CDM Automation

the Key to Success


07/04/2010
Martin Schmidt
Slide 1

CDM Specialist Training

There are different ways to build a Biogas plant

The simple way without any technology


07/04/2010
Martin Schmidt
Slide 2

CDM Specialist Training

There are different ways to build a Biogas plant

07/04/2010
Martin Schmidt

The professional way with process


control for high efficiency and safety.
Slide 3

CDM Specialist Training

The proven way


Of course, there are many other ways between how to build a
Biogas plant, but there are not much flexibility in the way of
engineer a CDM projects.

How a system integration


should not look like!

07/04/2010
Martin Schmidt
Slide 4

Our competence and our solutions will help to


implement the CDM Biogas projects much faster and
doubtless proven.

CDM Specialist Training


Part 01
07/04/2010
Martin Schmidt
Slide 5

CDM Specialist Training

CDM Solution
9 Introduction
9 Example for CDM: Biogas Short Introduction
9 CDM Background / Requirements
9 Validation Competence Position of E+H
9 Automated CDM Methane Solution
9 Services for CDM Solutions
9 Market and CAV
07/04/2010
Martin Schmidt
Slide 6

CDM Specialist Training

CDM Regulation Example Methodology

07/04/2010
Martin Schmidt
Slide 7

CDM Specialist Training

CDM Regulation Example

07/04/2010
Martin Schmidt
Slide 8

CDM Specialist Training

CDM Regulation Example Methodological Tool

07/04/2010
Martin Schmidt
Slide 9

CDM Specialist Training

CDM Regulation Example

07/04/2010
Martin Schmidt
Slide 10

CDM Specialist Training

CDM Regulation Example

07/04/2010
Martin Schmidt
Slide 11

CDM Specialist Training

The V Model
REMEMBER ?! PHARMA REQUIREMENTS
URS
User Requirement
Specification

PQ
Performance
Qualification
OQ
Operational
Qualification

FS
Functional
Specification

: Hardware & System


: Software Specification

DS
System
Specification

: Software Architecture
: Software Module Specification
: User Manual

IQ
Installation
Qualification

DS
SW Design
Specification

DQ Module
Integration
Test

Implementation

07/04/2010
Martin Schmidt
Slide 12

Additional
Documentation

Project :
Acceptance :
Form :
SAT :

OQ Documents for
Memo-Graph S :

IQ Test plan :

Signature List :
Documents for Memo-Graph S :

Module Integration Test :


(Software Integration Test) :
(Software Modulation Test) :

CDM Specialist Training

CDM UNFCCC (international)


do YOU see the similarity ?

Abbreviation:
PP
DOE
EB
DNA
COP
MOP
AE
CER

Project Participant
Designated Operational Entities
Executive Board
Designated National Authority
Conference of Parties
Meeting of Parties
Applicant Entity
Certified Emission Reduction

07/04/2010
Martin Schmidt
Slide 13

CDM Specialist Training

Similar Requirements Well Known in Endress+Hauser

URS
User Requirement
Specification

PQ
Performance
Qualification
OQ
Operational
Qualification

FS
Functional
Specification

: Hardware & System


: Software Specification

DS
System
Specification

: Software Architecture
: Software Module Specification
: User Manual

07/04/2010
Martin Schmidt
Slide 14

IQ
Installation
Qualification

DS
SW Design
Specification

DQ Module
Integration
Test

Implementation

Additional
Documentation

Project :
Acceptance :
Form :
SAT :

OQ Documents for
Memo-Graph S :

IQ Test plan :

Signature List :
Documents for Memo-Graph S :

Module Integration Test :


(Software Integration Test) :
(Software Modulation Test) :

CDM Specialist Training

What is ? ... Validation Qualification Calibration

Validation

Process

Supply Process
Production Process
Computer Systems
Cleaning Process

Qualification

Equipment

Location and Equipment:


Plant, Production, Package Units
Design, Construction, Function, Performance

Calibration
07/04/2010
Martin Schmidt
Slide 18

Instrument

CDM Specialist Training

Documentation for the Regulated Industry


FAT, SAT, IQ, OQ, Audit Trail, CoC
Endress+Hauser Process
Solutions AG
Christoph-Merian-Ring 23
CH-4153 Reinach
Tel. +41 61 715 73 00
Fax +41 61 715 73 01

Endress+Hauser
Process Solutions AG

Audit Trail
Meldung T-M-BK49-1 ; G41 R024 Brutschrank 5 - Temperatur :
G41 Mikrobiologie mit Zeit Filter von 18,06,2002 bis 20,06,2002
VALUE
DATE / TIME IN
TAG NAME
DESCRIPTION 10:54:22
G41 R024 Brutschrank 5 - Temperature

31,2

OK

20,06,2002 09.21.37 T-M-BK49-1

G41 R024 Brutschrank 5 - Temperature

?????

