Você está na página 1de 160

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 1 of 99

TABLE OF CONTENTS
EXECUTIVE SUMMERY 8
CHAPTER 1: PROJECT INTRODUCTION ............................................................................................ 15
1.1
1.2
1.3
1.4

Project Award and Introduction of Client ........................................................................................................15


Project Brief, Scope & Objectives .....................................................................................................................16
Methodology ....................................................................................................................................................16
Structure of the Report ....................................................................................................................................20

CHAPTER 2: PHYSICAL FEATURES OF THE TOWN ....................................................................... 21


2.1 GENERAL CITY PROFILE ........................................................................................................................................21
2.1.1 Historical Importance ..................... ................................................... ................................................... ............. 21
2.1.2 Katni District Profile ....................................................................... ................................................... ................ 21
2.1.3 Location and connectivity ................ ................................................... ................................................... .......... 21
2.1.4 Climate & Rainfall ....................... ................................................... ................................................... ................ 21
2.1.5 Topography and Geology ....................................................................... ................................................... ........ 22
2.1.6 Wind Direction ............................ ................................................... ................................................... ................ 22
2.1.7 Base Map........................................... ................................................... ................................................... .......... 23

CHAPTER 3: DEMOGRAPHIC & SOCIO-ECONOMIC PROFILE ..................................................... 24


3.1 Demography ........................................................................................................................................................24
3.1.1 Population Growth Trend ..................... ................................................... ................................................... ........ 24
3.1.2 Population Projections ...................... ................................................... ................................................... ............ 25
3.1.3 Population Density .......................... ................................................... ................................................... .............. 25
3.1.4 Average household Size ...................... ................................................... ................................................... .......... 26
3.1.5 Other Demographic Indicators.................................................................... ................................................... ..... 26
3.1.6 Issues...................................... ................................................... ................................................... ....................... 26
3.2: SOCIO ECONOMIC PROFILE .................................................................................................................................26
3.2.1 Sex Ratio ......................................... ................................................... ................................................... .............. 26
3.2.2 Literacy Rate.............................. ................................................... ................................................... ................... 26
3.2.3 Work Participation Ratio (WPR) ................................................................ ................................................... ...... 26
3.2.4 Occupation Structure ....................... ................................................... ................................................... ............ 27
3.2.5 Industries/trade and commerce ................................................................. ................................................... .... 28

CHAPTER 4: PHYSICAL PLANNING AND GROWTH MANAGEMENT ......................................... 30


4.1 Spatial Growth Trends .........................................................................................................................................30
4.2 Spatial Distribution of Population ........................................................................................................................30
4.3 Land use...............................................................................................................................................................30
4.4 Master plan Provision ..........................................................................................................................................31
4.5 Housing................................................................................................................................................................31
4.6 Housing in Barhi...................................................................................................................................................31
4.7 Housing demand for the year 2035 ......................................................................................................................32
4.8 Unauthorised colonies/Settlements ....................................................................................................................32
4.9 Future Growth Direction ......................................................................................................................................32

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 2 of 99

CHAPTER 5: TOWN INFRASTRUCTURE ............................................................................................ 34


5.1 Water Supply .......................................................................................................................................................34
5.1.1 Quality and Quantity of Water at Source .................................................... ................................................... . 34
5.1.2 Quality and Quantity of Water in distribution System ...................................... ............................................. 35
5.1.3
Water Distribution Arrangement........................................................................ ........................................... 35
5.1.4
Internal Distribution Networks .................... ................................................... ............................................... 35
5.1.5
Coverage & Supply................................. ................................................... ................................................... .. 36
5.1.6
Institutional Set-up .............................. ................................................... ................................................... .... 37
5.1.7
Operation & Maintenance (O&M) ..................... ................................................... ......................................... 37
5.1.8
Present and Future Demand and Supply Gaps ............................................................ .................................. 38
5.1.9
Water Supply Project .............................. ................................................... ................................................... . 38
5.1.10 Comparative Analysis (Service Levels) ................................................................ .......................................... 39
5.1.11 SWOT Analysis ..................................... ................................................... ................................................... ... 39
5.1.12 Key Issues ........................................ ................................................... ................................................... ........ 39
5.1.13 City specific Strategies and Action Plans ............................................................ ........................................... 40
5.2 Sewerage System .............................................................................................................................................41
5.2.1
Existing Sewerage System.............................................................................. ................................................ 41
5.2.2
Household Latrines .................... ................................................... ................................................... .............. 41
5.3 Existing Sanitation System ...................................................................................................................................42
5.3.1
Public Toilets .................................... ................................................... ................................................... ........ 42
5.3.2
Present, Future Demand and Supply Gaps ............................................................... ..................................... 42
5.3.3
Sanitation Projects ............................... ................................................... ................................................... .... 42
5.3.4
Comparative Analysis with the UDPFI, CPHEEO Guidelines ............................................... ........................... 42
5.3.5
SWOT Analysis ..................................... ................................................... ................................................... .... 43
5.3.6
Key Issues........................................ ................................................... ................................................... ......... 43
5.3.7
City specific Strategies and Action Plans ............................................................ ........................................... 43
5.4 Solid Waste Management ....................................................................................................................................44
5.4.1
Quantity of Waste Generated .......................................................................... ............................................. 44
5.4.2
Constituents of Municipal Waste ................... ................................................... ............................................ 45
5.4.3
Current practices of Solid Waste Management........................................................... .................................. 45
5.4.4
Segregation & Storage of Solid Waste ................................................................. .......................................... 45
5.4.5
Primary and Secondary Collection ..................................................................... ............................................ 45
5.4.6
Processing & Disposal of Waste..................... ................................................... ............................................. 46
5.4.7
Vehicles for Solid Waste collection and Transportation ............................................... ................................. 46
5.4.8
Institutional Set-up .............................. ................................................... ................................................... .... 46
5.4.9
Estimation of Waste Collection .................... ................................................... .............................................. 47
5.4.10 Comparative Analysis with Guidelines ................................................................. ......................................... 47
5.4.11 SWOT Analysis ..................................... ................................................... ................................................... ... 47
5.4.12 Key Issues ........................................ ................................................... ................................................... ........ 48
5.4.13 City specific Strategies and Action Plans ............................................................ ........................................... 48

5.5 Drainage System...............................................................................................................................................49


5.5.1 Existing Drainage System .................... ................................................... ................................................... .......... 49
5.5.2 Major Water Bodies .......................... ................................................... ................................................... ............ 49
5.5.3 Tertiary Drains............................. ................................................... ................................................... .................. 49
5.5.4 Flood-prone Areas or Environmentally Sensitive Areas ........................................... ........................................... 49
5.5.5 Air and Noise pollution ..................... ................................................... ................................................... ............ 50
5.5.6 Present and Future Demand and Supply Gaps ...................................................... ............................................. 50

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 3 of 99

5.5.7 SWOT Analysis................................ ................................................... ................................................... ............... 51


5.5.8 City specific Strategies and Action Plan ....................................................... ................................................... .... 51
5.6 Traffic & Transport...............................................................................................................................................52
5.6.1 Existing Traffic & Transportation Scenario ..................................................... ................................................... .. 52
5.6.2
Travel Characteristics............................. ................................................... ................................................... .. 52
5.6.3
Intermediate Public Transport System ................................................................. ......................................... 53
5.6.4
Parking Assessment ................................ ................................................... ................................................... . 53
5.6.5
SWOT Analysis ..................................... ................................................... ................................................... .... 54
5.6.6
Service Adequacy and Key Issues ...................................................................... ............................................ 54
5.6.7
City specific Strategies and Action Plan ............................................................. ............................................ 54
5.7 Street lighting & fire fighting ............................................................................................................................56
5.7.1
Existing Situation of Street Lights ................................................................. ................................................ 56
5.7.2
Fire Services ..................................... ................................................... ................................................... ........ 56
5.7.3
Present and Future Demand and Supply Gaps ............................................................ .................................. 56
5.7.4
SWOT Analysis ..................................... ................................................... ................................................... .... 56
5.7.5
City specific Strategies and Action Plan ............................................................. ............................................ 56
5.8 Urban Poor and Their Accessibility to Basic Services ........................................................................................57
5.8.1 Introduction .............................. ................................................... ................................................... .................. 57
5.8.2
Poverty in the Town............................... ................................................... ................................................... .. 57
5.8.3
Information pertaining to BPL Population and Slum Population ......................................... ......................... 58
5.8.4
Present and Future Housing Demand.................................................................... ........................................ 58
5.8.5
SWOT Analysis ..................................... ................................................... ................................................... .... 59
5.8.6
Issues ............................................ ................................................... ................................................... ........... 59
5.8.7
City specific Strategies and Action Plans ............................................................ ........................................... 60
5.9 Social infrastructure .........................................................................................................................................60
5.9.1
Educational Facilities ................ ................................................... ................................................... ............... 60
5.9.2
Health Facilities.................................. ................................................... ................................................... ...... 61
5.9.3
Socio-Cultural Facilities ......................... ................................................... ................................................... ... 61
5.9.4
Recreation/ Leisure/ Parks and Play Grounds .......................................................... ..................................... 62
5.9.5
Markets ........................................... ................................................... ................................................... ......... 62
5.9.6
Crematoria & Burial Grounds ....................... ................................................... .............................................. 62
5.9.7
City specific Strategies and Action Plans ............................................................ ........................................... 62

CHAPTER 6

INSTITUTIONAL FRAMEWORK .............................................................................. 63

CHAPTER 7 MUNICIPAL FINANCE....................................................................................................... 65


7. Present Scenario ....................................................................................................................................................65
7.1 Revenue and Capital Accounts:.................................................................... ................................................... ....... 65
7.1.1 Financial status: ........................... ................................................... ................................................... ................. 65
7.1.2 Composition of own revenue and expenditure: .................................................... ............................................. 66

CHAPTER 8 CAPITAL INVESTMENT PLAN (CIP) & FINANCIAL OPERATING PLAN (FOP) 67
8.1 City Investment Plan - Introduction .....................................................................................................................67
8.1.1 Water Supply System (WS) ....................................................................... ................................................... ....... 67
8.1.2 Sewerage .................................... ................................................... ................................................... ................... 68

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 4 of 99

8.1.3 Storm Water Drains (SWD) ....................................................................... ................................................... ....... 69


8.1.4 Solid Waste Management (SWM) ................................................................... ................................................... . 69
8.1.5 Sanitation .................................. ................................................... ................................................... .................... 70
8.1.6 Traffic & Transportation (T&T) ................................................................. ................................................... ........ 71
8.1.7 Electricity and Street Lighting ................................................................ ................................................... .......... 72
8.1.8 Urban Poor .................................. ................................................... ................................................... .................. 73
8.1.9 Environmentally Sensitive Areas ................................................................ ................................................... ...... 73
8.1.10 Urban Governance ........................... ................................................... ................................................... ........... 73
8.1.11 Social Infrastructure ...................... ................................................... ................................................... .............. 74
8.2 FINANCIAL OPERATING PLAN (FOP) - Introduction: .............................................................................................75
8.2.1 Objective and Methodology: ..................................................................... ................................................... ...... 75
8.2.2 Assumptions and Reforms ..................... ................................................... ................................................... ....... 75
8.2.2.2 Municipal Taxes: .................................................. ................................................... ......................................... 76
8.2.2.3 Non-Tax Sources .................................................. ................................................... .......................................... 78
8.2.2.4 New O&M Cost .................................................. ................................................... ............................................ 78

CHAPTER 9: URBAN REFORMS ............................................................................................................ 82


CHAPTER 10: SUMMARY OF WORKSHOP PROCEEDINGS.......................................................... 84
10.1 Purpose and Importance of the workshop .........................................................................................................84
10.2 Stakeholder Identification .................................................................................................................................84
10.3 Preparation of hand-outs and questionnaires ....................................................................................................85
10.4 District level Workshop/Meeting at District Head Quarters (Jabalpur). .............................................................85
10.5 Extended Discussion with Deputy Director ........................................................................................................86
10.6 Town level Workshop/Meeting at Town Level: ..................................................................................................86
10.6.1 Preparation for the workshop................................................................... ................................................... ..... 86
10.6.2 Presentation on Town profile and discussion with participants ................................. ...................................... 87
10.6.3 Summary of the Sector Analysis ................................................................ ................................................... .... 87
10.6.4 Workshop Summary ........................... ................................................... ................................................... ........ 88
10.6.5 Photographs taken during the workshop ......................................................... ................................................ 90

CHAPTER 11: CITY VISION .................................................................................................................... 91


11.1 Public Opinion on Existing Infrastructure Facilities and Services in Barhi ...........................................................91
11.2 Public opinion on prioritizing the proposed list of developments ......................................................................92
11.3 Planning, developing and managing urban growth in Municipal area ................................................................93
11.4 Sectoral strategy framework ..............................................................................................................................93
11.5 Conclusion: Brief strategies, actions and projects for the city ............................................................................95

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 5 of 99

LIST OF TABLES
TABLE 3.1: DECADAL GROWTH RATE OF THE TOWN ........................................................... ............................................ 25
TABLE 3.2: POPULATION PROJECTION OF THE TOWN ........................................................ ............................................. 26
TABLE 3.3: POPULATION PROJECTION OF THE TOWN(INCLUDING KHANNA PANCHAYAT) ............................................ 26
TABLE 3.4: AREA, POPULATION & GROWTH RATE ............................................................ ............................................... 26
TABLE 3.5: CATEGORY WISE WORK FORCE .................................................................. ................................................... .. 27
TABLE 3.6: OCUPATION STRUCTURE ....................................................................... ................................................... ...... 28
TABLE 3.7: IMPORTANT COMMODITIES ..................................................................... ................................................... ... 29
TABLE 4.1: WARD-WISE DETAILS OF THE TOWN ............................................................. ................................................. 3 0
TABLE 4.2: UDPFI STANDARDS FOR LAND USE ............................................................. ................................................... 30
TABLE 4.3: LAND USE BREAKUP ......................................................................... ................................................... ........... 31
TABLE 4.4: DETAILS OF HOUSES, HOUSEHOLDS AND HOUSEHOLDS SIZE OF BARHI ................................ ........................ 32
TABLE 4.5: HOUSING DEMAND FOR THE YEAR 2035 .......................................................... .............................................. 32
TABLE 5.1: DETAILS OF WATER SOURCE & SYSTEM ......................................................... ................................................ 34
TABLE 5.2: DETAILS OF ELSR IN BARHI ................................................................. ................................................... ......... 35
TABLE 5.3: DETAILS OF THE DISTRIBUTION SYSTEM ....................................................... ................................................. 3 5
TABLE 5.4: DETAILS OF WATER SUPPLY CONNECTION IN BARHI TOWN ......................................... ................................ 36
TABLE 5.5 : DETAILS OF WATER CONNECTIONS IN BARHI .................................................... ............................................ 36
TABLE 5.6 : DOMESTIC WATER SUPPLY DETAILS IN BARHI 2011 ............................................ ....................................... 37
TABLE 5.7: DETAILS OF WATER CHARGES IN BARHI 2011................................................. ............................................ 38
TABLE 5.8: WATER DEMAND ASSESSMENT 2035 ........................................................... .............................................. 38
TABLE 5.9: SERVICE LEVELS IN BARHI .................................................................. ................................................... ......... 39
TABLE 5.10 : DETAILS INDICATING THE EXISTING SANITATION FACILITIES ................................... ................................... 41
TABLE 5.11 : DETAILS HOUSEHOLD LEVEL SANITATION FACILITIES ........................................... ....................................... 41
TABLE 5.12 : DETAILS OF PUBLIC CONVENIENCE FACILITY .................................................. ............................................. 42
TABLE 5.13 : DEMAND ASSESSMENT 2035 ................................................................ ................................................... . 42
TABLE 5.14 : SERVICE LEVELS IN BARHI ................................................................. ................................................... ........ 42
TABLE 5.15 : SOLID WASTE DETAILS IN BARHI 2011 ..................................................... ................................................. 4 5
TABLE 5.16 : SOLID WASTE TRANSPORT AND DISPOSAL ARRANGEMENTS......................................... ............................. 46
TABLE 5.17 : STAFF FOR SOLID WASTE MANAGEMENT IN BARHI ............................................... ..................................... 47
TABLE 5.18 : DETAILS OF CURRENT SERVICE LEVELS ....................................................... ................................................. 4 7
TABLE 5.19 : DETAILS INDICATING THE EXISTING DRAINAGE CONNECTIONS .................................... .............................. 49
TABLE 5.20 : DETAILS OF ENVIRONMENTAL SENSITIVE AREAS ................................................ ........................................ 50
TABLE 5.21 : DEMAND AND SUPPLY GAPS FOR SWD SYSTEM.................................................... ...................................... 50
TABLE 5.22 : ROAD SURFACE DETAILS .................................................................... ................................................... ....... 52
TABLE 5.23 : DETAILS OF STREET LIGHTING IN BARHI ..................................................... ................................................. 5 6
TABLE 5.24 : WARD WISE BPL & SLUM DETAILS ............................................................ ................................................... 58
TABLE 5.25 : SLUM MATRIX WITH REFERENCE TO INFRASTRUCTURE COVERED .................................... ......................... 59
TABLE 5.26 : DETAILS OF THE EDUCATIONAL INSTITUTIONS IN BARHI ........................................ .................................... 60
TABLE 5.27 : DETAILS OF MEDICAL FACILITIES IN BARHI .................................................. ................................................ 61
TABLE 5.28 : DETAILS OF FUTURE DEMAND FOR THE MEDICAL FACILITIES ..................................... ................................ 61
TABLE 8.1: INVESTMENT REQUIREMENTS FOR WATER SUPPLY SECTOR .......................................... .............................. 67
TABLE 8.2: INVESTMENT REQUIREMENTS FOR SEWERAGE SECTOR .............................................. ................................. 68
TABLE 8.3: INVESTMENT REQUIREMENTS FOR STORM WATER DRAINS SECTOR .................................... ....................... 69
TABLE 8.4: INVESTMENT REQUIREMENTS FOR SOLID WASTE MANAGEMENT SECTOR ................................ ................. 69
TABLE 8.5 : INVESTMENT REQUIREMENTS FOR SANITATION SECTOR ............................................ ................................. 70
TABLE 8.6 : INVESTMENT REQUIREMENTS FOR TRAFFIC & TRANSPORTATION ..................................... .......................... 71
TABLE 8.7: INVESTMENT REQUIREMENTS FOR STREET LIGHTING .............................................. .................................... 72
TABLE 8.8: INVESTMENT REQUIREMENTS FOR URBAN POOR.................................................... ..................................... 73
TABLE 8.9: INVESTMENT REQUIREMENTS FOR ENVIRONMENTALLY SENSITIVE AREAS.............................. .................... 73
TABLE 8.10 : INVESTMENT REQUIREMENTS FOR SOCIAL INFRASTRUCTURE FACILITIES ............................ ...................... 74
TABLE 8.11 : SUMMARY OF PROPOSED INVESTMENTS ......................................................... ........................................... 74
TABLE 10.1 : SUMMARY/FINDINGS OF THE SECTOR WISE ANALYSIS AND TOWN PROFILE OF BARHI ............................. 87

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 6 of 99

TABLE 11.1 : SHOWS THE PRIORITIZATION FOR VARIOUS DEVELOPMENTS. ...................................... ............................. 92

LIST OF MAPS
MAP 1.1

Base map

MAP 2.1

Density map

MAP 4.1

Landuse map

MAP 4.2

Future growth map

MAP 5.1

Existing water supply system of Barhi

MAP 5.2

Existing solid waste disposal location map

MAP 5.3

Drainage network Map

MAP 5.4

Environmental Sensitive Areas

MAP 5.5

Road network in Barhi

MAP 5.6

Location of Slums

LIST OF ANNEXURES
ANNEXURE - I

FOP

ANNEXURE - II

Proposed Landuse Map

ANNEXURE - III

Proposed Water Supply Network Map

ANNEXURE - IV

Proposed Sewerage System Map(DEWATS)

ANNEXURE V

Proposed Solid waste Disposal Map

ANNEXURE VI

Proposed Road Network Map

City Development Plan for Barhi Town

EXECUTIVE SUMMARY

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 7 of 99

Executive Summary
I. Overview
The Jawaharlal Nehru National Urban Renewal Mission (JnNURM) is an ambitious programme of the
Government of India to bring about improvements in the existing urban service levels and urban
infrastructure in a financially sustainable manner. The primary objective of the programme is to create
economically productive, efficient, equitable and responsive cities. The projects that qualify under this
scheme include sub-sectors of water supply, sewerage and sanitation, drainage, solid waste management,
traffic and transportation facilities, housing infrastructure and basic services for urban poor. Further, special
projects including urban transit systems, urban expressways, sea-links and other sectors of similar nature
would also be covered under this scheme. In order to access funds through the mission, the state
government and the cities seeking assistance require to sign-up to a set of reforms covering various areas of
urban management and good governance.
The City Development Plan (CDP) shall provide a comprehensive long term strategy (Vision 2035) as well as
a City Investment Plan (CIP), based on which the concerned ULB's can approach and be eligible to the
funding under GoI /GoMP schemes along with their own and other sources of finances based on priority
actions and projects identified in the CDP. The document shall also provide Financial Operating Plan (FOP) to
direct the ULBs for mobilizing various financial resources to implement the identified priority projects. The
scope of the services include all necessary steps formulated in JnNURM Toolkit 2, that would help to prepare
the CDP, such as Data Collection & Field Visits, Municipal Staff & all Stakeholders consultative meetings,
Sector Analysis, organising necessary workshops for the successful completion of the CDP. The specific
objectives of the project are as follows;

CDP would scale up existing urban development and poverty alleviation schemes within a
comprehensive and coherent strategic planning framework, in order to ensure optimal benefit from
available resources to the citizens of the ULBs.

CDP would aim to catalyze new thinking and provoke debate through a consultative stakeholder
driven process. The vision and strategic thrusts of the CDP would be built around the lessons and
findings of a comprehensive and rigorous stakeholder consultation and documentation process.

It is expected that the CDP would serve the purpose and meet the requirements of UIDSSMT and
IHSDP programmes as well as JnNURM and other development schemes.

The CDP will generate specific priority actions and projects that can be the basis, for mobilizing
funds from diversified sources.

Government of Madhya Pradesh has taken up a huge task of preparation of CDPs for 293 towns and the
consultancy of preparation of reports has been awarded to various consultants and the Barhi is one of the
towns out of the 7 towns assigned to Aarvee Associates.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 8 of 99

II. Town Profile


Barhi town is constituted in the year 1981, with an area of 18.09 sq. kms and it constitute of 15 municipal
wards. The salient feature of Barhi City is its strategic located on the gateway to few importance tourist
places in Madhya Pradesh state like Bhandharghad National Park, Khajuraho, Amarkantak, Chitrakutt and
Maihar.

Barhi is a town with Nagar Parishad status in Barhi tehsil of Katni district in the state of Madhya Pradesh.
Barhi geographically lies between 23.9N latitude and 80.8E Longitude, at an altitude of 361 meters (1184
feet's) above mean sea level and it is nearly 51 Km away from the District headquarters Katni and around
457 Kms from the state Headquarter Bhopal. The town is well connected with Road, where State Highway
11 and 10 will intersect at core area of the town. The town is also connected by railway line.

The physical development is extending towards Katni and Badanpur towns, which is predominantly linear
development in nature. Thus, pockets of agricultural land are still available for development within the
municipal limits. In the other parts of the town, physical development is observed in South-East direction.

III. Infrastructure Assessment

Water Supply
Barhi is predominantly dependent on ground water source for water supply. Presently, water is drawn from
a depth of 100 120 ft. Direct pumping is in practice for storage and distribution of water supply. As per the
assessment made by the officials at Nagar Parishad of Barhi, there are 24 tube wells in the town. Water is
supplied through tankers to the areas where water supply is scarce and areas not covered with distribution
network. The present per capita water supply is 50 LPCD.

Sewerage
Barhi lacks adequate sanitary facilities. Three out of ten houses have no latrine facilities indicating open
defecation in the town. As per the sanitation surveys conducted during 2008, about 65 percent households
have access to improved sanitation within household and remaining 35 percent households lack these
facilities. About 60 percent of the households have septic tank connections. As per the discussions with the
Nagar Parishad officials, as per 2011, there are 20% of households with no latrine facilities (Open
defecation).

Solid Waste Management


As per the Nagar Parishad officials, approximately 3.5 tons of waste is collected per day which indicates a
collection performance of 80 per cent. There is door-to-door collection system is in practice in Ward No.'s
1,5, 6,7,9 and 13 of the town. Landfill site is proposed near to ward number 15, which is 3 km away from
the city core. The total extent of the site is about 6.0 acres.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 9 of 99

Storm Water Drains


The total length of tertiary drains as per available data is 12 km. Out of this, pucca drains length is 5 km and
remaining 7 km length is kutcha in nature. The total drain length accounts to 82 per cent of total road
length. There are three water bodies existing in the city, comprising of about 19 ha in its area.

Traffic & Transportation


Barhi is well accessed by road. Barhi town is connected with the region through SH-10, which connects the
town to Katni and Mahiriya. The effective carriage width of the state highway is affected in the central part
of the town due to the activities related to the informal sector activities and dispersed pedestrian movement.
The total road length in Barhi is 14.5 km out of which 10.5 km is maintained by the Nagar Parishad and
remaining 4.0 km by the PWD. Around 29 percent of the roads laid by cement concrete. The share of WBM
roads is 27.5 per cent and remaining 43.5 per cent are earthen roads.

Street Lighting
In Barhi there are about 400 street lights with different types of electrical fixtures. The average spacing of
street light poles ranges between 45 m to 50 m, as against the norm of 30 m indicating gross inadequacy of
the system. However, this condition is not uniform.

Urban Poor
As per the latest estimate of poverty in Barhi have converged to between 50 to 60 percent of total
population. As per the latest estimate made available by Nagar Parishad - Barhi, the slum population in the
town stands at 4465, which accounts to 32 percent of the total population and total slum households are
812, which accounts to 28.0 percent of total households.

