of Lifting Operation:

Lifting & transferring spools from deck of SEAMEC PRINCESS to bed sea beside SFNY#686.
Lift Category: Routine: Non-Routine: Yes
Weight Of Load: 20 Ton Actual / Assessed (delete as appropriate)
Lifting Equipment & Accessories To Be Used (specify type &SWL)

• Pedestal crane, (SWL #100 T).


• Four shackles bolt type anchor, SWL=25 T.
• Four webbing sling, SWL=18 T
• Eight wire rope sling 7 m. (1.5") , SWL= 18 T

All Lifting Operations Require The Following To Be Considered But This List Is Not Exhaustive.

• Cultural, communication and language • Environmental conditions including weather and permissible
difficulties limits
• Weight, size, shape and center of gravity of load • Lighting in the pick-up and lay-down areas;
• Availability of approved lifting points on load • Proximity hazards, obstructions, path of load
• Method of slinging/attaching/detaching the load • Working under suspended loads
• Overturning/load integrity/need for tag lines • Access and emergency escape routes
• Suitability and condition of Lifting Equipment • Experience, competence and training of personnel
to be used
• Number of personnel required for task
Task Details (Step By Step)
• Tool box meeting with all whom share in operation to designated responsibility (Risk and control).
• Attach four webbing sling to the spool in equal distance.
• Connect four wire sling to four webbing sling, connect four shackles to wire slings.
• Attach four wire slings to shackles & then to the hook of crane.
• Attach two tag lines to spool from both sides.
• Down the spool slowly to sea bed.
• De rigging webbing , shackles & wire sling from spool in bed sea.

Method(s) Of Communication To Be Used Radio  Verbal Hand Signals 

Steps Taken To Eliminate Danger To Personnel Involved and Others (including barriers where appropriate):-

De-brief and learning points:

Prepared By: M.Mounir Signature: