SECTION 01025
MEASUREMENT AND PAYMENT

F. Optional Services, is a contingency item to be utilized ONLY as authorized by the CITY. This
Item may authorize additional work to the contractor for unforeseen conditions and for items not
specifically included in the individual unit price bid items. This item may not be used at all or
may be partially used. The disbursement of any/all of this item is totally at the discretion of the
ENGINEER/CITY and shall not be considered due the CONTRACTOR.





Item #

Item Description

Unit of Measure

Basis of Payment

GENERAL CONDITIONS / CONTRACT ITEMS





















2














Mobilization








Testing & Survey





Maintenance Of
Traffic (MOT)









LS







LS





LS

Price and payment will be full compensation


for mobilization and demobilization of equipment and
personnel to and from the job site, including acquisition of
required construction staging areas and setting up and
removal of any required temporary facilities and services and
for cleanup of project site. Payment for any item of work
called for in the plans and specifications and not included
under any other item including but not limited to
Consideration for Indemnification and Payment of
Performance and Payment Bonds shall be included in this
payment
item. The payment for this item shall be limited to a
maximum of 15% of total Base Bid price.
Price and payment will be full compensation
to perform all calculations and field work required, in order
to establish all horizontal and vertical controls, set all stakes
needed, such as grade stakes, offset stakes, reference point
stakes, slope stakes, and other reference marks or points,
necessary to provide lines and grades for construction
and as-builting of all roadway, utility construction and
miscellaneous items. Payment for this item also includes all
field- testing and laboratory work including reports as
required by the plans and specifications.
Price and payment will be full compensation
for all equipment, supplies, and labor necessary to prepare,
obtain permit approval, and carry out the Maintenance of
Traffic Plan, including but not limited to all
temporary signage and stripping, barricades, temporary
barrier walls, drums, cones,
lights, high intensity lights, flashing arrow boards, impact
attenuators, temporary reflective pavement markers,
temporary drainage structures (if needed), temporary

01025-3

SECTION 01025
MEASUREMENT AND PAYMENT




Florida Trench
Safety Act
Compliance
Permit
Allowance

4



5

Optional
Services

DRAINAGE ITEMS









7
Furnish and Install
36 RCP









FurnishandInstall
24RCP







8






Furnish and Install


18 RCP

pavement (asphaltic concrete and base). Temporary asphalt


shall consist of 6" lime rock base with 2" of asphaltic
concrete and other items relating to maintenance of traffic.

LS

AL

AL





LF








LF



LF

Price and payment will be full compensation for the total


cost of compliance with the Florida Trench Safety Act.
Price and Payment for permitting allowance is a contingency
item to be utilized ONLY as authorized by the City. Payment
will be made for cost paid by the contractor for outside agency
permits.
Price and payment for Optional Services, is
a contingency item to be utilized ONLY as authorized by the
CITY. Payment will be made for authorized additional work
to the contractor as unforeseen conditions.
Price and payment will be by linear foot. Includes all work,
material and testing necessary for the installation of storm
drainage piping including but not limited to pipe and pipe
appurtenances, excavation, pipe bedding, backfilling material
and compaction. Prices and payment includes the complete
restoration of the surface disturbed by the construction but not
limited to pavement restoration, sidewalk restoration, curb
restoration, pavement marking and signage restoration,
driveway restoration, landscape restoration.
Price and payment will be by linear foot. Includes all work,
material and testing necessary for the installation of storm
drainage piping including but not limited to pipe and pipe
appurtenances, excavation, pipe bedding, backfilling material
and compaction. Prices and payment includes the complete
restoration of the surface disturbed by the construction but not
limited to pavement restoration, sidewalk restoration, curb
restoration, pavement marking and signage restoration,
driveway restoration, landscape restoration.
Price and payment will be by linear foot. Includes all work,
material and testing necessary for the installation of storm
drainage piping including but not limited to pipe and pipe
appurtenances, excavation, pipe bedding, backfilling material
and compaction. Prices and payment includes the complete
restoration of the surface disturbed by the construction but not
limited to pavement restoration, sidewalk restoration, curb
restoration, pavement marking and signage restoration,
driveway restoration, landscape restoration.