Social Infrastructure Facilities


The town has one government hospital and three clinics are providing health services. There are 9 primary
schools in the town. In addition to the primary schools, there are 3 other schools that are catering to the
needs of secondary education and senior secondary education. The town does not have any land earmarked
for Socio-cultural activities except a community hall.
Weekly market (Mela ground) is located in ward-6, where the total no. of shops are about 1,000 and 10,000
people visit on that day. Lack of parking place at Mela ground is leading to the congestion in the area there
by obstructing the pedestrian and traffic movement. There are 3 burial grounds in the town, which are
primarily serving the needs of Hindu and Muslim religions.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 10 of 99

IV. Documentation of Consultative Workshops

Kick-off Workshop
In the initial (Kick-off Meeting) stage, Project Consultants, M/s
Aarvee associates architects engineers and consultants pvt ltd.,
team comprising of Mr. K. Jagadeesh, Mr. B.NeelaKantam Raju, and
Mr. Raghu ram, Ms. Sukeerthi and Mr. Ravi Teja visited Jabalpur on
21st Nov, 2011 and held discussions with Dy. Director, Urban
Development Department at Jabalpur divisional office. On behalf of
the

Divisional

Commissioner,

Jabalpur,

Dy.

Director,

Urban

Development Department, Jabalpur Division chaired the start-up meeting and addressed the Presidents and
CMOs of all 7 project towns.
Further, consultants team visited the Barhi town on 22/11/2011 and
conducted a one day kick-off meeting at Nagar Parishad Office. The
President, Chief Municipal Officer (CMO), ULB Officials and other Ward
Parishads were present in the workshop. Consultants briefed about the
project objectives and importance to the stakeholders.

2nd Stage Workshop at state & ULB level


In the 2nd Workshop stage, M/s Aarvee associates architects
engineers and consultants pvt ltd representatives, Mr. K.
Jagadeesh, Mr. Raghuram and Mr. Vishwanath, Urban and
environmental planner, visited Jabalpur on 13th April, 2012 and
held

initial

discussions

with

Director,

Urban

Development

Department at Jabalpur Divisional Office. Shri Gulshan Bamra,


Collector, Jabalpur District has reviewed the progress of the CDP work and Chaired the meeting, addressed
the CMOs and representatives of all 7 project towns. Detailed deliberations were made with Shri. Rajeev
Nigam, Dy. Director, urban development. He emphasized on;

Provision of Water Supply, Sanitation and Solid Waste


Management,

Relocation of slums

Imparting training on folk art and folk culture to the slum


dwellers

Inculcate Social Awareness

Provision of a buffer zone (Urban Forest) along the river


bed

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 11 of 99

The 2nd stage town level workshop was organized by Aarvee


associates Pvt. Ltd with the co-operation of Chief Municipal Officer
(CMO) Barhi and active participation of Municipal staff. The
information on conducting the workshop was passed onto Nagar
Parishad well in advance so as to involve as many as identified
stakeholders to participate in the workshop. Workshop on CDP
was held at Barhi Nagar Parishad on 28th of May 2012. The
purpose of the workshop was to involve stakeholders and facilitate
in the discussions, record the Comments & obtain suggestions so as to incorporate them into the plan
preparation of CDP.

Summary of workshops
On the whole, there was very good response from all the stakeholders and the major proposals for the
development of Barhi Town are expressed below:

Provision of potable drinking water

Provide better Drainage Network/DEWATS system.

Provision of root-zone treatment method to recycle the waste water

Provide better public transportation system

Provision of Bus stand/bus shelters along the proposed by-pass

Improvements to the Solid Waste Management practices like implementation of Door-todoor collection system.

Provision of recreational facilities like parks, playgrounds, community halls.

Provision of women and child healthcare facilities.

Provision of Diploma/ITI institutions for better employment oppurtunities to youth.

Provision of agro-based industries like warehouses and cold storages.

Provision of basic services with Inclusive Planning.

3rd Stage Workshop at ULB level


The 3rd stage/final town level workshop was organized by Aarvee
associates Pvt. Ltd with due consultations with Chief Municipal
Officer (CMO) Barhi and active participation of Municipal staff. The
information on conducting the workshop was passed onto Nagar
Parishad well in advance so as to involve as many as identified
stakeholders to participate in the workshop. Workshop on CDP
was held at Barhi Nagar Parishad on 22nd of December 2012.
The purpose of the workshop was to deliberate on the City

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 12 of 99

Investment Plan and Financial Operation Plan. Total investment for the Barhi town is estimated to the tune
of about Rs. 62.55 crores by the end of the plan period 2035. All the major proposals are incorporated as
suggested in the earlier workshop held at Barhi town. The stakeholders have readily accepted the
investment plan as well financial operation plan and have expressed their willingness to pay the taxes as per
the Financial Operating Plan.
The sizable investment (58% of the total investment) is worked
out for traffic and transportation sector proposals followed by
urban poor sector. As of now water supply system is quite
sufficient in the town and needs the improvement of pipeline
system at un-served areas. Provision of bus stand, bus shelters,
bye-pass road, additional dust bins & vehicles and landfill site
area and other social infrastructure facilities like parks, play
grounds and community halls are covered in the investment
plan.

V. Investment Plan

The summery of Sector wise Investment Required for Implementation of Proposed Projects are as follows;
Sector wise Summery of
Investments

Water Supply (WS)


Sewerage
Sanitation
Solid Waste Management (SWM)
Storm Water Drains (SWD)
Traffic & Transportation (TT)
Street Lighting (SL)
Social Infrastructure (SI)
Environment
Urban Governance
Urban Poor (UP)
Grand Total

City Development Plan for Barhi Town

Total Amount
(lakhs)

Phase 1

Phase 2

Phase 3

2012-2015

2015-2025

2025-2035

512.91

323.81

103.85

85.25

150.60

41.025

73.05

36.525

78.60

78.6

112.62

86.62

20.66

5.33

219.75

101.63

83.75

34.38

3658.25

71.50

1761.75

1825.00

70.25

32.65

16.9

20.7

155.00

65.00

71.25

18.75

30.00

15.00

15.00

10

10

1258.00

283.60

365.40

609.00

6255.98

1109.43

2511.61

2634.93

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 13 of 99

VI. Vision Statement

To develop Barhi Town as an important urban center by improving


the economic activities with infrastructure and
better Quality of Life.
VII. Urban Reforms
S.N
o

Mandatory Reforms

Reforms Status
at ULB

Adoption of the modern


accrual-based double entry
system of accounting in ULBs
and Parastatal agencies

Yet to be
Implemented

Introduction of a system of Egovernance


using
IT
applications such as GIS & MIS
etc.

Yet to be Initiated

Reform of Property Tax with


GIS applications

Yet to be Initiated

Levy of reasonable User


Charges by ULBs with the
objective that the full cost of
O&M is collected within the
next 5 years.

Remarks
System was not implemented
due to lack of awareness,
professional manpower and
software
procurement/equipment. Keen
to adopt the system.
System was not implemented
due to lack of funds, except
few
stand-alone
desktop
machines being used for
accounting purpose. Keen to
adopt
the
system
with
additional funds availability.
GIS Mapping for utilities need
to be done for effective
collection.

October,
2013

March,
2014

July, 2013

Partially achieved,
except water and
consolidated taxes

Collecting water tariff from


household level and collection
efficiency is about 60%. UGD
taxes are nil due to absence
of system and street lighting
tax is minimal.

2016-17
(UGD
system
may not
be
considered
due to
proposal
of
DEWATS)

2014-2015

2013-2014

Internal earmarking within


local body budget for basic
services to urban poor.

Yet to be
Considered

As of now, ULB is not able to


spend any amount for urban
poor
sector.
Specific
allocations have not been
made in the budget for urban
poor.

Provision of basic services to


Urban Poor including security
of tenure at affordable prices,
improving
housing
and
infrastructure facilities

Partially Initiated

ULB has issued few "Pattas"


to slum dwellers in the past
years

City Development Plan for Barhi Town

Target

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 14 of 99

S.No

Reforms Status
at ULB

Optional Reforms

Remarks

Revision of bye-laws to
streamline
the
approval
process for construction of
buildings, development of site
etc

Yet to be Initiated

Possible with the directives of


State level stance.

Conversion of land from


agriculture to non-agriculture

Yet to be Initiated

Possible with the directives of


State level stance.

Introduction of property title


certification system in ULB

Yet to be Initiated

Possible with the directives of


State level stance.

20-25% of land earmarking


for EWS & LIG category with
a
system
of
cross
subsidization

Yet to be Initiated

Possible with the directives of


State level stance.

Revision of byelaws to make


rainwater
harvesting
mandatory in all buildings

Yet to be Initiated

Possible with the directives of


State level stance.

Bye-laws
for
recycled water

Yet to be Initiated

Possible with the directives of


State level stance.

Encouraging PPP models

Yet to be Initiated

Possible with the directives of


State level stance.

re-use

of

City Development Plan for Barhi Town

Target

These
Reforms
are
targeted
for
implement
ation
simultane
ously with
the
implement
ation of
Mandatory
reforms

PROJECT INTRODUCTION

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 15 of 99

CHAPTER 1: PROJECT INTRODUCTION


1.1

Project Award and Introduction of Client

The Urbanization in Madhya Pradesh is at a faster rate, due to which Urban Local Bodies of the state are
experiencing hard challenges to facilitate the requirements of the growing population with limited technical
and financial resources. GoI as well as GoMP have initiated a number of programmes/schemes to meet the
growing demands of infrastructure and service delivery. The list of GoI schemes include: Urban
Infrastructure Development Scheme for Small and Medium Towns (UIDSSMT) and Integrated Housing and
Slum Development Programme (IHSDP). On the other hand GoMP has initiated DFID funded MPUSP, which
links reforms with investment in infrastructure for the poor. In addition to the above there are several other
programmes that have been initiated by the GoI and GOMP.

Preparation of the CDP will take advantage of the Revised CDP preparation toolkit/Heritage cities toolkit
prepared by GoI under JNNURM and UADD/CMAMP guidelines. These toolkits shall provide guidance to the
formulation of a CDP based on the concept of a consultative strategic planning process.

Focus areas: Government of Madhya Pradesh is planning to improve the water supply system of the towns
by upgrading the prevailing systems. Hence, this CDP shall be focusing on water supply sector as one of the
key area in a comprehensive manner. The revenue generation (revenue from ULBs own sources specially
property tax etc.) and strategies for the enhancement of the same shall also be incorporated in the CDP.
Currently planning is only a discretionary function of ULBs in MP and there is a general lack of planning
culture even in the larger Corporations. The CDP's of four cities of MP (Bhopal, Indore, Jabalpur, Ujjain),
included in JNNURM have been already prepared, along with the CDP's of 96 ULBs in the State. The lessons
learnt from these exercises need to be incorporated into the proposed CDPs. The CDP will be linked to the
overall spatial planning, policy framework of Master Plan and more importantly into the annual municipal
budgeting. Linking the investment plan of the CDP with the municipal budgets will be crucial in ensuring the
O&M and thus sustainability of the infrastructure assets created.

Preparation of the CDP shall include city development strategies, which are out comes of a structured
consultative process. The process will enable elected representatives, key staff of MC departments,
parastatal agencies and other institutions, policy makers and the citizens to participate and plan for spatial,
social and economic development of the concern cities. A City Development Plan (CDP) will present both a
vision of a desired future perspective for the city and the ULBs strategic framework of sectoral plans
translated into actions that define on how the ULB, together with other stakeholders, intends to work
towards achieving their long-term vision for the next five years.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 16 of 99

This project of preparing the City Development Plan (CDP) for Barhi Parishad Area, Madhya
Pradesh has been entrusted to Aarvee Associates Architects Engineers & Consultants Pvt. Ltd
(Consultant) ,Hyderabad. The work is assigned through Commissioner, Urban Administration and
Development Department, Government of Madhya Pradesh (Client). The aim of this exercise is to
support various Cities/Urban Local Bodies of Madhya Pradesh with a comprehensive City Development Plan
(CDP) for their long term vision.
1.2

Project Brief, Scope & Objectives

The CDP shall provide a comprehensive long term strategy (Vision 2035) as well as a City Investment Plan
(CIP), based on which the concerned ULB's can approach and be eligible to the funding under GoI /GoMP
schemes along with their own and other sources of finances based on priority actions and projects identified
in the CDP. The document shall also provide Financial Operating Plan (FOP) to direct the ULBs for mobilizing
various financial resources to implement the identified priority projects. The scope of the services include all
necessary steps formulated in JNNURM Toolkit 2, that would help to prepare the CDP, such as Data
Collection & Field Visits, Municipal Staff & all Stakeholders consultative meetings, Sector Analysis, organising
necessary workshops for the successful completion of the CDP. The specific objectives of the project are as
follows;

CDP would scale up existing urban development and poverty alleviation schemes within a
comprehensive and coherent strategic planning framework, in order to ensure optimal benefit from
available resources to the citizens of the ULBs.

CDP would aim to catalyze new thinking and provoke debate through a consultative stakeholder
driven process. The vision and strategic thrusts of the CDP would be built around the lessons and
findings of a comprehensive and rigorous stakeholder consultation and documentation process.

It is expected that the CDP would serve the purpose and meet the requirements of UIDSSMT and
IHSDP programmes as well as JNNURM and other development schemes.

The CDP will generate specific priority actions and projects that can be the basis, for mobilizing
funds from diversified sources.

1.3

Methodology

The CDP is prepared through a participatory process, wherein the various stakeholders, citizens and the
concerned authorities play a major role in the formation of the vision for the future development of the city.
The planning process therefore has to be a consultative one, with stakeholders representing a varied
spectrum of qualification taking part in the discussions and dialogue leading to the formulation of a vision,
development of objectives, identification of priority sectors and projects. CDP is prepared as a multistage
exercise, mainly with the following Stages;

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 17 of 99

Stage 1:

Mobilization and Inception

The Consultants with ULB support would organize a one day kick-off workshop to familiarize the
stakeholders with the purpose, process, and expected outcomes of the CDP and build confidence,
understanding and commitment to the CDP. The kick off workshop will help in deriving a consensus along
with the stakeholders firming the process and agreeing upon a structured programme to take the CDP
forward.
Stage 2:

Assessment of Existing Situation

In this stage, interaction with various stakeholder groups (meetings, workshops, focus group discussions,
etc.) and review relevant publications, reports, GOs, resolutions, procedures, laws etc. to analyze the current
situation in each of the sector identified. In-depth analysis of the existing situation, covering the
demographic profile, economic profile, urban governance, Physical & Social infrastructure facilities, and
environmental aspects. Gap analysis and future needs will be calculated/identified at every sector level.
Stage 3:

Development of City Vision and Sector Goals and Strategies

Based on the cities present scenario and SWOT analysis, the future city vision statement will be formulated.
Discussion will be initiated on strategies, priorities and major actions that may be required in the next five
years to move towards the vision 2036. To achieve the city vision, it is imperative to identify the necessary
goals and strategies for each sector.
Stage 4:

Development of Strategies and Priority Actions

The strategies will be evaluated from the perspective of stakeholders contribution in achieving the vision and
sector goals. Criteria will be developed for prioritizing the strategies, programmes and projects in
consultation with the Steering Group. The priority actions will support the strategies to achieve the sector
goals.
Stage 5:

Preparation of City Investment Plan (CIP) and Financial Operating Plan (FOP)

City Investment Plan (CIP) and Financial Operating Plan (FOP) are the key components in the entire process
of City Development Plan (CDP). Based on the availability of resources, logical sequencing of actions and
potential for immediate implementation, the Consultants will prepare a City Investment Plan (CIP) in
consultation with ULB that lays out the cost and revenue estimates of all priority projects in the next five
years. The preparation of the CIP is a reiterative process requiring adjustments to individual projects as well
as changes in scheduling to make the whole package work financially. The City Investment plan would be
supported with a Financial Operating Plan (FOP).
Stage 6:

Draft City Development Plan (CDP)

The Draft CDP includes City Investment Plan (CIP), Financial Operating Plan (FOP), duly considering the
feedback from all the stakeholders and working groups.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 18 of 99

Stage 7:

Final CDP Document

The final CDP document incorporating the feedback from the workshop and the inputs received at the 2nd
Stage State Level discussion.

In all the above stages, the consultations with all the Stakeholders and working groups will be made
extensively. The following Methodology is adopted for entire process of City Development Plan (CDP) for
Barhi Nagar Parishad.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 19 of 99

Fig 1.1 Methodology Followed for the CDP

Stage 1: Mobilisation and Inception


Kick-off Workshop with officials of Municipality.
and other key parastatal agencies ,
Data needs and requirements.
Reconnaissance visit of project area.

Stage 2: Assessment of Existing


Situation
Sector Analysis
City Profile

Stage 3: City Vision and Sector Goals


and Strategies
Sector Strategies
Vision, Goal and Strategies

Stage 4: Strategies and Priority


Actions
Evaluation of Strategies
Reform Action Plans

1st Stage District Level

2nd Workshop to Prioritize


Sector Strategies &
Proposals

1st Stage State Level


Presentation

Stage 5: City Investment Plan (CIP) and


FOP
Project Costing and Funding Sources
Scheduling Priority Actions and CIP
FOP to Support CIP

Stage 6: Draft CDP


including CIP & FOP
Performance Monitoring indicators etc.,

Workshops to Finalise Draft CDP


3rd Workshop to
Finalise Draft CDP

2nd Stage District Level


Presentation to finalise Draft

Stage 7: Final CDP


including CIP & FOP
Performance Monitoring indicators and Council
Resolution

City Development Plan for Barhi Town

2nd Stage State Level


Presentation to finalise
Draft CDP

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 20 of 99

1.4

Structure of the Report

Chapter 1: Introduction: Detailed description of Project background and Methodology adopted for the
entire City Development Plan (CDP) process.

Chapter 2, 3 & 4: City Profile: It includes City Profile, Physical features, Demography details, SocioEconomic details and Housing scenario.

Chapter 5: City Infrastructure: This chapter deals with Physical and Social Infrastructure analysis, demandgap analysis, formation of goals, strategies and action plans for respective sectors, SWOT analysis

Chapter 6: Institutional Framework

Chapter 7: Municipal Finance: deals with Income and Expenditure analysis

Chapter 8: Capital Investment Plan: Detailed and summary of Sector wise Investment Required for
Implemetation of Proposed Projects and Financial Operating Plan

Chapter 9: Urban Reforms: status of Mandatory and optional reforms at both ULB and State level

Chapter 10: Summary of Workshop Proceedings

Chapter 11: City Vision: Provide the city vision along with the consolidated sector strategies

City Development Plan for Barhi Town

PHYSICAL FEATURES OF
THE TOWN

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 21 of 99

CHAPTER 2: PHYSICAL FEATURES OF THE TOWN


2.1 GENERAL CITY PROFILE
2.1.1 Historical Importance
Barhi town is constituted in the year 1981, with an area of 18.09 sq. kms and it constitute of 15 municipal
wards. The salient feature of Barhi City is its strategic located on the gateway to few importance tourist
places in Madhya Pradesh state like Bhandharghad National Park, Khajuraho, Amarkantak, Chitrakutt and
Maihar.
2.1.2 Katni District Profile
Katni District is a district of Madhya Pradesh State, which is constituted in the year 2011. Earlier, it is in the
part of Jabalpur District. Katni also known as Murwara (Katni) or Mudwara and its lies between 23 37N to
24 80 N latitude and 79 57 E to 80 58 East Longitude. Katni town serves as the administration
headquarters district. Katni is also known as the city of lime because it is rich in reserves of limestone.
Katni district extends with an area of 4949.59 km. The district is located in the Northeastern part of Madhya
Pradesh it forms the Northern district of Jabalpur commissionerate division. Mudwara Katni, Chhoti Mahanadi
and Umdar are the main rivers of this district.
2.1.3

Location and connectivity

Barhi is a town with Nagar Parishad status in Barhi tehsil of Katni district in the state of Madhya Pradesh.
Barhi geographically lies between 23.9N latitude and 80.8E Longitude, at an altitude of 361 meters (1184
feet's) above mean sea level and it is nearly 51 Km away from the District headquarters Katni and around
457 Kms from the state Headquarter Bhopal. The town is well connected with Road, where State Highway
11 and 10 will intersect at core area of the town. The town is also connected by railway line.
2.1.4

Climate & Rainfall

Even through Barhi is a town, by virtue of its village environment, the town is pleasant and healthy. It is
generally dry except in monsoon. The cold season start from November to February followed by the hot
season from March to the middle of June. The period from mid-June to the end of September is the rainy
season. The months of October constitute the post-monsoon or transition season.
The maximum temperature is at about 45 degree Celsius and low is at 18 degree Celsius.
Rainfall
The average rainfall in Barhi is approx. 915.7 mm. The rains usually start in the month of June, with the
maximum number of rainy days experienced during the months of July and August.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 22 of 99

2.1.5 Topography and Geology


Physiographical Barhi town is located in elevated position and slope towards south west direction. It is
located to nearby rich deposit lime stone area i.e., Bujabuja area.
Mahanadi is the principal river of the district, which flow on the North West direction, at distance of 10 kms
from center the town.
2.1.6 Wind Direction

Winds are controlled by the shifting of pressure belts. They are predominantly from South-West during the
monsoon.
Figure 2.1 Location Map of Barhi Town

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 23 of 99

2.1.7

Base Map

The scaled Base Map is not available for Barhi Nagar Parishad. However, a guide map with all the roads and
ward boundaries was acquired from the Nagar Parishad. Taking this map as reference, scaled Base Map has
been prepared using Google satellite imageries. The Preliminary Base map thus Prepared is shown in Map
No.2.1.

City Development Plan for Barhi Town

DEMOGRAPHIC & SOCIOECONOMIC PROFILE

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 24 of 99

CHAPTER 3: DEMOGRAPHIC & SOCIO-ECONOMIC PROFILE


3.1 Demography
3.1.1 Population Growth Trend
The Population of Barhi Nagar Parishad as per 2011 census is 13,946. The population details of the Barhi
town for the past three decades are as follows;
Table 3.1 Decadal Growth Rate of the Town

Year

Population

Decadal

Growth

Incremental

% Decadal

Yearly %

Growth rate

Difference

Increase

Increase

Increase

1991

8192

2001

10923

0.33

2731

2731

33.34

3.33

2011

13946

0.28

3016

285

27.61

2.76

Source: Census of India, 2001 & 2011

From the above table it is evident that the Population growth rate in Barhi town is declined from 33.34 % to
27.61 % for the year 2001 to 2011. It is mainly due to establishment of few administrative offices like Barhi
Tehsil office, Sub-electricity Station, Warehouses, Police Station, Government Degree College in Khanna
Panchayat, which is vicinity village that resulted in out-migration of population from the Town to Khanna
Panchayat.

Figure 3.1 Decadal Growth Rate of the Town

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 25 of 99

3.1.2 Population Projections


The Projections of population for future years are worked out in three different methods for the year 2015,
2025 & 2035. The details of Population projection are
Table 3.2: Population Projection of the Town

Sl.
No.
1
2
3

Methods
Arithmetic Increase method
Geometric increase method
Incremental increase method

Population
for 2011
13946
13946
13946

Year 2015

Year 2025

15088
15638
16927

17962
20404
20199

Year 2035
20835
26622
23757

In Keeping the view of developments in Khanna Panchayat and also in consultation with officials of Barhi, it
is could be advantage in extension of Barhi Nagar Parishad limits by adding of Khanna Panchayat.

Table 3.3: Projected Population of the town


Sl. No.

Methods

2011

2015

2025

2035

1 Arithmetic Increase method

17939

20257

26053

31848

2 Geometric increase method

17939

23975

51339

141407

3 Incremental increase method

17939

23849

30043

36523

The above projected population figures indicate that the population by all methods except Geometric
Increase method is above the Average growth rate of Barhi and looks on higher side. So, from the past
Population growth trend, it is appropriate to consider Incremental Increase Projection as appropriate,
figuring to population of 36,523
3.1.3 Population Density
As per 2011 census, Gross Population density of Barhi town is 8 Persons per Hectare, which is on lower side
when compared to UDPFI standards for Small town. But the core area and its surrounding areas in the town
are densely populated.
Table 3.4: Population, Area & Density Details of the Town

Year

Population

Area in Ha

Population Density Per Ha

1991

8192

1809

2001

10923

1809

2011

13946

1809

Source: Census of India, 2011

Map No.3.1 shows the Density Details of Barhi

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 26 of 99

3.1.4 Average household Size


As per 2011 census, the total number of households in Barhi Town is 2846; the average household size is
4.9. And there is slight increase in avg. household size from 4.3 to 4.9 for the year 1991 to 2011.
3.1.5 Other Demographic Indicators
As per 2011 Census, the total SC population of Barhi is about 1109 and ST Population is 977. The total share
of SC population is 10 percent of the total population and 9 percent is ST population.
3.1.6 Issues
Other than agriculture activities and household industries like bamboo basket making, there is no other
alternative source for employment in the town. Due to that there is out-migration of population in search of
employment to nearby cities i.e., Jabalpur, Katni, Satna, Rewa, Nagpur and Bhopal.
3.2: SOCIO ECONOMIC PROFILE
3.2.1

Sex Ratio

From the figure, it can be seem that there is gradual increase in sex ratio from 898 to 933 for the year 1981
to 2011, it can be analysis in two ways, one is out-migration of male population in search of employment
and another is proper execution of government schemes
related to the improve and safeguard female population such
as Ladli Laxmi Yojana, Gaon Ki Beti Yojana, Free cycle
distribution, Pratibha Kiran YojanaJanani Suraksha Yojana,
Mukhyamantri Kanyadan Yojana etc.,.
The sex ratio of the city is higher than the State (920) and
district (925) figures
3.2.2

Figure 3.2 Sex Ratio of the Town

Literacy Rate

As per 2011 census, Barhi has an average literacy rate of


57.64%, lower than the national average of 59.5%; with 62%
of the males and 38% of females literate
3.2.3 Work Participation Ratio (WPR)
As per 2011 census, work force participation (i.e., Main Workers, Marginal Workers, Cultivators and Labors)
is 34.13% of total population.
Table 3.5: Category-wise Workforce

S.No

Category

Total Workers

Main Worker

City Development Plan for Barhi Town

Total Population

Male

Female

4761

3582

1179

3494

2857

637

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 27 of 99

S.No
3

Category

Total Population

Marginal Workers

Male

1267

Female

725

542

Source: Census of India, 2011

Figure 3.4 Classification of WPR

Figure 3.5 Gender Ratio WPR

3.2.4 Occupation Structure


As per 2011 Census, it has been observed that 7.75 % of the workers in Barhi are engaged in Household
Activities (can be seen from figure), 63.07 % in Other Activities like trade and commerce activities, business
activities, employees, and other small scale industrialists and 29.17 % in primary activities i.e cultivators and
agricultural laborers.
Table 3.6: Occupational Structure

Category

Cultivators

Agriculture

Household

Others

Workers

448

941

369

3003

Percentage

9.41

19.76

7.75

63.07

Figure 3.6 Occupation Structure

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 28 of 99

3.2.5 Industries/trade and commerce


The hinterland of the town is predominantly agricultural in nature. The town caters to the trading and other
activities of the surrounding areas. A Weekly market is also held in the town to serve the town population
and surrounding village population.

