Yanbu Export Refinery Project

OPERATING INSTRUCTIONS FOR SP1 TANK FARM


EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

TABLE OF CONTENTS
1.0

PURPOSE ................................................................................................................... 4

2.0

100 EMERGENCY SHUT DOWN ............................................................................... 4

3.0

200 LOSS OF UTILITIES .......................................................................................... 36

4.0

300 LOSS OF CRITICAL SYSTEMS/COMPONENTS ............................................. 45

5.0

400 UNUSUAL OCCURRENCES ............................................................................. 47

TABLES
Table 1 MOS and SUO requirement ....................................................................................... 7
Table 2 Non phenolic pumps shutdown signals ...................................................................... 9
Table 3 phenolic pumps shutdown signals ........................................................................... 10
Table 4 crude pumps shutdown signals ................................................................................ 11
Table 5 NHT pumps shutdown signals ................................................................................. 12
Table 6 NHT pumps shutdown signals ................................................................................. 12
Table 7 DCU pumps shutdown signals ................................................................................. 13
Table 8 DHT pumps shutdown signals ................................................................................. 14
Table 9 HCK pumps shutdown signals ................................................................................. 15
Table 10 heavy naphtha pumps shutdown signals ............................................................... 16
Table 11 off spec diesel pumps signals ................................................................................ 17
Table 12 Isomerate, Light reformate , NHT light naphtha pumps shutdown signals ............. 20
Table 13 BEU raffinate pumps shutdown signals ................................................................. 20
Table 14 Reformate pumps shutdown signals ...................................................................... 21
Table 15 Light naphtha pumps shutdown signals ................................................................. 22
Table 16 propane pumps shutdown signals.......................................................................... 23
Table 17 Coker LPG pumps shutdown signals ..................................................................... 24
General Confidential
Page 2 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Table 18 Butane pumps shutdown signals ........................................................................... 27


Table 19 slop pumps shutdown signals ................................................................................ 27
Table 20 Desalter effluent shutdown signals ........................................................................ 27
Table 21 Benzene pumps shutdown signals......................................................................... 28
Table 22 BEU pumps shutdown signals ............................................................................... 28
Table 23 Sulfur pumps and cooler shutdown signals............................................................ 29
Table 24 Diesel pumps shutdown signals ............................................................................. 31
Table 25 Gasoline pumps shutdown signals......................................................................... 34
Table 26 Benzene pumps shutdown signals......................................................................... 35
Table 27 control valves fail action ......................................................................................... 36
Table 28 control valves fail action ......................................................................................... 40
Table 29 Shutdown valves fail action .................................................................................... 45
Table 30 Floating roof protected by foam system ................................................................. 48
Table 31 spheres and spheroids protected by water deluge system .................................... 50
Table 32 Fire and gas emergency table................................................................................ 53

General Confidential
Page 3 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

1.0 PURPOSE
This document covers step by step instructions for emergency procedure of SP1
scope of work (SWS-142, TKF-143, PBF-157, PSL-172).
2.0 100 EMERGENCY SHUT DOWN
The principal aims and objectives of a safety system are:

Protection of personnel.

Protection of facility and equipment.

Prevention of pollution to the environment.

The functions of the ESD shall include:

Automatically sense an abnormal operational or equipment condition.

React automatically to this condition by shutting down and/or isolating the


installation, preventing any consequential effects of the abnormal condition.

Provide additional manual facilities for the shutdown and/or isolation and blow
down of sections of the installation.

Provide audible and visual system status information for the operator and/or
other Personnel as appropriate.

Provide sequence of events recording.

Safety System Availability


The facility is designed for 92% Plant-wide uptime (availability) with 95% unit
availability for defined areas. The requirement for safety availability of safety systems
is as listed
below:

SIL3 applications: 99.9% to 99.99%

SIL2 applications: 99% to 99.9%

SIL1 applications: 90 to 99%

The parameters considered for calculations are listed below:

MTTR: 8 hours

Proof Test Interval: 10 years ( for Logic solver subsystem)

Proof Test interval for Analog ESD Inputs (Transmitters, Transducers and
Trip Amplifiers): 12 months

Proof Test Interval for Discrete ESD Inputs such as process switches: 6
months
General Confidential
Page 4 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Proof Test Interval ( Full stroke test) for ZV (ESD Isolation Valves): 12
months (Note1)

Partial stroke test for ZV: 3 months

Plant Design Lifetime: 25 years

Note1:ZV assemblies shall be fully stroked on yearly basis when a full ZV bypass is
Available, the process or equipment is spared or the process operation can be
Maintained.
Equipment Location
The ProSafe-RS Safety System hardware, associated marshalling cabinets and
network equipment are installed in PIBs/ PIRs and in the CCB which are indoor safe
area locations, non-classified electrical area as per ANSI/ NFPA 70, NEC, Article
505. Saudi Aramco specifications require ESD system indoor equipment to be
suitable for installation in climate controlled buildings with the following environment
conditions:

Ambient temperature range: 10 oC to 35 oC

Ambient relative humidity: 20% to 80%

ESD Inputs
The input section of the ESD system shall be designed to receive input signals from
Non-Intrinsically safe analog (HART) field devices or process activated switch
contacts that are closed (i.e., normally energized) during healthy process conditions
(and will open when process variables exceed predetermined limits).
All shutdown inputs shall be configured with input validation logic to detect
transmitter failure. Input status shall be transmitted to the PAS for indication and
alarming.
ESD Inputs: Failsafe Operation

ESD transmitter failure mode and transmitter validation logic shall be applied
to minimize spurious trips and spurious alarms. Consequently, 1oo1 ESD
transmitters shall be configured to have a defined failure mode, in the
direction opposite to the trip setting. In case of a transmitter fault, a time
delayed shutdown is applied up to 30 minutes, if the fault is not rectified
within this time delay.
A single transmitter may be used to provide both Low-Low trip (LTRP) and
High-High trip (HTRP) ESD input signals if that the transmitter's calibrated
range spans both LTRP and HTRP trip settings, and that it is acceptable to
bypass both LTRP and HTRP inputs at the same time when performing
maintenance on the transmitter. For 1oo1 ESD transmitters used for both
HTRP and LTRP, the fail safe configuration shall be towards the HTRP by
default unless otherwise specified.

The digital input shall be validated upon any fault detection independently
depending on the fault detection design. The fail safe setting in input channel
General Confidential
Page 5 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

parameter and signal validation setting in application program shall be


configured independently accordingly.

All ESD digital input (trip initiators) shall be configured to failsafe to trip on
detection of a channel and/or line fault. Line monitoring (detect disconnection
and detect short circuit) are not provided for limit switches that are non-trip
initiator.

ESD Outputs
ESD outputs shall be designed to be Non- Intrinsically safe, normally energized
(when healthy) and de-energize upon the loss of appropriate input signals unless
otherwise specified.
However, alarm/ local indication lamp outputs from the ESD system shall be
configured to energize on trip.
ESD outputs shall go to de-energized state on occurrence of a channel fault or wire
Break. All ESD outputs to ZVs (ESD isolation valves) shall have line monitoring to
detect disconnection in case of a wire break.
Line monitoring for digital output channels are selected by channel parameter
settings in the ProSafe-RS software configuration. For details, refer to ESD
Software Design Specifications document [192-SP1-PE-ESD-1002].
ESD Reset
ESD logic shall be designed such that if it is de-energized for any reason, it can only
be reset or reenergized by deliberate, momentary actuation of a reset button.
ESD systems reset buttons shall be initiated from the PAS operator's workstation
(HIS) along with an event log, to time-tag the actuation of the reset by its specific tag
number and descriptor.
Resetting ESD system logic shall not cause a ZV (ESD isolation valve) or other
equipment to automatically return to its normal operating position or state. Manual
intervention by field operator is required to return a ZV to its normal state after a trip.
ESD Input & Output Bypasses
All shutdown sensing devices shall have an input bypass switch to facilitate
maintenance or testing. Bypass switches shall be software-configured with a
restrictive access mechanism using a MOS Enable Authentication Soft Switch and
password. The MOS Enable Authentication Switch will remain active after successful
password entry for a predetermined time period (presently set at 5 minutes). MOS
input bypasses are only required for input signals wired to the ESD system and used
for shutdown logic.
Input bypass switch implementation shall be software configured. Activation of an
input bypass switch shall confirm the bypass logic and cause an associated status
light or graphic window to be illuminated. Activation or deactivation of a bypass
switch shall initiate a system generated alarm in the DCS HIS and SOE event log
which archives the change of state of the bypass switch with its tag number and
descriptor.
General Confidential
Page 6 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Input bypasses shall not result in the loss of measurement and/or annunciation of the
condition being monitored by the ESD.
Input bypass switches are not envisaged for ESD trip push/ pull buttons.
Start-up Bypasses
Timed automatic startup bypass shall be configured in ESD application software for
devices which would prevent the normal startup of plant equipment such as minimum
flow, level, pressure, temperature, motor load startup-current and vibration. Startup
bypasses shall be automatically reset when the plant or equipment reaches normal
operating parameters or when a prescribed time period has elapsed.
Activation or deactivation of an automatic startup bypass switch shall initiate an SOE
event log which archives the change of state of the bypass switch with its tag number
and descriptor.
Startup bypass timers shall be specified including a stabilization timer for operating
parameters to stabilize after the equipment has started up. The stabilization time
specified could be in the order of ten seconds or as per individual process
requirements.
Below table identifies types of signals that have MOS and / or SUO switches:
Signals that require Maintenance
Override Switches (MOS)
1
2.a

2.b
2.c
3
4
5
6
7

Signals that require Start Up Override


Switches (SUO)

Open Limit Switches (ZXSO) of normal


ZV's (111 off)
100% open (ZXSO) of Critical ZV's (16
off)

80% open (ZXSO) of Critical ZV's (16


off)
Close (ZXSC) of Critical ZV's (16 off)
Level Transmitters (LIT) connected to
ESD (13 off)

Open Limit Switches (ZXSO) of Discharge


ZV's (as per attached List)
Common SOU for Critical Discharge ZV's
Limit Switches (0%, 80%, 100%) (as per
attached List)
SP-7 Trip Signals (172-YS-G-1001/1002/1011)

All VMS Trip Signals (except for 2oo2


voting)
MOV's Open Limit Switches- XSO (from
DCS) as in ESD Logic Diagram
Level Switches (8 off) 143-LS0005A/B/C/D & 143-LS-0006A/B/C/D
Temperature Switches (7-off) (143-TS0062/64/67/87/56/57, 172-TS-0015) on
progressive cavity pumps.
SP-7 Trip Signals (172-YS-G1001/1002/1011)

Table 1 MOS and SUO requirement


General Confidential
Page 7 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Alarm Annunciation and First Out Status