01025-4









10




11





FurnishandInstall
15RCP

Furnish and
Install 12x18
ERCP

LF

12

13



14



15

16

17







LF

Furnish and
Install Type C-4
Inlet

Furnish and
Install Type C-5
Inlet


Furnish and Install
FDOT Type E inlet


FurnishandInstall
4DiaManhole

Connect to
Existing
Structures

Manhole
Adjustment

EA


EA

SECTION 01025
MEASUREMENT AND PAYMENT
Price and payment will be by linear foot. Includes all work,
material and testing necessary for the installation of storm
drainage piping including but not limited to pipe and pipe
appurtenances, excavation, pipe bedding, backfilling material
and compaction. Prices and payment includes the complete
restoration of the surface disturbed by the construction but not
limited to pavement restoration, sidewalk restoration, curb
restoration, pavement marking and signage restoration,
driveway restoration, landscape restoration.
Price and payment will be by linear foot. Includes all work,
material and testing necessary for the installation of storm
drainage piping including but not limited to pipe and pipe
appurtenances, excavation, pipe bedding, backfilling material
and compaction. Prices and payment includes the complete
restoration of the surface disturbed by the construction but not
limited to pavement restoration, sidewalk restoration, curb
restoration, pavement marking and signage restoration,
driveway restoration, landscape restoration.
Payment by each unit. Includes all work, material and
testing necessary for the installation of storm drainage
structures including but not limited to excavating,
concrete, brick masonry, sealing pipe inlets and outlets,
backfilling and restoration.
Payment by each unit. Includes all work, material and testing
necessary for the installation of storm drainage structures
including but not limited to excavating, concrete, brick
masonry, sealing pipe inlets and outlets, backfilling and
restoration.



EA



Payment by each unit. Includes all work, material and testing


necessary for the installation of storm drainage structures
including but not limited to excavating, concrete, brick
masonry, sealing pipe inlets and outlets, backfilling and
restoration.



EA

Payment by each unit. Includes all work, material and testing


necessary for the installation of storm drainage structures
including but not limited to excavating, concrete, brick
masonry, sealing pipe inlets and outlets, backfilling and
restoration.

EA

EA

Payment by each unit. Prices include but not limited to


excavation, dewatering, backfilling and compaction, core
drilling, saw cutting, grouting, construction of the connection,
restoration, and all else necessary for a complete and
functional installation.
Payment by each unit. Includes all work and
materials necessary for the adjustments of manhole rims,
valve, junction, control and electric pull boxes and their
assemblies and any incidentals as may be required
throughout the course of construction to maintain a true and
level driving and walking surface.
01025-5

SECTION 01025
MEASUREMENT AND PAYMENT
PAVING & EARTHWORK



18
Driveway Repair



SY

19

Milling

SY

20

21

1 Asphalt
Overlay

Retention Ponds

SY

LS


22

Hydroseeding

Tree Relocation

Payment by square yard. Includes but is not


limited to all subgrade, limerock, earthwork, compaction,
reconstruction of the driveway to the same depth and material
as the existing one, furnishing and installation of material,
disposal of excess material, and the appurtenant items for
which separate payment is not specifically included in the Bid
Schedule.
Payment by squared yard completed within the neat lines as
indicated and accepted under the terms of the contract. No
additional payment will be made for cleaning of existing
payment or final pavement surfaces, removal of existing
asphalt, and saw cut of existing pavement.
Payment by squared yard completed within the neat lines as
indicated and accepted under the terms of the contract. Includes
all work, material, and testing necessary for the installation of a
maximum of type S-III asphalt. No additional payment will
be made for primer, tack coat, cleaning of existing pavement,
removal of existing asphalt and saw cut of existing pavement.
Lump sum payment for the construction of the retention pond.
Includes all work, material and equipment, earthwork, disposal
of material and all other work necessary to complete the task.
Payment by square footage. Includes all work, material and
equipment necessary for the installation of hydroseed.

SF

EA

Payment by each unit. Includes all work, material and testing


necessary for the removal and disposal of existing trees or
relocation according with the plans and specifications

23





END OF SECTION 01025