Table 3.7: Important commodities available in Barhi


Commodities details

Particulars

Imported

Kirana

Cloth

Cement

Export

Lime stone

Cassette

Food grain

Manufactured

Cassete

Bidi

Gitti creshar

Source: Census Handbook and Barhi Town

3.3 SAIL
3.3.1 Introduction
SAILs iron & Flux mines are spread over the states of Jharkhand, Orissa, Chattisgarh and Madhya Pradesh.
These mines are operated as captive sources of raw materials for its integrated steel plants. Operations of
SAILs mines in Jharkhand, Orissa, Chattisgarh and Madhya Pradesh are controlled by Raw Materials Division
(RMD) of SAIL. The Limestone mining project of Kuteshwar Limestone Mine located in katni District of
Madhya Pradesh state was started at right bank lease in 1973 as a captive source of Limestone for use as
flux mainly in the steel melting shops (SMS) of Bokaro Steel Plant (BSL). Subsequently, mining operations at
Left Bank Lease of Kuteshwar Limestone Mine were also started during 1992-93. In the year 1990, the mine
was brought under RMD, SAIL with a view to supply Limestone to other SAIL steel plants. The Kuteshwar
Limestone Mine consists of two mining lease on the two flanks of river chhoti Mahanadi i.e. Right Bank
Lease and Left Bank Lease. The present combined production capacity of both the leases under Kuteshwar
Limestone Mine is 0.9 Million Tonnes per Annum (MTPA).
Details of the area
Village, Tehsil, District & State

Kuteshwar

Village,

Vijayraghavgarh

Katni District, Madhya Pradesh


Mine Lease area

91.14 ha

Nature of the area

Plain

Toposheet No

63 D/16 & 64 A/13

Latitude & Longitude

Latitude : 230 58 28 to 230 59 22


Longitude : 800 48 55 to 800 49 43
General Climatic Conditions

Max. Temperature (Annual)

45.20 C

Min. Temperature (Annual)

04.00 C

City Development Plan for Barhi Town

Tehsil,

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 29 of 99

Annual Rainfall (Average)

808.8 mm

Wind Pattern during study period

Northwest during Summer Season

Elevation above mean sea level

332 m to 343 m AMSL


Historical / Important Places

Archaeological / Historically Important Site

None within 10 km radius of the ML area

Sanctuaries / National Parks

None within 10 km radius of the ML area

Important Religious & Tourist Places

None within 10 km radius of the ML area


Mahanadi River Adjacent
Bhadar Nadi 6.6 km E
Jarjara Nallah 6.8 km N
Gahra Nallah 2.1 km SW

Environmental Sensitive Place

Hardua RF 5.1 km NW
Karreha RF 7.5 km N
Bara RF 9.0 km NE
Open Mixed Jungle 6.7 km SE
Bandhavgarh National Park 13.2 km S

3.3.2 Topography:
The Mine lease area falls in the southern foot hills of the kaimur range. The area is generally flat to
moderately undulating and is intersected by some nallahs.
3.3.3 Socio Economic Development Measures:
In accordance to the MoEF guidelines, SAIL has envisaged its policy on Corporate Social Responsibility (CSR)
and committed towards economic as well as social development. The policy also aims improving the quality
of life of the workforce and their families as well as the local community and society at large.
Proposed Budget for Socio-Economic Welfare Activities (For Year 2013-14)

City Development Plan for Barhi Town

PHYSICAL PLANNING AND


GROWTH MANAGEMENT

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 30 of 99

CHAPTER 4: PHYSICAL PLANNING AND GROWTH MANAGEMENT


4.1 Spatial Growth Trends
The physical development is extending towards Katni and Badanpur towns, which is predominantly linear
development in nature. Thus, pockets of agricultural land are still available for development within the
municipal limits. In the other parts of the town, physical development is observed in South-East direction.
4.2 Spatial Distribution of Population
The Municipal area is divided into 15 wards for civic administration. The ward wise population is given in
the following table.
Table 4.1: Ward-wise Details of the Town

Ward Number

Ward Name

1
2
3
4
5
6
7
8
9
10

Ballabh Bhai Patel


Maharana Pratap
Dr. Bheemrao Ambedkar
Chandrashekhar
Ram Manohar Lohiya
Jawahar Lal Nehru
Shaheed Bhagat Singh
Lal Bahadur Shastri
Mahatma Gandhi
Maulana Ajad

11
12
13
14
15

Indira Gandhi
Vivekanand
Vijaynath
Shiwaji
Rajeev Gandhi
Total

Person

Male

Female

1036
1352
475
990
440
553
577
696
512
962

534
680
234
536
239
289
309
354
263
503

502
672
241
454
201
264
268
342
249
459

641
606
1239
2369
1498
13946

319
301
658
1236
756
7214

322
303
581
1128
738
6724

Source: Census of India, 2001 & 2011

4.3 Land use


The essential characteristics of land use and its pattern have to be analyzed to have a better approach to
its problems and proposals. The land use map has been prepared based on Google image interpretation
and subsequent ground truth verification.
Table 4.2: UDPFI Standards for Land Use

Land use

% of Developed Area
Small Towns

Medium Towns

Large Cities

Metro Cities

Residential

45 50

40-45

35-40

35-40

Commercial

23

3-4

4 -5

4-5

Industrial

8 10

8-10

10-12

12-14

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 31 of 99

% of Developed Area

Land use

Small Towns

Medium Towns

Large Cities

Metro Cities

Public & Semi Public

68

10-12

12-14

14-16

Recreational

12 14

18-20

18-20

20-25

Transport & Communication

10 12

12-14

12-14

15-18

Agriculture & Water bodies

Balance

balance

balance

balance

The land use percentages were calculated using the prepared base map and the available data. The
residential land comprises of 7.63% of total land, the agriculture area comprises of almost 79.7%. Map
4.1 shows the Existing Land Use Map of Barhi town. The following table provides the calculated land use
percentages.
Table 4. 3: Land use Breakup

Sl. No

Land use

Area (Ha)

% to Developed land

% to total area

Residential use

138.04

41.74

7.63

Commercial use

1.36

0.41

0.08

Mixed use

5.60

1.69

0.31

Public and Semi Public

Recreation use/Open

Transportation

7
8

Water bodies

2.50

0.76

0.14

60.48

18.29

3.34

122.70

37.11

6.78

Developed Land

330.68

100.00

Agriculture Area

1441.70

79.70

20.28

1.12

1809.01

100.00

Total

Source: Google image interpretation and subsequent site visits

Map No. 4.1: Existing Landuse of Barhi


4.4 Master plan Provision
With the absence of no master plan in place for the town lead to unplanned, haphazard development.
4.5 Housing
Housing is the constituent of the social infrastructure of the economy. Like the other constituents, such
as the system of education and health, housing divergences also can either reduce or enhance the
disparities in the society.
4.6 Housing in Barhi
According to the census 2001 & 2011, existing housing units are 3896. The housing is spread in all the
15 wards of Barhi town.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 32 of 99

Table 4. 4: Details of houses, households and households size of Barhi

No. of occupied
Total Population

residential
Houses

No. of

Average

Households

Household Size

1991

8192

1865

1920

4.3

2001

10923

2016

2190

5.0

2011

13946

NA

2846

4.9

Years

Source: Census, 2001 & 2011


4.7 Housing demand for the year 2035
We assumed that the average household size would not fall less than 4.9 by 2011, 2015, 2025 and 2035.
Table 4. 5: Housing demand for the year 2035

Projected years

Existing

Category

(2011)

2015

2025

2035

Population

17939
( Barhi + Khanna Panchayat)

23849

30043

36523

Households

3588

4770

6010

7305

5.0

5.0

5.0

5.0

Household size

By the year 2035 the additional Houses required are 3718 taking into the consideration one
home/development per one household. The land requirements for these housing needs are taken into
consideration in the proposed Land Use map.
4.8 Unauthorised colonies/Settlements
It has been observed that, there are few Unauthorized Settlements in ward 14 & 15 in the land belongs
to Railway authority and Forest Department.

4.9 Future Growth Direction


In future, growth of the town guides along SH 11 & 10, which is towards Katni and Maihar road, due to
the upcoming 6 thermal plants in South-West of Barhi Town.
Map 4.2: Anticipated Future Growth Map
Figure 4.1: location of proposed Thermal Plant

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 33 of 99

City Development Plan for Barhi Town

TOWN INFRASTRUCTURE

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 34 of 99

CHAPTER 5: TOWN INFRASTRUCTURE


Infrastructure is the basic requirement of urban life and its adequacy and accessibility are two important
ingredients key contributors in the up-gradation and enrichment of quality of urban life which is the
primary objective of any planned development effort. The extent and the nature of problems faced by
different towns vary by size, geographical conditions & local natural resources, state/regional differentials
in the resource availability & the policies, resource base of local authorities and several such factors
directly or indirectly affecting the population of cities/towns.
Social amenities and infrastructure fall under the social welfare objectives of the urban development
programmes, as distinct from economic development objectives and especially in the context of the
rapidly developing liberalized and competitive economic scenario. These infrastructure facilities are
broadly classified into two aspects,
Physical Infrastructure

Social Infrastructure

Water Supply

Health

Sewerage & Sanitation

Education

Solid Waste Management

Recreational Facilities

Storm Water Drains

Social security

Traffic & Transportation

Housing

Street Lighting
5.1 Water Supply
5.1.1 Quality and Quantity of Water at Source
Barhi is predominantly dependent on ground water source for water supply. Presently, water is drawn
from a depth of 100 120 ft. Direct pumping is in practice for storage and distribution of water supply.
As per the assessment made by the officials at Nagar Parishad of Barhi, there are 24 tube wells in the
town. Water is supplied through tankers to the areas where water supply is scarce and areas not covered
with distribution network. Currently the quantum of water supplying in Barhi is approximately 0.69 MLD.
The details are shown in the Table.
Table 5.1: Details of Water Source & System

Sl. No.
1.
2.
3.
4.
5.
6.

Ground Source Particulars


Number of Tube wells
Number of Hand pumps
Number of ELSRs
Quantum of water Supplied (MLD)
Per capita consumption (LPCD)
Estimated Transmission and Distribution losses (% of total supply)

Source: Nagar Parishad Barhi

City Development Plan for Barhi Town

Details
13
98
2
0.69
50
15-20

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 35 of 99

5.1.2 Quality and Quantity of Water in distribution System


The available data only indicates to total water storage capacities at town level. However, it does not
provide details on the quantity of water supplied at ward level. Presently there are two ELSRs are
available for water storage.
The total available storage capacity of these ELSR's is 0.44 ML. As per the Census of India 2011, the
population is estimated to 13,946. Assuming consumption of 135 lpcd, the total demand for water supply
is 1.88 MLD. Assuming the storage capacity required is 33
percent of the total water supply, the demand is 0.62 ML. It is
observed that the current shortage of storage capacity is about
0.18 ML. The demand of water supply (both Barhi Nagar
Parishad and Khanna Panchayat) by the end of the horizon
period of CDP is about 5.0 MLD for which additional storage
capacity of 1.63 ML is required by 2035. Table 16 indicates the
details of the ELSR and the wards covered. Map 5.1 indicates
the water supply system of the town.
Table 5.2: Details of ELSR in Barhi

Sl.

Capacity

Location of ELSRs

No.
1.

(in ML)

ELSR-1, Ward 4

Wards Covered

0.18

1,3,4,5,6,7 & 8

0.26

9,10,11 &13

Eight tube wells are connected to this ELSR


2.

ELSR-2, Ward 7
Five tube wells are connected to this ELSR
Total Storage Capacity (ML)

0.44

Source: Nagar Parishad Barhi


5.1.3 Water Distribution Arrangement
The existing water distribution system in the town is very old and is connected at various places with new
pipelines. GI pipes with diameters ranging from 1.5 mm to 2.0 mm form majority of the water supply
network. About 10 km of length of pipeline is laid for distribution system and it accounts to 68 percent of
the existing road length. The details of the water supply distribution system given in Table
Table 5.3: Details of the Distribution System

Main Types

Distribution Main Details or Dimension

Percentage of Coverage

Range

Network

a.

PVC

2.0 mm to 2.5 mm

b.

GI

1.5 mm to 2.0 mm

65

Source: Nagar Parishad, Barhi, 2010-11


5.1.4 Internal Distribution Networks
The total number of household service connections is 943. There are no metered connections in the
town. Apart from this, 20 hand pumps and 120 Public Stand Posts are catering to water supply. It is

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 36 of 99

observed that the commercial service connections are very less numbering to mere 12. The total number
of water supply connections increased in the 865 to 943 in past three years. The details of service
connections and growth rates are indicated in the following Table.
Table 5.4: Details of Water Supply Connection in Barhi Town

Year
2009-10
2010-11
2011-12

Connections
865
900
943

% Growth of Connections
4.0
4.7

Source: Nagar Parishad, Barhi 2010-11

The domestic connections account to 91.7 percent of the total connections and 31 percent of the total
households. The total commercial connections are account to 1.3 per cent of total connections. There are
66 public stand posts, which serves 2.4 percent of total households. Table indicates the details of the
service connections in the town.
Map 5.1: Existing Water Supply System of Barhi
Table 5.5: Details of Water Connections in Barhi

Sl.
No.
1
2

Particulars
Total Population 2011
Number of Households 2011
Connections

3
4
5
6

Units

Domestic
Non-domestic (other than industrial)
Industrial
Public Stand Posts
Total Number of Connections

Number
865
12
0.0
66
943

13,946
2,846
% to total
Connections
91.7
1.3
0.0
7.0
100.0

% to total
Households
31.7
0.4
0.00
2.4
> 30.0

Source: Nagar Parishad, Barhi, 2010-11


5.1.5 Coverage & Supply
The distribution network covers 68 percent of the developed area. Water is supplied for a total of 4
hours per day during winter and 2 hours per day in summer. Barhi has very infrequent and interrupted
water supply due to frequent and untimely power cut. The per capita supply works out to 50 LPCD. Out
of 24 tube wells, 11 are directly connected to supply network. Thus, the current water supply system is
severely dependent on electricity. The areas which are not covered under supply network are located in
ward nos 2 & 12.
As per the assessment of officials at Nagar Parishad, low pressure areas are located in six wards. The
detail of the existing coverage & supply is indicated in the following Table

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 37 of 99

Table 5.6 : Domestic Water Supply Details in Barhi 2011

S. No.

Particulars

Units

Per Capita Supply


1

Population 2011

13,946

Water Supply (in MLD)

Current Per Capita water supply per day (in LPCD)including loss

Per capita supply as per CPHEEO Norm (in LPCD)

0.69
50.0
135.0

Coverage
5

% population covered under piped Water Supply

Areas

Surplus Supply

Nil

with

Moderate Supply

All wards (except wards with less


supply and no supply)

0.0 %
75.0 %

Less Supply

Ward No. 1, 3, 5,13

15.0 %

No Supply

Ward No. 2, 12

10.0 %

Storage Capacity
7

Total Storage Capacity available (in ML)

0.44

Total Storage Capacity required (in ML)

1.06

Deficit (in ML)

0.62

Distribution Network (%)


8

Good

50

Fair

10

Poor

40

Staff Details
9

Permanent Staff

Nil

10

Temporary Staff

14

Source: Nagar Parishad, Barhi, 2010-11


Irrespective of supply from ELSR, every ward is getting the direct supply from remaining tube wells. The
assessment made by the officials at Nagar Parishad, Barhi suggests that the distribution and transmission
losses are about 15 to 20 percent.
5.1.6 Institutional Set-up
The O&M of the water supply system is taken care of by the Nagar Parishad, Barhi. Currently, both
technical and non-technical duties related to water supply are discharged by 14 temporary employees of
Nagar Parishad. With the growing population, the demand for adequate services is increasing and the
role of the local body as a service provider calls for better performance.
5.1.7 Operation & Maintenance (O&M)
The sustainability of water supply system is assured only if local resources are generated for O&M by the
ULB. The systematic planning, expansion and maintenance requires dedicated planning approach.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 38 of 99

Cost Recovery
Nagar Parishad collects a flat rate of Rs.50.00 per month per household for domestic connection and
Rs.150.00 for non-domestic connection. In small towns like Barhi no user charges are collected on prorata basis, the reason being absence of metering devices. None of the connections in Barhi are metered.
The charge for new connection is Rs.1200 which includes road cutting charges. Table 5.7 gives the
details of the flat rate per month and the installation of new connection charges.
Table 5.7: Details of Water Charges in Barhi 2011

Description
Flat Rate per Month

1.

Charges Per Connection (in Rs)


50.00
150.00

Domestic
Commercial
New Connection Charges

2.

Domestic
Commercial

1000.00 + 200.00 (road cutting)


1000.00 + 200.00 (road cutting)

Source: Nagar Parishad, Barhi, 2010-11


5.1.8

Present and Future Demand and Supply Gaps

The present per capita water supply is 50 LPCD. The future population growth calls for:
Augmentation of water on a sustainable basis.
Increase in storage capacity to meet the requirement of the growing population and increased
developed areas.
Table 5.8: Water Demand Assessment 2035

Particulars

Projected Population
Projected Households
Total quantum of water required
(in MLD) @ 135 lpcd per capita
Required capacity of treatment plant (in MLD)
Additional Storage capacity (in ML)

Phase 1

Phase 2

Phase 3

2011-2015
23848
4770
3.22

2015-2025
30043
6009
4.06

2025-2035
36522
7305
5.00

3.22
1.06

4.06
1.34

5.00
1.63

Source: Analysis
The cumulative water demand projected for the coming 25 years is indicated in the Table. Considering a
per capita supply of 135 LPCD, the total domestic water demand will be 3.42 MLD by 2036. Adequate
facilities for water storage, treatment and supply should be planned.
5.1.9 Water Supply Project
As on now, the town is not covered under any planned schemes/projects for Water supply system in the
town.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 39 of 99

5.1.10 Comparative Analysis (Service Levels)


The water system in the town can be improved by efficient extension of the water supply network,
increase in the number of Household Service Connections, rehabilitation works, and efficient cost
recovery plans. The existing system is not adequate to meet the growing demand of the population. The
current service levels are indicated in the following Table
Table 5.9: Service Levels in Barhi

Indicator

Norm

Per Capita Supply


Storage capacity
Length of distribution network as per cent to total
road length
Treatment Plant capacity
Number of HHs with HSC connections
Loss due to leakages

135 lpcd
33.0 per cent
100 per cent

Existing Levels
50 lpcd
63.0 percent
69 percent

100 per cent


100 per cent
20 per cent

Nil
31.0 percent
25 percent

Source: Analysis

5.1.11 SWOT Analysis


Weaknesses

Strengths

Location of

natural Water Body

(Mahanadi) is potential for future

requirement

Predominantly Majorly dependent on


water

ground

Inadequate network length


Age of current supply system

Lack of adequate man power


Threats

Opportunities

Implementation
harvesting

water

High dependency on electricity as the supply is


also dependent on pumping through motors

Existing treatment plant can be


improved for future requirement

Poor distribution of water can lead to health


problems and unhygienic conditions in the city.

of

rain

5.1.12 Key Issues

No treatment plant in the town

Ground water level is decreasing annually.

Lack of metered connections, reflecting the loss in ULB revenue

The flat rates are required to be revised as the amount collected is very meager.

The distribution system is not adequate as various parts of the town are not connected or
integrated to the system.

Lack of manpower has affected the operation and maintenance of water supply system including
the revenue collection..

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 40 of 99

No initiatives for rain water harvesting, reuse of waste water and lack of community participation

and awareness in improving water management system, system efficiency, O&M and decision
making.
There is no water quality monitoring done on a regular basis both at the transmission end and

consumer end
5.1.13 City specific Strategies and Action Plans
Issue

Goal

Strategies

To provide
Water
Source

surface
water
source

Inadequate

100 %

storage

storage

capacity

capacity

100 %

Inadequate

coverage

Coverage

with

and Supply

"potable

Network

water

supply"
Inadequate

man power
for

100 %

Operation

O&M

&

Recovery

Maintenance

Identify proper "Network


Plan" for Intake Pipe line
& Raising Main from
surface source to the
town.
Improve
the
existing
Water Treatment Plant
Increase the capacity of
"Centrifugal Pumps".
Identify the location and
number
of
ELSRs
required.
Storage capacity should
meet future demand
Replacement
and
extension
of
existing
network system.
Phase-wise replacement
of pipe lines.
Supply network plan for
future developments
Capacity
building
programmes for ULB staff
to improve skills.
Provide
metered
household
service
connections in a phased
manner.
Regular
monitoring
system.

Action plans/Proposals

Surface
source
from
Mahanadhi (8 km away from
the town)
1 km length of intake pipeline
& 8 km length of raising main
has to be laid.
5.00 MLD capacity of WTP has
to be constructed.
75 hp capacity of centrifugal
pumps are required

2 ELSRs are required.


1.63 ML of additional storage
capacity is required by the end
of the plan period 2035

5 km length of existing
network system has to be
replaced.
4.5 km length of network has
to be laid in unserved areas.
31 km length of pipeline
network has to be laid in
future development areas.

Training & capacity building


programs for ULB staff.
New connections for 1000
households in a phased
manner.
Water rate should revise time
to time

Priority Actions

Provision of water supply system with Mahanadi River (8 km away from the town) as the
source
5 km length of water supply network system has to be replaced
4.5 km length of network system has to be developed in the un-served areas
Provision of 5.00 MLD Capacity of Water Treatment Plant (WTP) near to the surface source
1 km length of intake pipeline has to be laid to draw the water from Mahanadhi River to WTP
8 km length of Raising main has to be laid from WTP to Service Reservoirs
31 km length of network system has to be laid for future development areas

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 41 of 99

5.2
5.2.1

Sewerage System
Existing Sewerage System

Hundred percent network coverage for sewerage system is one of the high priority needs of any
developing town and taking up the same would present a major challenge to the implementation
capability of ULBs. Lack of Under Ground Sewerage system in Barhi also leads to unhygienic conditions
in the town.
Table 5.10: Details indicating the Existing Sanitation Facilities, 2011

1.
2.
3.

Particulars
Total Number of Households
Particulars
Per cent of Households having Bathroom
Facility within the House
Type of Connectivity for Waste water Outlet
1. Closed Drainage
2. Open Drainage
3. No Drainage

Nos.
2,846
% of Total No. of Households
36.5
31.29
30.17
38.53

Source: Census 2011


Sewage & Sullage Collection
The domestic waste water presently passes through the open drains along the road side. In the areas
not served by any kind of drainage network, the waste water flows on the roads and in few places get
stagnated.
The areas within the core area (ward nos 4, 11, 10 & 13) has lack proper waste water disposal. Thus,
the waste water is to flow allowed in open areas or vacant sites in these localities. The blocking of drains
by solid waste is the main cause for stagnation of waste water.
5.2.2 Household Latrines
Barhi lacks adequate sanitary facilities. Three out of ten houses have no latrine facilities indicating open
defecation in the town.
Table 5.11: Details indicating the Existing Sanitation Facilities

Particulars

% of Total No. of Households


(2011)

% of Total No. of
Households (2011)

Pit Latrine

7.46

Water Closet

25.27

77.11

Other Latrine

4.18

3.18

No Latrine

63.08

15

Source: Census 2011

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 42 of 99

5.3 Existing Sanitation System


As per the sanitation surveys conducted during 2008, about 65 percent households have access to
improved sanitation within household and remaining 35 percent households lack these facilities. About 60
percent of the households have septic tank connections.
5.3.1

Public Toilets

There is one public convenience with 4 seats in the town. The average users per day are estimated to be
10. The details of public conveniences are shown in the Table.
Table 5.12: Details of Public Convenience facilities

a.
b.
c.

Public Convenience Systems (Sulabh Sauchalaya)


Public Conveniences
Total Seats
No of Users/ Day

1
4
10

Source: Nagar Parishad, Barhi


5.3.2

Present, Future Demand and Supply Gaps

The cumulative sewerage demand projected for the coming 25 years is indicated in the Table 23.
Considering a per capita supply of 135 LPCD the total domestic sewerage demand will be 4 MLD by 2035
(considering 80 percent of total water demand).
Table 5.13: Demand Assessment 2035

Particulars

Projected Population
Quantum of water required (in MLD)
Total quantity of sewage (in MLD)
Length of Trunk Lines (600 mm dia)
Length of lateral Lines (100 mm dia)
Capacity of treatment plant (in MLD)

Phase 1

Phase 2

Phase 3

2011-2015
23848
4770
3.22
2.58

2015-2025
30043
6009
4.06
3.24
10
40

2025-2035
36522
7305
5.00
4.00
27

Source: Analysis
5.3.3 Sanitation Projects
At present, there are no Proposed or On-going Projects for augmentation of existing Sewerage system in
the town.
5.3.4 Comparative Analysis with the UDPFI, CPHEEO Guidelines
As per the UDPFI/ CPHEEO norms, about 80 per cent of the total water supply is assumed to be
discharged as sewage. Hence the total sewage generated is estimated about 4.0 MLD.
Table 5.14: Service Levels in Barhi

Indicator
Sewerage Estimated

Source: Analysis

City Development Plan for Barhi Town

Norm

Levels

80 % of water supply

4.0 MLD

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 43 of 99

5.3.5 SWOT Analysis


Strengths

Weaknesses

One-third

of

households

have access to improved


sanitation.

Lack of under Ground sewerage(UGS)


Lack of Treatment Plant
Laying of CC roads in major parts of the town without
provisions for UGS system

Mostly the sewage goes into the open drains.