ESD input alarms shall be combined into first-out groups, within each ESD system,
to distinguish between initial and subsequent alarms. This information shall be
available on the DCS HMI.
First Out groups shall be configured based on logic groups or equipment basis as
applicable. Each first-out group shall have a separate reset faceplate button. Firstout status shall be reset when the trip initiators goes back to normal condition upon
activation of the First-out reset.
Architectural Design of the ESD System
The ProSafe-RS comprises Safety Control Station(s) (SCS), the Safety Engineering
PC (SENG), and the real-time control bus called Vnet/IP that connects the SCS and
the SENG and also integrates the ProSafe-RS with the PAS (Centum VP DCS). The
SCS performs safety control for ESD application, and the SENG is used for
engineering and maintenance of the SCS. The SCS can be operated and monitored
by the HIS (human interface station) of the PAS.
Fault Tolerant Design
The ESD system is a dedicated system using Yokogawa ProSafe RS Safety
Instrumented System incorporating a redundant architecture which is fault tolerant,
failsafe and fully integrated with the PAS via a redundant, common safety and control
bus (Vnet/IP).
Each ProSafe-RS CPU, input or output function module features a dual architecture,
providing SIL 3 level protection on a single card.
In case of a failure of one of the redundantly configured CPU or IO modules, the
system continues to operate without any degraded or crippled mode
Sequence of Events (SOE)
SOER (Sequence of Events Recorder) is a function for recording events detected by
an SCS so that these can be used in analysis. With SOER, changes in analog
inputs/outputs, discrete inputs/outputs and application logics can be collected/saved
as event information. Collected event information is displayed in the SOE Viewer.
Moreover, a function to synchronize to the standard time is provided in order to
maintain the accuracy of the time stamps attached to the events.
Sequence of Events Recording for ESD system includes:

ESD inputs and transition of analog/digital devices past shutdown limits

ESD pull/push buttons, Manual Reset buttons

ESD DI are time stamped at the Digital input module

ESD Analog Inputs are time stamped in the application logic scan cycle

MOS Enable/ Disable operation

The below tables shows the shutdown signals for SP1 scope.
General Confidential
Page 8 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

SWS-NP-3000
Non-Phenolic Sour Water Storage Tank
The shutdown of the non-phenolic system is carried out by the following signal:
Tag No.

Description

Interlock Action
Initiate an ESD:
Stop Non Phenolic SW Stripper Skim oil Pumps
142-G-0005A/B
Initiate an ESD:
Stop Non Phenolic SW Stripper Skim oil Pumps
142-G-0005A/B
Initiate an ESD:
Stop Non Phenolic SW Stripper Skim oil Pumps
142-G-0005A/B
Initiate an ESD:
Stop Non Phenolic SW Stripper Skim oil Pumps
142-G-0005A/B
Initiate an ESD:
Stop Non Phenolic SW Stripper Skim oil Pumps
142-G-0005A/B
Initiate an ESD:
Stop Non Phenolic SW Stripper Skim oil Pumps
142-G-0005A/B

142-ZXSC-0057

142- G-0005A/B discharge


header valve close

142-ZHS-0057D

15 m remote close 142-ZV-0057

142-ZIC-0057A

close 142-ZV-0057 from DCS

142-ZXSC-0056

142- G-0005A/B suction header


valve close

142-ZHS-0056D

15 m remote close 142-ZV-0056

142-ZIC-0056A

CLOSE 142-ZV-0056 from DCS

142-HS-0049A

142- G-0005A stop from DCS

Stop Non Phenolic SW Stripper Skim oil Pumps


142-G-0005A

142-HS-0050A

142- G-0005B stop from DCS

Stop Non Phenolic SW Stripper Skim oil Pumps


142-G-0005B

142-HS-0051A

142- G-0002A stop from DCS

Stop Non Phenolic SW Stripper Feed Pump


142-G-0002A

142-HS-0052A

142- G-0002Bstop from DCS

Stop Non Phenolic SW Stripper Feed Pump


142-G-0002B

Table 2 Non phenolic pumps shutdown signals

General Confidential
Page 9 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Phenolic Sour Water Storage Tank


The shutdown of the phenolic system is carried out by the following signal:
Tag No.

Description

Interlock Action

142-ZXSC-0552

142- G-0025A/B Suction header


valve close

142-ZHS-0552D

15 m remote close 142-ZV-0552

142-ZIC-0552A

close 142-ZV-0552A from DCS

142-ZXSC-0553

142- G-0025A/B Discharge


header valve close

142-ZHS-0553D

15 m remote close 142-ZV-0553

142-ZIC-0553A

close 142-ZV-0553 from DCS

Initiate an ESD:
Stop Phenolic SW Skim Oil Pump 142-G-0025A/B

142-HS-0547A

142- G-0025A stop from DCS

Stop Phenolic SW Skim Oil Pump 142-G-0025A

142-HS-0548A

142- G-0025B stop from DCS


Stop Phenolic SW Skim Oil Pump 142-G-0025B
142-C-1022 Phenolic SW Stripper Stop Phenolic SW Stripper Feed Pumps Train
Level (By EPC-3) LAHH-1085
142-G-1022/0023
Stop Phenolic SW Stripper Feed Pumps Train
142- G-1022 stop from DCS
142-G-1022.
Stop Phenolic SW Stripper Feed Pumps Train
142- G-0023 stop from DCS
142-G-0023.
142-C-2022 Phenolic SW Stripper Stop Phenolic SW Stripper Feed Pumps Train
Level (By EPC-3)LAHH-2085
142-G-2022 /0023
Stop Phenolic SW Stripper Feed Pump Train
142- G-2022 stop from DCS
142-G-2022

142-LIT-1085
142-HS-1003A
142-HS-0546A
142-LIT-2085
142-HS-2003A

Initiate an ESD:
Stop Phenolic SW Skim Oil Pump 142-G-0025A/B
Initiate an ESD:
Stop Phenolic SW Skim Oil Pump 142-G-0025A/B
Initiate an ESD:
Stop Phenolic SW Skim Oil Pump 142-G-0025A/B
Initiate an ESD:
Stop Phenolic SW Skim Oil Pump 142-G-0025A/B
Initiate an ESD:
Stop Phenolic SW Skim Oil Pump 142-G-0025A/B

Table 3 phenolic pumps shutdown signals

General Confidential
Page 10 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

TKF-NP-3000
Crude Storage
The shutdown of the crude oil system is carried out by the following process signals:
Tag No.

Description

Interlock Action

143-ZXSO-0557B

143-G-0001A/B/C suction valve


header (80% open)

Stop the crude charge pumps (143-G-0001A/B/C)

143-ZXSC-0557

143-G-0001A/B/C suction valve


header close

Stop the crude charge pumps (143-G-0001A/B/C)

143-ZHS-0557D

15 m remote close 143-ZV-0557

Stop the crude charge pumps (143-G-0001A/B/C)

143-ZXSO-0562B
143-ZXSC-0562

143-G-0001A/B/C discharge
header valve (80% open)
143-G-0001A/B/C discharge
header valve is closed

Stop the crude charge pumps (143-G-0001A/B/C)


Stop the crude charge pumps (143-G-0001A/B/C)

143-HS-0036A

143-G-0001A stop PB from DCS

Stop the crude charge pump (143-G-0001A)

143-HS-0037A

143-G-0001B stop PB from DCS

Stop the crude charge pump (143-G-0001B)

143-HS-0046A

143-G-0001C stop PB from DCS

Stop the crude charge pump (143-G-0001C)

143-YS-1001O

143-G-0001A HH Vibration

Stop the crude charge pump (143-G-0001A)

143-YS-2001O

143-G-0001A HH Temperature

Stop the crude charge pump (143-G-0001A)

143-YS-1101O

143-G-0001B HH Vibration

Stop the crude charge pump (143-G-0001B)

143-YS-2101O

143-G-0001B HH Temperature

Stop the crude charge pump (143-G-0001B).

143-YS-1201O

143-G-0001C HH Vibration

Stop the crude charge pump (143-G-0001C).

143-YS-2201O

143-G-0001C HH Temperature

Stop the crude charge pump (143-G-0001C).

Table 4 crude pumps shutdown signals

General Confidential
Page 11 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Naphtha Hydrotreater (NHT) Feed Storage


The shutdown of the NHT system is carried out by the following process signals:
Tag No.

Description

143-ZHS-0107D

15 m remote close 143-ZV-0107

143-ZHS-0108D

15 m remote close 143-ZV-0108

143-HS-0103A

143-G-0003A stop PB from DCS

142-HS-0104A

143-G-0003B stop PB from DCS

143-YS-2003O

143-G-0003A HH Temperature

143-YS-2103O

143-G-0003B HH Temperature

Interlock Action
Initiate an ESD:
Stop the NHT feed pumps SGP Naphtha (143G-0003A/B).
Initiate an ESD:
Stop the NHT feed pumps SGP Naphtha (143G-0003A/B).
Stop the NHT feed pump SGP Naphtha (143-G0003A).
Stop the NHT feed pump SGP Naphtha (143-G0003B).
Initiate an ESD:
Stop the NHT feed pump SGP Naphtha (143-G0003A).
Initiate an ESD:
Stop the NHT feed pumps SGP Naphtha (143G-0003B).

Table 5 NHT pumps shutdown signals


Naphtha Hydrotreater Feed Tank (Coker Naphtha/ SGP Naphtha) (143-D-0004)
The shutdown of the NHT feed system (COKER NAPHTHA/SGP NAPHTHA) is
carried out by the following process signals:
Tag No.
143-ZHS-0530D

Description
15 m remote close 143-ZV-0530

Interlock Action
Initiate an ESD:
Stop the NHT feed pumps Coker Naphtha
(143-G-0023A/B).
Initiate an ESD:
Stop the NHT feed pumps Coker Naphtha
(143-G-0023A/B).
Initiate an ESD:
Stop the NHT feed pumps Coker Naphtha
(143-G-0023A/B).

143-ZHS-0533D

15 m remote close 143-ZV-0533

143-ZIC-0533A

Close 143-ZV-0533 from DCS

143-HS-0105A

143-G-0023A stop PB from DCS

Stop the NHT feed pump Coker Naphtha (143G-0023A).

143-HS-0106A

143-G-0023B stop PB from DCS

Stop the NHT feed pump Coker Naphtha (143G-0023B).

Table 6 NHT pumps shutdown signals

General Confidential
Page 12 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

DCU FEED STORAGE:


The shutdown of the DCU feed storage system is carried out by the following
process signals:
Tag No.

Description

Interlock Action

143-ZXSO-0424B

143-G-0004A/B suction header


valve (80% Open)

Initiate an ESD:
Stop the DCU feed pumps (143-G-0004A/B).

143-ZXSC-0424

143-G-0004A/B suction header


valve close
15 m remote close 143-ZV-0424

Initiate an ESD:
Stop the DCU feed pumps (143-G-0004A/B).
Initiate an ESD:
Stop the DCU feed pumps (143-G-0004A/B).
Initiate an ESD:
Stop the DCU feed pumps (143-G-0004A/B).
Initiate an ESD:
Stop the DCU feed pumps (143-G-0004A/B).

143-ZHS-0424D
143-ZXSO-0425B
143-ZXSC-0425
142-ZHS-0425D
143-HS-0138A
143-HS-0139A
143-YS-1004O

143-G-0004A/B discharge
header valve (80% Open)
143-G-0004A/B discharge
header valve close
15 m remote close 143-ZV-0425

Initiate an ESD:
Stop the DCU feed pumps (143-G-0004A/B).

143-G-0004A stop PB from DCS

Stop the DCU feed pump (143-G-0004A).

