CDM Specialist Training

Part 05 - Summary
07/04/2010
Martin Schmidt
Slide 1

CDM Specialist Training

Similar Requirements Well Known in Endress+Hauser

URS
User Requirement
Specification

PQ
Performance
Qualification
OQ
Operational
Qualification

FS
Functional
Specification

: Hardware & System


: Software Specification

DS
System
Specification

: Software Architecture
: Software Module Specification
: User Manual

07/04/2010
Martin Schmidt
Slide 2

IQ
Installation
Qualification

DS
SW Design
Specification

DQ Module
Integration
Test

Implementation

Additional
Documentation

Project :
Acceptance :
Form :
SAT :

OQ Documents for
Memo-Graph S :

IQ Test plan :

Signature List :
Documents for Memo-Graph S :

Module Integration Test :


(Software Integration Test) :
(Software Modulation Test) :

CDM Specialist Training

Position of Endress+Hauser: Fulfiller

Authorities

Owner / Investor / Operator

PI and PDD

CDM
Team
Work

CDM Consultant
Ensure CDM compliant automation
solutions and calculate CERs.

Biogas EPC
Process Design and Performance
with PI&D according CDM rules.

Automation

07/04/2010
Martin Schmidt
Slide 3

CDM Specialist Training

Biogas Composition

Limits of variation

Average

Methane

45 .. 70%

60%

Carbon dioxide

25 .. 55%

35%

Water vapor

0 .. 10%

3,1%

Nitrogen

0,01 .. 5%

1%

Oxygen

0,01 .. 2%

0,3%

Hydrogen

0 .. 1%

<1%

Ammonia

0,01 .. 2,5 mg/m

0,7 mg/m

10 .. 30.000 mg/m

500 mg/m

Hydrogen sulfide
DVGW study
07/04/2010
Martin Schmidt
Slide 4

CDM Specialist Training

Tele Alarm Functionality

Alarms
Acknowledgment
of alarms
Set relays

4 20 mA

Relays 1-12

Memograph M : Tele Alarm provides fast


information to plant operator and service
for fastest possible reaction.
07/04/2010
Martin Schmidt
Slide 5

CDM requires reliability, sustainability and


availability. Malfunction need to be
informed and optimized as fast as possible.

CDM Specialist Training

Memograph M Mathematic Module simplified

> Norm Volume/Mass


> Humidity
> Gas Composition

DIN/ISO 5167

> dp
>p
>T
07/04/2010
Martin Schmidt
Slide 6

Mathematic &
Integration
Function

Memograph M calculate and


documented the Methane
Flow in kg/h and integrate the
flow over time for the total
amount in kg or t.
Norm Volume Flow

RMC621 calculation of compensated dp Flow


According Standard DIN/ISO 5167 !

In addition (customization),
Memograph M can deliver
signals to control the gas
engine, to calculate for other
biogas measuring points (e.g.
flare gas flow) or the control
system at all.

CDM Specialist Training

Gas Flow Comparison

9 Service 2nd device


9 complex traceability
9 T, p compensation

9 application engineering
9 Service 2nd device
9 NO compensation

9 DIN/ISO !
9 recalibration
9 T, p compensation
Vortex: Prowirl 72F

07/04/2010
Martin Schmidt
Slide 7

dp: Deltatop Series

Thermal MassFlow

Accuracy

1% (Volume)

1% (Volume)

2% (Mass)

Flowrate

High (Need Min


Flow)

Low

Low

Wet Gas
accuracy

Good

Good

Bad (Good for Dry


Gas)

Straight
Length

15D

5D (b 0.1) . . 22D
(b 0.75)

15D

CDM Specialist Training

Tips & Traps

07/04/2010
Martin Schmidt
Slide 8

CDM Specialist Training

Tips & Traps

07/04/2010
Martin Schmidt
Slide 9

CDM Specialist Training

Tips & Traps Low Flow/Max Flow

07/04/2010
Martin Schmidt
Slide 10

CDM Specialist Training

Benefits and Added Value Examples


Competence in Validation, Qualification, Traceable (Re-)Calibration and
complete automated solutions will benefit in suitable documentation as
well as fast and professional customization of the CDM Solutions.

SAFETY

QUALITY

PROFIT
07/04/2010
Martin Schmidt
Slide 11

CDM Specialist Training

Benefits and Added Value Examples

CDM Rules and Conservative Way of


Certified Emission Reduction !
+x

SAFETY

+y

In a conservative way, all possible errors are


deducted from the measured and calculated
value of Methane and CO2e .

QUALITY

-y
-x
Delta CO2e !

PROFIT
07/04/2010
Martin Schmidt
Slide 12

The balance of the calculated and measured


emission reduction takes any probable loss
and error into account.

Therefore, accuracy of instrumentation,


equipment and error calculation plays a
major role for the profit !

The selection of the Design, the Equipment and the


Procedures according Good Practices and described in
the PDD, will have a Major Impact on the CDM Result !

CDM Specialist Training

Benefits and Added Value Examples

CDM Rules and Conservative Way of


Certified Emission Reduction !

+x
+y

-y
07/04/2010
Martin Schmidt
Slide 13

-x
Delta CO2e !

Customer Project Description:


% each error counts

CDM Automation
the Key to Success
07/04/2010
Martin Schmidt
Slide 14

CDM Specialist Training

What are the drivers for CDM investors?


On the example of a PDD:
Fossil fuel replacement with Methane capture from
anaerobic digestion of bio waste.
The solution has to be:
As efficient as possible
Easy and fast to implement
Lowest risk in CDM validation process
Fastest return of investment
07/04/2010
Martin Schmidt
Slide 15

Traceability
Durable to ensure the Verification after years of operation

CDM Specialist Training

The proven way


Of course, there are many other ways between how to build a
Biogas plant, but there are not much flexibility in the way of
engineer a CDM projects.

How a system integration


should not look like!

07/04/2010
Martin Schmidt
Slide 16

Our competence and our solutions will help to


implement the CDM Biogas projects much faster and
doubtless proven.

CDM Specialist Training

There are different ways to build a Biogas plant

The simple way without any technology


07/04/2010
Martin Schmidt
Slide 17

CDM Specialist Training

CDM Automation
Specialist Seminar
Fast ROI

Thank You
Any Question ?
Martin Schmidt,

Easy
Safety
Services

Diploma Physicist (Master)

Industry Manager Renewable Energy


E-Mail: Martin.Schmidt@my.endress.com
Phone: +60 17 200 7184
Patent pending
07/04/2010
Martin Schmidt
Slide 18