Opportunities

Surface drains are used to carry the sewerage leading


to environment hazards
Threats

Letting out of sewage and sullage into open areas can


lead to health hazards

Prospective degradation of environment due to water


and Air pollution

Dangi Talab & Bada Talab are getting heavily polluted


as a result of sewage inflow.

Availability of undeveloped
land for locating amenities

Decentralized waste water


management
(Small

systems

Diameter

Gravity

Inadequate public conveniences

Sewer(SDGS) Systems)
5.3.6 Key Issues

Absence of an UGS system, open defecation and stagnation of sewage leading to environmental
and health problems.

Low coverage of individual disposal system and about 35 percent of the households resort to
open defecation.

Sewage and waste water entering the water bodies resulting in pollution.

Mixing up of solid waste with the sewage leading to choking of drains.


5.3.7 City specific Strategies and Action Plans
Issue

Goal

Strategies

Under Ground

Provision of

Sewerage
(UGS) system

UGS with 100


% coverage

Conducting a detailed physical

Action plans/Proposals

of

survey

Comprehensive

Coverage of core areas on

Sewerage

Extension of network to new


developed areas

network

plan.

priority basis

Preparation

10 km length of trunk
lines & 67 km of lateral
lines has to lie.

Open

Remove the

defecation

practice of

toilets by providing adequate


facilities.

open
defecation

Improving the existing public

City Development Plan for Barhi Town

25 percent of the households

Improvement

of

existing public toilets: 1


Nos.

Constructing

shall be provided with LCS

toilets

focusing on urban poor.

areas: 4 Nos.

in

public
unserved

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 44 of 99

Construct the new public toilets

in unserved areas.

Construction
Cost

of

Low

Sanitation

units

for 25 percent of the


total Households: 1115
Nos.
Absence of

Provision of

sewerage

mini

the current gap and future

Small Diameter Gravity

treatment

sewerage

requirements

Sewer

plant

treatment
plant

Capacity of STP should meet


in

phased

manner.

Sewerage

quality

4.0 MLD capacity of


(SDGS)

or

Decentralized
Waste
Water
Treatment

analysis

system (DEWTAS) has

needs to be upgraded.

to construct.
Lack of
Operation &

Adopt the
utility

Training & capacity building


programs for ULB staff.

Maintenance

mapping

Regular monitoring system.

system

Private
Sector
participation in O&M to
increase efficiency of
service delivery.

Priority Actions

Provision of Public Conveniences near Bus stand and market junction

Laying 67 km length sewer lines by 2035

Construction of toilets through low cost sanitation programs

Construction of public toilets in slums & poor settlements

Campaign at town level on stopping open defecation

Provision of Small Diameter Gravity Sewer or Decentralised Waste Water Treatment system

5.4 Solid Waste Management


Unorganised disposal of Solid waste affects major pollutants in a town resulting harmful health effects on
its residents. Urbanization has changed the composition of waste generated in larger towns and cities. It
is seen that the amount and kind of waste generated varies according to the income level. While most of
the residents are unaware of the health hazards, the contributors too are equally unaware of the effects
of pollution on the Town. These risks can be properly managed and their negative effects can be
minimized. Hence, there is a need for proper collection, storage, transportation and scientific disposal of
such waste by the respective local governments.
5.4.1

Quantity of Waste Generated

The quantity of solid waste generated in Barhi has increased in the past few years due to the growth of
commercial and service activities. At present the solid waste generated at household level and in from
revise streets is collected either directly from the dustbins and open dumping points. The regular
collection is confined to the main streets of the town. The details of the existing SWM system are detailed
in the following Table.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 45 of 99

Table 5.15: Solid Waste Details in Barhi 2011

Sl. No.

Particular

Details

1.

Total Population (2011)

2.

Waste generated from households

3.

Amount of Hospital Waste Generated (in tons)

4.

Total Waste Generated Per Day (in tons)

3.5

5.

Total Waste Collected Per Day (in tons)

3.5

6.

Collection Performance (%)

Note:

13946
3.5
-

80 %

Nagar Parishad, Barhi

The average solid waste generated in Barhi town is about 3.5 tons per day. The major source of waste
generation is the domestic waste. There is no hospital waste generated in the town.
5.4.2
The

Constituents of Municipal Waste


various

sources

of

solid

waste

are

domestic

and

commercial. Out of the total waste generated in Barhi around 60


percent is domestic waste and 40 percent is commercial waste.
The

domestic

biodegradable

waste

has

components.

both

biodegradable

Some

of

the

and

non-

biodegradable

components are vegetable waste, meat waste, poultry waste,


leftover food, etc. The non-biodegradable waste comprises of
plastic, rubber, packaging materials, metal, batteries, and
construction waste.
5.4.3

Current practices of Solid Waste Management

There is door-to-door collection system is in practice in Ward No.'s 1,5, 6,7,9 and 13 of the town.
5.4.4

Segregation & Storage of Solid Waste

At present there are no standard practices followed for segregation and storage.
5.4.5

Primary and Secondary Collection

Both primary and secondary type of collection is practice in the town. In some areas, the solid waste is
collected from houses and is deposited at a predetermined location from where it is carried to dumping
site through trucks.
As per the assessment of officials at Nagar Parishad officials, approximately 3.5 tons of waste is collected
per day which indicates a collection performance of 80 percent. The main roads are swept every day and
the waste is deposited in the containers, and is taken to dumping site. The shortfall in the collection
process is due to the following reasons:

Throwing the waste into drains which is left unattended.

Less manpower for day to day collection.

Non-availability of adequate infrastructure in terms of number of tractors, dustbins, equipments,


etc.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 46 of 99

Improper dumping points and unscientific disposal methods like open dumping of waste on

roadsides, vacant sites, etc.


Improper collection methods.

5.4.6

Processing & Disposal of Waste

It is informed by the officials at Nagar Parishad that a new land fill site is proposed near to ward 15,
which is 3 km away from the city Centre. The total extent of the site is about 6.0 acres. The following
Table 26 indicates the existing transport & disposal arrangements.

Map 5.2 shows disposal location

points.
Map 5.2 shows disposal location points.
Table 5.16: Solid Waste Transport and Disposal Arrangements

1.

Particulars
Number of Dustbins

2.

Total Number of Vehicles (Tractor)

3.

Capacity of each vehicle

4.

Total Number of Tippers/Handcarts

5.

Age of Vehicle (in Years)

Units
10 ( which are Poor Condition)
1
4 tons
8
12 years

6.

Persons per vehicle

7.

Total Capacity of Vehicles (in tons)

1 driver + 5 persons
2

8.

Number of trips per day per vehicle

9.

Type of Disposal

Open Dumping

Source: Nagar Parishad, Barhi


5.4.7

Vehicles for Solid Waste collection and Transportation

The Nagar Parishad owns 1 tractor for disposal of solid waste. Capacity of each tractor is 4.0 tons.
Number of trips per day per vehicle is two. The distance traversed by each tractor per day is around 4 km
and the weekly hour of operation is 8 hours. However lack of adequate infrastructure and manpower has
led to improper removal and transfer methods.
5.4.8

Institutional Set-up

Solid Waste Management is enlisted in the state list and is the obligatory responsibility of the ULB
handled by the Health wing of each municipality. The MSW rules 2000 putsforth detailed guidelines for
the entire process of solid waste management. The staffs for SWM include Environmental Engineer,
Health Officer, Health Inspector and field staff including drivers, cleaner & loaders. The number of staff in
the ULBs varies depending on the size of the ULB.
The staffing pattern as provided by the Nagar Parishad, Barhi indicates that currently 8 employees of
Nagar Parishad are discharging the duties of Solid waste and Sanitation and additional 12 persons are
employed for attending various duties. The details of the staff are indicated in the Table

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 47 of 99

Table 5.17: Staff for Solid Waste Management in Barhi

Staff for SWM


Safai Daroga/Driver
Safai Karmachari

Number
2
6
Total

8
12

Grand Total

20

Temporary staff/Daily Wages

Source: Nagar Parishad, Barhi


5.4.9

Estimation of Waste Collection

Estimated waste generation in the town by the year 2035 is about 9.1 tons. Approximately 7.3 tons of
waste collection will be done based on existing collection performance.

5.4.10 Comparative Analysis with Guidelines


Table 5.18: Details of Current Service Levels

Indicator
Waste collection performance
Spacing of Dustbins
Road length per conservancy staff
Conservancy staff per 100 population

Norms
90 100 %
100 m
400 600 m
3

Number of Units
80
Irregular
1500 m
0.15

Source: Analysis
5.4.11 SWOT Analysis
Strengths

Weaknesses

Door to Door collection is in


practice

Execution of new land fill site

Multiple disposal points.


Dumping process is within the town.
Absence
markets

of

Slaughter

houses

&

mutton

Community bins are not available at convenient


locations.

Functional overlap-sanitation & solid waste


management
Threats

Opportunities

Adaptation
of
Composting methods

Vermi

City Development Plan for Barhi Town

Possibility of public health hazards as the


dumping yard s are located in the town

Absence of segregation of bio medical waste


from private clinics

Lack of solid waste management facilities in


the town leading to indiscriminate dumping of
garbage

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 48 of 99

5.4.12 Key Issues

Absence of segregation of waste at source.

The staff in the ULB is skeletal.

The locations of dustbins should be fixed with proper intervals and at proper places so that
efficiency can be increased.

The existing transportation infrastructure and resources are inadequate.

Although the quantity of biomedical waste generated in Barhi is very less, the improper handling of
the waste from the private clinics results to infectious conditions.

5.4.13

City specific Strategies and Action Plans

Issue
Open
dumping

Absence of
Door-to-Door
(D2D)
collection in
few wards

Goal

Strategies

Suitable space
(landfill site) for
disposal of
waste

100% D2D
collection
system

Lack of skilled Strengthen the


man power
existing system

Absence of
segregation of
waste at the
source

Encourage
Scientific
methods for
segregation

Initiating segregation of
waste at source.
Place
collection
bins
wherever
is
necessary
(suitable locations).

Action Plans/ Proposals

Provision of adequate facilities


at landfill site (Platform,
fencing, watchmen shed etc.).
Provision of 5 litter bins in
commercial areas & 74
community bins in the town
by the end of plan period2035.
Identification of primary Provision of 5 auto tippers, 15
collection points.
try
cycles
for
primary
Scheduling the timings of
collection.
Provision
of
2
metal
collection.
Provision
of
adequate
containers and 2 dumper
equipment & vehicles.
placer vehicles for secondary
collection.
Structuring of man power Conducting capacity building &
requirements and assignment
Training programmes.
of responsibilities.
Recycling
and
Reuse Development of sanitary land fill
methods has to put in practice.
site.
Equipment and infrastructure as
per MSW guidelines 2000.

Priority Actions

Provision of infrastructure & man power required for efficient solid waste management
Provision of slaughter house
Development of solid waste land fill site
Construction of Vermi-composting yard
Campaign for segregation of waste at source

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 49 of 99

5.5

Drainage System

5.5.1 Existing Drainage System


The storm water drainage system in the town comprises of only tertiary drains due to the limitations in
the availability of data, the analysis is confined to the macro level. The storm water drains need to be
strengthened by separating the sanitation, sewerage and drainage aspects, which are currently
intermixed. Barhi needs to develop an adequate storm water drainage network in a scientific manner,
taking into consideration key parameters of precipitation intensity, catchments delineation, percolation
characteristics and surface run-off.
5.5.2 Major Water Bodies
There are two major water bodies existing in the city. And the total area is about 28 hectares. At present,
waste water is directly disposed into major water bodies. It is leading to un-hygienic conditions in the
area. Few of the slums are developing around these water bodies.
Primary & Secondary Drains: There is lack of primary drains in the town.
Map 5.4 shows Drainage network map.
5.5.3 Tertiary Drains
The tertiary drains are the roadside, built-up open or closed drains and those of the unlined kutcha type.
The total length of tertiary drains as per available data is 5 km. The total drain length accounts to 35
percent of total road length. Table 33 indicates the details of the type of storm water drains in the town.
The road drain ratio works out to 1:0.82. In the other words, for every 1000 m road length, 820 m drain
length is available.
Table 5.19: Details indicating the Existing drainage connections

1.
2.

Drain Type
Open Drains Pucca
Open Drains Kutcha

3.

Closed Drains

Length (km)
5.0
7.0
Total

4.
5.

% to Total Road Length


Road Drains Ratio

12.0
82 percent
1: 0.82

Source: Census 2001


Map 5.4: Environmentally Sensitive Areas
5.5.4 Flood-prone Areas or Environmentally Sensitive Areas
Environmentally sensitive areas in urban areas require prior attention as they are prone to pollution due
to the increasing demand for land for various development needs, generation of biodegradable and nonbiodegradable wastes, sewage, etc. Thus, environmentally sensitive areas needs protection from the
likely ill effects caused due to human interactions. Environmentally sensitive areas can also potentially
result in health hazards if not protected.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 50 of 99

Table 5.20 Details of Environmental Sensitive Areas


Particulars

Area
(ha)

Tenure

Status

Condition

Remarks

Bhadhe Talab

Govt.

regulated

Moderate

lacks
maintenance

Sangi Talab

10

Govt.

Un-

Moderate

lacks

Talab ( Nearby

Pvt.

regulated
SAIL Office)

Un-

maintenance
Bad

regulated

lacks
maintenance

Source: Nagar Parishad, Barhi


5.5.5 Air and Noise pollution
Due to presence of steel authority of India within the municipal limits, we can observe movement of
heavy container trucks on State Highway which passes through the center of the town causing air and
noise pollution.
It is noticed that, due to the Stone crushing activities in Udana village, which is located at a distance of 8
kms from the town which causing damage to building structures and also causing noise pollution.

Stone Crushing
Activity Area

Barhi

5.5.6 Present and Future Demand and Supply Gaps


Table 5.21 : Demand and Supply Gaps for SWD System

Sl.
No.
1
2
3

Components
Existing Municipal road length
Additional road length required
Contemplated road length

City Development Plan for Barhi Town

Length
in km/ Nos.
14.5
31
46

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 51 of 99

Sl.
No.
4
5
6
7
8

Length
in km/ Nos.
12
2.5
9.5
25
3

Components
Existing pucca drain length
Rehabilitation of existing pucca drain length
Provision of pucca drains in un-served areas (current gap)
Provision of pucca drains in future expansion areas
Number of lakes requiring development

Source: Analysis
5.5.7 SWOT Analysis
Weaknesses

Strengths

Considerable Size of water body

Inadequate coverage area of drainage system

Opportunities

Threats

Development of recreational
spots in abutting areas of water
bodies

Pollution of major water bodies


Stagnation of waste water in old areas

5.5.8 City specific Strategies and Action Plan

Issue
Lack of road

Goal

Strategies
of

Rehabilitation of existing drains

side

system and extension in un-

Provision

side pucca

road

drains

drains

Action Plans/ Proposals

served areas.

Rehabilitation of road side


pucca drains: 2.5 km.

Extension
of
drainage
network
in
un-served

Provision

Provision of road side drains in


future extension areas.

areas: 9.5 km.


of

road

side

drains in future expansion


areas: 25 km.
Lack of

Protection and

Avoiding the mixing of sewage

Letting out of the sewage

Maintenance

conservation

and solid waste with the storm

water into the tank only

of Three

of

water.

after treatment.

Talab's

bodies.

water

To avoid flooding on streets.


Properly

collecting

the

rain

water through proper drainage


network. Connecting the water

and New Talab.

Provision of
harvesting.

Lying of new roads after


completing the drainage

bodies.
Provision of
drains along

To
create
sufficient

lanes in city

space

core areas

laying of the

Removing
and
encroachments.

for

drainage
system

City Development Plan for Barhi Town

avoiding

Plantation
around
the
Bhada Talab, Sangi Talab

network.

rain

water

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 52 of 99

Priority Actions

Refurbishment of existing drainages


Improvement of drainages in outer areas

Provision of 31 km length of drainages by 2035

Implementation of Rain Water Harvesting

Development of green belts for the protection of nallahs & water bodies

5.6 Traffic & Transport


5.6.1 Existing Traffic & Transportation Scenario
Barhi is well accessed by road. Barhi town is connected with the region through SH-10, which connects
the town to Katni and Mahiriya. The effective carriage width of the state highway is affected in the
central part of the town due to the activities related to the informal sector activities and dispersed
pedestrian movement.
Table 5.22: Road Surface Details

Length
(km)

Surface Type
A.

Condition of Road
(in km)
Good

Fair

Bad

1.5

1.5

1.5

1.0

34.4

5.0

27.5

2.0

2.0

5.0

6.0

Municipal Roads
1.

Concrete

2.

Water Bound Macadam

3.

3.0

Earthen

2.5
5.0

Total
B.

% to Total
Length

State Highways

17.5

10.5
4.0

Total

20.6

14.5

3.5

Source: Nagar Parishad, Barhi


The total road length in Barhi is 14.5 km out of which 10.5 km is maintained by the Nagar Parishad and
remaining 4.0 km by the PWD. Around 20 percent of roads laid by cement concrete. The share of WBM
roads is 17 percent and remaining 35 percent are earthen roads.
Map 5.5: Map shows the road network in Barhi
5.6.2 Travel Characteristics
Barhi has higher concentration of pedestrians especially along mayan road, katni road and amarpon
village. The town does not have dedicated footpath along any of the main roads. The related facilities like
street furniture, drinking water fountains, shaded seating and waiting areas are absent. The junctions
are not regulated by traffic signals and lack traffic safety measures to guide the traffic and pedestrian
movement.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 53 of 99

Rail & Air connectivity


Barhi Town lacks both rail and air connectivity. The nearest railway station is located at Jabalpur, which is
at a distance of 140 km from the town.

Need for Bypass


A lot of physical development has crossed the by-pass road in northern direction of the city and to avoid
the movement of heavy container trucks passing through the center of the town. Hence a bypass is
required widening for longer run to avoid the regional traffic entering the town.

By-pass
For the preliminary analysis, it is noticed that they is a lot of inter-state traffic (heavy container) moves
along the State highway 11, which pass through the town and in future there is proposal of thermal
plants near Buabuja Village, which will also add some-more inter-state traffic movement in the town
along SH 10, both these traffic have to pass through the core area of the town and which results traffic
congestion and degradation of environment. So it is essential to develop By-pass connected SH 10 & SH
11 in South-West direction.

Junctions
There are four main junctions in the town namely, Bus stand
Junction, Market Junction, petrol station Junction and Baghat singh
junction. The effective width of the roads leading to the junction is
low due to lot of informal, commercial & parking. These junctions
need to be widened and provided with traffic signals, signages,
kerbs & foot paths
5.6.3 Intermediate Public Transport System
The main modes of transport in the town are two-wheelers and Intermediate Public Transport
(IPT).Other than rickshaws there is no other alternative available in the town. Lack of adequate parking
areas has resulted in vehicles being parked along the SH-10 in the town. The unregulated movement and
irregular parking of these vehicles creates problem to vehicular and pedestrian movement. The intra city
commuting is predominantly pedestrian.
5.6.4 Parking Assessment
There are no organized parking areas in the town for any type of
mode. The rickshaws, jeeps, and the two-wheelers are haphazardly
parked in all parts of the commercial and institutional areas. On
street parking is not regulated. There are no bus bays, bus shelters
and truck terminal in the town. The absence of organized parking
is leading to congestion at junctions and market areas.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 54 of 99

5.6.5 SWOT Analysis


Strengths

Weaknesses

Organic
form
and
congestion
encroachments in old area

Laying of CC roads without laying service


networks

Absence of foot paths and medians

Regular interaction of local traffic with regional


traffic along the arterial roads can lead to
congestion and accidents

Lack of access
residential areas

Arterial road network is organized

to

Absence of signaling systems at junctions


Lack of maintenance of bus stand

Lack of parking places


Threats

Opportunities

due

land available for bus stand


Developing
terminals

bypass

road

&

truck

to

emergency

facilities

in

5.6.6 Service Adequacy and Key Issues

Lack of bus station

The regional traffic passing through the town has put the pedestrian safety at stake. The interior
roads cut the National Highways at many points indicative of conflicting points.
The roads widths are narrow in old areas which create problems to emergency services such as

ambulance and fire services.


Most of the roads in the older parts are with CC surfaced. Remaining roads are kutcha in nature,

causing problems especially during rainy season. The road side drains being very small in narrow
roads in older areas, during rainy season the entire road gets drained.
Foot paths are completely absent in all parts of the town. The pedestrian movement is displaced

hindering the traffic movement.


The main roads carrying heavy traffic are interconnected by narrow streets; this sometimes leads

to choking of traffic flow. These streets are also used as shortcuts leading to loss of quietude in
residential areas.
Lack of organized parking for IPT modes.

5.6.7

City specific Strategies and Action Plan

Lack of Bus
Stand

Provision of bus
stand
with
proper
amenities
&
adequate
facilities

City Development Plan for Barhi Town

Traffic & Transportation

Improve the existing bus stand


with adequate facilities
Provide
mini-bus
stands
wherever is necessary

Improve the existing bus


stand

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 55 of 99

Traffic & Transportation

Lack of Bus
Shelters

Provision of bus
shelters along
the highway

Placed bus shelters wherever is


necessary

Provision of bus shelter


along market junction &
baghat singh junction

Regional
traffic is
passing
through
the town

To
minimize
the interaction
of
regional
traffic
with
local traffic

Provision of Bye Pass to


divert the regional traffic from
the town
Provision of Truck Terminals
along the SH-10

4 km length of Bye-pass
road has to be laid
Provision
of
truck
terminal along Katni road
(2035)

Nonuniform
and narrow
widths of
roads

To
make
uniform
and
regular width of
the roads

Removal
of
current
encroachments and avoiding
future encroachments
Widening of roads

Improvement of Existing
roads:
Earthen roads to WBM
roads: 5 km
WBM Roads to CC
Roads: 2.5 km
Resurfacing of existing
roads:
CC Roads: 1.5 km
WBM Roads: 2 km
Widening of Roads:
SH-10: 4km
sub-arterial roads: 4 km

Lack of
public
parking
spaces

Provision
of
On street and
Off
street
parking space
in appropriate
locations

Provision of parking spaces for


Rickshaws & Autos
Provision of parking spaces in
commercial public & semipublic
places

Provision
of
parking
spaces near Bus stand
junction, market junction
for rickshaws, 2 & 4
wheeler vehicles.

Improper
Road
Junctions

Improving
junctions
for
safe
and
smooth flow of
traffic

Widening of junctions
Provision of traffic signaling
systems
Provision of medians

Improvement of
Bus
stand junction, Police
junction
Traffic signals at all the
junctions.
4 km Length of median
along SH-10

Lack of
Foot Path

Improvem
ent
of
foot
paths

Provision of foot paths along


the main roads & commercial
areas

Roads Requiring
Footpaths:
State Highway 10: 4
km

Priority Actions
Widening of SH-10
Provision of foot paths along the main roads
Provision of parking areas near junctions & Markets
Provision of medians along SH-10 & 11
Provision of high mast poles along Major roads
Provision of traffic signaling systems at Bus stand junction, market junction and baghat
singh Junction
Provision of By-pass road

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 56 of 99

5.7

Street lighting & fire fighting

5.7.1

Existing Situation of Street Lights

Street lighting is an important component of Traffic safety and management. In Barhi there are about
400 street lights with different types of electrical fixtures. The average spacing of street light poles
ranges between 45 m to 50 m, as against the norm of 30 m indicating gross inadequacy of the system.
However, this condition is not uniform.
Table 5.23: Details of Street Lighting in Barhi

Description

Street Lights

1.

High Mast Lamps

2.

Energy Saver Lamps(CFL)

3.

Sodium Vapour Lamps

4.

Tube Lights
Total

Percentage to Total

200

50

10

2.5

190

47.5

400

100.00

Source: Nagar Parishad, Barhi


5.7.2 Fire Services
There is no fire station in the town, but there is a fire tender for emergency purpose. Fire station is
located at district headquarters Katni.
5.7.3 Present and Future Demand and Supply Gaps
The total number of street lights required for the present scenario is about 345 numbers.. By end of the
horizon period, an additional 1045 street light are to be provided.
5.7.4 SWOT Analysis
Strengths

Weaknesses

Barhi town is nearer to district


headquarter

Lack of power supply, Manpower for fire


services.

Proper access from Katni

Opportunities

Threats

Land available for fire and fighting

High density development in core area

services.
5.7.5

City specific Strategies and Action Plan

Issue

Goal

Strategies

Action Plans/ Proposals

Inadequa
te Street
Lights

100 %
coverage of
streets
lighting in
the town

Provision of street
lights in un-served
areas.

Current gap:

Provision of sodium vapour: 45 Nos.


Additional street lights:

Assessment of street
lights in future
development areas.

City Development Plan for Barhi Town

Replacement of existing Energy saver lights


to sodium vapour lamps: 230Nos.

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 57 of 99

Issue

Goal

Strategies

Action Plans/ Proposals

Provision of high mast


poles.

5.8

Replacement of tube lights to sodium


vapour lamp: 70 Nos.
Street lighting for Additional Road length:
810 Nos.
Provision of High Mast lamps: 3 Nos.

