SIMPLEX INFRASTRUCTURE LTD


DAILY WORK DIARY

Activity

Manpower employed
C/P
MA

S/F
1) Column Deshuttering, shuttering for bal 2 columns
2) Colum Repairing

Structure works completed


(1)Lintel beam fixing

bottle necks

employed
H

Total
0

9
0

5
0

SIMPLEX INFRASTRUCTURE LTD


PROGRAMME FOR COMPLETION
Works planned

MA 44
Footings
Columns
Slab scaffolding/ shuttering
Reinforcement
Beam side shuttering
MA 45

Planned start
Slab completion
Date :

29-Mar
31-Mar
3-Apr
4-Apr
completion Date :

planned
complete

Planned
Actual start
duration

4/5/2015

Actual
complete

days remaining
3
3
3
2
1

31-Mar
2-Apr
4-Apr
4-Apr
3/30/2015

23-Mar
29-Mar
2-Apr
4-Apr
4-Apr

Actual
Duration

duration
elasped

% of Work
Complete

200%
67%
100%
250%
500%

100%
85%
100%
285%
285%

28-Mar
30-Mar
4-Apr

days remaining

6
2
3
5
5

80%

MA 47 B

Excavation
Road base 1st laying
Road base 2nd laying
PCC
Reinforcement & Shuttering
footing concreting
columns casting
Grade slab works
Slab scaffolding & shuttering
reinforcement works
Stair case works
LV 85C
Excavation
Road base 1st layer ( low level)
Road base 2nd laying ( low level)
PCC ( first part)
Trench PCC
Reinforcement & Shuttering
footing concreting
Road base 1st layer ( 2nd part)
Road base 2nd laying ( 2nd part)
PCC ( 2nd part)
Reinforcement & Shuttering
Trench Wall- 2 trenches

footing concreting
columns casting
Grade slab works
Slab scaffolding & shuttering
reinforcement works

completion Date :

28-Mar

4/19/2015

29-Mar

30-Mar
1-Apr
2-Apr
3-Apr
5-Apr
6-Apr
11-Apr
14-Apr
17-Apr
14-Apr

31-Mar
2-Apr
2-Apr
4-Apr
5-Apr
10-Apr
13-Apr
16-Apr
18-Apr
19-Apr

2
2
1
2
1
5
3
3
2
6

4/16/2015

completed
completed
completed

on progress
(4 beams
balance)
awaiting for MEP
Clearance

24-Mar

completion Date :

bottlenecks for
completion

-9

30-Mar
24-Mar

4/8/2015

Status

-3

Tie beam
Road base

Date :

**

days remaining

11

24-Mar

15.00

days remaining

19-Mar
29-Mar
29-Mar
29-Mar
29-Mar
30-Mar
31-Mar

28-Mar
29-Mar
29-Mar
29-Mar
29-Mar
31-Mar
31-Mar

9
1
1
1
1
2
1

1-Apr

1-Apr

1-Apr
1-Apr
2-Apr
1-Apr

1-Apr
1-Apr
3-Apr
3-Apr

1
1
2
3

4-Apr

4-Apr

5-Apr
9-Apr
11-Apr
14-Apr

8-Apr
10-Apr
13-Apr
16-Apr

4
2
3
3

19-Mar
28-Mar
28-Mar
29-Mar
29-Mar

250%

70%

in progress

100%
100%
100%
1000%

100%
100%
100%
100%

completed
completed
completed
on progress

Different levels may


leads delay
and MEP casing needs
to be break

8
28-Mar
29-Mar
29-Mar
30-Mar
30-Mar

9.00
1.00
1.00
10.00

( depends on MEP
CASING WORKS)

one footing after 3


days from date of
trench wall casting

SIMPLEX INFRASTRUCTURE LIMITED


IMG THEME PARK PROJECT, DUBAI
LOG SHEET
EQUIPMENT NAME :-

DATE

OPERATOR
NAME

START
TIME

END
SIGN

TIME

SIGN

BREAK
DOWN
HRS

TOTAL WORK
HOURS

FUEL
GALON

SIGN

LOCATION & WORK DETAILS


with site Engineer sign

MANPOWER REQUIREMENT - IMGTP


Sl.No

Structure

Works Remaining

C/P

Present manpower
S/F
MA
Helper

Total

C/P

Required Manpower
S/F
MA
Helper Total

Milestones completion/ concrete qty

Daily Total
Manpower

MA 41
S/F

16-Mar

S/F
C/P
MA 45 Footings -16 Nos

38 m3

C/P

MA 42
MA

OT

24 1. Tie beam one no shutteting & Reft fxing


2. Marking done at afternone for RCC columns
29

MA

OT

TOTAL

64

17-Mar

S/F
28

MA

MA48 Ac duct precast cover (1)

0.8 m3

OT

MA41 Tie beam (1)

0.3 m3
TOTAL

62

5 m3

C/P

MA

OT

S/F
C/P
MA

MA 48 AC return duct cover

0.9 m3

OT

11

TOTAL

69

19-Mar

MA45-M.pit wall, Fg, Pedestal


MA42- ST2 staircase

C/P

MA44
MA

OT

Completed

Constraints

S/F

C/P

MA

OT

S/F

C/P

MA

OT

MA 45
S/F

12

C/P 15

MA 45 A
MA

OT

S/F

1) Foundation concrete -15 Nos (38 cum)