143-G-0004B stop PB from DCS

Stop the DCU feed pump (143-G-0004B).

143-G-0004A HH Vibration

Initiate an ESD:
Stop the DCU feed pump (143-G-0004A).

143-G-0004A HH Temperature

Initiate an ESD:
Stop the DCU feed pump (143-G-0004A).

143-YS-2004O

Table 7 DCU pumps shutdown signals

General Confidential
Page 13 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

DHT FEED STORAGE:


The shutdown of the DHT FEED system is carried out by the following process
signals:
Tag No.

Description

Interlock Action

143-ZHS-0916D

15 m remote close 143-ZV-0916

143-ZHS-0917D

15 m remote close 143-ZV-0917

143-ZHS-0600D

15 m remote close 143-ZV-0600

143-ZHS-0610D

15 m remote close 143-ZV-0610

143-HS-0175A

143-G-0006 A stop PB from


DCS

143-HS-0176A

143-G-0006 B stop PB from


DCS

Stop the DHT feed pump (143-G-0006B).

143-HS-0177A

143-G-0006 C stop PB from DCS

Stop the DHT feed pump (143-G-0006C).

143-HS-0188A

143-G-0005 A stop PB from DCS

Stop the DHT feed pump-start-up (143-G0005A).

143-HS-0189A

143-G-0005 B stop PB from DCS

Stop the DHT feed pump-start-up (143-G0005B).

143-YS-1005O

143-G-0005A HH vibration

143-YS-2005O

143-G-0005A HH Temperature

143-YS-1105O

143-G-0005 B HH Vibration

143-YS-2105O

143-G-0005 B HH Temperature

Initiate an ESD:
Stop the DHT feed pump-start-up (143-G0005A).
Initiate an ESD:
Stop the DHT feed pump-start-up (143-G0005A).
Initiate an ESD:
Stop the DHT feed pump-start-up (143-G0005B).
Initiate an ESD:
Stop the DHT feed pump-start-up (143-G0005B).

Initiate an ESD:
Stop the DHT feed pumps (143-G-0006 A/B) and
the DHT feed pumps start-up (143-G-0005A/B).
Initiate an ESD:
Stop the DHT feed pumps (143-G-0006 B/C).
Initiate an ESD:
Stop the DHT feed pumps (143-G-0006 A/B/C).
Initiate an ESD:
Stop the DHT feed pumps start-up (143-G0005A/B).
Stop the DHT feed pump (143-G-0006A).

Table 8 DHT pumps shutdown signals

General Confidential
Page 14 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

HCK FEED storage:


Tag No.

Description

Interlock Action
Initiate an ESD:
Stop the HCK feed pumps (143-G-0007 A/B) and
the HCK feed pumps start-up (143-G-0008A/B).
Initiate an ESD:
Stop the HCK feed pumps (143-G-0007 B/C).
Initiate an ESD:
Stop the HCK feed pumps (143-G-0007 A/B/C).
Initiate an ESD:
Stop the HCK feed pumps start-up (143-G0008A/B).

143-ZHS-0918D

15 m remote close 143-ZV-0918

143-ZHS-0919D

15 m remote close 143-ZV-0919

143-ZHS-0616D

15 m remote close 143-ZV-0616

143-ZHS-0636D

15 m remote close 143-ZV-0636

143-HS-0236A

143-G-0007 A stop PB from DCS

Stop the HCK feed pump (143-G-0007A).

143-HS-0237A

143-G-0007 B stop PB from DCS

Stop the HCK feed pump (143-G-0007B).

143-HS-0238A

143-G-0007 C stop PB from DCS

Stop the HCK feed pump (143-G-0007C).

143-HS-0248A

143-G-0008 A stop PB from DCS

Stop the HCK feed pump-start-up (143-G-0008A).

143-HS-0249A

143-G-0008 B stop PB from DCS

Stop the HCK feed pump-start-up (143-G-0008B).

143-YS-1008O

143-G-0008A HH Vibration

Initiate an ESD:
Stop the HCK feed pump-start-up (143-G-0008A).

143-YS-2008O

143-G-0008A HH Temperature

Initiate an ESD:
Stop the HCK feed pump-start-up (143-G-0008A).

143-YS-1108O

143-G-0008 B HH Vibration

Initiate an ESD:
Stop the HCK feed pump-start-up (143-G-0008B).

143-YS-2108O

143-G-0008 B HH Temperature

Initiate an ESD:
Stop the HCK feed pump-start-up (143-G-0008B).

Table 9 HCK pumps shutdown signals

General Confidential
Page 15 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

HEAVY NAPHTHA FEED STORAGE:


Tag No.

Description

143-ZHS-0585D

15 m remote close 143-ZV-0585

143-ZHS-0588D

15 m remote close 143-ZV-0588

143-HS-0278A

143-G-0009A stop PB from DCS

143-HS-0279A

143-G-0009B stop PB from DCS

143-YS-1009O

143-G-0009A HH vibration

143-YS-2009O

143-G-0009A HH temperature

143-YS-1109O

143-G-0009B HH Vibration

143-YS-2109O

143-G-0009A HH Temperature

Interlock Action
Initiate an ESD:
Stop the heavy naphtha feed pumps (143-G0009A/B).
Initiate an ESD:
Stop the heavy naphtha feed pumps (143-G0009A/B).
Stop the heavy naphtha feed pump (143-G0009A).
Stop the heavy naphtha feed pump (143-G0009B).
Initiate an ESD:
Stop the heavy naphtha feed pump (143-G0009A).
Initiate an ESD:
Stop the heavy naphtha feed pump (143-G0009A).
Initiate an ESD:
Stop the heavy naphtha feed pump (143-G0009B).
Initiate an ESD:
Stop the heavy naphtha feed pump (143-G0009B).

Table 10 heavy naphtha pumps shutdown signals

General Confidential
Page 16 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

OFF-SPEC DIESEL/FLUSH OIL TANK STORAGE:


The shutdown of the OFF-SPEC DIESEL/FLUSH OIL storage system is carried out
by the following process signals:
Tag No.

Description

Interlock Action
Initiate an ESD:
Stop the HCK Transfer pumps (143-G-0010)
and Flush oil pump (143-G-0043).
Initiate an ESD:
Stop the HCK Transfer pumps (143-G-0010).

143-ZHS-0880D

15 m remote close 143-ZV-0880

143-ZHS-0881D

15 m remote close 143-ZV-0881

143-HS-0364A

143-G-0010 stop PB from DCS

Stop the HCK Transfer pumps (143-G-0010).

143-ZHS-0887D

15 m remote close 143-ZV-0887

Initiate an ESD:
Stop Flush oil pump (143-G-0043).

143-HS-0888A

143-G-0043 stop PB from DCS

Stop Flush oil pump (143-G-0043).

143-YS-1043O

143-G-0043 HH VIBRATION

Stop Flush oil pump (143-G-0043).

143-YS-2043O

143-G-0043 HH Temperature

Stop Flush oil pump (143-G-0043).

Table 11 off spec diesel pumps signals

General Confidential
Page 17 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

ISOMERATE/LIGHT REFORMATE AND NHT LIGHT NAPHTHA STORAGE


TANKS:
The shutdown of isomerate/light reformate storage system is carried out by the
following process signals:

Tag No.

143-LIT-0512

Description

143-D-0014 level low-low

143-LIT-0517

143-D-0015 level low-low

143-LIT-0522

143-D-0044 level low-low

143-ZHS-0503D

15 m remote close 143-ZV-0503

143- ZHS-0504D
143- ZHS-0506D
143- ZHS-0508D
143- ZHS-0509D
143- ZHS-0510D
143- ZHS-0511D

15 m remote close 143-ZV-0504


0506
0508
0509
0510
0511

Interlock Action
Initiate an ESD:
Stop the isomerate/light reformate pumps (143G-0011A/B).
Stop the NHT light naphtha pumps (143-G0026A/B)
Stop the HGU light naphtha HP pumps (143-G0030/0073A/B)
Stop the CCR Heavy Reformate Blending
pumps (143-G-0012A/B)
Stop the Boiler Fuel Light Naphta pump
143-G-0045
Initiate an ESD:
Stop the isomerate/light reformate pumps (143G-0011A/B).
Stop the NHT light naphtha pumps (143-G0026A/B)
Stop the HGU light naphtha HP pumps (143-G0030/0073A/B)
Stop the CCR Heavy Reformate Blending
pumps (143-G-0012A/B)
Stop the Boiler Fuel Light Naphta pump
143-G-0045
Initiate an ESD:
Stop the isomerate/light reformate pumps (143G-0011A/B).
Stop the NHT light naphtha pumps (143-G0026A/B)
Stop the HGU light naphtha HP pumps (143-G0030/0073A/B)
Stop the CCR Heavy Reformate Blending
pumps (143-G-0012A/B)
Stop the Boiler Fuel Light Naphta pump
143-G-0045
Initiate an ESD:
Close isomerate/light reformate 143-ZV-0503
inlet to 143-D-0014
Initiate an ESD:
Stop the isomerate/light reformate pumps (143G-0011A/B).
Stop the NHT light naphtha pumps (143-G0026A/B)
Stop the HGU light naphtha HP pumps (143-G-

General Confidential
Page 18 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Tag No.

Description

Interlock Action
0030/0073A/B)
Stop the CCR Heavy Reformate Blending
pumps (143-G-0012A/B)
Stop the Boiler Fuel Light Naphta pump
143-G-0045

143-ZHS-0540D
143- ZHS-0542D
143-ZHS-0620D
143- ZHS-0623D
143-ZHS-0637D
143- ZHS-0638D
143-ZHS-0660D
143- ZHS-0663D

15 m remote close 143-ZV-0540


15 m remote close 143-ZV-0542
15 m remote close 143-ZV-0620
15 m remote close 143-ZV-0623
15 m remote close 143-ZV-0637
15 m remote close 143-ZV-0638
15 m remote close 143-ZV-0660
15 m remote close 143-ZV-0663

143-HS-0548A

143-G-0011A stop PB from DCS

143-HS-0548A

143-G-0011B stop PB from DCS

143-HS-0628A

143-G-0026A stop PB from DCS

143-HS-0629A

143-G-0026B stop PB from DCS

143-HS-0645A

143-G-0045 stop PB from DCS

143-HS-0668A

143-G-0030A stop PB from DCS

143-HS-0670A

143-G-0073A stop PB from DCS

143-HS-0669A

143-G-0030B stop PB from DCS

143-HS-0671A

143-G-0073B stop PB from DCS

143-YS-1011O

143-G-0011A HH vibration

143-YS-1111O

143-G-0011B HH Vibration

143-YS-1026O

143-G-0026A HH Vibration

143-YS-1126O

143-G-0026B HH Vibration

Initiate an ESD:
Stop the isomerate/light reformate pumps (143G-0011A/B).
Initiate an ESD:
Stop the NHT light naphtha pumps (143-G0026A/B).
Initiate an ESD:
Stop the Boiler fuel naphtha pumps (143-G0045).
Initiate an ESD:
Stop the HGU light naphtha HP pumps (143-G0030/0073A/B)
Stop the isomerate/light reformate pump (143G-0011A).
Stop the isomerate/light reformate pump (143G-0011B).
Stop the NHT light naphtha pumps (143-G0026A)
Stop the NHT light naphtha pumps (143-G0026B)
Stop the Boiler fuel naphtha pumps (143-G0045).
Stop the HGU light naphtha HP pumps (143-G0030A)
Stop the HGU light naphtha HP pumps (143-G0073A)
Stop the HGU light naphtha HP pumps (143-G0030B)
Stop the HGU light naphtha HP pumps (143-G0073B)
Initiate an ESD:
Stop the isomerate/light reformate pump (143G-0011A).
Initiate an ESD:
Stop the isomerate/light reformate pump (143G-0011B).
Initiate an ESD:
Stop the NHT light naphtha pumps (143-G0026A).
Initiate an ESD:
Stop the NHT light naphtha pumps (143-G0026A/B).