10F

?????

10F

G41 R024 Brutschrank 5 - Temperature

19,06,2002 11.53.37

GW.T-M-BK49-1 nderung(en) durchgefhrt von & sUserName

OK

19,06,2002 11.53.37

GW.T-M-BK49-1 nderungsgrund. Ibs bz POLTE

OK

19,06,2002 11.53.37

(IFIX ) Fix32,IFIX.T-M-BK49-1,A_LOPRI set to L by


IFIX_C02::POLTE
GW:T-M-BK49-1 LO Prio. Alt. M neu: L

OK

19,06,2002 11.53.37
19,06,2002 09:31:43 T-M-BK49-1

(IFIX ) Fix32,IFIX.T-M-BK49-1,A_ALMEXT2 set to 19,06,2002


11.53 POLTE ibs by IFIX_C02::POLTE
G41 R024 Brutschrank 5 Temperatur

Ok

OK
31,4

OK

0,0

LOLO

19,06,2002 09:31:43 T-M-BK49-1

G41 R024 Brutschrank 5 Temperatur

19,06,2002

9:31:09

OK

19,06,2002

9:31:09

(IFIX ) T-M-BK49-1 ALARM is acknowledged by


IFIX_C02::POLTE
T-M-BK49-1 ALARM is acknowledged by POLTE

19,06,2002

9:31:09

ALK: T-M-BK49-1: ibs bz POLTE

OK

19,06,2002

9:31:09

T-M-BK49-1

G41 R024 Brutschrank 5 Temperatur

40,2

OK

19,06,2002

9:31:09

T-M-BK49-1

G41 R024 Brutschrank 5 Temperatur

57,3

HIHI

19,06,2002 09:28:17
19,06,2002 09:28:16

OK

C
C

(IFIX ) T-M-BK49-1 ALARM is acknowledged by


IFIX_C02::POLTE
T-M-BK49-1 ALARM is acknowledged by POLTE

OK
OK

19,06,2002 09:28:16

ALK: T-M-BK49-1: ibs bz POLTE

19,06,2002 09:28:03 T-M-BK49-1

G41 R024 Brutschrank 5 Temperatur

30,0

19,06,2002 09:25:53 T-M-BK49-1

G41 R024 Brutschrank 5 Temperatur

50,4

19,06,2002 09:25:18
19,06,2002 09:25:17

(IFIX ) T-M-BK49-1 ALARM is acknowledged by


IFIX_C02::POLTE
T-M-BK49-1 ALARM is acknowledged by POLTE

19,06,2002 09:25:17

ALK: T-M-BK49-1: ibs bz POLTE

19,06,2002 09:21:23 T-M-BK49-1

G41 R024 Brutschrank 5 Temperatur

19,06,2002 09:21:11

(IFIX ) T-M-BK49-1 ALARM is acknowledged by


IFIX_C02::POLTE

Page 1 of 2

Slide 20

20,06,2002 09.04.24 T-M-BK49-1

19,06,2002 11.53.37

07/04/2010
Martin Schmidt

UNIT STATUS

20,06,2002 09:21:47 T-M-BK49-1

OK
C
C

OK
HI
OK
OK
OK

26,6

OK
OK

CDM Specialist Training

CDM Project Activity Cycle Design

Design Project Design Document


To prepare the Project Information Note (PIN) as well
as the Project Design Document (PDD), the design of
the project must be clear !
This design will be frozen and subject for Validation,
Registration, Monitoring, Verification and the final
issuance of CERs (Certified Emission Reduction).

07/04/2010
Martin Schmidt
Slide 21

CDM Specialist Training

Position of Endress+Hauser: Fulfiller

Authorities

Owner / Investor / Operator

PI and PDD

CDM
Team
Work

CDM Consultant
Ensure CDM compliant automation
solutions and calculate CERs.

Biogas EPC
Process Design and Performance
with PI&D according CDM rules.

Automation

07/04/2010
Martin Schmidt
Slide 22

CDM Specialist Training

Any Questions?

07/04/2010
Martin Schmidt
Slide 23