2) Maintanance pit Deshuttering & Wall reft works,
shuttering
3) Tie beam desuttering & Shuttering
4) Backfilling started

HOLD

Constraints

Constraints

S/F

C/P 16

MA

C/P

hold
2

OT

1) Tie beam shuttering -10 Nos


2)Footing deshuttering & PCC Preparation- 5 Nos
3) Pedestal Reft fixing
4) Back filling is in progress ( spreading by bobcut)
5) PCC done -4 Nos (night)

Completed

Constraints
C/P

MA

OT

Constraints
LV 85C Excavation started

S/F

1) Finishing/ Repairing works - roof beams


2) ST-2 Shuttering works
3) Column shuttering for jacketing

26 1) Reinforcement fixing for columns


2) Scaffolding for Columns
28

0.5 m3

OT

Constraints

S/F

C/P

1) Electrical Trench casting done

Constraints
hold

S/F
18-Mar

Constraints

MA 45 PCC 1no

MA 43
MA

Showel not available

23 1) Vertical fixing for columns (incl drilling)

C/P

Constraints

S/F
10 m3

C/P

1. ST-2 Staircase shuttering

Constraints

MA45-Tie beam(10s) & PCC (4)

S/F

S/F

C/P

MA

OT

S/F

1)ST -2 waist slab huttering completed, Reft works is in


progress
2)Finishing / Repiaring works
3)column concreting near ST4 staircase

Completed

Constraints

Constraints

C/P

MA

OT

S/F

C/P 16

MA

OT

1) PCC laying -1 no
2)Reft, Shuttering for Footing 5 Nos
3)Pedestal shuttering, Bolt fixing is in progress
4)Backfilling is in Progress

S/F

C/P

hold

Constraints
Manpower shortage for Deshuttering

S/F

C/P

S/F

12 Column shutter making

C/P

34

9 m3

MA

6.0 m3

OT

TOTAL

58

Constraints

MA

OT

S/F

C/P

MA

OT

S/F

C/P

MA

OT

S/F

C/P 21

MA

hold
OT

1) ST2-stair reft, shuttering


2)Finishing & Repairing works
3)ST2 stair concrete (night) -6 m3

completed

1) Pedestal reft & shuttering,


2) Backfilling and grading for grade slab
3)Deshuttering, bitumin paint applying, HK works
4) concreting- M.pit, Fg-2,Pedestal -5 nos

Constraints

Constraints

Constraints
1) concrete not available for balance fg, pedtls

S/F

C/P

hold

hold

Milestones completion/ concrete qty

Daily Total
MA 45 A
Manpower

MA 46
MA

16-Mar

HOLD
MA 45 Footings -16 Nos

38 m3

S/F

24

C/P

29

MA

OT

TOTAL

OT

17-Mar

28
4

10 m3

MA

MA48 Ac duct precast cover (1)

0.8 m3

OT

MA41 Tie beam (1)

0.3 m3
5 m3

TOTAL

18-Mar

S/F

26
28

0.5 m3

MA

MA 48 AC return duct cover

0.9 m3

OT

11

19-Mar

MA42- ST2 staircase

C/P

MA 47 B
MA

MA 48

OT

S/F

C/P

Constraints

Constraints

Constraints

OT

S/F

C/P

MA

OT

S/F

C/P

MA

OT

S/F
1)
2)
3)
4)

1) Curing only

LV 85 C
MA

OT

S/F

C/P

MA

OT

Constraints

C/P

MA

OT

S/F

C/P

MA

OT

MA

OT

S/F

C/P

MA

OT

MA

OT

S/F

C/P

MA

OT

Chipping of Lift opening


AC return duct precast slab casting 1Nos
Lift hook beam fixing
Lintel beam fixing and column fixing

Dwg not confirmed


OT

S/F

S/F

12

C/P

34

9 m3

MA

6.0 m3

OT

58
hold

C/P

MA

OT

1) Excavation is in progress

S/F

C/P

MA

OT

1) curing only

S/F

C/P

Completed

Dwg not confirmed


MA

TOTAL

S/F

1) Lift hook fixing is in progress

69hold

LV 85C Excavation started

MA45-M.pit wall, Fg, Pedestal

OT

MA 45 PCC 1no

hold

MA 47
MA

1) Curing only

62hold

C/P

TOTAL

1) Excavation is in progress

MA
hold

C/P

1) excavator, 2) dwg non-confirmity


MA

C/P

1) Electrical Trench-1 Excavation Completed


2) foundation Excavation Started after 3 PM

64hold

1) Electrical Trench
S/Fcasting
23 done
MA45-Tie beam(10s) & PCC (4)

S/F

OT

S/F

C/P

MA

OT

1) excavation stopped due machinary shifted to LV 85 c


(80% excavation completed)

Dwg not confirmed

S/F
1) curing only

C/P

MA

OT

S/F

C/P

Reft & shuttering works for BW beams,

1) Excavation is in progress (cum progress 65%)


(Excavation done for EZ25 also along with LV 85 C)

constraints
1) Electrical trench details not available/ heavy ug
utilities