P&ID Number
P&ID 100-002
Process Description
Vapor product from R-100 is partially condensed at E-100 using cooling water. The two-phase product goes to D-100, where the
condensed liquid is separated from the uncondensed vapor. The liquid product is sent to R-200 via P-100, and its flowrate is
controlled by D-100 level. On the other hand, the vapor product is sent to T-100 for further processing.
Deviation
1. No/Less Flow
Causes
Consequences
Safeguards
2. More Flow
3. Low Pressure
4. High
Pressure
Remarks
(FYI: Clogging of temporary
strainer on P-100 suction line
during startup and check valve
failure are also considered on
actual HAZOP, but not
considered for this course).
(Company Name)
BY:
KCD
CHKD:
KCD
(Company Address)
REV:
DATE:
A
APVD:
04-12-2015
KCD
Causes
Consequences
SHEET:
Safeguards
5. Low
Temperature
6. High
Temperature
of
Remarks
(Company Name)
BY:
KCD
CHKD:
KCD
(Company Address)
REV:
DATE:
A
APVD:
04-12-2015
KCD
Causes
Consequences
SHEET:
Safeguards
LIC-10204 on D-100
malfunctions and causes FV10209 on D-100 liquid product
line to fully open.
of
Remarks
8. High Level
(Company Name)
BY:
KCD
CHKD:
KCD
(Company Address)
REV:
DATE:
A
APVD:
04-12-2015
KCD
Causes
Consequences
SHEET:
Safeguards
of
Remarks
is called steam explosion and it
is very difficult to protect any
system against it. The rate of
vaporization is much faster than
the response time of any
interlocks and the opening time
of any PSV.)
LIC-10204 on D-100
malfunctions and causes FV10209 on D-100 liquid product
line to fully close.
(Company Name)
BY:
KCD
CHKD:
KCD
(Company Address)
REV:
DATE:
A
APVD:
04-12-2015
KCD
Causes
Consequences
SHEET:
of
Safeguards
Remarks
high level interlock (LAHH10204) and (2) LAH-10215 on D100 vapor line close XV-10204
on D-100 feed line when
activated.
Pressure.