Urban Poor and Their Accessibility to Basic Services

5.8.1 Introduction
The urban poor and slums are by-product of economic development and urbanisation process. As per
2001 population census, 285.35 million people reside in urban areas. It constitutes 27.8 percent of the
total population of the country. In post-independence era while population of India has grown three
times, the urban population has grown five times. The rising urban population has also given rise to
increase in the number of urban poor. It is indispensable to analyse status of poverty for any city
development exercise. Besides it becomes more important in the state like Madhya Pradesh where level
of poverty is relatively higher.
This section deals with the access of urban poor in Barhi to basic services, drawing from secondary
information as well as site visits to slums in the town, and interaction with local residents. The aim is to
identify key issues in service delivery to the poor in Barhi and suggest strategies that would enable the
Nagar Parishad, Barhi to address issues and fulfill its mandate of providing basic services to the poor in
the town.
5.8.2 Poverty in the Town
Various estimates of poverty in Barhi have converged to between 50 to 60 percent of total population. As
per the latest estimate made available by Nagar Parishad - Barhi, the slum population in the town stands
at 5,576, which accounts to 40 percent of the total population and total slum households are 1,013,
which accounts to 55.0 percent of total households.
It is now widely understood that poverty is experienced through a variety of dimension of which low
income is only one. Further that within the poor, there are important differences in depth of poverty, the
ability of poor households to graduate from poverty and the relative vulnerability of different groups to
withstand risks to livelihood such as unemployment, sickness and eviction. Effective poverty reduction
programmes need to be able to differentiate these groups and design appropriate and targets responses.
A total of 6,993 persons in Barhi have been identified as those living Below Poverty Line (BPL). This
would mean that more than 57 percent of total population in the town is living Below Poverty Line.
Although the figures suggest that a majority of slum dwellers in Barhi are living Below Poverty line. A
major poor population lives around the water body areas where they have ancestral shelters to live in
but are mostly unemployed.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 58 of 99

5.8.3 Information pertaining to BPL Population and Slum Population


There are mainly two different types of houses in Barhi characterized by type of their housing
condition. Majorly tiled roof houses are observed in entire city and wood and bamboo materials used for
housing in slums. The total slum population of Barhi town is 4465.
Map 5.6 shows Location of Slums
Table 5.24: Ward Wise BPL & Slum Details

Ward No

Ward Name

2011-slums
HH

Population

Ward No.1

Ballabh Bhai Patel

75

414

Ward No.2

Maharana Pratap

98

541

Ward No.3

Dr. Bheemrao Ambedkar

35

190

Ward No.4

Chandrashekar

72

396

Ward No.10

Maulana Ajad

70

385

Ward No.11

Indira Gandhi

47

256

Ward No.12

Vivekananda

44

242

Ward No.13

Vijayanath

90

496

Ward No.14

Shivaji

172

946

Ward No.15

Rajeev Gandhi

109

599

812

4465

Total

Source: Nagar Parishad, Barhi


5.8.4 Present and Future Housing Demand
The information on housing scenario in slums is not available. However, it was indicated that about 60
per cent of the slum dwellers live in temporary shelters and during the reconnaissance visits, it was
observed that most of the houses are constructed using brick, wood and bamboo materials.

Housing Condition in Slum Area

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 59 of 99

Ballabh Bhai Patel

Pvt

Maharana Pratap

Pvt

Pvt

Pvt

Dr. Bheemrao
Ambedkar
Chandrashekar
Maulana Ajad

10

Pvt

Indira Gandhi

11

Pvt

Vivekananda

12

Pvt

Vijayanath

13

Pvt

Shivaji

14

Govt.

Rajeev Gandhi

15

Govt.

Security

Social

Health

Education

Roads

Street Lights

Drains

Strom Water

SWM

(Sewer Line)

Sanitation

(Piped)

No.

Water

Ward

Supply

Ward Name

Land Tenure

Table 5.25: Slum Matrix with reference to Infrastructure covered

Covered
Partially Covered

5.8.5

SWOT Analysis

Strength

Weakness

Inadequate
facilities

Poor condition of housing status

Availability of land for relocating the


slums

Lack of awareness
reduction schemes

Opportunities

Threats

Motivate private sector to participate in


slum up-gradation projects

5.8.6

physical and social infrastructure

programmes

for

poverty

Environmental degradation due to lack of access to


improved sanitation

Issues

Following are the issues based on the analysis done through secondary sources as well as observations
and discussions with ULB engineers, community based organizations and slum dwellers. Major issues in
brief are given below:
Inadequate infrastructural facilities like water supply, sewerage and roads, etc.
Concentrating the major slums in same location
Lack of comprehensive urban poverty reduction strategy
In absence of proper strategy and policies to create affordable housing stock for the urban poor

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 60 of 99

Un-regulated physical development.


5.8.7 City specific Strategies and Action Plans
Urban Poor & Slums
Issue

Goal

Lack of
access to
basic services

Strategies

Universalization
basic services

of

Action Plans/ Proposals

Awareness of the slum


development schemes and
programs
Equitable access to basic
services with minimum
standards,
within
the
affordability
limit
and
willingness to pay
Livelihood Promotion and
Community Development
Implementation of slum
up-gradation programmes

Relocate the existing


slums along the major
water bodies
Provide
affordable
housing stock
Providing adequate social
and
physical
infrastructure facilities

5.9 Social infrastructure


5.9.1 Educational Facilities
The availability of skilled manpower for diversification of economic base in a town depends on the
provision of quality education.

There are 5 primary schools in the town. In addition to the primary

schools, there are other schools that are catering to the needs of secondary education and senior
secondary education.

People from surrounding villages are dependent on Barhi town for education

purpose. The details of the existing educational institutions are provided in Table.
Table 5.26: Details of the Educational Institutions in Barhi

Type
Norm (UDPFI)
Projected Population
Primary
Secondary/
High School
Senior
Secondary
School
College

Poly Technic

No.
Area
No.
Area
No.
Area

1/ 2500 population
0.4 Ha
1/ 7500 population
1.6 Ha
1/ 7500 population
1.6 Ha

No.

1/ 125000
population
4.0 Ha
1/ 1000,000
2.4 Ha

Area
No.
Area

Source: Town Directory, Census of India, 2011

City Development Plan for Barhi Town

Existing

Cumulative Demand

2011
5
1
1
-

15333
2016
7
2.0
1
4.8
1
4.8

18818
2026
8
2.4
2
4.8
2
4.8

22302
2035
9
2.8
3
6.4
3
6.4

0
-

0
-

0
-

4.0
1
2.4

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 61 of 99

The nearest engineering, and medical institutions are available at Katni, which is at a distance of 28 km
from the town.
A total of 9 primary schools & 3 secondary and senior secondary schools are required by the end of
horizon period. Considering the dependency of the surrounding rural areas, possibility of developing a
general college & a polytechnic college is factored into the educational requirements of the town, though
the population size of Barhi is less.
5.9.2 Health Facilities
The town has a government hospital and 2 male doctors working in the hospital. The details of the
medical facilities available in Barhi town are provided in Table 41. To avail specialized services, people
resort to travelling to Katni. There is a request by the public to have a female doctor in the hospital & to
upgrade the hospital with 30 beds.
Table 5.27 : Details of Medical Facilities in Barhi

1.
2.
3.

Medical Facilities
Hospitals
Health Centres
Others/Clinics

Nos.

Number of Doctors

1
1
3

2
1
3

Source: Barhi
The available data is compared with UDPFI guidelines to assess the adequacy of medical facilities. The
details of future demand for the medical facilities are provided in Table.
Table 5.28: Details of Future Demand for the Medical Facilities

Type
Norm (UDPFI)
Projected Population
Hospital

Maternity
Centers/Clini
cs
Community
Health
Centers

No.
Area
No.
Area
No.
Area

1 for 100000
persons
3.7 Ha
1/ 45000
population
0.2 Ha
1/ 45000
population
0.2 Ha

Existing

Cumulative Demand

2011
1

15333
2016
1

18818
2026
1

22302
2035
1

3.7
3

3.7
3

3.7
4

0.6
1

0.6
1

0.8
2

0.2

0.2

0.4

Source: Town Directory, Census of India, 2011


5.9.3 Socio-Cultural Facilities
The town does not have any land earmarked for Socio-cultural activities except community hall. Presently
community hall is not in use because lack of maintenance. There are no proper recreational and cultural
facilities available in the town. Table indicates the requirement of recreational facilities for the town by
the end of horizon period.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 62 of 99

5.9.4 Recreation/ Leisure/ Parks and Play Grounds


It is observed that there is a deficiency in recreational facilities in the town. There is a park in the town.
Only two play ground is located in school premises. There is a need to develop and maintain further
recreational facilities in the town. At present, town level sports facilities are not available.
5.9.5 Markets
The major activity is observed at daily market, which is located along the NH in the town. This market
primarily caters the daily needs of the population of the town. The market runs for 6 days in a week.
About 200-300 people visit the market on a regular week day. Weekly market (Mela ground) is located in
ward-6, where the total no.of shops are about 1,000 and 10,000 people visit on that day. Lack of parking
place at Mela ground is leading to the congestion in the area there by obstructing the pedestrian and
traffic movement.
5.9.6 Crematoria & Burial Grounds
There are 3 burial grounds in the town, which are primarily serving the needs of Hindu and Muslim
religions. The burial grounds and crematoria are maintained well. In quantity, these are sufficient to cater
to the present needs however; there is a need for allotting more space for the same.
5.9.7 City specific Strategies and Action Plans
Social Infrastructure
Issue
Inadequate
social
infrastructure

Goal
Development
of
social
infrastructure
to improve the
Quality of Life

Strategies
Development
higher
education
facilities,
vocational training centers
and job oriented training
facilities
Improvement of specialized
health services
Provision of cultural &
recreational facilities
Provision of additional burial
grounds
Provision
of
firefighting
facilities
Provision of hotels facilities
for visitors (outsiders)

Priority Actions

Provision of town level Fire Station

Provision of Improvement of Existing Parks

Provision of Burial Grounds

Provision of ITI College

Provision of Community Halls

City Development Plan for Barhi Town

Action Plans/ Proposals


Provision of Educational facilities:
Primary schools: 9
Secondary high schools: 3
Senior secondary schools: 3
ITI college: 1
Polytechnic college: 1
Provision of Heath facilities:

Hospitals: 0

Maternity hospitals: 1

Community health centers: 1


Provision of cultural facilities:

Community halls: 3

Recreation club: 1

Auditorium: 1
Provision of land for additional burial
grounds: 2
Provision fire station: 1
Provision of hotels: 2

INSTITUTIONAL
FRAMEWORK

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 63 of 99

CHAPTER 6

INSTITUTIONAL FRAMEWORK

The Organizational Structure of the deliberative wing in Barhi Nagar Parishad

Public sphere
in Bhopal

President/Chairperson

Ward Councilors

President in Council

Appeal Committee

Advisory Committee

Ward Committee

Departments under Nagar Parishad


Housing, Environment and Public works Department
Water Works Department
Health and Medical Department
Market Department
Education Department
Women and Child Welfare Department
Food and Civil Supplies Department
Rehabilitation and Employment Department
Revenue Department
Law and General Administration Department

Figure 6.1: Organization Structure of the deliberative wing in Barhi Nagar Parishad

As shown in the above figure, President and Vice-President are the elected bodies, whereas the Nagar
Parishad is headed by Chief Municipal Officer.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 64 of 99

The organizational Structure of the Executive wing in Barhi Nagar Parishad

Divisional Officer (OSD)

Chief Municipal Officer

Departmental Heads

Zonal Officers
-

Public Works Department


Housing, Sanitation Department
Water Supply Department
Finance and Accounts Department
General Administration
Departments
Revenue & Tax Department
Public Relation and Library
Department
Fire Brigade & Workshop Department
Law Section and Legal Cell
Department
Planning and Development
Department
Garden and Parks Department

Technical Staff

Non
Technical Staff

Ward Officers

Figure 6.2: Organization Structure of the Executive wing in Barhi Nagar Parishad

City Development Plan for Barhi Town

MUNICIPAL FINANCE

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 65 of 99

CHAPTER 7 MUNICIPAL FINANCE


7. Present Scenario
The Nagar Parishad prepares the budgets for every year. For the purpose of the analysis, the Nagar
Parishad finances of Barhi have been reviewed for the last four years, commencing from the financial
year 2008-09 and also the items of account have been categorized under the following major heads.
7.1 Revenue and Capital Accounts:
All recurring items of income and
expenditure are included

under

revenue head. These include taxes,


charges,

salaries,

maintenance

expenditure, etc., and an item


under capital accounts are nonrecurring in nature and includes
loans, contributions by GoMP, other agencies and capital grants under various State and Central
Government programmes. Expenditure items include expenses booked under developmental works.
7.1.1 Financial status:
Revenue income of Barhi Nagar Parishad has grown to a level of Rs.96.98 lakhs in the financial year
2011-12 from INR 47.87 lakhs in financial year 2008-09, the revenue income had registered an average
annual growth of 29%, whereas the revenue expenditure increased at an average annual rate of 47%.
It can be clearly known that the growth rate in revenue income is less than growth rate in expenditure,
which leads to negative in revenue operating surplus. Since, lack of revenue operating surplus, the
capital account transactions are also considered for the purpose of the Analysis. The capital receipts
include the grants, amounts from state financial corporation etc.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 66 of 99

7.1.2 Composition of own revenue and expenditure:


The revenue expenditure is more than revenue income. Since, there is no revenue operating surplus.
Accordingly, the capital Income and expenses are also considered for the purpose of the analysis. The
graph shows the composition of own revenues and revenue expenditure of Nagar Parishad:

City Development Plan for Barhi Town

CAPITAL INVESTMENT
PLAN (CIP) & FINANCIAL
OPERATING PLAN (FOP)

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 67 of 99

CHAPTER 8 CAPITAL INVESTMENT PLAN (CIP) & FINANCIAL


OPERATING PLAN (FOP)
8.1 City Investment Plan - Introduction
The Capital Investment Plan is the multi-year scheduling of identified and prioritized investments. The
CIP is developed after the in-depth analysis of existing infrastructure, service delivery gaps and various
stakeholder workshops at town and state level. The strategies identified/structured for improvement of
existing service gaps and proposal for future requirement.

The proposed projects are identified under three components;

Projects for system Augmentation,

Projects for system Refurbishment and

Other Development projects.

8.1.1 Water Supply System (WS)


The total investment requirement for the water supply sector is estimated at about Rs. 512.91 Lakh. The
investment requirement is estimated for various components of water supply system, including Storage
facility, pipeline for clear water transmission, internal distribution network and installation of water
meters. The investment requirement for leak detection and rectification in the transmission mains and
internal distribution system is also estimated.

A summary of projects and corresponding capital investment requirement for augmentation and
refurbishment of the water supply system is presented in Table
Table 8.1 Investment Requirements for Water Supply Sector

Water Supply (WS)

Unit

Unit
Cost
(lakhs)

Total
Amount
(lakhs)

Phase
1
20122015

km

5.5

27.50

27.50

4.5

km

5.5

24.75
52.25

24.75
52.25

0.00

0.00

31
0.62

km
ML

5.5
60

170.50
37.20

18.60

85.25
18.60

85.25
-

3.61

MLD

11

39.71

39.71

Gap/
Demand

A. System Refurbishment
Existing improvement of
pipeline network
laying of network system in
un-served Areas
Sub Total (A)
B. System Augmentation
Pipeline system for
future/additional road length
Additional storage capacity
Additional Treatment Plant
Capacity

City Development Plan for Barhi Town

Phase
2
20152025

Phase
3
20252035

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 68 of 99

Water Supply (WS)

Gap/
Demand

Centrifugal pumps capacity


required
Raising Main Length
Intake Pipeline length

75
8
1

Sub Total (B)


C. Others
Capacity Building
Programmes for ULB Staff
DPR Preparation including
topographic survey
Sub Total (c)

Unit

Unit
Cost
(lakhs)

Total
Amount
(lakhs)

hp
km
km

0.17
20
5.5

12.75
160.00
5.50

Phase
1
20122015

Phase
2
20152025

Phase
3
20252035

425.66

12.75
160.00
5.50
236.5
6

103.85

85.25

LS

5.00

5.00

LS

30.00
35.00

30.00
35.00
323.8
1

0.00

0.00

103.85

85.25

Grand Total (A+B+C)

512.91

8.1.2 Sewerage
Proposed projects in sewerage sector were identified based on the future demand. In this sector
proposals are to prepare Root-Zone treatment system instead of Underground drainage system. Total
proposed investment is Rs. 150.60 lakh, which also includes conducting capacity building programmes at
town level.
A summary of projects and corresponding capital investment requirement for augmentation and
refurbishment of the sewerage system is presented in Table
Table 8.2: Investment Requirements for Sewerage Sector

Sewerage

Gap/
Demand

A. System Refurbishment
Sewerage network plan- Root
zone system
Sub Total (A)
B. System Augmentation
Provision of DEWATS (Baffled
treatment system)
Sub Total (B)
C. Others
Capacity Building Programmes
for ULB Staff
Sub Total (c)
Grand Total (A+B+C)

City Development Plan for Barhi Town

Unit

Unit
Cost
(lakhs)

LS

7305

No's

LS

0.02

Total
Amount
(lakhs)

Phase 1
20122015

Phase 2
20152025

Phase 3
20252035

2.00

2.00

2.00

2.00

0.00

0.00

146.10

36.53

146.10

36.53

73.05
73.05

36.53
36.53

0.00
73.05

0.00
36.53

2.50

2.50

2.50
150.60

2.50
41.03

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 69 of 99

8.1.3 Storm Water Drains (SWD)


The proposed investment for storm water drainage sector includes upgradation and remodeling of kutcha
to pucca drains, open drains to closed drains and formation new drains in uncovered areas in the city.
The total investment proposed in this sector is Rs. 219.75 lakh and the summary of projects and
corresponding capital investment requirement for augmentation and refurbishment of the storm water
drainage system is presented in Table
Table 8.3: Investment Requirements for Storm Water Drains Sector

Storm Water Drains


(SWD)
A. Rehabilitation
Rehabilitation of existing
road side drains
Provision of road side drains
in un-served areas

Phase
3
20252035

Unit

2.5

Km

5.00

5.00

9.5

Km

5.5

52.25

52.25

57.25

57.25

0.00

0.00

5.5

137.50

34.38

68.75

15.00

15.00

34.38
-

10.00

10.00

162.5
219.75

44.38
101.63

83.75
83.75

34.38
34.38

Km
No's

25
3

Improvement of Lakes
Provision of Rainwater
harvesting system

Phase
2
20152025

Total
Amount
(lakhs)

Sub Total (A)


B. Refurbishment
Pucca drains in future
expansion areas (in km)

Phase
1
20122015

Unit
Cost
(lakhs)

Gap/
Demand

LS

Sub Total (B)


Grand Total (A+B)

8.1.4 Solid Waste Management (SWM)


Proposed projects identified in Solid water Management component consist of procurement of additional
primary collection vehicles, secondary collection vehicles, and transportation vehicles like Dual loaded
dumped placers. For scientific disposal of waste generated in city, development of Landfill sites for nonrecyclable solid waste disposal and Compost site development for recyclable wastes. Total capital
investment proposed in this component is Rs. 112.62 lakh, and the summary of projects and
corresponding capital investment requirement for augmentation and refurbishment of the solid waste
management system is presented in Table
Table 8.4: Investment Requirements for Solid Waste Management Sector

Solid Waste Management


(SWM)

Gap/
Demand

A. Household Level
Auto tippers (1 for 900-1000
HH)

City Development Plan for Barhi Town

Unit

Unit
Cost
(lakhs)

Total
Amount
(lakhs)

Phase
1
20122015

Phase
2
20152025

Phase
3
20252035

HH

2.4

12.00

3.00

6.00

3.00

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 70 of 99

Unit

Unit
Cost
(lakhs)

Total
Amount
(lakhs)

Phase
1
20122015

Phase
2
20152025

Phase
3
20252035

15

HH

0.08

1.20

0.30

0.60

0.30

74

HH

0.01

Solid Waste Management


(SWM)

Gap/
Demand

Try Cycles (1 for 300-400 HH)


Community Bins (1 for 50-60
HH)

94.00

Sub Total (A)

0.74

0.74

13.94

4.04

6.60

3.30

B. Commercial Area
Litter Bins (1 for 200m)

Sub Total (B)


C. Street Sweeping & Drain
desilting

km

125

push carts (1 for 2km)

0.01

0.065

125

Sub Total (c)

0.05

0.05

0.05

0.05

0.00

0.00

8.13

2.03

8.13

2.03

4.06
4.06

2.03
2.03

D. Secondary Collection
Metal Container (1 for 2000 HH)

Dumper Placer vehicles

HH

0.25

0.50

0.50

10

20.00

10.00

10.00

20.50

10.50

10.00

0.00

50.00

50.00

10.00

10.00

Sub Total (D)


E. Disposal site
Improvements at site
(fencing/storage/segregation)

LS
Ha

Land acquisition for landfill site


Construction of Sanitary landfill
site

10

LS

5.00

5.00

LS

65.00
5.00
5.00

65.00
5.00
5.00

0.00
0.00

0.00
0.00

112.62

86.62

20.66

5.33

Sub Total (E)


F. IEC Activities
Sub Total (F)
Grand Total
(A+B+C+D+E+F)
8.1.5 Sanitation

Proposed projects in Sanitation sector were identified based on the future demand. In sanitation sector it
is proposed to construct 4 nos of public toilets across various locations in the city. Total proposed
investment is Rs. 78.60 lakh, which also includes conducting capacity building programmes at town level
and construction of Low Cost Sanitation Units.
A summary of projects and corresponding capital investment requirement for augmentation and
refurbishment of the Sanitation system is presented in Table
Table 8.5 : Investment Requirements for Sanitation Sector

Sanitation

Gap/
Demand

Unit

No's

A. System Refurbishment
Improvement of Existing

City Development Plan for Barhi Town

Unit
Cost
(lakhs)
3

Total
Amount
(lakhs)
3.00

Phase 1
20122015
3.00

Phase 2
20152025

Phase 3
20252035

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 71 of 99

Sanitation

Gap/
Demand

Unit

Unit
Cost
(lakhs)

Total
Amount
(lakhs)

Phase 1
20122015

Phase 2
20152025

Phase 3
20252035

Public Toilets
Sub Total (A)
B. System Augmentation
Construction of New Toilets
Construction of low cost
sanitation units
Sub Total (B)
C. Others
Capacity Building
Programmes for ULB Staff
Sub Total (c)
Grand Total (A+B+C)

3.00

3.00

0.00

0.00

No's

6.5

26.00

26.00

1115

No's

0.04

44.60

44.60

70.60

70.60

0.00

0.00

0.00
0.00

0.00
0.00

LS

5.00

5.00

5.00
78.60

5.00
78.60

8.1.6 Traffic & Transportation (T&T)


The proposed investments in road improvement works consist of strengthening /improvement to existing
roads, upgradation of roads, widening of sub arterial roads in the city and new formation of roads in
extension areas to maintain a better circulation pattern. The investment proposed in road improvement
works is Rs. 3658.25 Lakh. A summary of projects and corresponding capital investment requirement for
augmentation and refurbishment of the Traffic & Transportation is presented in Table
Table 8.6 : Investment Requirements for Traffic & Transportation

Traffic & Transportation


(TT)

Gap/
Demand

A. Existing Improvement
CC roads
WBM roads
Sub Total (A)
B. Up gradation of existing
roads
WBM to CC roads
Kucha to WBM roads
Sub Total (B)
C. Widening of Roads
SH 10
Sub-Arterial road
Sub Total (C )
D. Laying of New roads
laying of roads in future

City Development Plan for Barhi Town

1.5
2.5

2.5
5

4
4

46

Unit

km
km

km
km

km
km

km

Unit
Cost
(lakhs)

Total
Amount
(lakhs)

Phase
1
20122015

Phase
2
20152025

Phase
3
20252035

2.5

3.75

3.75

20

50.00

50

53.75

50

3.75

10

25.00

25

22

110.00

110

135

110

25

25

100.00

100

0.00

25

100.00

0.00
-

100

100

3450.00

1725

1725

75

100

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 72 of 99

Traffic & Transportation


(TT)

Gap/
Demand

Unit

Unit
Cost
(lakhs)

Total
Amount
(lakhs)

Phase
1
20122015

Phase
2
20152025

Phase
3
20252035

3450

1725

1725

development areas
Sub Total (D)
E. Parking Facilities
Near Bus stand
Near Market Junction
Sub Total (E)
F. Bus Shelters
Along police station
Sub Total (F)
G. Junction Improvements
(no's)
Bus stand
police station
Sub Total (G)
H. Foot Paths (km)
Along SH 10
Sub Total (H)
I. Provision of Bye Pass

LS

0.5

0.5

LS

0.5

0.5

2.50

2.5

2.5

2.5

8.00

8.00

16

30.00

30

0.00

0.00

30

30

1
1

Bye-pass road

No's

No's
No's

Km

Km

2.5

7.5

400

Sub Total (I)


Grand Total
PWD Investment
ULB Investment

1600.00

1600

1600

1600

5388.25
1730.00

201.5
130

1761.75
0.00

3425
1600.00

3658.25

71.5

1761.75

1825

8.1.7 Electricity and Street Lighting


The proposed projects in street lighting include replacement repaired and old tube fixtures and
installation of new fixtures as per standards. To curtail the energy consumption in street lighting sector
power saving switches (CFL) has been proposed. Total investment in street lighting is Rs. 70.25 lakh.
Table 8.7: Investment Requirements for Street Lighting

Street Lighting (SL)

Gap/
Demand

Unit

Unit
Cost
(lakhs)

45
200

No's
No's

0.15
0.1

230
3

No's
No's

0.15
3

Provision of Sodium Vapour/CFL


Replacement of bulbs to CFL
Street Lighting for additional
road length
Provision of high mast lamps
Grand Total

City Development Plan for Barhi Town

Total
Amoun
t
(lakhs)

Phase
1
20122015

Phase
2
20152025

Phase
3
20252035

6.75

6.75
10

10

6.9
9
32.65

6.9
16.9

20.7
20.7

20.00
34.50
9.00

70.25

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 73 of 99

8.1.8 Urban Poor


To improve the basic infrastructure facilities inside the slum area and for redevelopment, rehabilitation of
slums following projects have been identified with a total investment of Rs.1258 lakh
Table 8.8: Investment Requirements for Urban Poor

Urban Poor (UP)

Gap/
Demand

Unit

Phase
2
20152025

Phase
3
20252035

243.6

365.4

609

15

15

1233

258.6

365.4

609

15

15

15

15

10

10

0
365.4

0
609

Unit
Cost
(lakhs)

Total
Amount
(lakhs)

1.5

1218.00

Phase
1
20122015

A. Slum Upgradation
Construction of houses

No's
LS

812

Health & Education Programmes


Sub Total (A)
B. Livelihood Promotion
Provision of training
centers/meeting halls etc.

