Sample Presentation

On
Bangladesh Legal Requirement For
Energy Efficiency
Prepared By
Avijeet Chakraborty
Date 01.03.2015

Legal Requirement On Power Factor Correction


1

Power2 factor correction charge (18.75% of total


electricity consumption) is applicable for
Following classes unable to maintain monthly average
PF at least 0.95

Residential
and non residential light & electricity/charitable
3
organization where approved load is more than 10 kW
Office/Commercial class where approved load is more than
20 kW
Small scale industry where approved load is more than 50 kW
3 phase 400V street water pump consumer class
3 phase 400V Irrigation pump (> 15HP)for agricultural field
Consumer(General Use) under 11kV, 33kV , 132kV classes

Legal Requirement On Power Factor Correction


1

PFC charge
is also applicable for Electricity
2
Distribution Company (at 230/132kV, 132/33kV,
33/11kV Substation & 11kV Line)unable to maintain
monthly average PF at least 0.90
3

Ref Bangladesh Energy Regulatory Commission


4 Order (Commission Order On Power Factor
Improvement Plant Installation)
Ref Electricity Distribution Code (Draft) by
Bangladesh Energy Regulatory Commission (P-150)

Legal Requirement On Solar Panel Installation


1

Solar 2panel shall be installed while taking new


electricity connection/load extension as per
following basis

Residential consumer with load more than 2kw , shall


install solar panel for at least 3% of its total demand load
3
Industrial
and commercial consumer with load at most
50kW, shall install solar panel for at least 7% of its total light
& fan load
Industrial and commercial consumer with load more than
50kW, shall install solar panel for at least 10% of its total
light & fan load
Garment Industries shall install solar panel for at least 5%
of its total light & fan load

Legal Requirement On Solar Panel Installation


1

Ref 2Procedure For Electricity Connection by


Bangladesh Power Development Board
Ref Load wise Installable Solar System by
Bangladesh Power Development Board
Above3 reference provides list of advices on Energy
Efficiency such as
4
Use quality energy saving light (CFL) & energy saving
equipment
Use electronic ballast for tube light

Legal Requirement On Energy Efficiency Labeling


1

List of2 Equipment and Appliances Applicable to


Energy Efficiency Labeling Obligations Phase 1

Room air conditioners


3
Refrigerators,
freezers
3 phase induction motors
Compact Fluorescent Lamps (CFLs)
Electrical fans
Gas cook stoves

Legal Requirement On Energy Efficiency Labeling


1

Phase2 2

All types of water pumps over 2 horsepower


Electric water heaters
Microwave ovens
Television
sets
3
Clothes irons
Rice cookers
Blenders/mixers
Washing machine

Phase 3 Other appliances to be determined

Legal Requirement On Energy Efficiency Labeling


2014

Phase-1

2015

2016

2
Voluntary Voluntary Compulsory

Phase-2

Voluntary

2017

2018

Compulsory

Compulsory

Voluntary

Compulsory

Phase-3 3
4

Voluntary

Voluntary Phase: Star labeling will be introduced.


Compulsory Phase: Only the equipment and appliances
with certain star labeling will be allowed to be sold
Ref - Energy Efficiency and Conservation Rules, Initial
Draft 22 October 2012 (P-15)

1
2

Thank You !!!