General Confidential
Page 19 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Tag No.

Description

143-YS-1045O

143-G-0045 HH Vibration

Interlock Action
Initiate an ESD:
Stop the Boiler fuel naphtha pumps (143-G0045).

Table 12 Isomerate, Light reformate , NHT light naphtha pumps shutdown


signals
BEU RAFFINATE STORAGE TANK:
The shutdown of the BEU RAFFINATE pumps is carried out by the following process
signals:
Tag No.

Description

143-ZHS-0445D

15 m remote close 143-ZV-0445

143-ZHS-0448D

15 m remote close 143-ZV-0448

143-HS-0440A

143-G-0025A stop PB from DCS

142-HS-0438A

143-G-0025B stop PB from DCS

143-YS-1025O

143-G-0025A HH VIBRATION

143-YS-1125O

143-G-0025B HH VIBRATION

Interlock Action
Initiate an ESD:
Stop the BEU RAFFINATE PUMP (143-G0025A/B).
Initiate an ESD:
Stop the BEU RAFFINATE PUMP (143-G0025A/B).
Stop the BEU RAFFINATE PUMP (143-G0025A).
Stop the BEU RAFFINATE PUMP (143-G0025B).
Initiate an ESD:
Stop the BEU RAFFINATE PUMP (143-G0025A).
Initiate an ESD:
Stop the BEU RAFFINATE PUMP (143-G0025B).

Table 13 BEU raffinate pumps shutdown signals

General Confidential
Page 20 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

REFORMATE STORAGE TANK


The shutdown of CCR heavy reformate is carried out by the following process
signals:
Tag No.

Description

143-ZHS-0572D

15 m remote close 143-ZV-0572

143-ZHS-0575D

15 m remote close 143-ZV-0575

143-HS-0397A

143-G-0012A stop PB from DCS

143-HS-0398A

143-G-0012B stop PB from DCS

143-YS-1012O

143-G-0012A HH VIBRATION

43-YS-2012O

143-G-0012A HH TEMPERATURE

143-YS-1112O

143-G-0012B HH VIBRATION

43-YS-2112O

143-G-0012B HH TEMPERATURE

Interlock Action
Initiate an ESD:
Stop the CCR heavy reformate blending
pumps (143-G-0012A/B).
Initiate an ESD:
Stop the CCR heavy reformate blending
pumps (143-G-0012A/B).
Stop the CCR heavy reformate blending
pumps (143-G-0012A).
Stop the CCR heavy reformate blending
pumps (143-G-0012B).
Initiate an ESD:
Stop the CCR heavy reformate blending
pumps (143-G-0012A).
Initiate an ESD:
Stop the CCR heavy reformate blending
pumps (143-G-0012A).
Initiate an ESD:
Stop the CCR heavy reformate blending
pumps (143-G-0012B).
Initiate an ESD:
Stop the CCR heavy reformate blending
pumps (143-G-0012B).

Table 14 Reformate pumps shutdown signals

General Confidential
Page 21 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

LIGHT NAPHTHA TANK


The shutdown of CCR heavy reformate is carried out by the following process
signals:
Tag No.

Description

143-ZHS-0913D

15 m remote close 143-ZV-0913

143-ZHS-0914D

15 m remote close 143-ZV-0914

143-HS-0926A

143-G-0013A stop PB from DCS

143-HS-0927A

143-G-0013B stop PB from DCS

143-YS-1013O

143-G-0013A HH VIBRATION

143-YS-1113O

143-G-0013B HH VIBRATION

Interlock Action
Initiate an ESD:
Stop the HCK light naphtha pumps (143-G0013A/B).
Initiate an ESD:
Stop the HCK light naphtha pumps (143-G0013A/B).
Stop the HCK light naphtha pumps (143-G0013A).
Stop the HCK light naphtha pumps (143-G0013B).
Initiate an ESD:
Stop the HCK light naphtha pumps (143-G0013A).
Initiate an ESD:
Stop the HCK light naphtha pumps (143-G0013B).

Table 15 Light naphtha pumps shutdown signals


PROPANE SPHERES
The shutdown of Propane sphere system is carried out by the following process
signals:
Tag No.
Description
Interlock Action
143-LIT-0711

143-D-0025 level low-low

143-LIT-0717

143-D-0024 level low-low

143-LIT-0723

143-D-0026 level low-low

143-ZHS-0748D
143-ZHS-0749D

15 m remote close 143-ZV-0748


0749

143-ZHS-0701D

15 m remote close 143-ZV-0701

Initiate an ESD:
Stop the HP propane booster and transfer
pumps (143-G-0014A/B &143-G-0072A/B).
Stop the LP propane transfer pumps (143-G0015A/B).
Initiate an ESD:
Stop the HP propane booster and transfer
pumps (143-G-0014A/B &143-G-0072A/B).
Stop the LP propane transfer pumps (143-G0015A/B).
Initiate an ESD:
Stop the HP propane booster and transfer
pumps (143-G-0014A/B &143-G-0072A/B).
Stop the LP propane transfer pumps (143-G0015A/B).
Initiate an ESD:
Stop the HP propane booster and transfer
pumps (143-G-0014A/B &143-G-0072A/B).
Initiate an ESD:

General Confidential
Page 22 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Tag No.

Description

Interlock Action

143-ZHS-0706D
143-ZHS-0703D
143-ZHS-0707D
143-ZHS-0705D
143-ZHS-0708D
143-ZHS-0752D
143-ZHS-0756D
143-ZHS-0757D

0706
0703
0707
0705
0708
15 m remote close 143-ZV-0752
0756
0757

Stop the HP propane booster and transfer


pumps (143-G-0014A/B &143-G-0072A/B).
Stop the LP propane transfer pumps (143-G0015A/B).

143-HS-0732A

143-G-0014A stop PB from DCS

143-HS-0735A

143-G-0014B stop PB from DCS

143-HS-0736A

143-G-0072A stop PB from DCS

143-HS-0737A

143-G-0072B stop PB from DCS

143-HS-0741A

143-G-0015B stop PB from DCS

143-YS-1072O

143-G-0072A HH vibration

Stop the HP propane booster pump (143-G0014A)


Stop the HP propane booster pump (143-G0014B)
Stop the HP propane transfer pump (143-G0072A)
Stop the HP propane transfer pump (143-G0072B)
Stop the LP propane transfer pump (143-G0015B)
Initiate an ESD:
Stop the HP propane booster and transfer
pumps (143-G-0014A &143-G-0072A).

143-YS-1172O

143-G-0072B HH vibration

143-YS-1115O

143-G-0015B HH VIBRATION

Initiate an ESD:
Stop the LP propane transfer pumps (143-G0015B).

Initiate an ESD:
Stop the HP propane booster and transfer
pumps (143-G-0014B &143-G-0072B).
Initiate an ESD:
Stop the LP propane transfer pumps (143-G0015B).

Table 16 propane pumps shutdown signals

General Confidential
Page 23 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

COKER LPG spheres (143-D-0031/0032)


The shutdown of Coker LPG sphere system is carried out by the following process
signals:
Tag No.

Description

143-LIT-0463

143-D-0031 level low-low

143-LIT-0859

143-D-0032 level low-low

143-ZHS-0479D
143-ZHS-0470D
143-ZHS-0477D
143-ZHS-0867D
143-ZHS-0869D

15 m remote close 143-ZV-0479


0470
0477
0867
0869

143-ZHS-0471D

15 m remote close 143-ZV-0471

143-ZHS-0478D

15 m remote close 143-ZV-0478

143-HS-0458A
143-HS-0461A
143-YS-1024O

143-G-0024A stop PB from DCS


143-G-0024B stop PB from DCS
143-G-0024A HH VIBRATION

143-YS-1124O

143-G-0024B HH VIBRATION

Interlock Action
Initiate an ESD:
Stop the Coker LPG pumps (143-G-0024A/B).
Initiate an ESD:
Stop the Coker LPG pumps (143-G-0024A/B).
Initiate an ESD:
Stop the Coker LPG pumps (143-G-0024A/B).

Initiate an ESD:
Stop the Coker LPG pumps (143-G-0024A).
Initiate an ESD:
Stop the Coker LPG pumps (143-G-0024B).
Stop the Coker LPG pumps (143-G-0024A).
Stop the Coker LPG pumps (143-G-0024B).
Initiate an ESD:
Stop the Coker LPG pumps (143-G-0024A).
Initiate an ESD:
Stop the Coker LPG pumps (143-G-0024B).

Table 17 Coker LPG pumps shutdown signals


MIXED BUTANE SPHERES
The shutdown of Butane sphere system is carried out by the following process
signals:
Tag No.

Description

143-LIT-0824

143-D-0027 level low-low

143-LIT-0830

143-D-0028 level low-low

143-LIT-0836

143-D-0029 level low-low

Interlock Action
Initiate an ESD:
Stop the HP butane transfer pumps
(143-G-0016A/B).
Stop the LP butane transfer pumps
(143-G-0017A/B).
Initiate an ESD:
Stop the HP butane transfer pumps
(143-G-0016A/B).
Stop the LP butane transfer pumps
(143-G-0017A/B).
Stop export butane transfer pumps
(143-G-0068A/B).
Initiate an ESD:

General Confidential
Page 24 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Tag No.