LS

Sub Total (B)


C. Social Security

LS

Security of tenure for urban poor

10

10

1258

283.6

Sub Total ( C )
Grand Total

8.1.9 Environmentally Sensitive Areas


To improve the living environment in the Town, list of projects have been proposed which include
afforestration. Total investment proposed for urban environmental improvement is Rs.30 lakhs.
Table 8.9: Investment Requirements for Environmentally Sensitive Areas

Description
Afforestration in Lake/ Pond
Catchments Areas
Total

Unit

Unit Cost
(lakhs)

10

Amount
(Lakhs)

Phase 1
20122015

Phase 2
20152025

30
30

15
15

15
15

Phase 3
20252035

8.1.10 Urban Governance


For efficient management of the increasing administrative responsibilities and the welfare activities it is
proposed for e governance, restructuring of Municipal Council (institutional strengthening) organization
setup to take up new responsibility, double entry accounting system, town planning and municipal
information system (MIS), property Mapping GIS for efficient collection performance. Besides this
capacity building and periodic training also proposed with a total investment of Rs. 10.00 lakh.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 74 of 99

8.1.11 Social Infrastructure


Total investment proposed under this head is Rs. 155.00 lakh, which include development of community
halls, renewal of existing commercial establishments, construction of slaughter houses, electric
crematorium, construction of vegetable markets and facilities like social security and emergency services
etc. The detailed cost estimates are presented in Table
Table 8.10 : Investment Requirements for Social Infrastructure Facilities

Social Infrastructure
(SI)

Unit

Unit
Cost
(lakhs)

Total
Amount
(lakhs)

Phase 1
20122015

Phase 2
20152025

Phase 3
20252035

Fire & Emergency


Services

LS

75

56.25

18.75

Parks & Playgrounds

LS

25

25

Community Halls

LS

15

15

Crematorium Facilities
Market/Slaughter
house/Mela Ground

LS

10

10

LS

15

15

Social Security

LS

15

15

155

65

71.25

18.75

Grand Total
Summary of Sector wise Investments

The summary of proposed investment is presented in Table 8.11. Total investment proposed is Rs.
6255.98 lakh out of which Rs. 4997.98 lakh is proposed for urban infrastructure and governance and Rs.
1258.00 lakh is proposed for basic services to the urban poor and housing for urban poor.
Table 8.11: Summary of Proposed Investments

Sector wise Summery of Investments

Water Supply (WS)


Sewerage
Sanitation
Solid Waste Management (SWM)
Storm Water Drains (SWD)
Traffic & Transportation (TT)
Street Lighting (SL)
Social Infrastructure (SI)
Environment
Urban Governance
Urban Poor (UP)
Grand Total

City Development Plan for Barhi Town

Total
Amount
(lakhs)

Phase 1

Phase 2

Phase 3

2012-2015

2015-2025

2025-2035

512.91

323.81

103.85

85.25

150.60

41.025

73.05

36.525

78.60

78.6

112.62

86.62

20.66

5.33

219.75

101.63

83.75

34.38

3658.25

71.50

1761.75

1825.00

70.25

32.65

16.9

20.7

155.00

65.00

71.25

18.75

30.00

15.00

15.00

10

10

1258.00

283.60

365.40

609.00

6255.98

1109.43

2511.61

2634.93

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 75 of 99

8.2 FINANCIAL OPERATING PLAN (FOP) - Introduction:


The Financial Operating Plan (FOP) is a multi-year forecast of finances of the Nagar Parishad. The FOP
has been generated for a short term period (0 to 3 yrs) beginning 2013-14 to 2015-16, and also for the
long-term period till 2035-36. In the context of this assignment, the FOP is generated for the short term
and has been extended for the long-term (20 years) to essentially provide a snapshot of the impact of
identified investments on the municipal finances in the long run.
8.2.1 Objective and Methodology:
The objective of this plan is to assess the investment sustenance capacity of the Nagar Parishad with
respect to the project cost identified in the Capital Investment Plan (CIP) as part of the City
development plan (CDP). FOPs are essentially a financial forecast, worked out on the basis of the
realistic assumptions and the growth trends of various components of given Revenue and Capital
Receipts and expenditure.
The investment sustenance of the Barhi Nagar Parishad is assessed using a Financial Operating Plan
(FOP) model. The FOP is a multi-year forecast of finances for a term till 2035-36. This analysis is first
done without introducing the identified capital investments in order to arrive at the borrowing and
investment capacities. The second step is to introduce certain reforms and consider necessary
measures, which is expected to improve the financial capability of the Nagar Parishad. The third step is
the sustainability will be checked with the reforms and without reforms. In simple, FOP is worked out
under three scenarios, viz.
a) Base Case; i.e. Do Nothing Scenario
b) Introduce reforms with no capital Investments; and
c) Investment Sustenance.
8.2.2 Assumptions and Reforms
The Analysis is based on a whole range of assumptions related to income and expenditure. These
assumptions plays a vital role to ascertain the investment sustenance and would also provide a tool to

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 76 of 99

test certain specific policy decisions regarding revenue and expenditure drivers on the overall Parishad
fiscal situation. It explains the assumption adopted for the three FOP scenarios:

8.2.2.1 Assumptions for Forecasting Income and Expenditure:


Generally, the assumptions for forecasting Nagar Parishad income and expenditure for the three
scenarios are considered based on past trends (4-year average growth trend or 4-year compound annual
growth rate - CAGR, whichever is lower)-

8.2.2.2 Municipal Taxes:


The primary tax sources, viz. property tax, water tax/charge are forecasted based on assumptions on the
base (number of assessments) and basis (tax demand per assessment) and the collection efficiencies. In
addition to the above taxes, provision is also made for estimating income from solid waste, subject to
implementation of the proposed scheme.

Property Tax
1. Number of Assessments
In case of property tax, the total number of property tax assessments in 2011-12 as per BNP (Barhi
Nagar Parishad) records adopted as the base and the property tax assessments are 2783. The number of
properties in BNP has increased from 2783 to 11519 at a CAGR of 6.28 per cent during 2012-13 to 203435. A nominal growth rate of 2.00 per cent (equivalent to forecast population growth rate of 6.32 per
cent during 2012-13 to 2034-35) is adopted for forecasting the number of property tax assessments.

2. Tax Demand per Assessment


The annual property tax demand per assessment in 2011-12 is Rs 200/- for pucca houses and is assumed
to be revised by 25 per cent beginning from 2012-13, at a conservative growth rate of 15 percent for
each three years. The presumed rate for analysis for domestic houses is Rs.250 and commercial is Rs.350
Per annum.

3. Collection Efficiency
The average property tax collection efficiency during 2009-10 to 2011-12 was 77 per cent of tax
demands. It is assumed that BNP would consider 80% in 2012-13 and gradually increase its tax collection
performance to 90 per cent against arrears and current tax demand respectively.
Water Tax/Charges
4. Number of Assessments
Presently, there are 943 water connections, out of which, 913 are domestic and 30 are commercial,
which is 33.88% of the property tax assessments. Based on the population, the water connections are
assessed by dividing 5 people per house-hold. In this regard, based on the growth of the population, the
connections are increased to 5237 for the year 2034-35.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 77 of 99

5. Tax Demand per Assessment


The average monthly water tax demand per assessment in 2011-12 is Rs. 50 for domestic and Rs.150 for
commercial and is proposed/assumed to be revised to Rs. 80 Per month and Rs.180 per month for
domestic and commercial respectively beginning from 2012-13, at a conservative simple growth rate of
15 per cent per 3 years. The new water connection in 2011-12 is Rs.1200 and is proposed to be revised
to Rs.1400 & Rs.1500 from 2012-13 for domestic and commercial connections respectively, at a
conservative simple growth rate of 15 per cent per 3 years.

6. Collection Efficiency
It is assumed that BNP would gradually increase its tax collection performance from 80 percent to 90
percent against arrears and current tax demand respectively.

Solid waste charge


It does not levy a solid waste charge currently. Hence this tax is not considered in the base case
scenario. However, if this scheme, envisaged as part of the CIP is implemented, it is assumed that BNP
would levy a solid waste charge.

7. Number of Assessments
The ultimate number of assessments for solid waste charge is purely based on the property tax
assessments. It is assumed the total number of property tax assessments is the base for the collection of
revenue.

8. Tax Demand per Assessment


It is assumed that the average monthly solid waste charge demand is Rs. 25 per house hold for domestic
Rs.35 for commercial and it is also assumed that the rate will be revised for every three years at a
conservative growth rate of 15 per cent per every three years.

9. Collection Efficiency
It is assumed that BNP would gradually increase its tax collection performance from 55 percent to 90
percent against arrears and current tax demand respectively.
Other Taxes
Other relatively insignificant taxes like Road tax, improved technology tax, Market fees, tourists tax, etc.,
are forecast to grow at a nominal rate of 10-15% per cent per annum. These rates are assumed on the
basis of CAGR and Average annual growth (trend) rate, whichever is lower.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 78 of 99

8.2.2.3 Non-Tax Sources


The non-tax sources of revenue income, viz. municipal own sources, compensation and assigned revenue
and revenue grants are forecast based on past trends. The establishment expenditure of BNP has grown
at an average CAGR of about 19 per cent during the last four years. The same growth rate 1-15% per
annum is assumed for forecasting establishment expenditure. The other expenditures are assumed based
on CAGR and average 4 year trend.

8.2.2.4 New O&M Cost


The capital investments envisaged as per the CIP are bound to impose additional establishment and O&M
expenditure on BNP. Such additional expenditure is estimated based on percentage of capital costs as
estimated by the consultants from their experience in other projects.

FINANCIAL OPERATING PLAN


Before moving to the various scenarios, it is necessary to discuss the details of the Capital Investment
Plan (CIP) and its application on the FOP. The next paragraphs detail on the same. For the purpose of
incorporating new investments, Let us discuss the below:

Phasing of new investments: The identified investments are phased into three; the first one, being
the short term is made for 5 years beginning 2011. The second phase is the mid-term and begins from
2016-2026, and the third one being the long term ends with 2035-36.This is based on the demand and
priorities. The following table gives the details of phasing of investments.
Amount Rs.(lakhs)

The Grant from the central and state government is considered as 80:10 and the Nagar Parishad will get
its contribution as Loan from outside institutions.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 79 of 99

O&M Costs:

The details of O&M costs for each sector have been worked out and the same has been

incorporated in the analysis. The annual growth rate of O&M cost is 8% per annum. The details of O&M
calculation:
Loan calculations: The Grant mix between central and State Government (GoMP) is taken at a ratio of
80:10, while ULB contribution stays at 10% is considered as Loan taking from outside Organisation. The
following loan terms have been assumed.

Amount Rs.
In lakhs
625.60
7.00%
15 years
3 Years

Sr.No Particulars
1
2
3
4

Loan amount (Rs.)


Interest (%)
Repayment period
Morotorium period

The Principal and interest repayments for the Loan taken is

Description
Year
1 Principal Outstanding
2 EAI
3 Interest due

Sl.No.

Year 1
2012-13
0.00
0.00
43.79

Year 2
2013-14
0.00
0.00
43.79

Year 3
2014-15
0.00
0.00
43.79

Year 4
2015-16
625.60
39.76
43.79

Year 5
2016-17
629.63
39.76
44.07

Year 6
2017-18
633.95
39.76
44.38

A) SCENARIO 1: Base Case; i.e. Do Nothing Scenario :


The financial operating plan, under the first scenario which is a Do Nothing situation (without
introduction of new investments). The details of same can be seen here

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 80 of 99

It is to be noted that the above FOP is done without introducing any new investments. The TE/TR ratio
during the year 2034-35 is 1.02 and having negative closing balance of Rs.-12.95 crores at the end of the
plan i.e 2034-35. The Computations of the base case scenario has given in annexure.

B) Scenario 2 Introduce reforms with no capital Investments;


We are introducing reforms that are likely, rather necessary for the ULB to execute, in order to improve
their financial position. Certain assumptions have been made on this account, which are the prevailing
trends in various other places. However, based on the assumptions that are already discussed above, the
FOP is prepared.

It is to be noted that the above FOP is done without introducing any new investments. But by introducing
some reforms with assumptions. The TE/TR ratio during the year 2034-35 is 0.83 and having a closing
balance of Rs.13.91 crores at the end of the plan i.e 2034-35.

C) Scenario 3: Investment Sustenance Plan:

This scenario is done to test the strength of ULB after incorporating the new investments on to scenario
2. While the same set of assumptions on management measures is made as in Scenario 2 is assumed
and considered here. The table is

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 81 of 99

It is to be noted that the above FOP is done by introducing new investments. The TE/TR ratio during the
year 2034-35 is 0.97 and having a closing balance of Rs.13.33 crores at the end of the plan i.e 2034-35.
Recommendations:
The recommendation suggested therefore, is that the Nagar Parishad shall first introduce certain
management reforms and also certain management measures (not included in FOP) to start with, try
outsourcing activities, which will enhance revenues. It is advised after implementing measures, then the
Nagar Parishad is better to move to the Capital Investment plan. i.e implementing the measures gives
rather cash flows than capital investment.
Suggested Measures:
The following measures are suggested to be implemented by the management of Nagar Parishad, which
is helpful for the improvements in managing the municipal activities. A few are given below:

Improvement to Property tax collections- Have tie-ups with nationalized banks and open E-SEVA
centers (like in Andhra Pradesh at Vijayawada Municipal Corporation) for collection of property
tax, so that payments become easier and will improve collection efficiency.
Do Campaigns within the community to explain the benefits of payment of taxes
Address Government to expedite in resolving court cases, if any, the books of the municipality.
We suggest to Impose penalties on unauthorized connections
As a final step and a more technologically advanced step, it is suggested that the ULB goes in for
GIS mapping of the entire properties, which will help in bringing all properties into tax net. This
needs to be updated periodically. A separate cell in the Municipal Administration is to be
maintained in this regard.
Automatic revision of property tax rates and other taxes once in 3 years shall be made
mandatory.

On the expenditure side minimal reforms are helpful to reduce manpower and operational expenditure
can be attempted such as:

Introduce machinery for water supply like for pumping etc., and there by the Human resource
cost for the new investment can be reduced.
Outsource of solid waste management activities involving primary and secondary collection; there
are possibilities where, even the vehicles purchases can be invested by the operator.
Similarly, maintenance of street lights can be outsourced to ESCO (Energy Saving Companies
Periodical maintenance of pumps, etc. can prevent huge O&M expenditure and this also can be
outsourced.

City Development Plan for Barhi Town

URBAN REFORMS

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 82 of 99

CHAPTER 9: URBAN REFORMS


The Reforms under JnNURM aim at strengthening urban governments and to decentralize and devolve
functions, finances and functionaries to them so as to enable them to function as self-governing
institutions providing services efficiently and effectively. Broadly, the reforms aim to:

Provide for an integrated governance framework with transparency and clear lines of
authority and accountability to achieve the objectives of good urban governance;
Facilitate and promote inclusiveness, civic engagement and effective participation of the civil
society in city management;
Contribute towards financial sustainability of cities - strengthen the financial base of the cities
and make them bankable;
Enable the cities to work towards planned and integrated provision and operation and
maintenance of infrastructure;
Develop partnerships with public, private and other sectors for better provision and delivery
of services;
Extend the canvas of IT and eGovernance to all aspects of city management for efficient,
effective and timely service delivery; and
Promote pro-poor urban governance and work towards slum free cities with universal,
adequate and affordable housing and basic services;
Ensure renewal and revival of inner cities;
Contribute to municipal capacity enhancement.

Implementation of Reforms
Implementation of governance reforms is central to JnNURM. These reforms address issues of urban
governance and urban poverty in a sustainable manner. In what follows, an overview of mandatory and
optional reforms is presented.
S.
No

Mandatory Reforms

Reforms
Status at ULB

Adoption
of
the
modern
accrual-based double entry
system of accounting in ULBs
and Parastatal agencies

Yet to be
Implemented

Introduction of a system of Egovernance


using
IT
applications such as GIS & MIS
etc.

Yet to be
Initiated

Reform of Property Tax with


GIS applications

Yet to be
Initiated

City Development Plan for Barhi Town

Remarks
System was not implemented
due to lack of awareness,
professional manpower and
software
procurement/equipment. Keen
to adopt the system.
System was not implemented
due to lack of funds, except
few
stand-alone
desktop
machines being used for
accounting purpose. Keen to
adopt
the
system
with
additional funds availability.
GIS Mapping for utilities need
to be done for effective
collection.

Target

October,
2013

March, 2014

July, 2013

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 83 of 99

Levy
of
reasonable
User
Charges by ULBs with the
objective that the full cost of
O&M is collected within the
next 5 years.

Partially
achieved, except
water and
consolidated
taxes

Collecting water tariff from


household level and collection
efficiency is about 60%. UGS
taxes are nil due to absence of
system and street lighting tax
is minimal.

2016-17
(UGS system
may not be
considered
due to
proposal of
DEWATS)

2014-2015

2013-2014

Internal earmarking within local


body budget for basic services
to urban poor.

Yet to be
Considered

As of now, ULB is not able to


spend any amount for urban
poor
sector.
Specific
allocations have not been
made in the budget for urban
poor.

Provision of basic services to


Urban Poor including security of
tenure at affordable prices,
improving
housing
and
infrastructure facilities

Partially Initiated

ULB has issued few "Pattas" to


slum dwellers in the past years

Optional Reforms

Reforms Status
at ULB

Remarks

Revision
of
bye-laws
to
streamline the approval process
for construction of buildings,
development of site etc

Yet to be Initiated

Possible with the directives


of State level stance.

Conversion
of
land
from
agriculture to non-agriculture

Yet to be Initiated

Possible with the directives


of State level stance.

Introduction of property
certification system in ULB

Yet to be Initiated

Possible with the directives


of State level stance.

20-25% of land earmarking for


EWS & LIG category with a
system of cross subsidization

Yet to be Initiated

Possible with the directives


of State level stance.

Revision of byelaws to make


rainwater harvesting mandatory
in all buildings

Yet to be Initiated

Possible with the directives


of State level stance.

Bye-laws for re-use of recycled


water

Yet to be Initiated

Possible with the directives


of State level stance.

Encouraging PPP models

Yet to be Initiated

Possible with the directives


of State level stance.

S.No

title

City Development Plan for Barhi Town

Target

These
Reforms are
targeted for
implementa
tion
simultaneou
sly with the
implementa
tion of
Mandatory
reforms

SUMMARY OF WORKSHOP
PROCEEDINGS

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 84 of 99

CHAPTER 10: SUMMARY OF WORKSHOP PROCEEDINGS


10.1 Purpose and Importance of the workshop
Developing a Vision for the City is essential for the preparation of the City Development Plan (CDP). A
Vision is a statement of where the City/Town wishes to grow, within a given time frame, and is often
expressed in terms of clear expectations. It defines the potential of the city and reflects its unique
attributes in terms of comparative and competitive advantages, values and preferences of the city
residents, relationship of the city to state, national and global economies and of course, the history and
physical characteristics of the city. A vision aligns stakeholders energies to work cohesively for the
development of the city. Cities need to systematically consider the future requirements, and design Vision
statement to address the shape of the future for the horizon year.
The main purpose of Stakeholders Workshop is to formulate and develop City Vision and Sector goals and
strategies for Barhi Parishad. The CDP shall reflect the priorities and concerns of the public at city level.
Therefore, at different stages, consultative workshops with various stakeholders required to be
conducted.
10.2 Stakeholder Identification
As per Terms of Reference of preparation of CDP for Barhi Town the following stakeholders have been
identified and involved for the workshop.

MLA (Member of Legislative Assembly)

Municipal Chairperson

Ward Councilors

Chief Municipal Officers

Town and Country Planning Department Regional Representative

Line Departments of the State Government such as Pollution Control Broad, Health Department,
Tourism Department, PHED, PWD, Traffic and transportation etc.,

Private Sector agencies such as chambers of commerce and industry,

South Eastern Coalfield Limited Representative

Government School Representative

State Bank of India Representative

Inspector of Police

Non-governmental and community based organizations

Representatives of the poor communities

Representatives of ongoing urban development Programmes

Representatives of media

All the stakeholders and the citizens of the Town become the planning partners of the City Development
Plan.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 85 of 99

All the stakeholders identified play an important role in the City Development Planning Process and their
suggestions on various issues regarding the improvement of the quality of life in the Town are very much
a part of the City Development Plan.
10.3 Preparation of hand-outs and questionnaires
A four page Handout/questionnaire has been prepared which briefs the process of City Development
Plan and particularly the Vision and Goals stage of the Process. The later part is a questionnaire
designed to extract the opinions of all the stakeholders in an organized format. The first part focuses on
performance of existing infrastructure and the second part intends to identify the priority projects
necessary for the people (Appendix 1 provides the handout/questionnaire used for the presentation).
10.4 District level Workshop/Meeting at District Head Quarters (Jabalpur).
In the 2nd Workshop stage, M/s Aarvee associates architects engineers and consultants pvt ltd
representatives, Mr. K. Jagadeesh, Mr. Raghuram and Mr. Vishwanath urban and environmental planner
visited Jabalpur on 13th April, 2012 and held initial discussions with Director, Urban Development
Department at Jabalpur Divisional Office. Shri Gulshan Bamra, Collector, Jabalpur District has revised
the progress of the CDP work and Chaired the meeting, addressed the CMOs and representatives of all 7
project towns.

District level Workshop

On behalf of the consultant team, Mr. K. Jagadeesh, Manager and Mr. Raghuram, Urban Planner
presented the methodology of the study, Visions and Strategies foreseen for the preparation of City

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 86 of 99

Development Plan. The consultants addressed the importance of data inputs from various line
departments in the plan preparation. Handouts have been circulated to all the representatives of 7 towns
and details are showed in Annexure.
All the suggestions were recorded during the meeting, and shall be incorporated in the Priorities and
Projects stage.
10.5 Extended Discussion with Deputy Director
Detailed deliberations were made with Shri. Rajeev Nigam, Dy. Director, urban development
Department, Jabalpur Division. He emphasized on

Provision of Water Supply, Sanitation and Solid Waste Management,

Relocation of slums

Giving training on folk art and folk culture to the slum dwellers

Imparting social awareness

Provision of a buffer zone (Urban Forest) along the river bed

Discussion with Deputy Director

10.6 Town level Workshop/Meeting at Town Level:


10.6.1 Preparation for the workshop
The workshop was organized by Aarvee associates Pvt. Ltd with the co-operation of Chief Municipal
Officer (CMO) Barhi and the Municipal staff. The information on conducting the workshop was passed
onto Nagar Parishad well in advance so as to invite various identified stakeholders to participate in the
workshop. Workshop on CDP was held at Barhi Nagar Parishad on 28th of May 2012. The purpose of
the workshop was to involve stakeholders and facilitate to various discussions, record the Comments &
suggestions to finally incorporate in the preparation of CDP.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 87 of 99

10.6.2 Presentation on Town profile and discussion with participants


The workshop started with Introduction to the CDP Process and importance of the public participation in
the process. Firstly, the town profile and sector analysis has been presented to facilitate the discussion
among the participants (Please see enclosed appendix 2 for the copy of presentation). The
summary/Findings of the Sector Analysis is also done in the following section of the report.
10.6.3 Summary of the Sector Analysis
The following are the Summary/findings of the sector wise analysis and Town Profile of Barhi, which was
explained to the stakeholders.
Table 10.1 : Summary/findings of the Sector Wise Analysis and Town Profile of Barhi

Analysis

Sectors

Demography

The Population of the Municipal area according to the 2011 census is 13946.
Proposal for including of Khanna Panchayat into Barhi Nagar Parishad
Decadal Growth rate was 0.28 % for the 2001 2011 years
Population Density (Persons per Hectare) was 8 (2011 year)
The estimated population for the year 2035 is 36523

Landuse

The residential land comprises of 7% of total land,


The agriculture area comprises of almost 80%

Income
Property taxes, Grants, other revenues are the major Income sources
Property taxes and grants are gradually increasing year by year, which explains the
increase in growth and development activities
Expenditure
Health facilities, new construction, salaries and other expenditure are the major
expenditure sectors.
The priority has been clearly on improving health facilities and new construction of
various infrastructure provisions

Income and
expenditure

Economic
base

Agriculture & business are the main Source of Economy


The current workforce participation in Barhi is about 35.9 percent.

Housing

Number of households are 2788 and average households size is 5.0


By the year 2035 the additional Houses required are 1672

Nagar Parishad also plays a role in water supply, having 13 Tube wells, 98 hand
pump facility.
Water Supply deficiency wards are 2, 15
Population covered by water supply is (75%) and 50 LPCD
Total demand of water will be 3.01 MLD
Additional Storage capacity for the year 2035 is 1.63 ML

Water supply

Sewerage/
sanitation

Sanitation system is completely through open drains along the roadways and
houses
Some of the wards drains are maintained properly, but there are issues with the
stocking of water due to waste materials in the drain.
This problem is acute in rainy season.
There are no regularly planned drains in slum residing wards.
The storm water also runs through the same drains causing stocking problems in
rainy season.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 88 of 99

Analysis

Sectors

Solid waste
management

Roads and
Transportation

Electricity

Educational

Nagar Parishad is responsible to collect and transfer the solid waste generating
from all the households in the Nagar Parishad
Tractors available for solid waste collection and transfer
The collection frequency is once a week, leading to stockage of waste along
roadside and near dust bins
Some of the slum wards have a very poor management of solid waste; the
situation demands for a better frequency of waste collection from the Nagar
Parishad
No segregation of waste
Estimated waste generated for the year 2035 is 9.1 tonnes
Barhi Nagar Parishad is well connected by roads to surrounding areas of Katni and
other nearby places.
The total road length in Barhi is 14.5 km.
Provision of By-pass Road
There is no Public Transport facility available in Barhi Nagar Parishad to nearby
places.
The town is well developed with almost 85% of households having electricity
connections.
The remaining 15% of the households who are not having connections are the
squatter settlements.
10 to 12 hours of power cut a day.
There are provisions for street lighting in the main roadways of Nagar Parishad.
There are 5 primary and 1secondary
A total of 9 primary schools, 3 secondary are required by the end of horizon
period.
At college level education, people try to study in Katni.

Health

The Barhi town has only 1 dispensary which does not have satisfactory health
facilities when compared to standards.

Other facilities

There is two petrol filling facility in Barhi.


There are 1 park and 2 play grounds

There are slums located at every ward in Barhi Nagar Parishad


The total slum population of Barhi is around 4465, comprising 31% of total
population
The BPL Population is around 6993.
There is no government housing scheme implemented in Barhi Nagar Parishad for
Slums
The open drains present are either fully or partially covered with trash leading to
water stagnancy and posing an unsafe / unhygienic environment
No Public Toilet available

Slums

Environmental
Sensitive
Areas

Barhi has many Sites which needs to be considerd like railway crossing, core areas
where water logging happening and along SH-10

10.6.4 Workshop Summary


The Meeting was attended by the president, Chief Municipal Officer and all the Municipal Councilors and
general public attended the meeting and gave their valuable suggestions for development of the town.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 89 of 99

The workshop summary has been explained in following stages.


