U-TUBE TUBESHEET According to UHX of ASME BPVC Sec. VIII Div. 1, 2013 Edition
Configuration d: Tubesheet Gasketed With Shell and Channel
Data Summary
differential design pressure
Ps = shell side design pressure
Psd,max = maximum shell side design pressure
Psd,min = minimum shell side design pressure
Pt = tube side design pressure
Ptd,max = maximum tube side design pressure
Ptd,min = minimum tube side design pressure
T = tubesheet design temperature
tubesheet material
S = allowable stress for tubesheet material at T
E = modulus of elasticity for tubesheet material at T
tube material
StT = allowable stress for tube material at T
EtT = modulus of elasticity for tube material at T
cs = tubesheet corrosion allowance on the shell side
ct = tubesheet corrosion allowance on the tube side
hg = tube side pass partition groove depth
dt = nominal outside diameter of tubes
tt = nominal tube wall thickness
p = tube pitch
tube pattern
ro = radius to outermost tube hole center
C p = perimeter of the tube layout measured stepwise in increments of
one tube pitch from the center-to-center of the outermost tubes
A p = total area enclosed by C p
AL = total area of untubed lanes
tx = expanded length of tube in tubesheet
A = outside diameter of tubesheet
Gs = diameter of shell gasket load reaction
Ws = shell flange design bolt load for gasket seating condition
Wm1s = shell flange design bolt load for operating condition
Gc = diameter of channel gasket load reaction
Wc = channel flange design bolt load for gasket seating condition
Wm1c = channel flange design bolt load for operating condition
h(nom) = nominal thickness of tubesheet
hr(nom) = nominal thickness of tubesheet extension
--0.000
-0.104
MPa
MPa
0.931
0.000
148.900
A285GRC
108.250
195121.600
B111C44300
68.948
106179.300
0.000
3.175
0.000
15.875
1.651
19.050
30
205.590
1341.633
MPa
MPa
C
MPa
MPa
mm
mm
mm
mm
mm
mm
mm
mm
143237.800
18968.000
36.000
508.000
482.600
653889.000
653889.000
482.600
720612.000
720612.000
35.687
13.168
mm2
mm2
mm
mm
mm
N
N
mm
N
N
mm
mm
MPa
4
-0.104
0.000
482.600
0.145
MPa
MPa
Ps
Pt
Do
p
hg
b)
1
-0.104
0.931
427.055
0.167
20.452
0.000
MPa
MPa
mm
mm
mm
1.130
1.130
-3493.986
4
1.130
1.130
-351.087
STEP 3 - Assume a value for the tubesheet thickness, h, and calculate , d , , and h/p. Determine
E /E and from UHX-11.5.2 and calculate E .
h/p
E /E
mm
mm
MPa
d)
e)
1
K
F
f)
4
-0.104
0.000
427.055
0.167
20.452
0.000
s
c
MT S
c)
1.190
0.421
4
32.512
1.000
14.731
0.280
1.707
0.265
0.358
51732.781
4
1.190
0.421
W
M
N
N
1
720612.000
-3493.986
4
720612.000
-351.087
Mp
Mo
M
h)
N
N
N
1
-713.405
-10616.280
10616.280
4
-71.685
-1066.756
1066.756
2S
MPa
MPa
4
21.644
216.500
MAX[ ] 2S; The assumed value for the tubesheet thickness, h is acceptable.
i)
0.8S
MPa
MPa
MAX[ ] 0.8S; The assumed value for the tubesheet thickness, h is acceptable.
4
2.049
86.600
2.069
MPa
2.586
0.000
MPa
MPa
0.517
0.000
260.000
SA-516Gr70
137.900
186848.000
SB111C70600
55.158
114453.000
0.000
3.200
4.763
19.050
1.245
23.813
30
520.700
3331.502
MPa
MPa
C
MPa
MPa
mm
mm
mm
mm
mm
mm
mm
mm
883222.930
60581.000
55.910
1241.600
1104.900
3002550.000
3002550.000
1140.000
2597762.000
2597762.000
108.610
86.610
mm2
mm2
mm
mm
mm
N
N
mm
N
N
mm
mm
4
---------
MPa
MPa
1
Ps
Pt
Do
p
hg
b)
MPa
MPa
mm
-------------
mm
mm
1
-------
4
-------
STEP 3 - Assume a value for the tubesheet thickness, h, and calculate , d , , and h/p. Determine
E /E and from UHX-11.5.2 and calculate E .
1
h
h/p
E /E
mm
-----------------
mm
MPa
d)
e)
1
K
F
f)
-------------
s
c
MT S
c)
-----
4
-----------------
4
-----
W
M
1
N
N
-----
4
-----
1
Mp
Mo
M
h)
N
N
N
-------
4
-------
2S
MPa
MPa
-----
4
-----
MAX[ ] 2S; The assumed value for the tubesheet thickness, h is acceptable.
i)
0.8S
MPa
MPa
-----
MAX[ ] 0.8S; The assumed value for the tubesheet thickness, h is acceptable.
4
-----
MPa
MPa
MPa
MPa
MPa
C
C
MPa
MPa
MPa
MPa
MPa
MPa
MPa
MPa
MPa
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm2
mm2
mm
mm
mm
N
N
mm
mm
mm
mm
mm
W
W m1
G
hG
hr
N
N
mm
mm
mm
4
-----------
Calculation Procedure
a) STEP 1 - Calculate Do , , p , and hg from UHX-11.5.1.
1
Ps
Pt
Do
p
hg
b)
MPa
MPa
mm
mm
mm
0.000
4.482
666.750
0.250
26.292
0.000
4
-------------
s
c
MT S
c)
1.233
1.181
-53961.550
4
-------
STEP 3 - Assume a value for the tubesheet thickness, h, and calculate , d , , and h/p. Determine
E /E and from UHX-11.5.2 and calculate E .
h/p
E /E
mm
mm
MPa
4
-----------------
c
kc
c
c
c
e)
mm1
N
MPa
mm3 /N
mm2
4
-----
1
N
N
0.000
-33661.880
4
-----
Mp
Mo
M
h)
1.419
0.966
W
M
g)
-----------
K
F
f)
N
N
N
1
13468.081
-89827.680
89827.680
4
-------
2S
MPa
MPa
MAX[ ] 2S; The assumed value for the tubesheet thickness, h is acceptable.
4
-----
0.8S
MPa
MPa
4
-----
MAX[ ] 0.8S; The assumed value for the tubesheet thickness, h is acceptable.
j)
STEP 10 - For configuration e, calculate c,m , c,b , and c for the channel, and check the acceptance
criterion.
c,m MPa
c,b
MPa
c
MPa
1.5Sc MPa
SPS,c MPa
Procedure
4
-------------
If c 1.5Sc , the channel design is acceptable and the calculation procedure is complete.
Otherwise, proceed to STEP 11.
k)
STEP 11 - Since c SPS,c for all loading cases, option 3 is used. Calculate Ec for each loading case
where > 1.5Sc . Recalculate kc , c given in STEP 4 using the applicable reduced effective modulus
Ec . Recalculate F given in STEP 5. Recalculate M p , Mo , and M given in STEP 7. Recalcurate
given in STEP 8.
Ec
kc
c
F
Mp
Mo
M
2S
MPa
N
MPa
N
N
N
MPa
MPa
1
132571.320
1569880.200
0.063
0.836
10013.940
-93281.820
93281.820
183.717
275.780
4
-------------------
MAX[ ] 2S; The assumed value for the tubesheet thickness, h is acceptable.
-------------------