Description

143-LIT-0853

143-D-0030 level low-low

143-LIT-0859

143-D-0032 level low-low

143-ZHS-0842D
143-ZHS-0847D
143-ZHS-0867D
143-ZHS-0869D

15 m remote close 143-ZV-0842


0847
0867
0869

143-ZHS-0844D
143-ZHS-0848D
143-ZHS-0846D
143-ZHS-0849D
143-ZHS-0865D
143-ZHS-0868D

15 m remote close 143-ZV-0844


0848
0846
0849
0865
0868

143-ZHS-0920D
143-ZHS-0921D

15 m remote close 143-ZV-0920


0921

143-ZHS-0819D
143-ZHS-0400D

15 m remote close 143-ZV-0819


0400

143-ZHS-0403D
143-ZHS-0402D

15 m remote close 143-ZV-0403


0402

143-ZHS-0404D

15 m remote close 143-ZV-0404

143-ZHS-0401D

15 m remote close 143-ZV-0401

143-HS-0809A

143-G-0016A stop PB from DCS

143-HS-0812A

143-G-0016B stop PB from DCS

Interlock Action
Stop the HP butane transfer pumps
(143-G-0016A/B).
Stop the LP butane transfer pumps
(143-G-0017A/B).
Stop export butane transfer pumps
(143-G-0068A/B).
Initiate an ESD:
Stop the HP butane transfer pumps
(143-G-0016A/B).
Stop the LP butane transfer pumps
(143-G-0017A/B).
Stop export butane transfer pumps
(143-G-0068A/B).
Initiate an ESD:
Stop the HP butane transfer pumps
(143-G-0016A/B).
Stop the LP butane transfer pumps
(143-G-0017A/B).
Initiate an ESD:
Stop the HP butane transfer pumps
(143-G-0016A/B).
Stop the LP butane transfer pumps
(143-G-0017A/B).
Initiate an ESD:
Stop the HP butane transfer pumps
(143-G-0016A/B).
Stop the LP butane transfer pumps
(143-G-0017A/B).
Stop export butane transfer pumps
(143-G-0068A/B).
Initiate an ESD:
Stop export butane transfer pumps
(143-G-0068A/B).
Initiate an ESD:
Stop the HP butane transfer pumps
(143-G-0016A/B).
Initiate an ESD:
Stop the LP butane transfer pumps
(143-G-0017A/B).
Initiate an ESD:
Stop the LP butane transfer pumps
(143-G-0017A).
Initiate an ESD:
Stop the LP butane transfer pumps
(143-G-0017B).
Stop the HP butane transfer pumps
(143-G-0016A).
Stop the HP butane transfer pumps

General Confidential
Page 25 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Tag No.

Description

Interlock Action
(143-G-0016B).
Stop the LP butane transfer pumps
(143-G-0017A).
Stop the LP butane transfer pumps
(143-G-0017B).
Stop export butane transfer pumps
(143-G-0068A)
Stop export butane transfer pumps
(143-G-0068B)
Initiate an ESD:
Stop export butane transfer pumps
(143-G-0068A)
Initiate an ESD:
Stop export butane transfer pumps (143-G0068B)
Initiate an ESD:
Stop the LP butane transfer pumps (143-G0017A).

143-HS-0815A

143-G-0017A stop PB from DCS

143-HS-0818A

143-G-0017B stop PB from DCS

143-HS-0865A

143-G-0068A stop PB from DCS

143-HS-0866A

143-G-0068B stop PB from DCS

143-YS-1068O

143-G-0068A HH vibration

143-YS-1168O

143-G-0068B HH vibration

143-YS-1017O

143-G-0017A HH VIBRATION

143-YS-1117O

143-G-0017B HH VIBRATION

Initiate an ESD:
Stop the LP butane transfer pumps (143-G0017B).

143-YS-2017O

143-G-0017A HH TEMPARTURE

Initiate an ESD:
Stop the LP butane transfer pumps (143-G0017A).

143-YS-2117O

143-G-0017B HH TEMPARTURE

Initiate an ESD:
Stop the LP butane transfer pumps (143-G0017B).

143-YS-1016O

143-G-0016A HH VIBRATION

Initiate an ESD:
Stop the HP butane transfer pumps (143-G0016A).

143-YS-1116O

143-G-0016B HH VIBRATION

Initiate an ESD:
Stop the HP butane transfer pumps (143-G0016B).

143-YS-2016O

143-G-0016A HH TEMPARTURE

Initiate an ESD:
Stop the HP butane transfer pumps (143-G0016A).

General Confidential
Page 26 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Tag No.
143-YS-2116O

Description
143-G-0016B HH TEMPARTURE

Interlock Action
Initiate an ESD:
Stop the HP butane transfer pumps (143-G0016B).

Table 18 Butane pumps shutdown signals


SLOP OIL TANKS:
The shutdown of slop oil storage system is carried out by the following process
signals:
Tag No.

Description

143-LIT-0948

143-D-0047 level low-low

143-ZHS-0498D

15 m remote close 143-ZV-0498

143-ZHS-0496D
143-ZHS-0497D
143-ZHS-0785D
143-YS-1070O

15 m remote close 143-ZV-0496


0497
15 m remote close 143-ZV-0785

143-G-0070 HH VIBRATION

Interlock Action
Initiate an ESD:
Stop the slop oil pumps (143-G-0028A &
143-G-0070).
Initiate an ESD:
Stop the slop oil pumps (143-G-0028B).
Initiate an ESD:
Stop the slop oil pumps (143-G-0028A &
143-G-0070).
Initiate an ESD:
Stop the slop oil pumps (143-G-0028B &
143-G-0070).
Initiate an ESD:
Stop the slop oil pumps (143-G-0070).

Table 19 slop pumps shutdown signals


DESALTER EFFLUENT STORAGE TANK:
Tag No.

Description

Interlock Action

143-HS-0409A

143-G-0033 stop PB from DCS

Stop Desalter effluent oil pump


(143-G-0033).

143-HS-0412A

143-G-0049 stop PB from DCS

Stop Desalter rag layer to CDU pump


(143-G-0049).

143-HS-0415A

143-G-0034A stop PB from DCS

Stop Desalter Effluent water pump


(143-G-0034A).

143-HS-0418A

143-G-0034B stop PB from DCS

Stop Desalter Effluent water pump


(143-G-0034B).

Table 20 Desalter effluent shutdown signals

General Confidential
Page 27 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

BENZENE STORAGE TANK


Tag No.

Description

Interlock Action
Initiate an ESD:
Stop the benzene pumps (143-G-0027A/B).
Initiate an ESD:
Stop the benzene pumps (143-G-0027A/B).

143-ZHS-0474D

15 m remote close 143-ZV-0474

143-ZHS-0476D

15 m remote close 143-ZV-0476

143-HS-0962A

143-G-0027A stop PB from DCS

Stop the benzene pump (143-G-0027A).

143-HS-0965A

143-G-0027B stop PB from DCS

Stop the benzene pump (143-G-0027B).

143-LIC-0098

Low Liquid Level in Benzene


Sump (143-D-0061)

Stop the Benzene sump pump (143-G-0046)

143-HS-0098A

STOP Benzene sump Pump (143G-0046)

Stop the Benzene sump pump (143-G-0046)

Table 21 Benzene pumps shutdown signals


BEU FEED TANK
Tag No.

Description

Interlock Action
Initiate an ESD:
Stop the BEU FEED pumps (143-G-0035A/B).
Initiate an ESD:
Stop the BEU FEED pumps (143-G-0035A/B).

143-ZHS-0915D

15 m remote close 143-ZV-0915

143-ZHS-0925D

15 m remote close 143-ZV-0925

143-HS-0972A

143-G-0035A stop PB from DCS

Stop the BEU FEED pumps (143-G-0035A).

143-HS-0973A

143-G-0035B stop PB from DCS

Stop the BEU FEED pumps (143-G-0035B).

143-YS-1035O

143-G-0035A HH VIBRATION

Stop the BEU FEED pumps (143-G-0035A).

143-YS-1135O

143-G-0035B HH VIBRATION

Stop the BEU FEED pumps (143-G-0035B).

Table 22 BEU pumps shutdown signals

General Confidential
Page 28 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

SULFUR STORAGE TANKS


Tag No.

Description

Interlock Action

143-HS-0606A

143-G-0050A stop PB from DCS

Stop Sulfur condenate pump (143-G-0050A)

143-HS-0607A

143-G-0050B stop PB from DCS

Stop Sulfur condenate pump (143-G-0050B)

143-HS-0611A

143-G-0051A stop PB from DCS

Stop Sulfur Transfer pump (143-G-0051A)

143-HS-0612A

143-G-0051B stop PB from DCS

Stop Sulfur Transfer pump (143-G-0051B)

143-HS-0601A

143-G-0047A stop PB from DCS

Stop Sulfur Transfer pump (143-G-0047A)

143-HS-0602A

143-G-0047Bstop PB from DCS

Stop Sulfur Transfer pump (143-G-0047B)

143-HS-0608A

143-E-0007A Fan stop PB from


DCS

Stop Condensate cooler (143-G-0007A)

143-VAH-0601

143-E-0007A Fan stop PB from


DCS

Stop Condensate cooler (143-G-0007A)

143-HS-0090A

143-E-0011A Fan stop PB from


DCS

STOP pump auxillary fan (143-E-0011A)

143-HS-0090B

143-E-0011B Fan stop PB from


DCS

STOP pump auxillary fan (143-E-0011B)

Table 23 Sulfur pumps and cooler shutdown signals

General Confidential
Page 29 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

PSL-NP-3000 Diesel Export Storage Tanks


Tag No.
172-ZXSO0090B

Description
172-G-0001A/B/C suction valve
header (80% Open)

172-ZXSC-0090

172-G-0001A/B/C suction valve


header close

172-ZXSO0099B

172-G-0001A/B/C discharge valve


header open (80% Open)

172-ZXSC-0099

172-G-0001A/B/C discharge valve


header close

172-ZHS-0099D
172-HS-0088A
172-HS-0089A
172-HS-0090A
172-VSA-0001A

15 m Remote Close 172-ZV-0099


STOP Diesel Export Pump 172-G0001A from DCS
STOP Diesel Export Pump 172-G0001B from DCS
STOP Diesel Export Pump 172-G0001C from DCS
172-G-0001A High High Vibration
(Main)

Interlock Action
Initiate an ESD:
Stop the Diesel export pumps (172-G0001A/B/C).
Initiate an ESD:
Stop the Diesel export pumps (172-G0001A/B/C).
Initiate an ESD:
Stop the Diesel export pumps (172-G0001A/B/C).
Initiate an ESD:
Stop the Diesel export pumps (172-G0001A/B/C).
Initiate an ESD:
Stop the Diesel export pumps (172-G0001A/B/C).
Stop the Diesel export pumps (172-G-0001A).
Stop the Diesel export pumps (172-G-0001B).
Stop the Diesel export pumps (172-G-0001C).
Stop the Diesel export pumps (172-G-0001A).

172-VSB-0001A

172-G-0001A High High Vibration


(Redundant)

Stop the Diesel export pumps (172-G-0001A).

172-TSA-0001A

172-G-0001A High High


Temperature (Main)

Stop the Diesel export pumps (172-G-0001A).

172-TSB-0001A

172-G-0001A High High


Temperature (Redundant)

Stop the Diesel export pumps (172-G-0001A).

172-VSA-0001B

172-G-0001B High High Vibration


(Main)

Stop the Diesel export pumps (172-G-0001B).

172-VSB-0001B

172-G-0001B High High Vibration


(Redundant)

Stop the Diesel export pumps (172-G-0001B).

172-TSA-0001B

172-G-0001B High High


Temperature (Main)

Stop the Diesel export pumps (172-G-0001B).

172-TSB-0001B

172-G-0001B High High


Temperature (Redundant)

Stop the Diesel export pumps (172-G-0001B).

172-VSA-0001C

172-G-0001C High High Vibration


(Main)

Stop the Diesel export pumps (172-G-0001C).

172-VSB-0001C

172-G-0001C High High Vibration


(Redundant)

Stop the Diesel export pumps (172-G-0001C).