1. In the welcome statement, the Chief Municipal Officer briefed the Purpose of the meeting.
2. The Engineer of Barhi Municipal Council has also elaborated on the role and need for the CDP.
3. Mr.Jagadeesh, Mr. Raghu Ram and Mr. Vishwanath, Urban Planners representing Aarvee Associates
Pvt Ltd Hyderabad for this project made a Presentation on the Sector analysis and Town Profile on the
following topics.
The Town profile and sector analysis included the following topics

Introduction about CDP

Demography Study

Land use analysis

Income and Expenditure analysis

Economic base of the Town

Housing

Physical infrastructure

Water Supply

Storm water/Sanitation

Solid Waste Management

Transportation and Roads

Electricity

Social Infrastructure

Educational Facilities

Health Facilities

Other Facilities

Slums and Environmental Sensitive Areas

Urban Reforms

Financial Operating Plan

Funding Pattern

Percentage increase in taxes to raise the fund by Nagar Parishad to meet the proposed
projects.

Detail deliberations took place on the above subjects and many suggestions were given to finalize a
vision statement for development of Barhi Town.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 90 of 99

10.6.5 Photographs taken during the workshop

City Development Plan for Barhi Town

CITY VISION

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 91 of 99

CHAPTER 11: CITY VISION


Introduction
The city development plan is a statement of objectives, policies and standards upon which the physical
economic and social development of the Nagar Parishad are based. The city development plan is based
on proposed broad land use plan (Master plan) showing the existing and proposed locations and intensity
of land development for specific uses such as residential, commercial, industrial, agricultural and
educational uses. The future of the community lies in the vision of the city development plan, so it is
crucial that the city development plan be well thought out and carefully written with the needs of the
community at the forefront, with the continuous involvement of various stakeholders and general public.
Developing a vision statement should be the first step when preparing or writing a city development plan,
a well-crafted statement will tie the rest of the plan together.
Vision Statement

To develop Barhi Town as an important urban center by


improving the economic activities with infrastructure and
better Quality of Life.
11.1 Public Opinion on Existing Infrastructure Facilities and Services in Barhi
The following figure shows the rating on quality of existing infrastructure services expressed by the
stakeholders of Barhi Town.
Figure 11.1 Shows the rating of quality of existing infrastructure services

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 92 of 99

As shown in the above figure The blue color stretch represents good, red color represents
satisfactory and Green color represents the not satisfactory opinions of the people. Even though some
of the facilities represent major portion as satisfactory at present, the service levels would become largely
deficient in the coming years. The CDP aims at evaluating and providing satisfactory service levels for the
year 2035.
11.2 Public opinion on prioritizing the proposed list of developments
Based on the priorities given by the Stakeholders in the Questionnaires, the following ranking for various
proposed developments are identified. The following table provides the prioritization for various
developments.
Table 11.1: shows the prioritization for various developments.

Type of Development

Priority

New Water Treatment Plant and Supply system

Re-design of all open drains

Encourage small scale industries

Public Transportation Facility

Proper collection, segregation and disposal of solid waste

Housing schemes for Economically weaker sections

City level Recreational Activity Park

Provision of Children Parks and Film Theatres

Self-Employment schemes from government

10

Allotment of Houses for Retired people through a share based scheme

11

New Market center providing spaces to all types of commodity Providers

12

Re-Design of Bus Stand Space

13

City beautification

14

From the above table it is observed that the first and foremost priority in town which needs immediate
attention is provision of better and sustainable source for water supply system. The provision of housing
schemes for economically weaker sections, Encouraging setting up of small scale industries, re-design of
open drains, job training Programmes, public transportation facility, better garbage disposal, and
provision of children parks and theatres would be the priorities to form a lively and healthy living city. The
developmental aspects like water supply, drainage, garbage etc., leads to healthy environmental
Condition in the town and also helps in improving quality of the life in the town.
Vision statement
The city development plan is a statement of objectives, policies and standards upon which the physical
economic and social development of the Nagar Parishad are based. The city development plan is based
on proposed broad land use plan (Master plan) showing the existing and proposed locations and intensity

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 93 of 99

of land development for specific uses such as residential, commercial, industrial, agricultural and
educational uses. The future of the community lies in the vision of the city development plan, so it is
crucial that the city development plan be well thought out and carefully written with the needs of the
community at the forefront, with the continuous involvement of various stakeholders and general public.
Developing a vision statement should be the first step when preparing or writing a city development plan,
a well-crafted statement will tie the rest of the plan together.
Essential elements of the vision
Because a vision statement will eventually be incorporated into the city development plan, it is essential
that the community identity or unique resources are identified, so that they are preserved through the
development process. Such categories may include, but are not limited to environmental resources such
as streams, mature woodlands, and agricultural resources historic cultural and scenic resources such as
parks and recreation areas and non-renewable resources of economic value such as sand, gravel, land,
mineral deposits. The vision statement in the city development plan must be specific to be effective. The
community should be proactive with its vision statement.
VISION STATEMENT: Planned Development for Nagar Parishad Barhi (2035)
11.3 Planning, developing and managing urban growth in Municipal area
By the year 2035, municipal area would have well planned development with economically productive and
environmentally sustainable aspects of growth. The development area will be well planned and balanced
with a focus on basic Infrastructure development, also planning for slum rehabilitation. High Quality
services such as water supply, sanitation, waste management, street lighting, health, housing and public
transport will be available to all. Development area will be governed by participatory, responsive and
people-oriented local government.
11.4 Sectoral strategy framework
The overall vision for the town and the Prioritization of the key sectors paved the way to formulate sector
specific vision and strategies. This sector specific approach with year wise strategies will be instrumental
in framing the action plan/ implementation plan. The sector specific reforms and investments are an
integral part of the year wise strategies and would be dealt in CIP section of the CDP.
I. Water Supply
At present there are 24 Tube wells in the town which draws about 0.69 MLD. The required supply of
water for the year 2035 would be almost to the tune of 5.00 MLD.
Vision
Vision is to provide adequate and clean water in an equitable, efficient and sustainable manner.

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 94 of 99

II. Sewerage
Analysis from the sewerage sector reveals that sewerage network coverage and maintenance is very low.
The entire town has open drainage system. The poor and slum dwellers lack safe sanitation facilities and
hence are prone to health related diseases. There is also no storm water drains available for the town
Vision
Vision is to create a healthy community by providing high quality sewerage and storm drain services
based on the principles of quality, equity, value and responsiveness.
III. Solid Waste Management
The local governments should effectively involve in efficiently collecting and disposing of solid waste,
encourage people to practice segregation of solid waste at source.
Vision
Vision is to achieve environmentally sustainable waste management practices.
IV. Development of open spaces
Small open spaces and vacant areas are available in the Town which could be used as public parks.
Developing the recreational spaces with adequate green coverage would also bring lot of relief to the
inhabitants.
Vision
Vision is to create healthy community environment by development of open spaces and recreational
spaces with Public Private Partnership (PPP).
V. Effective management of urban land
As most of the development is confined to only core area, there is lot of vacant urban land available that
can be effectively used for future development in town. The management of these land parcels must be
through efficient land use plan and with flexible land use zoning regulations.
Vision
Vision is to prepare an efficient land use plan with optimum utilization of land for present and future
needs and implement the plan in an effective manner.
VI. Urban Poverty
With about 40% of the population in town living in slums and BPL households are 4.50%, urban poverty
is a major issue confronting the town
Vision

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 95 of 99

The vision is to uplift the quality of life and to place the town slum free as possible by 2035 The goals
formulated to achieve the vision are:
Access to qualitative and affordable basic services
100 % literacy
Universal access to primary health care and no one should die of preventable diseases
Ensure livelihood to all urban poor
Tenurial security and Affordable Housing
Provision of land tenure security
Community empowerment
Linking livelihoods to towns economy
Development of housing through partnerships PPP
Relocation of slums located in hazardous and vulnerable Areas
Provision of basic infrastructure both physical (water, roads, sanitation and sewerage) and
social infrastructure (clinics, schools, training facilities, etc).
11.5 Conclusion: Brief strategies, actions and projects for the city
Urban Planning & Growth Management
The key issues emerging out of planning and growth management is that in-spite of not having master
plan for Barhi town, its lacks in implementation and managing the development in an organized fashion,
which is leading to unplanned haphazard development. Absence of strategic project implementation
mechanism and inadequate financial resources to implement the schemes, lack of private sector
community participation in development process were identified as the existing challenges before the city
Managers.
The CDP process has undergone extensive dialogue with the technical people and public opinion in
prioritizing the key sectors for investments and reform initiatives. The following are the top prioritized
proposals which may guide, facilitate the Town to have a sustainable infrastructure and satisfactory living
conditions with enhanced quality of life.

Re-design and development of open drains

New water treatment plant and supply system

Development of Solid Waste Management system- door to door collection

Housing schemes for economically weaker sections

Encouragement of small scale agro-based industries- Warehouses and cold storage

Providing Public Transportation System

Providing Recreational Facilities

City Development Plan for Barhi Town

SPECIAL PAPER

SPECIAL PAPER
ON
ENVIRONMENT & MINING ACTIVITY

"

Stone Crushing Activity Area

Barhi

$%&$

$& '%

#
+

+
*

* ( ,
.'$$

( )

$/ %/%

1,0 2

"

13 "02

"

(
3 "0

5'''

.''

&(

. 5''

6
4

)39 1)
(

75 '''
)

3 "0

& (

3 "0

!
#

)
(
4

<

)39

""#

!$
;
"

(
)
<

0(

%"

&"

0
6

<

"
+

' %

4
3
(

<

(
(

>

=
4

(
(

"

(
+

?
(
4

<

+
< <

)?*

(
(

(
*

WORKSHOP HANDOUTS

12/19/2011

ehar emgZ Ama {dH.mg {d^mJ6 Xoe gaH.ma


ehar {dH.mg

moOZm 2e8{d8 mo3

n[a moOZm g{jV Ama godmAm| H.m H.m 7jo:


e8{d8 mo8 go ~hV XrKH.m{bH. H.m 7Zr{V 2{dOZ #!$&3 Ho. gmW7gmW ehar {Zdoe moOZm
2e8{Z8 mo3 CnbY H.amZm h {Oggo g~{YV e8.Wm8{Z8 Ho. gaH.ma6 8n8 gaH.ma moOZm Ho.
gmW7gmW e8{d8 mo8 | mW{ H.Vm H.m Ama n[a moOZm nhMmZ Ho. AmYma na IwX Ho. Ed A
8moVm| go {Z{Y m mV H.aZo mo hm|Jr 0
BZ X.VmdoOm| | {dmr n[aMmbZ moOZm 2{d8n8 mo83 ^r Xr OmE Vm{H. e8{Z8 mo8 nhMmZr JB
n[a moOZmAm| Ho. AZwnmbZ Ho. {bE {d{^ {dmr 8moVm| go YZ OwQ>m gHo. 0
godmAm| Ho. H.m 7jo | Oo EZ EZ w Ama E Qy>b{H.Q>7# | ~mVmE JE g^r AmdD H. H.X
em{ b hm| {Oggo e8{d8 mo nyam H.aZo | XX { b gHo. Ogo AmYma gm Jr O m H.aZm Ama
jo7Xmam6 ZJa n[afX H. mo[a m| Ama g^r A XmdoXmam| go ^|Q>6 jo {dDbofU AmdD
H.m embmAm| H.m Am moOZ Ama e8{d8 mo [anmoQ> nyam H.aZm 0

12/19/2011

n[aM :
ehar {dH.mg moOZm | eha H.m gmnoj hd Ama AZwD XmoZmo h 0
h eha Ho. dV mZ {dH.mg H.s p.W{V XemVm h {H. A~ h H.hm h ?
h n[adVZ H.s {XemAm| H.mo ~VmVm h {H. h | H.hm OmZm h ?
h X~md jom| H.s nhMmZ H.admVm h {H. mW{ H.Vm Am Yma na h | N m H.aZm Mm{hE ?
Bg | n[adVZ bo AmZo Ho. {bE dH.pnH. am.Vo6 H.m Zr{V Ama h.Vjon H.m ^r gwPmd hmoVm h {H. h | bQ mV H.aZo |
H.go h.Vjon H.a| 0
Bg | Ro. dH. Ama {dOZ hmoZo go OmZ gH.Vo h n[a moOZmAm| H.s nhMmZ H.go hmo Ama AZwnmbZ H.go H.a| 0
h gwg.Wm{nV H.aVm h {H. {Zdoe {ZU Ho. y mH.Z Ho. {bE VH.gJV Ed gwgJ V T>mMo go H.go {ZnQ>m OmE 0

n[aM :
Odmhabmb Zoh. ZoeZb A~Z [a{Zdb { {eZ 2Oo8EZ8EZ8 w8Ama8E 3 H.mo mZ | aIVo hVE ehar {dH.mg
moOZm ~Zm r JB h Vm{H. {H.R.m Vr CnmXH.Vm6 gR. b6 m gJV Ama ^mdZr eham| Ho. bQ V ma {H. o
Om gHo. 0
Bg bQ H.mo mV H.aZo Ho. CoD go h gH.| {V H.a Vm h {H. Am{WH. Ama gm m{OH. AmYm[aH. g.WmZ Ho.
{dH.mg6 H.m 7Zr{V {Og | ehar Jar~ bmoJm| H.mo ^m{dV H.aZo dmbr g . mE6 gaH.mar ZJanm{bH.mAm| H.mo
O ~yV H.aZo Amoa CZHo. {dmr boIm7OmoIm Ama ~OQ> Umbr VWm {H. m6 Odm~Xohr Ama nmaX{eVm bmZo Ho.
{bE T>mM m V ma H.aZm6 ^y{ Ama Jh {Z mU {dnUZ na ^md S>mbZo {d{YH. ~mYmAm| H.mo XYa H.aZo Ho. N m
Cnm {H. o OmE 0
h eham| H.mo AmYma XmZ H.aVm h {Og o ehar jom| | gwYma bmZo Ama ehar AmYm[aV T>mMm| Ho. {bE j
{Zdoe H.aZo | XX { b gHo. 0

12/19/2011

dJuH.aU Ed {H. m AZwgaU


!Q>O
o 7" gJh U Ama ma^:
Bg Ad.Wm | ZJa n[afX6 XmdoXma Ama H.m dJ Ho. gX. Ama ZJa H.m gd}jU H.aZo dmbmo
H. Mm[a m| Ho. {bE EH. {H.H.7AmR. H.m embm Am mo {OV H.s OmVr h 0
!Q>O
o 7# dV(mZ n[ap!W{V m| H.m {ZYmaU:
dV mZ n[ap.W{V m| H.m JhZ {dDbofU {H. m OmVm h {Og | S>o moJm{R.H. moR.mBb6 EH.moZm{ H.
moR.mBb6 A~Z JdaZ|g6 A~Z BR.m.Q>NMa Ama EZdamBZ |Q>b EgnoNQ> em{ b h 0
!Q>O
o 7$ {gQ>r {dOZ H.m {dH.mg Ama jo b0 Ed H.m 7Zr{V:
eha H.m gmnoj Ama {dOZ H.m {dH.mg
!Q>O
o 7% H.m Zr{V m| Ama mW{(H.Vm H.m H.m {dH.mg:
eha Ho. ^mdr {dH.mg Ho. {bE eha Ed {dOZ H.s dV mZ p.W{V m| | ZOXr{H. m bmZo hoVw EH.
H.m 7Umbr V ma H.aZm 0

dJuH.aU Ed {H. m AZwgaU


!Q>oO7& eha {Zdoe moOZm 2e8{Z8 mo3 Ama {dmr MmbZ moOZm 2{d88 mo3:
eha {Zdoe Ama {dmr MmbZ moOZm g{hV {dmr H.m 7Zr{V V ma H.aZm 0
!Q>oO7' S>mQ> {gQ>r {dH.mg moOZm 2e8{d8 mo3:
g^r XmdoXmam| Ed H.m Xbm| go mV R.sS>7~H. H.mo mZ | aIVo hVE eha {Zdoe moOZm 2e8{Z8 mo3 Ama
{dmr MmbZ moOZm 2{d88 mo3 g{hV S>mQ> {gQ>r {dH.mg moOZm V ma H.aZm 0
!Q>oO7( A{V( e8{d8 mo8 boI:
A{V H.m embm H.s R.sS> ~H. 2{V{H. m3 VWm am .Va MMm go mV {V{H. m H.mo em{ b H.aVo hVE
A{V eha {dH.mg moOZm V ma H.s OmEJr 0
Cn wNV g^r .Q>oOm| | g^r XmdoXmam| Ama H.m Xbm| Ho. gmW mnH. .n go nam e {H. m OmEJm 0

12/19/2011

H.m`7Umbr 2gr8S>r8nr83:

H.m embm H.m CoB Ama (hd:


XmdoXmam| 2.Q>oH. hmoS>a3 H.s H.m embm H.m w CoD {gQ>r {dOZ H.m {dH.mg H.aZm h Ama ZJa n[afX Ho. jo bQ VWm
moOZm ~ZmZm h 0 e8{d8 mo8 eha .Va Ho. bmoJmo H.s mW{ H.VmAm| Ama {MVmAm| H.mo XYa H.aVm h 0 AV: {^7{^ MaUm| |
AZoH. H.ma Ho. XmdoXmam| Ho. {bE H.m embm Am mo{OV H.aVr h 0
eha {dH.mg moOZm 2e8{d8 mo3 V ma H.aZo Ho. {bE eha Ho. {dOZ H.m {dH.mg H.aZm AmdD H. h 0 {dOZ V mar go
eha9ZJa H.s Xem Ama {Xem H.m {X oJ o g Ho. ^rVa nVm MbVm h Ama .nbQ AnojmE gm Zo Am OmVr >h 0
h eha H.s j Vm VWm VwbZm H. Ama {V moJr lod>VmAm|6 y Ama eha {Zdm{g m| H.s ngX6 eha Ama am 6 ame> Ama
{dDd Am{WH. p.W{V H.m g~Y Ama eha H.s Eo{Vhm{gH. Ama ^mJmo{bH. {deofVmAmo H.mo {Z.{nV H.aVm h 0
Bg {dOZ go eha Ho. {dH.mg Ho. {bE XmdoXmam| Ho. ggpNVerb H.m H.aZo H.s H.m epNV H.m nVm MbVm h 0
eham| Ho. ^{db H.m EH. n{VnyU moOZm H.mo AnZmZo H.s AmdD H.Vm h Ama #!$& df Ho. {bE ^{db Ho. AmH.maZwgma
{dOZ .Q>oQ> |Q> V ma H.aZm h 0

12/19/2011

Data Requirement
{gQ>r moR.mBb
Ozgmp H.s>
gm_m{OH. Am{WH. nmDd{M
^m{VH. moOZm~Vm Ed d{ ~YZ
jo {dDbofU
Ob Amny{V ~YZ
R>mog Hy.S>m> ~YZ
b d.Wm6 ~mT> Ob {ZH.mgr9gR.mB ~Y
gS>H. Ama n[adhZ
.Q>rQ> bmBQ> Ama ApZe Z
JXr7~.Vr VWm gdXo Zerb n mdaU jo 9 X{H. mZygr jo
gm m{OH. d.Wm 2BR.m.Q>NMa3
n mdaUr gdXo Zerb Ed gajU jo
ZJa n[afX Ho. Am 7 H.m g{jV {ddaU
9

"
$

! "
# "$
$$

"##
"#

%&
*

%&

' (
2
5 )
6
27
9

"
$
8
4
3
:
!

" #
"!
'

( (

+ ,- . */
$! "
$3
" 4#
4 3#
"" :#
88 :#
"# "!
3# 8!
!# ##

6
* ;
6
( <=

1
3 34
# #!
# 8
#$
3 :!
: :
"
4 "$
## ##

+ )

"
$

>
5

?@A B

"# 4
"#"$4
"$ :4
"$!8

"#"4
"3#4$
4 $$
$##8$

"#$4
$ !8!
8 8#:
$34"$

CHECKLIST

City Profile
Aarvee Associates
Barhi

CompanyName
ULB Name

Yes

Whether the Sectoral Analysis report is as per UADD requisites

Town Brief

Geographical location (Town)


Average rainfall (annual)
Height above mean sea level
Municipal area (1991)
Municipal area (2001)
Municipal area (2011)
Date of Constitution of ULB

Population

Historic importance
Population Year 1981 (under Municipal
boundary only)
Population Year 1991 (under Municipal
boundary only)
Population Year 2001 (under Municipal
boundary only)
Population Year 2011 (under Municipal
boundary only)

In one or two
sentences

No Significant History for this town

5772
8192
10923
13939
Town level
Arithmetic Increase

Name of Population projection Method


Projected population adopted Year 2015

23848

Projected population adopted Year 2025

30043

Projected population adopted Year 2035

36522

Land Use

Land Use

239'
808'
500
361
18.09
18.09
18.09

Latitude
Longitude
MM
Mts
Sq kms
Sq kms
Sq kms
Date

Residential
Commercial
Mixed
Public - semi public
Agriculture
Industrial
Roads
Green area
Sensitive
Water bodies
Total

% Standard (as per Land use (Tentative Land use (Tentative


in Sq kms )
in percentage)
UDPFI)
48.0
2.0

0.0
8.0
5.0
10.0
12.0
7.0
3.0
5.0

1.38
0.09
0.05
0.025
14.41
0
1.24
0.65
0
0.25
18.095

7.63
0.50
0.28
0.14
79.64
0.00
6.85
3.59
0.00
1.38
100.00

City Profile (Ward Wise)


Ward #
Name of ward
Ward Population (2011)
Area (sq kms)
Density (PPSqkm)
Male
Female
SC
ST
BPL
Sex ratio
Literacy rate (%)
No. of Primary schools
No. of Primary Health Center
No. of Households
Primary occupation (Majority)

Ward 1
Ward 2
Ward 3
Ward 4
Ward 5
Ward 6
Ward 7
Ward 8
Ward 9
Ward 10
Ward 11
Ward 12
Ballabh Bhai Patel Maharana Pratap Dr. Bheemrao Ambedkar Chandrashekar Ram Manohar Lohiya Jawahar lal Nehru Bhagat Singh Lal Bahadur shastri Mahatma Gandhi Maulana Ajad Indira Gandhi Vivekananda
1036
1352
475
990
440
553
577
696
512
962
641
604
1.13
5.44
0.07
0.12
0.02
0.01
0.03
0.02
0.01
1.98
0.23
0.73
918
248
6807
8532
27385
98536
22661
45884
51635
486
2770
830
534
680
234
536
239
289
309
354
263
503
319
301
502
672
241
454
201
264
268
342
249
459
322
303
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

Ward 13
Vijayanath
1239
1.23
1007
658
581
NA
NA

Ward 14
Shivaji
2364
0.40
5891
1236
1128
NA
NA

Ward 15
Total
Rajeev Gandhi
1498
13939
6.63
18.03
226
773
756
7211
738
6724
NA
NA
NA
NA

940
NA
0

988
NA
0

1030
NA
0

847
NA
0

841
NA
0

913
NA
0

867
NA
0

966
NA
0

947
NA
1

913
NA
1

1009
NA
0

1007
NA
0

883
NA
2

913
NA
1

976
NA
0

932

188

246

86

180

80

101

105

127

93

175

117

110

225

430

272

2534

Business

Business

Business

Business

Business

Business

Business

Business

Business

Business

Business

Business

Business

Business

Seconday occupation

Shopkeeper

Shopkeeper

Shopkeeper

Shopkeeper

Shopkeeper

Shopkeeper

Shopkeeper

Shopkeeper

Shopkeeper

Shopkeeper

Shopkeeper

Shopkeeper

Shopkeeper Shopkeeper

Shopkeeper

Tertiary occupation

Agriculture

Agriculture

Agriculture

Agriculture

Agriculture

Agriculture

Agriculture

Agriculture

Agriculture

Agriculture

Agriculture

Agriculture

Agriculture

Agriculture

Agriculture

19

1
256

1
242

1
496

1
946

1
599

No. of SS/LS industrial units


No. of Commercial
establishments
No. of Slum pockets
Slum population
No. of Slum Households
No. of Individual water
connections in the ward
No. of Community water
connections
No. of Commercial water
connections
No. of Tubewells
No. of Handpumps
No. of OHTs
% Coverage of piped water
supply
No. of Individual Toilets

Business

414
75

541
98

190
35

396
72

1
0
0

1
0
0

1
0
0

1
0
0

1
0
0

1
385

70

47

44

90

172

109

15
4466
893

66

86

30

63

28

35

37

44

33

61

41

38

79

150

95

887

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

12

1
10
0

0
6
0

1
7
0

1
9
1

1
8
0

1
6
0

1
8
1

1
0
0

1
5
0

1
7
0

1
7

0
8

13
98
2

60

60

60

60

60

1
1
0

60

60

60

60

60

10

60

60

60

122

160

56

117

52

65

68

82

61

114

76

71

146

279

177

1647

No. of Individual Septic tanks

66

86

30

63

28

35

37

44

33

61

41

38

79

150

95

887

No. of Community Septic tanks

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

No. of Community toilets


% of population - Open
defecation
No. of Dust bins
Wardwise Waste generated
(Kgs)
Road sweeping (1 time or 2
times)
Total no. of sanitary workers in
the ward

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

10-15%

10-15%

10-15%

10-15%

10-15%

10-15%

10-15%

10-15%

10-15%

10-15%

10-15%

10-15%

10-15%

10-15%

10-15%

Na

Na

Na

Na

Na

Na

Na

Na

Na

Na

Na

Na

Na

Na

Na

Length of Pucca road (Mts)

5.5

Length of Kuccha road (Mts)

Length of State Highway


Length of National Highway

15

4 km
Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Length of Road side drains


Pucca (Mts)

0.5

0.7

0.5

1.5

5.2

Length of Natural drains


(Nallah) Pucca/Channelized
(Mts)

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

151

197

69

144

64

80

84

101

74

140

93

88

180

344

217

Length of Natural drains


(Nallah) Kuttcha (Mts)
No. of Streetlights
No. of Electricity connections

City Profile (Ward Wise)


Ward #
Name of ward

Ward 1
Ward 2
Ward 3
Ward 4
Ward 5
Ward 6
Ward 7
Ward 8
Ward 9
Ward 10
Ward 11
Ward 12
Ballabh Bhai Patel Maharana Pratap Dr. Bheemrao Ambedkar Chandrashekar Ram Manohar Lohiya Jawahar lal Nehru Bhagat Singh Lal Bahadur shastri Mahatma Gandhi Maulana Ajad Indira Gandhi Vivekananda

Ward 13
Vijayanath

Ward 14
Shivaji

Ward 15
Rajeev Gandhi

Total

Name of Tourist site if any

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Name of Heritage site if any

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Bus stop (No.)

