Activity Description

Quantity

Unit

100

Actual
Actual Start
Progress on
completion
date
date
date

Cumulative
progress

% Completion

93.35

93%

Camp Area/STP/RO Piping/Industrial Area (Phase II Works)


SS/JS/JE Accomodation(Balance Phase II )
Installation of SS/JS/JE Portacabins/Abultion blocks including
Plumbing and Electrical Hookups
Construction Area (On Plot)

1-Nov-14

0.02

GT Foundation 1
Formwork Fabrication

360

sqm

40

115

32%

Reinforcement Tying

38

MT

9-Mar-15

23%

Formwork Fabrication

360

sqm

28-Feb-15

330

92%

Reinforcement Tying

38

MT

28-Feb-15

26

68%

Formwork Fixing

300

sqm

9-Mar-15

224

75%

440

M3

2-Mar-15

3-Mar-15

440

100%

440

M3

2-Mar-15

8-Mar-15

440

100%

Reinforcement work for Columns upto Elevated Slab

8.4

Ton

18-Jan-15

7.47

89%

Form work for Columns upto Elevated Slab

384

Sqm

21-Jan-15

340

89%

Concreting for Columns upto Elevated Slab

46.43

Cum

27-Jan-15

0.0

42.5

92%

Form work for Slab

1624

sqm

27-Feb-15

105

6%

8.4

Ton

24-Jan-15

0.0

7.35

88%

Form work for Column upto Elevated Slab

383.77

Sqm

24-Jan-15

0.00

335

87%

Concreting for Columns upto Elevated Slab

46.43

Cum

4-Feb-15

0.0

40.34

87%

Form work for Slab

1624

Sqm

1-Mar-15

25

401

25%

GT Foundation 2

HRSG#1 - Main Structure & Main Stack Foundation (F1)


Excavation for foundations
HRSG#2 - Main Structure & Main Stack Foundation (F1)
Excavation for foundations
Unit Electrical building 1

Unit Electrical building 2


Reinforcement work for Column upto Elevated Slab

Page 1 of 7

PROJECT :- RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)
DAILY PROGRESS REPORT - INDUSTRIAL AREA/CAMP FACILITIES & CONSTRUCTION SITE ( On Plot / OHL)
Report No :- 123
Actual
Actual Start
Progress on
completion
date
date
date

Cumulative
progress

% Completion

25

74%

15-Feb-15

25

74%

Cum

26-Feb-15

20

86%

3.26

Ton

25-Jan-15

0.5

2.9

89%

Form work for Column upto Elevated Slab

159.83

Sqm

11-Feb-15

118.8

74%

Concreting for Column upto Elevated Slab

13.423

cum

11-Feb-15

10.98

82%

Form work for Elevated beam and Slab

760.23

Sqm

11-Mar-15

1.00

0.13%

Activity Description

Quantity

Unit

Reinforcement work for Column

34

Nos.

10-Feb-15

Form work for Column

34

Nos.

23.327

HRSG- Control Building

Concreting for Columns upto Elevated Slab


GTP- Control Building
Reinforcement work for Column upto Elevated Slab

Page 2 of 7

PROJECT :- RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)
DAILY PROGRESS REPORT - INDUSTRIAL AREA/CAMP FACILITIES & CONSTRUCTION SITE ( On Plot / OHL)
Report No :- 123

Activity Description

Quantity

Unit

Actual
Actual Start
Progress on
completion
date
date
date

Cumulative
progress

% Completion

Construction Area (132 kV Control Building / Off Plot Work / OHL )


132 KV Control Building
Curing for Floor Slab Concrete

100

Lot

6-Mar-15

13-Mar-15

10

100

100.00%

Roof Slab Colomn Reinforcement fixing

100

Lot

8-Mar-15

13-Mar-15

17

100.00%

Stair case foundation form work making (4 Nos)

100

Lot

11-Mar-15

100
5

Roof slab colomn shuttering work


132KV OHL line (Amal to Rabab)

100

Lot

13-Mar-15

5.00%

Tower Pile Hole Drilling


132 KV OHL line ROW road

450
143

Loc
Kmt

2-Feb-15
12-Feb-15

1
0.5

36
15.30

8.0%
10.70%

5.00%

Page 3 of 7

OWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

RIAL AREA/CAMP FACILITIES & CONSTRUCTION SITE ( On Plot / OHL)

Date :-13.03.15

Remarks

Formwork making is in Progress.


Reinforcement fixing is in progress

Raft Reinforcement Fixing is in Progress.


Formwork Alignment is in progress, pocket fixing ongoing

Staging work for elevated slab is ongoing .

Formwork for elevated slab is ongoing .


Page 4 of 7

OWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

RIAL AREA/CAMP FACILITIES & CONSTRUCTION SITE ( On Plot / OHL)

Date :-13.03.15

Remarks

Formwork fabrication in progress


Surface making and nito coating in progress
Backfilling and compaction work in Progress

Curing is ongoing of Plinth beam


Scaffolding for columns ongoing.