General Confidential
Page 30 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013
Tag No.
172-XSC-0099
(FF)
172-TSA-0001C
172-TSB-0001C

Description
172-G-0001A suction valve close
(FF Limit Switch)
172-G-0001C High High
Temperature (Main)
172-G-0001C High High
Temperature (Redundant)

172-ZHS-0091D

15 m Remote Close 172-ZV-0091

172-ZXSC-0092

172-G-0003 discharge header valve


close

172-ZHS-0092D

15 m Remote Close 172-ZV-0092

172-HS-0124A
172-VSA-0003
172-VSB-0003
172-XSC-0122
(FF)
172-XSC-0123
(FF)

STOP Diesel Export Circulation


Pump 172-G-0003
from DCS
172-G-0003 High High
Vibration/Temperature (Main)
172-G-0003 High High
Vibration/Temperature
(Redundant)
172-G-0003 suction valve close (FF
Limit Switch)
172-G-0003 discharge valve close
(FF Limit Switch)

Interlock Action
Stop the Diesel export pumps (172-G-0001A).
Stop the Diesel export pumps (172-G-0001C).
Stop the Diesel export pumps (172-G-0001C).
Initiate an ESD:
Stop the Diesel export circulation pump (172G-0003).
Initiate an ESD:
Stop the Diesel export circulation pump (172G-0003).
Initiate an ESD:
Stop the Diesel export circulation pump (172G-0003).
Stop the Diesel export circulation pump (172G-0003).
Stop the Diesel export circulation pump (172G-0003).
Stop the Diesel export circulation pump (172G-0003).
Stop the Diesel export circulation pump (172G-0003).
Stop the Diesel export circulation pump (172G-0003).

Table 24 Diesel pumps shutdown signals

General Confidential
Page 31 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Gasoline storage tank


Tag no.

Description

Interlock Action

Stop Gasoline Export Pump 172-G0002A from DCS


Stop Gasoline Export Pump 172-G0002B from DCS
STOP Gasoline Export Pump 172G-0002C from DCS

Initiate an ESD:
Stop the gasoline export pumps (172-G0002A/B/C).
Initiate an ESD:
Stop the gasoline export pumps (172-G0002A/B/C).
Initiate an ESD:
Stop the gasoline export pumps (172-G0002A/B/C).
Initiate an ESD:
Stop the gasoline export pumps (172-G0002A/B/C).
Initiate an ESD:
Stop the gasoline export pumps (172-G0002A/B/C).
Initiate an ESD:
Stop the gasoline export pumps (172-G0002A/B/C).
Stop the gasoline export pumps (172-G0002A).
Stop the gasoline export pumps (172-G0002B).
Stop the gasoline export pumps (172-G0002C).

172-VSA-0002A

172-G-0002A High High Vibration


(Main)

Stop the gasoline export pumps (172-G0002A).

172-VSB-0002A

172-G-0002A High High Vibration


(Redundant)

Stop the gasoline export pumps (172-G0002A).

172-TSA-0002A

172-G-0002A High High


Temperature (Main)

Stop the gasoline export pumps (172-G0002A).

172-TSB-0002A

172-G-0002A High High


Temperature (Redundant)

Stop the gasoline export pumps (172-G0002A).

172-VSA-0002B

172-G-0002B High High Vibration


(Main)

Stop the gasoline export pumps (172-G0002B).

172-VSB-0002B

172-G-0002B High High Vibration


(Redundant)

Stop the gasoline export pumps (172-G0002B).

172-TSA-0002B

172-G-0002B High High


Temperature (Main)

Stop the gasoline export pumps (172-G0002B).

172-TSB-0002B

172-G-0002B High High


Temperature (Redundant)

Stop the gasoline export pumps (172-G0002B).

172-VSA-0002C

172-G-0002C High High Vibration


(Main)

Stop the gasoline export pumps (172-G0002C).

172-ZXSO-0259B

172-G-0002A/B/C suction header


valve open (80% Open)

172-ZXSC-0259

172-G-0002A/B/C suction header


valve close

172-ZHS-0259D

15 m Remote Close 172-ZV-0259

172-ZXSO-0260B

172-G-0002A/B/C discharge valve


header open (80% Open)

172-ZXSC-0260

172-G-0002A/B/C discharge valve


header close

172-ZHS-0260D

15 m Remote Close 172-ZV-0260

172-HS-0252A
172-HS-0253A
172-HS-0254A

General Confidential
Page 32 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Tag No.

Description

Interlock Action

172-VSB-0002C

172-G-0002C High High Vibration


(Redundant)

Stop the gasoline export pumps


(172-G-0002C).

172-TSA-0002C

172-G-0002C High High


Temperature (Main)

Stop the gasoline export pumps


(172-G-0002C).

172-TSB-0002C

172-G-0002C High High


Temperature (Redundant)

Stop the gasoline export pumps


(172-G-0002C).

172-XSC-0261
(FF)

172-G-0002A suction valve close


(FF Limit Switch)

Stop the gasoline export pumps


(172-G-0002A).

172-XSC-0263
(FF)

172-G-0002B suction valve close


(FF Limit Switch)

Stop the gasoline export pumps


(172-G-0002B).

172-XSC-0265
(FF)

172-G-0002C suction valve close


(FF Limit Switch)

Stop the gasoline export pumps


(172-G-0002C).

172-ZXSC-0093

172-G-0005 suction header valve


close

172-ZHS-0093D

15 m Remote Close 172-ZV-0093

172-ZXSC-0094

172-G-0005 discharge header valve


close

172-ZHS-0094D

15 m Remote Close 172-ZV-0094

172-HS-0286A

STOP Diesel Export Circulation


Pump 172-G-0005
from DCS

Stop the gasoline export circulation pump


(172-G-0005).

172-VSA-0005

172-G-0005 High High


Vibration/Temperature (Main)

Stop the gasoline export circulation pump


(172-G-0005).

172-VSB-0005

172-G-0005 High High


Vibration/Temperature
(Redundant)

Stop the gasoline export circulation pump


(172-G-0005).

172-XSC-0288
(FF)

172-G-0005 suction valve close (FF


Limit Switch)

Stop the gasoline export circulation pump


(172-G-0005).

172-XSC-0289
(FF)

172-G-0005 discharge valve close


(FF Limit Switch)

Stop the gasoline export circulation pump


(172-G-0005).

172-ZXSC-0095

172-G-0006 suction header valve


close

Initiate ESD:
Stop the gasoline export circulation pump
(172-G-0006).

Initiate ESD:
Stop the gasoline export circulation pump
(172-G-0005).
Initiate ESD:
Stop the gasoline export circulation pump
(172-G-0005).
Initiate ESD:
Stop the gasoline export circulation pump
(172-G-0005).
Initiate ESD:
Stop the gasoline export circulation pump
(172-G-0005).

General Confidential
Page 33 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Tag No.

Description

172-ZHS-0095D

15 m Remote Close 172-ZV-0095

172-ZXSC-0096

172-G-0006 discharge header valve


close

172-ZHS-0096D

15 m Remote Close 172-ZV-0096

172-HS-0287A
172-VSA-0006
172-VSB-0006
172-XSC-0290
(FF)
172-XSC-0291
(FF)

STOP Diesel Export Circulation


Pump 172-G-0006 from DCS
172-G-0006 High High
Vibration/Temperature (Main)
172-G-0006 High High
Vibration/Temperature (Redundant)
172-G-0006 suction valve close (FF
Limit Switch)
172-G-0006 discharge valve close
(FF Limit Switch)

Interlock Action
Initiate ESD:
Stop the gasoline export circulation pump
(172-G-0006).
Initiate ESD:
Stop the gasoline export circulation pump
(172-G-0006).
Initiate ESD:
Stop the gasoline export circulation pump
(172-G-0006).
Stop the gasoline export circulation pump
(172-G-0006).
Stop the gasoline export circulation pump
(172-G-0006).
Stop the gasoline export circulation pump
(172-G-0006).
Stop the gasoline export circulation pump
(172-G-0006).
Stop the gasoline export circulation pump
(172-G-0006).

Table 25 Gasoline pumps shutdown signals

General Confidential
Page 34 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Benzene Export Storage Tank


Tag No.
172-ZXSC-0445

Description
172-G-0011A/B suction header
valve close

172-ZHS-0445D

15 m Remote Close 172-ZV-0445

172-ZXSC-0450

172-G-0011A/B discharge header


valve close

172-ZHS-0450D

15 m Remote Close 172-ZV-0450

Interlock Action
Initiate an ESD:
Stop Benzene export pumps 172-G-0011A/B
Initiate an ESD:
Stop Benzene export pumps 172-G-0011A/B
Initiate an ESD:
Stop Benzene export pumps 172-G-0011A/B
Initiate an ESD:
Stop Benzene export pumps 172-G-0011A/B

172-HS-0491A

STOP Benzene Export Pump 172G-0011A from DCS

Stop Benzene export pumps 172-G-0011A

172-HS-0492A

STOP Benzene Export Pump 172G-0011B from DCS

Stop Benzene export pumps 172-G-0011B

172-VSA-0011A

172-G-0011A High High


Vibration/Temperature (Main)

Stop Benzene export pumps 172-G-0011A

172-VSB-0011A

172-G-0011A High High


Vibration/Temperature
(Redundant)

Stop Benzene export pumps 172-G-0011A

172-VSA-0011B

172-G-0011B High High


Vibration/Temperature (Main)

Stop Benzene export pumps 172-G-0011B

172-VSB-0011B

142- G-0002Bstop from DCS

Stop Benzene export pumps 172-G-0011B

172-XSC-0475
(FF)

172-G-0011A suction valve close


(FF Limit Switch)

Stop Benzene export pumps 172-G-0011A

172-XSC-0480
(FF)

172-G-0011A discharge valve


close (FF Limit Switch)

Stop Benzene export pumps 172-G-0011A

172-XSC-0490
(FF)

172-G-0011B suction valve close


(FF Limit Switch)

Stop Benzene export pumps 172-G-0011B

172-XSC-0485
(FF)

172-G-0011B discharge valve


close (FF Limit Switch)

Stop Benzene export pumps 172-G-0011B

Table 26 Benzene pumps shutdown signals

General Confidential
Page 35 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

3.0 200 LOSS OF UTILITIES

201 Power Outage with Emergency Generator On


Each substation 12 and 13 are feed from 34.5 KV normal feeders through
substation 4 and substation 2 respectively and one emergency feeder
through substation 15 (SP4 contractor). During normal operation all normal
loads are feed from normal supply and all essential loads are fed from
emergency supply where emergency diesel generators are working
continuously. Power outage with emergency generator on, Electrical power
shall be lost for normal loads & essential loads shall be still fed from
emergency feeder.

202 Power Outage with Emergency Generator Out of Service


Electrical power shall be lost for normal & essential loads except for critical
loads fed from AC UPS shall have back up batteries for 15 minutes & loads
fed from battery charger shall have back up batteries for 2 hours. These back
up batteries shall be utilized for safe shutdown of the plant.

