Escolar Documentos
Profissional Documentos
Cultura Documentos
Action
Hopping
10
12
DXB
NE
AUH
Done (March-2015)
26-Feb-14
Done (March-2015)
26-Feb-14
8-Feb-14
Done (Feb-2015)
Done (Feb-2015)
8-Mar-14
AAN
#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
28
29
30
31
32.357
33.548
35
Action
Intrafrequency Neighbour Audit (Based on attempts and ranking)
Colocated Neighbour Check (IRAT/Intra/Inter)
Blind HO Audit
F3 Strategy and location Audit (F3 cluster & F1/F2 Cluster)
F3 Boundary Cells Changes Audit (Early IRAT etc)
DC-HSDPA Audit (including L2 Enhanced,64 QAM, DC Cell Group,UL BB Group,Node B Definition)
MAX TXPOWER Audit (Hardware/NodeB/RNC)
64 QAM Audit (RNC vs Node B definition)
CE Licence defined vs hardware capability
RNC Parameter Audit Intra Region/Inter Region (For activated features in all the RNCs)
Carrier Audit (No carrier is misising in any site/Carrier Definition/U900 etc)
External 3G Cell Parameter Check
External 2G Cell Parameter Cell
LTE cell/neighbour definition and parameter Audit for PS Redirection(ULTECELL/ULTENCELL)
RTWP Audit
Cell Definition/Activation/On Airing check
SIB Definition Check
Cell Selection Reselection Parmeters including IRAT Reselections in complaince with 2G (FDDQMin+Qsearch_I)
Cell Radius Definition
Licence (TTI 2ms)
3G -> LTE reselection parameters (only for LTE co-located sites)
One way neighbours audit for Intra Freq Neighbors
HSUPA & HSDPA activation on all cells
T Cell & SC consistency check for DC-HSDPA cells
All 2G Cells in neighor list defined in 2G external cell data
PLVA License check
CQI Adjustment switch (NodeB level)
HSDPA Flow Control Switch audit for all NodeBs (NodeB level)
R99 Flow Control Switch audit for all NodeBs (NodeB level)
MAC-E parameters audit (NodeB level)
Repeated SACs
IUR inconsistencies (External cell capabilities)
Sector Swap detection and clearance from stats
DXB
NE
AUH
Done (Feb-2015)
Done (Feb-2015)
42050
Done (Feb-2015)
Done (Feb-2015)
Done (Feb-2015)
Done (Feb-2015)
Done (Feb-2015)
Done (Feb-2015)
Done (Feb-2015)
Done (Feb-2015)
Done (Feb-2015)
42060
In Progress
Done (Feb-2015)
Done (Feb-2015)
Done (Feb-2015)
Done (Feb-2015)
28-Feb-15
20-Feb-15
Done (Feb-2015)
Done (Feb-2015)
28-Feb-15
Done (Feb-2015)
Done (Feb-2015)
20-Feb-15
Done (Feb-2015)
Done (Mar-2015)
2-Feb-15
To be disabled in progress
Done (Feb-2015)
23-Feb-05
Done (Jan-2015)
2-Feb-15
AAN
AUDIT
3G relations audit
10
11
12
13
14
15
PCI conflict
16
17
LTE configured TAC audit according to 3G LAC (Synchronised with core definition)
18
19
20
21
22
23
24
25
26
Cmd
AUH
DXB
CnOperatorTa
Done (Feb-2015)
EutranExternalCell
Done (Feb-2015)
UtranExternalCell
CSFallBackBlindHoCfg
Done (Feb-2015)
GeranNfreqGroup
GeranExternalCell
GeranNcell
CELLRESELGERAN
ENodeBAlgoSwitch
CSFallBackBlindHoCfg
CSFALLBACKPOLICYCFG
CSFALLBACKHO
UTRANNCELL
Done (Feb-2015)
ENODEBALGOSWITCH
Done (Feb-2015)
CSFALLBACKPOLICYCFG
Done (Feb-2015)
Done (Feb-2015)
NE
AAN