Page 5 of 7

OWER PLANT & HRSG PROJECT (CONTRACT NO.C311530)

RIAL AREA/CAMP FACILITIES & CONSTRUCTION SITE ( On Plot / OHL)

Date :-13.03.15

Remarks

In progress
In progress
In progress Unit no : 10 break down
Up to 17.5 kmt Grading work Completed. And compaction
work also in progress

Page 6 of 7

PROJECT :- RABAB HARWEEL POWER PLANT & HRSG PROJECT (CONTRACT NO. C311530)
MANPOWER & MAJOR TOOLS DEPLOYMENT AT PROJECT SITE
Report No :- 123

Date :-13.03.15
Man Power Deployment at project site

Major Tools & plant deployment

Indirect Manpower
AHEC

Category

Construction manager
PRO
HSE Manager
HSE Advisor
Planning Team
Camp boss
Journey manager
Sr. civil engineer
Civil engineer
Civil foreman
Surveyor
Mechanical engineer
Mechanical foreman
QA Engineer
Mech Rigging Chargehand
Electrical engineer
Electrical foreman
Electrical Tecnician
QA MGR
QA/QC inspector
Plant staff
Site Accountent
Material controller
Admin
Batching plant operator
Document controller for PDO
Document controller
Scaffolder Forman
Male nurse
Lab technician (Fugro)
HDD
Operator
LDD
Watchman
Catering

Total(Indirect Manpower)

Total(Direct+Indirect Manpower)

AHEC-In house

Expat

Omani

Expat

1
0
1
1
4
1
0
2
2
7
3
0
0
0
0
1
2
0
1
3
1
1
3
1
1
0
2
1
1
0
18
8
3
0
26

0
2
0
2
0
0
4
0
0
0
0
2
0
0
0
0
0
1
0
0
0
0
0
0
0
0
3
0
0
0
12
0
5
5

95

Omani

AHEC-Hire
Expat

Powertech

SMTC

EXOVA

Omani Expat Omani Expat Omani Expat Omani Expat Omani

Bar Bender
Carpenter
Instrument Fitter
Instrument Electrician
AC-Tecnician
Cable Jointer
Electrician
Gas Cutter/Grinder
Helper
Lineman
Mason
Plant Mechanic
Auto Electrician
Tyreman
Plumber
Rigger
Scaffolder
Spray Painter
Brush Painter
M/R Fitter
Sign writer
STR Fabricator
Fitter Pipe
Pipe Welder
Pipe Fabricator
STR Welder
Permithholder
Civil Charghand

2
1
2

1
2
2
2

2
1
1
2

2
1

3
3

Trade

AHEC-Inhouse

Expat

Omani

Expat

28
39
3
0
1
0
4
0
54
5
15
2
1
1
4
14
22
1
6
0
1
1
1
1
0
1
0
0

0
0
0
0
0
0
0
0
3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

16
22
3

Omani

AHEC-Hire

Powertech

SMTC

Seven Seas

Harweel Int

HI-Tech

3
1
12
5
5

15
5
3

3
4
4

12
17

10
13

11
11

3
9

1
4
20
5
5
2
1
1
2
13
16
1
6
0
1
1
1
1

3
3

34

27
3
4
1

10

2
1
6

1
1

1
2

1
2
1

1
1

13

36

46

Category

Total Numbers

Hiab
Tipper
Potable water tanker
Brakish water tanker
Diesel Tanker
Sewage vaccum tanker
40T Trailer
Canter
Pickups
MITSUBISHI TRUCK 7 TON
Mini Bus - 22 seater
AMBULANCE
LAND CRUISER
Big Bus - 60 seater
Toyota Prado

3
4
2
3
2
2
3
6
8
1
2
2
3
4
1

Total

46

AHEC-Inhouse

36

23

43

518

AHEC-Hire

Ptech

HARWEEL

SC SMTC

Expat Omani Expat Omani Expat Omani Expat Omani Expat Omani Expat Omani
Vehicles

2
2
7
3

1
3
1
1
3
1
1
0
2
1
1

AHEC

1
2

1
1
4
1

Direct Manpower
Harweel Intl

12

Total (Direct Manpower)

205

123

82

67

32

18

Crane 25T
Crane 50T
500 KVA Diesel Generator
65 KVA Diesel Generator
250 KVA Diesel Generator
10 KVA Diesel Generator
Excavator
Shovel
Grader
JCB
Dozier
Dumpers
Concrete mixer m/cs
Rig
CONCRETE PUMP
FORKLIFT
Roller compactor-1T
Bob Cat
Concrete vibrators
Air compressor
Welding machine
PLATE COMPACTOR
VIBRATOR (DIESEL)
Transit mixer
7 TON TRUCK
Batching Plant
Man basket
Total

2
1
1
2
1
1
1
3
1
5
1
0
3
1
0
1
3
1
1
3
6
6
6
2
0
1
2
55

2
2
1
0
1
2
0
1

1
1
1
1
1
2
2
0
3
0
2
0
3
0

10
17
Plant & Equipments
0
1
1
1
2
1
1
1
1
2

2
3
2
1
1
3
3

1
1
1

18
1

1
1
2
1

1
1
1

3
1
1
1
1
1

2
5
5
6
2
1
2
35

12

PageNo.3 of 3

Você também pode gostar