The Custodian of al-Haramain King Abdullah bin Abdul Aziz's Project


to increase the capacity of the Mataf:

-The proposition of a project to increase the capacity of the mataf was shown to King Abdullah in Ramadhan 1432 Hijri who directed to
start implementing it.
-King Abdullah assigned the Ministry of Higher Education, General Authority of Masjid al Haram and Masjid al Nabawi and Saudi Bin Laden
Group (Working team) to finish the studies on developing the proposed solution.
-The working team recommended a number of studies which were presented to King Abdullah, as follows:
1-Studies
2-Studies
3-Studies
4-Studies
5-Studies
it.

regarding
regarding
regarding
regarding
regarding

air movement in Mataf Expansion and First Saudi Expansion.


the building structure of the First Saudi Expansion.
Automated systems for Tawaf and Sa'ee for people with special needs.
systems for shading the new mataf and the roof of Haram.
crowd movement through an integrated system beginning from outside Masjid-al-Haram and the areas surrounding

-King Abdullah ordered that these recommended studies be conducted urgently.


-The proposed design was shown to the Supreme Hajj Committee after the Hajj Season of 1432H and they ordered to conduct studies
regarding increasing the width of the
Mataf with repititive floors and studies regarding re-building the structure of the First Saudi Expansion.
-The team of Ministry of Higher Education and General Authority of Masjid-al-Haram and Masjid-al-Nabawi arranged a work shop with the
Security forces in the month of
Rabi-ul-awwal 1433H to inform them about the proposed design and to take their opinion and to find out their demands.
-The meetings of the working team continued in order to develop the proposed solution including the observations and recommendations
of the security forces. Some of
the important observations which were taken into account are:
1-Studying and assessing of the structural system of the First Saudi Expansion.
2-Paying attention to crowd movement and fragmentation of human blocks inside and outside Masjid-al-Haram.
3-To Facilitate the entry and exit movement in the entrances of the Masjid al Haram building so as to provide safety and security to the
visitors.
4-Preparing passages and roads leading to Masjid al Haram and developing a guidance system to facilitate the arrival and departure.
5-Developing a system for shading the mataf courtyard and the roof of Masjid al Haram and the external squares surrounding it.
6-Providing specific and separate passages to people with special needs and the elderly and developing an automated system to serve
them.
7-The importance of linking (the Mataf) with the Third Saudi Expansion and activating the basement level.
-The Ministry team assigned a number of consulting offices (in the field of structural studies and supporting and re-enforcing structures)
to study and assess the structural system of the First Saudi Expansion and its ability to cope with the above-mentioned demands. The
results of this study suggested that the current structure was unable to support additional upper floors and future demands.
-The Ministry team and a representative of the Genral Authority recommended that the First Saudi Expansion should be rebuilt complying
with the same standards that were used in building the Third Saudi Expansion.
-Based on the above, the proposed project was developed to raise the capacity of the Mataf and the parts attatched to it. Part 1/2

________________________

Current State
First Saudi Expansion

Horizontal Projections

Longitudinal Sector of Mas'aa

Visuals of crowding in the current state

Directives and Standards for the design


-Fragmentation of Human blocks and their distribution on different floors and controlling them from outside the building of Masjid-alHaram.
-Preseving the old Haram and main gates with minarets as much as possible and rebuilding the First Saudi Expansion taking into account
the future vertical expansion.
-Linking the Mataf and Mas'aa floors on the same level.
-Specifying separate floors for people with special needs and the elderly to perform Tawaf and linking them with Mas'aa floors.
-Integration of systems and services, taking into account the future demands like shading and automated tawaf.

Initial Design
Basement Floor

Ground Floor

First Floor

First Floor Mezzanine

Second Floor

Exterior Perspective

Part 2/3
__________________________

Interior Perspective

Comparison between Current State, Initial Design and the Mas'aa.

Longitudinal Sector of Mas'aa-Comprehensive solution

Part 3/3

Thanks a lot to Makkawi.Pk who did this great work!


__________________

Source: http://xa.yimg.com/kq/groups/3336651...n_02122012.pdf

nooreng, Makkawi.Pk, Kooheji, penta_a, podvel and 1


others liked this post

Você também pode gostar