Until the 1970's, typical, large organizations tended to function in "silos", logical divisions
where essentially isolated groups of workers reported to a line manager or functional
manager. Imagine columns on a page with a line manager at the top of each column and a
group of workers inside each column under the manager.

As these groups operated autonomously, it was not unusual to find functions replicated in
each silo.

In an Information Technology company for example, you might find software programmers
in the development area, some more in the customer support area, and yet more in the
quality assurance area, because each of these functional units had a programming need.
If your organisation still operates in this manner, give your boss a copy of this article.

And so it was in the 1970s that attempts to improve traditional organization structures, led
to the creation of the “Matrix" organizational structure.

In the matrix organisation, considering our IT example above, all programmers are now in a
separate programming department and report to a functional manager in charge of
programming, and that manager would control almost all of their work. In a matrix we
usually refer to the line manager as a functional manager because all of their workers
perform similar functions.

So workers in a matrix organisation are compartmentalized by their required skills into silos,
like columns in a matrix, each with its dedicated manager. The workers report to and are
responsible to their functional manager, who in turn usually has sole responsibility for the
advancement of their workers, as well as the administration of their area, including
budgeting.

So far the matrix organization sounds much like the traditional organization, except that all
workers within a silo (a column in the matrix) are partitioned by a particular skill-set.

The other difference between traditional organisations and matrix organisations is that
matrices have rows (lines running across the columns, not fights).

Traditional organizations operated quite well, but they were inefficient, with lots of
duplication of skills around the company. But their major weakness was when they tried to
manage projects.

The problem was that in the traditional organisation, the concept of a project team, which is
my nature cross-functional, did not exist, because the project manager's "team" team
comprised of people from different functional areas, managed and controlled by different
functional managers -- not by the project manager. And this is not a recipe for successful
projects.
So we have our columns of functionally similar workers in each column of our matrix, with a
functional manager at the head of each column.
Now picture rows running across the page, with a project manager at the "head" (i.e. the
left hand side) of each row. The rows intersect the columns and so intersect the columns of
workers. So each row is a silo of workers of differing functionality, headed by a project
manager. In such a matrix structure there is an obvious tension between the project
managers at the head of each row (each project) and the managers at the head of each
column (each functional area) as they are sharing the same workers, and as each manager
(project and functional) has a job to do, we have a conflict of interest.

There are different types of matrix organization, designed to balance the power struggle-
struggle between the managers conflicting needs. The main types are listed below.

The Weak Matrix

This type of organizational structure is a bit of a nightmare for Project Managers because
they are effectively reduced to being project facilitators. They make plans and monitor the
execution, but they have no real authority over staff, and are almost totally reliant upon the
functional managers to provide resources.

The workers have little loyalty to the project managers (or the project), because it is the
functional managers who decide the advancement of the workers within the organization.
And the workers' performance is usually measured only on the work that they do for their
functional manager -- not on their project work -- so in fact working on a project may be
seen by the worker as undesirable as they will have less time to do their regular work, so
the project manager may find them unmotivated.

And as the PM has no real authority over the team members, then they often have to report
the problem of workers not performing, to the functional managers in the hope that they
will encourage the workers to work more on the project.

But remember that the functional managers are primarily responsible for the performance of
their own functional areas, so their workers performing project tasks can actually reduce the
productivity of their area (often projects are ignored in the benchmarks). So this leads to a
clear conflict of interest between the PM, the functional managers and the various workers.

In this situation the PM usually loses -- and that’s the easy to remember it -- the PM is weak
in a weak matrix.

The Strong Matrix

All these problems led to the creation of the “strong matrix” organization

In the strong matrix the tables are turned, it is the project managers that have
responsibility for the workers, not the line managers. But the PMs are not responsible for
the human resource administration.

This empowers the project managers to manage the workers directly, and thus properly
manage the whole project, but without tying the PMs up in HR administration.

I have worked in organizations like this, where I managed my teams and was responsible
for everything except the HR functions, and I found it a very satisfying environment from a
project point of view. So my teams would have me as project manager and I had sole
authority and responsibility to direct their work, but they also had staff managers who
looked after anything that was not project-related, i.e. performance reviews (but I provided
the key input to these) training, vacation administration, employment contracts etc. And
this meant that I could focus on the projects.

So when a project manager starts a new project, they discuss their staffing requirement
with the functional managers and the functional managers try to make the resources
available (and provide training fro them, where necessary). Usually the functional managers
will draw up plans and charts (e.g. Gantt charts) of how “their people” will fit inside
projects, and they might move staff between projects and project managers as required
(after consulting with the project managers).

Effectively the PM and the functional managers work together, but overall control of
everything project-related is the function of the project manager -- so in a strong matrix,
the project manager is the stronger party.

The Balanced Matrix

There is an old saying, “power corrupts, and absolute power corrupts absolutely”. In each
type of matrix organization there is a struggle for power, and so there needs to be some
way to bring this into balance, otherwise one group will dominate the other, to the
detriment of the project, and ultimately to the detriment of the organization as a whole
(although individual projects or functional areas may blossom for a while). A very dominant
project manager for example may bully the functional managers into always giving them
the best team members for their projects.

One way of reducing the problem is to make rules within the organization that varies who
can manage a worker, depending upon certain circumstances. For example there could be a
rule that says if an worker is to work on a project for less than one week then the functional
manager (or project manager) has sole control over the worker, but if the requirement is for
more than one week, control changes hands.
Or there may be rules that the same worker can’t work for the same PM, on two consecutive
projects.

There are many possible rules that could be made of course, but the goal is to balance the
power between the PM and the functional managers so that we don’t have a win/lose
situation, and I’m sure you can guess that this type of organizational structure is called a
“balanced matrix”.

So weak, strong, or balanced, the "strength" is always from the viewpoint of the project
manager.