203 Instrument Air Failure

204 Instrument Electrical Failure


Below table indicates control valves fail action based on air and electrical
failure

Table 27 control valves fail action


Control valve tag

Fail action (air failure)

Fail action (electric failure)

142-PCV-0032A

FO

FO

142-PCV -0532A

FO

FO

142-PCV-0032B

FO

FO

142-PCV-0532B

FO

FO

143-FCV -0043

FO

FO

143-FCV -0044

FO

FO

143-FCV -0045

FO

FO

143-FCV -0090

FO

FO

143-FCV -0096

FO

FO

143-FCV -0133

FO

FO

143-FCV -0160

FO

FO

General Confidential
Page 36 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Control valve tag

Fail action (air failure)

Fail action (electric failure)

143-FCV -0161

FO

FO

143-FCV -0162

FO

FO

143-FCV -0163

FO

FO

143-FCV -0180

FO

FO

143-FCV -0220

FO

FO

143-FCV -0221

FO

FO

143-FCV -0222

FO

FO

143-FCV -0227

FO

FO

143-FCV -0240

FO

FO

143-FCV -0270

FO

FO

43-FCV -0358

FO

FO

143-FCV -0359

FC

FC

143-FCV -0390

FO

FO

143-FCV -0419

FO

FO

143-FCV -0429

FO

FO

143-FCV -0452

FO

FO

143-FCV -0453

FO

FO

143-FCV -0498A

FO

FO

143-FCV -0498B

FO

FO

143-FCV -0498C

FO

FO

143-FCV -0553

FO

FO

143-FCV -0630

FO

FO

143-FCV -0631

FO

FO

143-FCV -0670

FO

FO

143-FCV -0742

FO

FO

143-FCV -0745

FO

FO

General Confidential
Page 37 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Control valve tag

Fail action (air failure)

Fail action (electric failure)

143-FCV -0747

FO

FO

143-FCV -0801

FO

FO

143-FCV -0806

FO

FO

14:1-FCV -0807

FO

FO

143-FCV -0808

FO

FO

143-FCV -0888

FO

FO

143-FCV -0908

FO

FO

143-FCV -0919

FO

FO

143-FCV -0920

FO

FO

143-FCV -0921

FO

FO

143-FCV -0966

FO

FO

143-LCV -0603

FLC

FC

143-LCV -0997

FC

FC

143-PCV -0116A

FO

FO

143-PCV -0116B

FO

FO

143-PCV -0124A

FO

FO

143-PCV -0124B

FO

FO

143-PCV -0134A

FO

FO

143-PCV -0134B

FO

FO

143-PCV -0181

FC

FC

143-PCV -0241

FO

FO

143-PCV -0271

FC

FC

143-PCV -0430

FC

FC

143-PCV -0450

FO

FO

143-PCV -0527A

FO

FO

143-PCV -0527B

FO

FO

General Confidential
Page 38 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Control valve tag

Fail action (air failure)

Fail action (electric failure)

143-PCV -0528A

FO

FO

143-PCV -0528B

FO

FO

143-PCV -0529A

FO

FO

143-PCV -0529B

FO

FO

143-PCV -0550

FC

FC

143-PCV -0608

FC

FC

143-PCV -0633

FC

FC

143-PCV -0706

FO

FO

143-PCV -0707

FO

FO

143-PCV -0708

FO

FO

143-PCV -0820

FO

FO

143-PCV -0821

FO

FO

143-PCV -0822

FO

FO

143-PCV -0850

FO

FO

143-PCV -0851

FO

FO

143-PCV -0852A

FO

FO

143-PCV -0852B

FO

FO

143-PCV -0909

FC

FC

143-TCV -0605

FC

FC

157-FCV -0007A

FC

FC

157-FCV -0007B

FC

FC

157-FCV -0013A

FC

FC

157-FCV -0013B

FC

FC

157-FCV -0019A

FC

FC

157-FCV -0019B

FC

FC

157-FCV -0046

FC

FC

General Confidential
Page 39 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Control valve tag

Fail action (air failure)

Fail action (electric failure)

157-FCV -0048A

FC

FC

157-FCV -0048B

FC

FC

157-FCV -0054A

FC

FC

157-FCV -0054B

FC

FC

172-FCV -0091

FO

FO

172-FCV -0092

FO

FO

172-FCV -0093

FO

FO

172-FCV -0255

FO

FO

172-FCV -0256

FO

FO

172-FCV -0257

FO

FO

172-FCV -0440

FO

FO

143-PCV-0576

FC

FC

Table 28 control valves fail action


Below table indicates shutdown valves fail action based on air failure

Tag Number

Fail action (air failure)

Fail action (electric failure)

142-ZV-0056

FC

FC

142-ZV -0057

FC

FC

142-ZV -0552

FC

FC

142-ZV -0553

FC

FC

143-ZV -0107

FC

FC

143-ZV -0108

FC

FC

143-ZV -0400

FC

FC

143-ZV -0401

FC

FC

143-ZV -0402

FC

FC

143-ZV -0403

FC

FC

General Confidential
Page 40 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Tag Number

Fail action (air failure)

Fail action (electric failure)

143-ZV -0404

FC

FC

143-ZV -0424

FC

FC

143-ZV -0425

FC

FC

143-ZV -0445

FC

FC

143-ZV -0448

FC

FC

143-ZV -0470

FC

FC

143-ZV -0471

FC

FC

143-ZV -0472

FC

FC

143-ZV -0473

FC

FC

143-ZV -0474

FC

FC

143-ZV -0476

FC

FC

143-ZV -0477

FC

FC

143-ZV -0478

FC

FC

143-ZV -0479

FC

FC

143-ZV -0496

FC

FC

143-ZV -0497

FC

FC

143-ZV -0498

FC

FC

143-ZV -0503

FC

FC

143-ZV -0504

FC

FC

143-ZV -0505

FC

FC

143-ZV -0506

FC

FC

143-ZV -0507

FC

FC

143-ZV -0508

FC

FC

143-ZV -0509

FC

FC

143-ZV -0510

FC

FC

143-ZV -0511

FC

FC

General Confidential
Page 41 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Tag Number

Fail action (air failure)

Fail action (electric failure)

143-ZV -0530

FC

FC

143-ZV -0533

FC

FC

143-ZV -0540

FC

FC

143-ZV -0542

FC

FC

143-ZV -0557

FC

FC

143-ZV -0562

FC

FC

143-ZV -0572

FC

FC

143-ZV -0575

FC

FC

143-ZV -0585

FC

FC

143-ZV -0588

FC

FC

143-ZV -0600

FC

FC

143-ZV -0610

FC

FC

143-ZV -0616

FC

FC

143-ZV -0620

FC

FC

143-ZV -0623

FC

FC

143-ZV -0636

FC

FC

143-ZV -0637

FC

FC

143-ZV -0638

FC

FC

143-ZV -0660

FC

FC

143-ZV -0663

FC

FC

143-ZV -0700

FC

FC

143-ZV -0701

FC

FC

143-ZV -0702

FC

FC

143-ZV -0703

FC

FC

143-ZV -0704

FC

FC

143-ZV -0705

FC

FC

General Confidential
Page 42 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Tag Number

Fail action (air failure)

Fail action (electric failure)

143-ZV -0706

FC

FC

143-ZV -0707

FC

FC

143-ZV -0708

FC

FC

143-ZV -0709

FC

FC

143-ZV -0748

FC

FC

143-ZV -0749

FC

FC

143-ZV -0752

FC

FC

143-ZV -0753

FC

FC

143-ZV -0754

FC

FC

143-ZV -0756

FC

FC

143-ZV -0757

FC

FC

143-ZV -0785

FC

FC

143-ZV -0819

FC

FC

143-ZV -0841

FC

FC

143-ZV -0842

FC

FC

143-ZV -0843

FC

FC

143-ZV -0844

FC

FC

143-ZV -0845

FC

FC

143-ZV -0846

FC

FC

143-ZV -0847

FC

FC

143-ZV -0848

FC

FC

143-ZV -0849

FC

FC

143-ZV -0850

FC

FC

143-ZV -0851

FC

FC

143-ZV -0864

FC

FC

143-ZV -0865

FC

FC

General Confidential
Page 43 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Tag Number

Fail action (air failure)

Fail action (electric failure)

143-ZV -0866

FC

FC

143-ZV -0867

FC

FC

143-ZV -0868

FC

FC

143-ZV -0869

FC

FC

143-ZV -0880

FC

FC

143-ZV -0881

FC

FC

143-ZV -0887

FC

FC

143-ZV -0913

FC

FC

143-ZV -0914

FC

FC

143-ZV -0915

FC

FC

143-ZV -0916

FC

FC

143-ZV -0917

FC

FC

143-ZV -0918

FC

FC

143-ZV -0919

FC

FC

143-ZV -0920

FC

FC

143-ZV -0921

FC

FC

143-ZV -0925

FC

FC

172-ZV -0090

FC

FC

172-ZV -0091

FC

FC

172-ZV -0092

FC

FC

172-ZV -0093

FC

FC

172-ZV -0094

FC

FC

172-ZV -0095

FC

FC

172-ZV -0096

FC

FC

172-ZV -0099

FC

FC

172-ZV -0259

FC

FC

General Confidential
Page 44 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Tag Number

Fail action (air failure)

Fail action (electric failure)

172-ZV -0260

FC

FC

172-ZV -0445

FC

FC

172-ZV -0450

FC

FC

Table 29 Shutdown valves fail action

205 Loss of Cooling Water


SP1 uses of cooling water are limited to pumps cooling, the below is the list
of pumps that utilize cooling water:
1. 143-G-0015A, refer to table 16 for propane shutdown signals.
2. 172-G-0001A/B/C, refer to table 24 for diesel shutdown signals.
3. 172-G-0002A/B/C, refer to table 25 for gasoline shutdown signals.
SP1 receive cooling water from SP4, any emergency cases shall be handled
by SP4.

206 Loss of MP Steam


SP1 uses of MP steam in the following:
1. Steam tracing for DCU lines.
2. Steam turbine for pump 143-G-0015A
3. Steam for controtrace of sulfur lines and for tanks heating system. A
temperature high, low alarms 143-TAH-0605 & 143-TAL-0605 are
provided to warn the operator from high or low temperature of steam used
for sulfur system.
Also a pressure high and low alarms 143-PAH-0608 &143-PAL-0608 are
provided to warn the operator from high pressure of steam used for sulfur
system.

4.0 300 LOSS OF CRITICAL SYSTEMS/COMPONENTS

302 Loss of Makeup


Make up loss will occur only in caustic scrubber package

As the caustic solution reacts with the H2S gas, the pH of the caustic solution will
begin to drop. The Caustic control valve 143-ACV-0100 will modulate continuously to
add fresh make-up caustic to the Caustic Circulating Drum in order to maintain a
constant pH.

