Technical lead for all capital projects for Oxbow and for Oxbows customers projects. Included all
design, estimating, scope, specification, bid documents, contract development, contractor negotiation,
construction, project and facility management resulting in repeat customer relations and extending
corporate contracts due to successes. Directed and managed average of 17 projects / year.
Strategic execution of all technical projects from 1998 until 2015 when company grew in size from $40M
to $3B. Since 2012 managed staff of corporate engineers, support staff and plant engineers.
In 2015 developed and implemented, first of its kind, solution to save $1M annually in gas consumption
at Argentinean plant.
First responder to facility emergencies to take charge of recovery and rebuild efforts. Coordinated and
rallied the team to replace a collapsed $4M shipload by redesigning and replacing at overseas operating
plant, under tight time and cost constraints. Resulted in eliminating $600,000/yr in demurrage and
generated a profit in despatch.
In 2009-2010 designed, developed and managed installation of 16 construction projects totaling $30M
mostly to help restart Oxbows Port Arthur facility after being ravished by Hurricane Ike. Best when
working under pressure and take pride in being someone to be counted on.
PROFESSIONAL EXPERIENCE
Oxbow LLC, West Palm Beach, FL
1998 - 2015
Fortune 500 privately held company with annual sales in excess of $3B, specializing in the energy and carbon
industries.
Director of Engineering, Construction and Project Management at following facilities:
ICEC Lynton Forming, Fort McMurray, Alberta, Canada (2012 2015)
Designed complete $120M sulfur forming facility in CN rail yard. Complete original design and concept for
entire facility, specified technology, developed process flow, specification, rail sidings, etc., on very small site
plot in difficult climate and lack of utilities were a few challenges that were overcome.
Chicago Calcining, Lemont, IL (2010 2012)
Generated design and managed implementation of $5M in various repairs / upgrades to Lemont Facility,
including first of its kind dust collection system for barn. Another example of a successful design, using standard
equipment, in never attempted configuration resulting in capitol savings over $200,000 USD.
COPETRO, La Plata, Argentina (2008 2009)
TOM BRANDLEIN
2.
Successfully designed and implemented $12M in major modifications to entire calcining facility to lower
environmental emissions due to lawsuits by surrounding community and government under tight time constraints
due to a court order.