Bus stand(No.)

1 (proposed)

Parks (No.)
Playground(No.)

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

1
0

0
0

0
0

No. of Residential properties

160

209

73

153

68

85

89

108

79

149

99

93

191

365

231

No. of Commercial properties

19

19213

25073

8809

18360

8160

10256

10701

12908

9495

17841

11888

11201

22978

43841

27707

258431

60-65%

60-65%

60-65%

60-65%

60-65%

60-65%

60-65%

60-65%

60-65%

60-65%

60-65%

60-65%

60-65%

60-65%

60-65%

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Total Property tax collection (in


Rs.)
Property tax coverage(in %)
Available Government land (Sq
kms)

Sectoral Analysis

Sewerage
Drainage
SWM

Existing Source
Tube well
Well

River/Lake

No. of Tubewell / River / Well

13

Water Supplied by Tubewell /


River / Well in MLD

0.69

Total water supply in the town (MLD)


Existing Supply rate (LPCD) considering distribution
losses
Water Charges per household per month (Rs.)
Flat/Metered
% Coverage under paid water supply
Whether any treatment plant exists (Y/N),If yes
mention capacity (MLD)
Proposed source (Surface)
Total sewage generation (MLD)
Whether any treatment plant exists (Y/N),If yes
mention capacity
Total no. of individual septic tanks
Total no. of community septic tanks
Total no. of Sewage/Mud pumps available with the
Frequency of Cleaning Individual Septic tanks
Frequency of Cleaning Community Septic tanks
Name of natural nallah (Storm water drain)
Length of natural nallah (Storm water drain) Kms
Ultimate disposal point of nallah
Length of road side drain (Kms)
Coverage of road side drainage w.r.t roads (%)
Ultimate disposal point of Road side drains
Any treatment plant/procedure adopted
Per capita Solid waste generation (Considering
Standards) (in gms)
Total SW generation (in Tons)
Frequency of SW collection by the ULB (1 time per
day/2 times per day)
Collection efficiency of the ULB (%)
Any initiative for DTDC (Yes /No)
Any initiative for scientific disposal of waste
Name of dumping/ landfill site
Is the existing site Dumping site or allotted site for
Scientific disposal
Area of allotted landfill site for Scientific disposal
Distance of the Dumping site/landfill site from main
settlement area (Kms)
No. of Tractor trolleys/vehicles available with the ULB
for carrying Solid waste to the LF site
If site for Scientific disposal is not allotted then
whether formally requested by the ULB

0.69
50
50 (Flat)
55
0
Mahanadhi
2.41
No
887
NA
Nil
once in 3 months
NA
NA
3.5
NA
5
35
Dangi Talab
Not Yet
250
3.50
1
80
No
No
Located in Ward-15
Allotted site
No
4
2 Trolleys
No

Name of National Highway passing from or nearby


from the town (NH-XYZ)

Roads

Physical Infrastructure

Water Supply

Source

Distance of National Highway if nearby from the town


(NH-XYZ) in Kms
Name of State Highway passing from or nearby from
the town (SH-XYZ)
Distance of State Highway if nearby from the town
(SH-XYZ) in Kms
CC
Total length of Pucca roads (Kms)
WBM
Total (kms)

SH-10
Passing through the town
3
2.5
5.5

Total length of Kuccha roads (kms)

(kms)

Gap w.r.t Standards

(kms)

20

Traffic & transportation


Street lighting

Physical Infrastructure

Sectoral Analysis
Total no. of vehicles in the town
Bus stand (yes/No)

Yes

Any intracity mass transport mode (yes/no)

Yes

Mini-Bus service

Name of locations facing major traffic


issues

1
2
3

Bus stand junction


Market Junction
-

Name of the street beautified as per the


instructions of UADD

Nil

Total no. of street lights

500

No. of Streetlights under working condition

400

No. of Streetlights having Tubes

190

No. of Streetlights having CFL

200

No. of Streetlights having Incandescent bulbs

No. of Streetlights having LED

10

No. of Streetlights having LPS

Heritage &
tourism
Environmen
t

Heritage & tourism

Power

Location of Substation
http://www.mptransco.nic.in

0
400 KV
220KV
132KV

Total no. of residential connections

1200

Total no. of Commercial connections


Any subsidy for BPL (Y/N)

230
Y (Single phase)

Duration of Electricity supply per day (in Hrs)

14

Name of Heritage site/s


Ownership/agency
Prevailing Heritage Act/s
Name of Tourist site/s
Ownership/agency

Nil
Nil
Nil
Nil
Nil

Total no. of Pilgrims/ Tourists visiting town per day

Nil

Name of River/Lake/Forest range/Any specific species


Prevailing Environmental Act/s
Areas facing threats

Health

No. of Hospitals

Multispeciality hospital if any (Y/N)

Education

Name of Nearby town reffered for


Treatment
No. of Primary schools
No. of Secondary/High schools
No. of Colleges
No. of ITI

Government
Beds
Private
Beds
No
Name of
town
Distance
(Kms)
5
1
0
0

No. of Beneficiaries under SJSRY (Street Vendor)

Social security schemes

Mahanadhi / No Forest / Nil


Madhya Pradesh Environ.Act 199..
Near Railway Crossing Area due to heavy
vehicles movement
4

No. of Primary Health centres/Dispensary

Social Infrastructure

Katni

No. of Beneficiaries under Haath thela/Rickshaw


chalak yojna
No. of Rain Basera/Night Shelter
Ownership of Rain Basera (with ULB/Rental)
No. of Beneficiaries under Gharelu Kamkaji Mahila
Yojana
Name of
Scheme
Deendayal
antodaya
Name of other Social security
Widow
schemes
pension

1
16
2
14
Katni
50
(Students capacity)
(Students capacity)

NA
NA
Nil
Nil
NA
Beneficiaries

Sectoral Analysis
Slums & Urban Poor
No. of
No. of
No. of
Name of Slum
Individual
No. of
Ward
Notified/
Ward
Slum
Community Handpump Individual Community
water
pocket/ reference
No
Un-notified population population
taps
toilets
s
toilets
connections
name

1
2
3
4
10
11
12
13
14
15
Total

Ballabh Bhai
Patel
Maharana
Pratap
Dr. Bheemrao
Ambedkar

Chandrashekar
Maulana Ajad
Indira Gandhi

Vivekananda
Vijayanath
Shivaji
Rajeev Gandhi

No. of
Pucca
houses

No. of Semi
pucca
houses

No. of
Kuccha
houses

No. of
No. of
Permanent Temporary
pattas
pattas
distributed distributed

No. of
Primary
school in
the slum
pocket

No. of
Beneficiarie
Any
Primary
s under intervention
Health
social
s under
centres in
security
IHSDP
the slum
schemes
(Y/N)
pocket

Notified

1036

414

50

Nil

41

Nil

46

33

NA

NA

NA

NA

NA

Notified

1352

541

65

Nil

54

Nil

60

43

NA

NA

NA

NA

NA

Notified

475

23

Nil

19

Nil

21

15

NA

NA

NA

NA

NA

Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified

990
962
641
604
1239
2364
1498
11161

190
396
385
256
242
496
946
599
4465

48
46
31
29
60
114
72
535.8

Nil
Nil
Nil
Nil
Nil
Nil
Nil

9
5
7
11
6
8
4
70

40
39
26
24
50
95
60
447

Nil
Nil
Nil
Nil
Nil
Nil
Nil

4
4
3
2
5
9
6
45

44
42
28
27
55
104
66
491

32
31
20
19
40
76
48
357

NA
NA
NA
NA
NA
NA
NA

NA
NA
NA
NA
NA
NA
NA

NA
NA
NA
NA
NA
NA
NA

NA
NA
NA
NA
NA
NA
NA

NA
NA
NA
NA
NA
NA
NA

N
N
N
N
N
N
N

Tax Receipts
Income Tax
Past Year Balance
Present Year Collection
Electricity Tax
Past Year Balance
Present Year Collection
Tourists Tax
others
Collection Under Special Rules
Kanji House
Others
Total
Income from Municipal Property
Collections from Water Tax
Without Meter
Vinighanon par byaj Tap Connection
Others, From Tankers
Sarvajanik pradharshni aur mela
Chamda aur singon ki bikri
Others, Audit Collection
Bajas bikri nikay ke khaton se expenditure
Other Details
Nikshep
Total
Fees, Service Charges & Penalties
Revenue from other sources
Najul Bhoomi se bhinn anny bhoomo se prapthi
Kanij Royalty
Income from Najul Bhoomi
Markets or Slaughter Houses
Vishisht prayojanarth prapth abhidan vikas
Nagar Vikas Upakar
Dhan petiyonse praptiy ration card I.P.L
Vivid praptiya suchana ka adhikar
Bharath Ghar
Matsya Sangrah Kshetra
Naav Fees
Chuna Eet Bhatta Stapit kiye jaane ke liye anugyapith fee
Khadya aur pay padharton ke
Baghikon ke liye anugyanpti fee sahukari licence
Ferry ke liye anugyapti fee
Prathilipi Fee
Vacant Land
From Building
Jann mrutyu panjiyan
Nagar aur anya aghiniyamon ke antarghat huye dhand ki rashi ke aghiniyamon ke shaskiya anudhan
composition samjoutha shulk
Purana Bhandar aur purana saman ke vikriya aagam
Revenue Transfers
Octroi
Grand Total
Capital Receipts
Grants & Donation (Madhya B)
Samanya and vishesh prayojnarth IHSDP
Shasan se
Samanya prayojan ke liye vidhyak
/sansad
Vishisht prayojan ke liye
(Road Repair)
Shekshnik prayojan ke liye
rajya vith
Aushadhiyon ke prayojan ke liye
mulbuth
manoranjan kar ke liye
environment
Staniiya Nikayon se

128451.00

40052.00
108500.00

22997.00
134311.00

22997.00
175000.00

37000.00
38861.00
752812.00
80000.00

10549.00
62315.00
870942.00
190000.00

20275.00
91323.00
1344758.00
50000.00

26677.00
125000.00
1400000.00
150000.00

5185.00
4811.00
1047120.00

8045.00
17695.00
1308098.00

17410.00
7523.00
1688597.00

20000.00
10000.00
1929674.00

289617.00
16000.00
6400.00
68442.00
17000.00

400000.00
60000.00
15000.00
132000.00
20000.00
2536
20653
11158
20000
216634.00
140501.00
141000.00
69953.00
6835.00
25143.00
27000.00
132700.00
118900.00
166842.00
170000.00
222189.00
363022.00
343644.00
378000.00

30320.00
62000.00
32550.00
6896.00
1477.00
48.00

254860.00
18000.00
7650.00
128000.00

10350.00
86199.00
65266.00
167000.00
5370.00
107236.00
2919.00
1300.00

900.00

1100.00
9650.00
3800.00
24369.00
217002.00
10000.00
76.00

370650.00
53000.00
12500.00
130600.00

45650.00
13194.00

50000
15000
15000
150000
28000
70000
5575
500
9500
50000
575

38000.00
27409.00
67570.00
5551.00
180.00

560.00

1700.00
5700.00
4800.00
34859.00
287941.00
10000.00
383.00

9000.00
9050.00
6100.00
55479.00
287695.00
2956.00

500
9500
9100
6100
56000
300000
1000000
2000.00

5000.00
1000.00
3555872.00
4825181

5510224.00
7181344

7088380.00
9120621

7100000.00
9407674

445868 402130.00
132900.00
132900.00

357829.00
200000.00

200000.00

390000.00
288750.00
512136.00
1750450.00
499500.00

440000.00
546800.00
1467700.00
2858900.00

450000.00
500000.00
348000.00
1406000.00

110000.00
509300.00
1052900.00
1887200.00

12 v vith
13 v vith
Hostel Facility B.R.G.F
Samanya prayojan ke liye jal parivahan
Shaikshanik karyon ke prayojan ke liye talab gahrikaran / sukha rahat
Shaikshanik karyon ke pratojan ke liye kichanshod
Other parameters
Model colour
Samanya prayojan ke liye abhidan samvi. Shiksh
shaikshanik karyon ke liye abhidhan census
aushidh prayojan ke liye abhidhan vikendrikaran
Mukhya mantri kanyadhan
rashtriya yojana
mudrank shulk
Grand Total

699300.00

699400.00

506000.00
564510.00

2152500.00
769600.00

848500.00

429000.00

850000.00
1900000.00
400000.00

650000.00

1000000.00

122105.00
410500.00
60000.00
1881281.00

100000.00

300000.00
190000.00
28000.00

1442025.00

1768820.00
283842.00
2904000
5871229

Revenue Expenditure
Establishments and Salaries

2008-09

2009-10

70000.00
1900000.00
234869.00
4019604
9124000

2010-11

2011-12

Establishment of general admin offices and repair of vehicles


Allowance
Emergency

738130
16940
69148

1080965
37999.00
80191.00

1201353.00
52914.00
161213.00

1501980
25000.00
160000.00

Establishment of Revenue department and payment to officials


Allowance
Emergency
Tax on octroi and boundaries
Allowance
Pension

580573
19376

642306.00
13798.00

692163.00
13638.00
101252.00

1073208.00
15000.00
100000.00

228256
27286

246720.00
48298.00

274377.00
153788.00

313200.00
160000.00

Total
office expenditure

1679709

Others Photocopy Machine


Parshadhon ka parichay poster
Inverter Cost
Computer Cost
Muldhan ka pratidhan Furniture/Almarah
Interest Girls School shops loan
Allowance
Private companies expenditure

Swagat Sarkar Samaroh


Kanooni Prabhar
Bhavishya nidhi mein anshdhan , pension, updhan, anukampa bhatta
Nirvachan
Telephone Trunk Call (lekha)Examination fee
Vigyanpan/Stationery
Dhak Ticket
Vahan Kiraya
Others Nikay ke vahnon par vyay
Others
Repair of Buildings
Haat Bazaar
Shopping Comples
Kanji House
EmergencyProvisions

2650698

3348388

30593.00

39280.00

90000.00
35000.00
30000.00

44913.00

10011.00
24990.00

518128

Anshudhan (samanya prayojan ke liye) Documentry Expenditure

Sarvajanik pradharshni mele gandhi mela jangannan

2150277

Trust Anshdhan

28640
15196
57506
3000

89494.00
23050.00
30794.00
14000.00

141400
2670
9487
96541
1250
167292

159824.00
61351.00
7873.00
155981.00
1000.00
130200.00
106174.00
14000.00
292316.00

634020.00
145191
21561.00
38849.00
29500.00
170130.00
18959.00
4606.00
197496.00
250.00
57800.00
201912.00
34540.00
333066.00

50000.00
30000.00
1000.00
100000.00
55000.00
24500.00
40000.00
35000.00
200000.00
10000.00
5000.00
200000.00
2000.00
60000.00
150000.00

1000000.00
5725.00

3750.00

6000.00

8000.00

Dhak Bangalow saray hotel dharmshala and rest house


Construction
Chabutra shod
Emergency
rangmanch nirman
Constructing and maintenance
Entrance
Others
Catching of monkeys
Vruksh vardhan sarvajanik udhyan baatika
Open Land
vrukshropan
Establishment
Park Provison
Other Activities
Talab ki med mein shod nirman
Anshdhan talab ki maed par boundary
Favvara nirman
Samajik kalyankari aapada rahat karyakalap

136575.00
102117.00
80136.00
18349.00
725774.00

8136.00
672209.00

320743

236213.00
26051.00

mukhya mantri kanyadhan

Pashuchikitsa prabhar general


Suraksha Pension
Establishment
Rashtriya Pari.saha.
Birth, death and marriage ka panjiyan
Total
public health and services
Health Care and its Facilities
Water Supply
Establishment
Emergency
Repair and Sangaran
Expenditure for New Activities (Puji Expenditure)
Construction and Maintenance of Wells and Jalashayon
Tanker Rent/ Maintenance

20744.00

34697.00

Pyao

Land allocated for Water Supply Scheme Pipeline


Rajya shasan ko deya bhu rajasva submersible mo.
Avakshayan nidhi stopdam/ dhandhaha nala
Rrun ka Prathidhan From Tanker jalapurthi
Muldhun ka pratidhan dhangi lake
Interest
Talab gaharikaran
Electricity Bill
Rrun nivaran nidhi ka bhugthan tractor par vyay
Pump House
Shod Nirman
Jal Saharan and Sangaran
Establishment Nala Construction
Establishment
Puliya Construction
Maintenance and Sandharan
Public Toilets

5320.00
240974.00
20154.00
136921.00

Total

30000.00
70000.00
1800000.00

1123925.00

1667750.00

54000.00
1297859.00

60000.00

60000.00

60000.00

3330323

4154500

3804133

100000.00
2000.00
4377500

171845
169266
509825
118945

126870.00
319940.00
575067.00
1177970.00

143645.00
363874.00
806504.00
1270334.00

1125720
100000
810000
1200000

17382.00
21650
339325.00
165000.00
47119.00
861474.00
76599.00

16838.00

4224
4752
227527
112097
148498
446560

936241
18863
10933
118992

629068

20000

1105991.00

9440.00
15387.00
411927.00

469308.00
483056.00
14076.00
406520.00
160239.00
631767.00
1451455.00

372762.00
337880.00

Public Security
Agni/Fire/Diesel
Permanent Establishment/Provisional
Allowance
Emergency Services and other material (Agni instrument, engine balti ka kray and repair etc)

50000.00
200000.00

50000
500000
500000
1500000
400000
1000000
1450000

805500

250560
10000
25532

27360.00

5160.00

10000.00

3653168

5298501

6933418

9731780

improvements
Public Works
Establishment
Institution
Construction of Higher Secondary School
Maintenance
Construction of BT Roads and Nalas
Repair and navnikaran W.B.M
Anshdhan (Land Acquisition)
Other Works
Samudhayik Bhavan
Repair works
Bhandar and anya prabhar
machinery ya upkaran karidhi
Education for all
Upkaran aur aakasmiktha madhya.bo
Rent of the Building Compulsory
Previous Students ko panchvade
Bhavanon ka kiraya kitchen shod nirman
Stapna model kal.kanya sha.bhava.
Rrun ka pratipadan
Muldhan ka pratipadan
Rrun nivaran ka bhugthan
Mal Vahan aur sandas
Swastya adhikari ki stapna aakasmiktha
Sarvajanik sandason ke liye stayee stapna
Niji sandas tos apashisht prabandh
Construction and wages to the workers
Astayee Stapnaa
Others Solid Waste Vehicle/ Plastic Bags
Construction
Cleaning Material Cost
Provisional Establishment
Cleaning
Aushadhalay and chikitsalay
Phynil/Malaria

1960.00
74698.00
43808.00
40797
89204
113574
30544

Capital Expenditure
- construction of buildings

2435.00

5000.00
50000.00
400000.00

255632
297690

1998006
362426

1750000
935000

105999

167025

278000

1765
195131
28000

1910.00

62640
574795

123031

466121
58790
177850

215849

241210
30519
16074.00
8882.00

43740.00
2344.00
48766.00
450164.00
244814.00
51256.00
1000.00
234386.00

129458.00

86233.00

190192.00

Vividh pravhar, rogiyon ke aahar sahith (Hotel) fagging machine cost


Sakramak prabhar fagging oil cost
Total
others
Electricity
Expenditure towards purchasing material (kerosene lamp, bulb, its repairs etc)
Electricity Supply Cost
End of Van prani sarp and stray dogs
Solar Street Lights
Others
Asadharan and Rrun
Prathibhutiyon mein rrun nivaran sanchith nidhi
Bachat Bank aaykar
Rrun Nivaran nidhi mein bhugthan vannijya kar
Agrami vetkar
Stayee
karmachari kalyani nidhi (L.W.F)
Nikshep
Total

6800.00

51800.00
644574.00
373289.00
5010.00
9925.00

141587.00
18248.00
810496.00
612060.00
10970.00
6654.00
122471.00

163356.00
20000.00
900000.00
1645176.00
150000.00
50000.00
15000.00
50000.00

107385.00

150000.00

461721.00
25000.00
1782184

3809646

4547344

7099066

108347.00
212202.00
365088.00

1021317.00
127581.00
560005.00

627841.00
202328.00
2992.00

24507.00

14211.00

11660.00

700000.00
210000.00
50000.00
100000.00
10000.00

113338
138134
56609
3397
8473
1030095
11475479

275000
161451
66499
367547
96938
92060
2782609
18195533

203729
115844
238253
53503
100700
1556850
19492443

205000
116000
240000
54000
101000
1786000
26342734

39917.00

Reforms Action Plan


Reforms

2012-13
Full migration of double accounting
System
Property tax reforms, 85% coverage
ratio and 90% collection ratio
Levy of user charges : full recovery of O
& M charges for sewerage, water supply
and SWM
Internal earmarking of basic services to
urban poor
E-governance
Provision of basic services to urban poor
including security of tenure at affordable
prices, improved housing, water supply,
sanitation

N
N
N

N
N
N

Preliminary
Any City specific
estimate (if any)
Strategies
for
adopted
implementation

Time line to achieve reforms till 2015

Achieved (Y/N)

2013-14

2014-15

2015-16

Implementing
agency

ANNEXURES

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 96 of 99

Annexure-I

Details

Assumption

Tax receipts
Property Tax

10%

Public Consolidated Tax

12%

Water Supply

15%

Road Tax

5%

Improvement Tax

1%

City development tax

13%

Other Improvement taxes

0%

Market fees

8%

Naye Pulo Patkar

3%

Najul Ayi

1%

Others

1%

Income from property


Rajhyashasan se udhaar

1%

Kule Bazzar prapth kiye gaye Udhhaar

1%

Water Supply

0%

Collection on with Meter Usage

6%

Collection on without Meter Usage

20%

Rent on Meters and Tankers

10%

Pratibhoot

1%

Others

10%

Interest

2%

Others collections

8%

House rent

10%

Najul Bhoomi se prapthi aye

1%

Income from selling lands

1%

Fees, Service charges & Penalties


Cycle stand fee

2%

Nikshep

3%

khadv aur peyi products ke vikray ke liye anugnayapith fees

8%

Colony vikash shulkh

1%

Dhalal Commission, agent nappayi tullayi vaalo se anugnayapith fees

1%

other fee
Bhavano ka nirmaan anugna shulk

City Development Plan for Barhi Town

10%
1%

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 97 of 99

Details

Assumption

Vinidhan par vyaj

1%

General

1%

Education / others

1%

Capital Receipts
samany pryojana keliye moolbhoot sadak

10%

State finance commission

20%

Fundamental services

5%

Slum development Programmes

1%

Special Fund for economic help

2%

12 / 13 finance commission

1%

Mid day meal

10%

Other Works

15%

Revenue Expenditure

Salary & Establishments


a. Officers payment / salary

12%

b. Allowance / Emergency

20%

c. Emergency / provisional establishment

1%

d. Travel allowance

1%

e. Chiki / bhadri / dress

1%

Office Expenditure
Establishment of revenue department and officials payment

13%

Allowance

10%

Emergency computerized taxation

1%

Remuneration

9%

other expenditure / city management

10%

Extra charges

1%

pension and donation

1%

Administrative expenses

8%

Education
Primary schools and mid day meal

15%

Mid day meal programme

1%

Cook / chef

1%

poverty line, boy-girl student stipend

1%

Construction and maintainance of school buildings

8%

library, auditorium,museums

City Development Plan for Barhi Town

10%

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 98 of 99

Details

Assumption

Water Works
Government water

1%

Bonfire

1%

construction of embankment

1%

Construction of Wells ,Lakes and pumps and maintenance

15%

Avashyan nidhi greshmkaleen jal sankat tanker

20%

others (extra charges, water tankers)

1%

- Establishment of Private Toilets

10%

- Establishment

15%

- Provisional establishment

12%

- various cleaning sanitation equipment

25%

road irrigation

10%

Communicable type

15%

Public health & Services


Establishment, construction workers

21%

Akasmikata

10%

equipment maintenance work

20%

Expenditure of work, equipment wealth expenditure

1%

Government , welfare works

1%

Improvements
Lok Nirman (Public Works)
Establishment
Construction workers
- Construction
New roads, lanes and drains construction

1%
1%
15%
1%
10%

Maintenance

8%

other works

10%

- Bhandar aur anya (others)

15%

Contribution for the service providing purpose

1%

Redemption at principal amount

1%

Interest

1%

Expenditure on diesel and oil

5%

Tractor maintenance

1%

Actual expenditure at work done for the private people

1%

Government exhibition fare

1%

legal chargers

1%

Future Nidhi me apradhan

1%

GIS Geographical information system

1%

City Development Plan for Barhi Town

Doc: Final Report for Barhi Nagar Parishad

Date: 26-12-2013
Page: Page 99 of 99

Details
ABF

Assumption
1%

Telephone and trunk call

10%

Expenditure fee

15%

Extra
Expenditure on stamp ticket and postages
check book, bank kale, chagr
expenditure on national festivals

1%
10%
1%
15%

Expenditure on elections

3%

expenditure for organizing learning other programmes

1%

remuneration for census data collection

1%

Asaadhaaran thata run

1%

Samvadhi nisheph

20%

saving Bank / Dhak Ticket

15%

Others

15%

nikhshep amanth raasi


Expenditure on policies / DPR and other grants

5%
10%

Others
Establishment

8%

purchasing of samagri (Lamp, oil, bulb, repair tools

5%

electricity supply expenditure

5%

New works

1%

forest animals, snakes, stay dogs vinash

1%

Purchase of stationary

5%

expenditure in advertisement

3%

Computer / xerox

5%

vehicle rent

1%

Furniture

1%