General Confidential
Page 45 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Based on 4000 ppmW inlet H2S loading from each Vacuum Residue Tank, the
minimum theoretical 20% make up caustic rate will normally be about 0.084 gpm
total, while both Vacuum Residue Tanks are venting. The minimum caustic
concentration in the recycle liquid should not fall below 0.5% (equivalent to pH 13.1)
During normal operation, the Circulating Caustic pH should be maintained above
12.5. The intermediate product - NaHS - can gas off a rotten egg odor if pH falls
below 12.5.
CAUTION: It is critical that the Na2S concentration in the liquid shall not exceed 5
wt% to minimize precipitation.
NOTE: operator should periodically analyze the recycle solution for Na2S content, to
ensure it does not exceed the 5 w% Na2S in solution.
If, however, the Na2S concentration does increase, then the tank will need to be
manually purged or dumped and refilled with fresh caustic solution.
Also Make-up water is added to caustic scrubber drum 143-D-0098 on level control
to compensate for water loss due to purge from the oil skimmer and evaporation.
The normal make-up water rate is expected to be about 0.5 gpm (minimum purge
rate to maintain less than 5 wt% Na2S, plus water loss in exhaust gas due to
evaporation). However, water will be lost with the skimmed oil, hence the make-up
water level control valve (143-LCV-0002) is sized to accommodate a higher inlet
make up water flow rate (2-5 gpm).

General Confidential
Page 46 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

5.0 400 UNUSUAL OCCURRENCES

403 Fire Near High Pressure Equipment


Foam Protection System
Foam protection system will be installed on all Open Floating roof tanks
storing flammable liquids. Foam system shall be provided for rim-seal fire
protection. Foam system shall be capable of controlling and extinguishing the
largest single rim-seal fire.
The foam system will comprise the piping, fittings, valves and equipment that
provides foam to the protected tank and notification of plant personnel of
such an event though MAC,horn and speakers shall be activated. The
purpose of foam system will be to extinguish fires in the rim-seal area of a
floating roof storage tank located in the YERP facilities.
Each protected tank will have permanently installed foam pourers specifically
designed for rim-seal application. These devices will be designed per NFPA
11 and YERP-SEAS-B-018.
The foam pourer assembly complete with foam ring supply and foam riser will
be included in scope the tank manufacture
Semi-fixed system shall be utilized. Sufficient valved hose connections (hose
manifold) shall be provided and connected to foam fire truck.
The foam concentration shall be designed for 3% ARAFFF proportioning. The
foam truck will be availed by client
(See table 29) for list of protected tanks with associated number of hose
connections, number of foam chambers, foam demand and water demand.
(See Dwg. 160-SP1-PE-PID-0018, 0019, 0020,0021, 0022, 0023, 0024,
0025,0026 for Foam system)

General Confidential
Page 47 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Dia
(m)

Foam
No. of
Foam
No. of
application
hose
solution foam
rate
connect
(l/min) pourer
(l/min/m2)
ions

Water
demand
(l/min)

Item

Service

143-D-0001

CRUDE OIL
TANK (FROM
YCOT)

110

20.4

4205

15

4079

143-D-0002

CRUDE OIL
TANK (FROM
YCOT)

110

20.4

4205

15

4079

143-D-0003

NHT FEED
TANK (SGP
NAPHTHA)

74.5

20.4

2841

10

2756

143-D-0007

DHT FEED
TANK
(KEROAND
DIESEL)

102.5

20.4

3917

14

3800

143-D-0009

HCK FEED
TANK
(AGO/VGO)

109

20.4

4167

15

4042

143-D-0016

REFORMATE
STORAGE
TANK

45

20.4

1707

1656

143-D-0017

REFORMATE
STORAGE
TANK

45

20.4

1707

1656

172-D-0005

GASOLINE
EXPORT
TANK

88

20.4

3360

12

3260

172-D-0006

GASOLINE
EXPORT
TANK

88

20.4

3360

12

3260

172-D-0007

GASOLINE
EXPORT
TANK

88

20.4

3360

12

3260

Table 30 Floating roof protected by foam system

General Confidential
Page 48 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Fixed Water Deluge System


Fixed water deluge system shall be provided to protect spheres and
spheroids containing flammable liquids. The minimum protected area for
spheres and spheroids shall be the surface area above the maximum
diameter of the vessel tank. Where liquid level is under normal operating
conditions but is below the maximum diameter of the vessel/tank, the
protected area shall include the surface area between the top of the
vessel/tank and normal liquid level. In this case, a ring of water sprays shall
be added to protect the area of the shell that is not wetted by the spray
system due to interference by the legs.The minimum protected area for
hemispheroids shall be the roof area.
Design of the fire water deluge system shall follow requirements of YERPSAESB-017 Total calculated flow rate should not exceed 238.2 m3/hr (1048
GPM).
The deluge valves shall be skid mounted and installed in a readily accessible
position, with access from the plant road and at least 15m from the protected
item.
System shall be activated automatically and manually as follows:
1- Automatic through fusible link.
2- Remote Manually through push buttons located in CCB room
3- Manually from manual valve located on deluge skid.
4- Manually through pneumatic manual valve located near to deluge skid
5- Remote DCS soft switch.
Actuation of the deluge skids shall be as per control system /instrumentation
design basis doc.no. 100-YER-PE-PDB-0001
Branch piping to spray heads shall be connected on the top of the distribution
piping or supply ring to minimize clogging of the heads.
(See table #30 for list of protected items with associated number of deluge
valve sizes, application rates and water demand

General Confidential
Page 49 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Water deluge
application rate
(l/min/m2)

Water
deluge
flow rate
(l/min)

Deluge
valve size
(in)

Item

Service

Dia
(m)

143-D-0024

Propane sphere

20

10.2

3970

143-D-0025

Propane sphere

20

10.2

3970

143-D-0026

Propane sphere

20

10.2

3970

143-D-0027

Mixed Butane

20

10.2

3970

143-D-0028

Mixed Butane

20

10.2

3970

143-D-0029

Mixed Butane

20

10.2

3970

143-D-0030

Mixed Butane

20

10.2

3970

143-D-0031

Coker LPG/Mixed
butane

20

10.2

3970

143-D-0032

Mixed Butane

20

10.2

3970

143-D-0014

Isomerate and
CCR light
reformate

88

10.2

9060

143-D-0015

Isomerate and
CCR light
reformate

33.94

10.2

9060

143-D-0044

NHT light
naphtha

33.94

10.2

9060

143-D-0047

Light slop tank

31

10.2

7360

Table 31 spheres and spheroids protected by water deluge system

General Confidential
Page 50 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Fire and gas emergency


Sphere 143-D-0024 fire fighting
Tag No.

Description

143-PIT-1140

Heat detection

143-HS-1000

Deluge hand switch located in


CCR

Interlock Action
Initiate an alarm :
Open deluge valve 143-ZXV-0975 for sphere
143-D-0024
Initiate an alarm :
Open deluge valve 143-ZXV-0975 for sphere
143-D-0024

Sphere 143-D-0025 fire fighting


Tag No.

Description

143-PIT-1143

Heat detection

143-HS-1001

Deluge hand switch located in


CCR

Interlock Action
Initiate an alarm :
Open deluge valve 143-ZXV-0976 for sphere
143-D-0025
Initiate an alarm :
Open deluge valve 143-ZXV-0976 for sphere
143-D-0025

Sphere 143-D-0026 fire fighting


Tag No.

Description

143-PIT-1146

Heat detection

143-HS-1002

Deluge hand switch located in


CCR

Interlock Action
Initiate an alarm :
Open deluge valve 143-ZXV-0977 for sphere
143-D-0026
Initiate an alarm :
Open deluge valve 143-ZXV-0977 for sphere
143-D-0026

Sphere 143-D-0027 fire fighting


Tag No.

Description

143-PIT-1149

Heat detection

143-HS-1003

Deluge hand switch located in


CCR

Interlock Action
Initiate an alarm :
Open deluge valve 143-ZXV-0978 for sphere
143-D-0027
Initiate an alarm :
Open deluge valve 143-ZXV-0978 for sphere
143-D-0027

Sphere 143-D-0028 fire fighting


Tag No.

Description

143-PIT-1152

Heat detection

143-HS-1004

Deluge hand switch located in


CCR

Interlock Action
Initiate an alarm :
Open deluge valve 143-ZXV-0979 for sphere
143-D-0028
Initiate an alarm :
Open deluge valve 143-ZXV-0979 for sphere
143-D-0028

General Confidential
Page 51 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Sphere 143-D-0029 fire fighting


Tag No.

Description

143-PIT-1155

Heat detection

143-HS-1005

Deluge hand switch located in


CCR

Interlock Action
Initiate an alarm :
Open deluge valve 143-ZXV-0980 for sphere
143-D-0029
Initiate an alarm :
Open deluge valve 143-ZXV-0980for sphere
143-D-0029

Sphere 143-D-0030 fire fighting


Tag No.

Description

143-PIT-1158

Heat detection

143-HS-1006

Deluge hand switch located in


CCR

Interlock Action
Initiate an alarm :
Open deluge valve 143-ZXV-0981for sphere
143-D-0030
Initiate an alarm :
Open deluge valve 143-ZXV-0981for sphere
143-D-0030

Sphere 143-D-0031 fire fighting


Tag No.

Description

143-PIT-1161

Heat detection

143-HS-1007

Deluge hand switch located in


CCR

Interlock Action
Initiate an alarm :
Open deluge valve 143-ZXV-0982for sphere
143-D-0031
Initiate an alarm :
Open deluge valve 143-ZXV-0982for sphere
143-D-0031

Sphere 143-D-0032 fire fighting


Tag No.

Description

143-PIT-1164

Heat detection

143-HS-1008

Deluge hand switch located in


CCR

Interlock Action
Initiate an alarm :
Open deluge valve 143-ZXV-0983for sphere
143-D-0032
Initiate an alarm :
Open deluge valve 143-ZXV-0983for sphere
143-D-0032

Spheroid 143-D-0014 fire fighting


Tag No.

Description

143-PIT-1167

Heat detection

143-HS-1009

Deluge hand switch located in


CCR

Interlock Action
Initiate an alarm :
Open deluge valve 143-ZXV-0984for spheroid
143-D-0014
Initiate an alarm :
Open deluge valve 143-ZXV-0984for sphere
143-D-0014

General Confidential
Page 52 of 53

Yanbu Export Refinery Project


OPERATING INSTRUCTIONS FOR SP1 TANK FARM
EMERGENCY PROCEDURES
Document No.: 143-SP1-PE-OPM-0003
Revision No.: A Issue Date: 08 OCT 2013

Spheroid 143-D-0015 fire fighting


Tag No.

Description

143-PIT-1170

Heat detection

143-HS-1010

Deluge hand switch located in


CCR

Interlock Action
Initiate an alarm :
Open deluge valve 143-ZXV-0985for spheroid
143-D-0015
Initiate an alarm :
Open deluge valve 143-ZXV-0985for sphere
143-D-0015

Spheroid 143-D-0044 fire fighting


Tag No.

Description

143-PIT-1173

Heat detection

143-HS-1011

Deluge hand switch located in


CCR

Interlock Action
Initiate an alarm :
Open deluge valve 143-ZXV-0986for spheroid
143-D-0044
Initiate an alarm :
Open deluge valve 143-ZXV-0986for sphere
143-D-0044

Spheroid 143-D-0047 fire fighting


Tag No.

Description

143-PIT-1176

Heat detection

143-HS-1012

Deluge hand switch located in


CCR

Interlock Action
Initiate an alarm :
Open deluge valve 143-ZXV-0987for spheroid
143-D-0047
Initiate an alarm :
Open deluge valve 143-ZXV-0987for sphere
143-D-0047

Table 32 Fire and gas emergency table

General Confidential
Page 53 of 53