Contractor

sno
1
2
3

6
7
8
9
10
11

B
C
D

Contractor response to c
Consultant queries
Variable frequency drive is not included in the submittal
MCC Panel is not included in the submittal
Sequence of operation is to be submitted

Ul Listing is required as per specifications

BMS connection details to be provided

specify Motor model


Contractor should submit two approved companies SPP and
PACO
Contractor to submit compliance sheet stamped by the
contractor and the supllier
Contractor to show in the catalogue , the proposed
specifications against project specifications
The attached curve is not same for the model of pump
To follow the below notes mentioned inside the catalogue

The Motor enclosure TEFC mentioned in pump data sheet is


not clearly mentioned on the catalogue

The Motor ambient temperature of 50 0 c mentioned in pump


data sheet is not clearly mentioned on the catalogue
Review with the mentioned standards in the catalogue against
project specifications
Determine the mechanical seal parts

ntractor response to consultant comments & queries


Contractor response
The VFD is to be provided by the BMS supplier

The MCC Panel from panel board supplier will be submitted soon.
Regarding the sequence of operation of chilled water pumps. Kindly note that all the pumps a
system. So we cannot define a sequence of operation for a single type of pumps seperately. H
provided by Baltimore co and approved by the consultant for isometric and schematic diagra
operation for 5 different modes. However we have already arranged a technical meeting requ
and agreed with the consultant the complete sequnece and operation of the system in the pr
the sequence of operation for secondary pumps , we shall submit seperately for your approva
going to affect pump head , capacity and other related materials. Sequence of operation can
requirement of the end user.

Kindly understand that in normal HVAC practise , there is no Ul listing required for chilled wa
chilled water application. In this regard please find attached email from grundfos printed on th
find attached letter from EWM , in which it is mention that paco pumps are part of Grundfos -C
manufactured under certified quality system under the condition QSR ISO 9001:2000 of QUAL
certificate from QSR.

All the Chilled water pumps are operated by DDC panels of BMS as per approved sequence of
no :GAB-M-IS-O3 dated 28th July 2014. This sequence of operation will be programmed in the
valves, pressure/temperature transmitter and prerssure sensor are provided on the piping net
DDC panels of BMS. The start and the stop of the equipment is done by DDC via MCC panel. i
of the equipment will be given by the MCC panel to DDC.

Motor is designated by its Make, Kilowatt and RPM compatible with the pump duty points whic

Paco pumps are approved as priority 1 . Hence we have submitted paco pumps for technical a
please find attached compliance sheet by the supplier with the stamp
please find attached compliance sheet by the supplier with the stamp

we have already attached the curve matching to the required duty points of the pump in th
the curve with higlighted duty points.

please refer to the Application information in marathon catalogue, it is clearly mentioned that
enclosures

Please refer to the catalogue , the motor winding has Class F insultion with temperature ratin
temp of 50 0 C. On the other hand , these pumps and motors are located inside the pump roo
resulting in the surrounding temperature of less than 40 0 C.

Refer to the attached compliance sheet


option 1 mentioned in the catalogue are used for mechanical seal of the pump. That is ceram
elastomer, stainless steel metal parts and stainless steel spring