Escolar Documentos
Profissional Documentos
Cultura Documentos
0 (Nov 05 Manual)
Document Control Information
Document Details
Document Name:
Purpose of Document:
3.0
Document Status:
Live
Document Owner:
Nicola Kelly
Prepared by:
Colin Bentley
Nov 2005
Date Approved:
01/01/2006
Approved by:
Colin Bentley
TBC
Version History
Version
Number:
Date
Approved:
3.0
01/01/2006
i
ni
t
i
a
t
i
ng
c
or
r
e
c
t
i
ngat
y
pomi
s
t
a
ke
.Al
lboxe
s
removed next to answers to bring format in line
with live papers. Document also brought in line
with APMG document management system.
Name
All
Title / Company
Public document
Distribution List
Version
All
Instructions
1.
2.
3.
4.
5.
6.
Candidate Number:
........................................
1. In PRINCE2 what product is used to define the information that justifies the
setting up, continuation or termination of the project?
a)
b)
c)
d)
Request Log
Daily Log
Quality Log
Issue Log
What provision in Planning can be made for implementing Requests for Change?
a)
b)
c)
d)
4. Fi
l
li
nt
hemi
s
s
i
ngphr
a
s
ef
r
om apr
oj
e
c
ti
sama
na
g
e
me
nte
nvi
r
onme
ntt
ha
ti
s
created for the purpose of delivering one or more business products according
t
o
a)
b)
c)
d)
TheCus
t
ome
r
sNe
e
ds
An Agreed Contract
The Project Plan
A specified Business Case
5. In what sequence would the (a) Project Initiation Document, (b) the Project
Mandate and (c) the Project Brief appear in a PRINCE2 project?
a)
b)
c)
d)
a, b, c
b, c, a
c, a, b
c, b, a
6.
7. Whi
c
hs
t
a
t
e
me
nti
sNOTaf
unda
me
nt
a
lpr
i
nc
i
pl
eof
Cl
os
i
ngaPr
oj
e
c
t
Ac
l
e
a
re
ndt
oapr
oj
e
c
t
Wha
ti
st
hemor
ec
ommont
e
r
m us
e
di
nPRI
NCE2f
or
de
l
i
ve
r
a
bl
e
?
a)
b)
c)
d)
9.
Item
Package
Product
Component
Exception Assessment
Highlight Reports
Project Closure
Work Package Authorisation
10. What name is given to the permissible deviation from a plan allowed without
immediate reporting to the Project Board?
a)
b)
c)
d)
Allowance
Contingency
Concession
Tolerance
Risk Management
Project Closure
Change Control
Project Initiation
12. Which of these processes does NOT trigger the Planning (PL) process?
a)
b)
c)
d)
Quality
Specialist
Technical
Management
14. If, after a Quality Review Follow-up Action, an error is still not resolved, what
action should be taken?
a)
b)
c)
d)
A fixed-PRICE contract
A Customer/Supplier environment
A specialist environment
A third-party environment
17. Which feature of PRINCE2 tells the Project Manager where a product is, what its
status is and who is working on it?
a)
b)
c)
d)
Work Package
Product Description
Checkpoint Report
Configuration Management
18. I
n
Cl
os
i
ngaPr
oj
e
c
t
(
CP)t
h
epr
oj
e
c
tf
i
l
e
sa
r
ea
r
c
hi
ve
d.Wha
ti
st
hee
xpl
a
na
t
i
on
given for this?
a)
b)
c)
d)
sa
c
t
i
ons
19. Which of the following statements is FALSE? Project Managers using PRINCE2
a
r
ee
nc
our
a
g
e
dt
o
a)
b)
c)
d)
Prevention
Denial
Reduction
Transference
Plans
Controls
Work Package
Configuration Management
22. Which document lists the major products of a plan with their key delivery dates?
a)
b)
c)
d)
Product Outline
Product Breakdown Structure
Checkpoint Report
Product Checklist
24. Which part of a product lifespan is not part of a project life cycle in the eyes of
PRINCE2?
a)
b)
c)
d)
25. What is the first job carried out on receipt of a new Project Issue?
a)
b)
c)
d)
Allocation of priority
Logging
Decision on what type of issue
Impact Analysis
St
a
r
t
i
ngUpaPr
oj
e
c
t
b) Ac
ompa
ny
sQMSbe
c
ome
spa
r
tofPRI
NCE2
c) PRINCE2 may f
or
m pa
r
tofac
ompa
ny
sQMS
d) The Stage Plan describes in detail how part of the Project Plan will be
carried out
28. Which one of these statements describes the true purpose of Acceptance Criteria?
a) A justification for undertaking the project based on estimated costs and
anticipated benefits.
b) A measurable definition of what must be done for the final product to be
acceptable to the Customer.
c) To provide a full and firm foundation for the initiation of a project.
d) Tot
r
i
g
g
e
r
St
a
r
t
i
ngupaPr
oj
e
c
t
.
29. How often does PRINCE2 recommend that open Project Issues should be
reviewed?
a)
b)
c)
d)
Weekly
At Exception Assessments
At Checkpoint Meetings
On a regular basis
30. What other product is reviewed at the end of each stage apart from the Business
Case and Project Plan?
a)
b)
c)
d)
31. Why is a copy of the Project Issue always returned to the author?
a)
b)
c)
d)
Post-Project Review
Post-Project Review Plan
End Project Report
Follow-on Action Recommendations
34. Thepe
r
s
onbe
s
ts
i
t
ua
t
e
dt
oke
e
pa
ne
y
eonar
i
s
ki
sc
a
l
l
e
di
t
s?
a)
b)
c)
d)
Supporter
Monitor
Owner
Librarian
35. Which document reviews actual achievements against the Project Initiation
Document?
a)
b)
c)
d)
36. I
nPRI
NCE2a
l
lpot
e
nt
i
a
lc
ha
ng
e
sa
r
ede
a
l
twi
t
ha
s?
a)
b)
c)
d)
e)
Configuration items
Requests For Change
Project Issues
Exception Reports
Action items
37. Which one of these is NOT a key criterion for producing a Product Flow
Diagram?
a)
b)
c)
d)
39. Thee
xi
s
t
e
nc
eofwha
tpr
oduc
ti
sc
he
c
ke
di
n
St
a
r
t
i
ngupaPr
oj
e
c
t
a
ndi
t
si
ni
t
i
a
l
ve
r
s
i
onf
i
na
l
i
s
e
di
n
I
ni
t
i
a
t
i
ngaPr
oj
e
c
t
?
a)
b)
c)
d)
40. Which does PRINCE2 regard as the third project interest, given user and supplier
as the other two?
a)
b)
c)
d)
Technical
Management
Business
Quality
41. PRINCE2 lists a number of reasons why it is seldom desirable or possible to plan
an entire project in detail at the start. Which of these is NOT one of these reasons?
a)
b)
c)
d)
Starting Up a Project
Initiating a Project
Authorising Initiation
Authorising a Project
46. The initial Project Plan is based on the Project Brief, the Project Quality Plan and
which other product?
a)
b)
c)
d)
Exception Report
Off-Specification
Follow-On Action Recommendations
Highlight Report
48. If there is a request to change a baselined product, and the change can be done
within the stage or Work Package tolerances, how can the decision to implement the
change be made?
a)
b)
c)
d)
Pr
oj
e
c
tMa
na
g
e
r
sde
c
i
s
i
o
n
Te
a
mMa
na
g
e
r
sde
c
i
s
i
on
Te
a
mme
mbe
r
sde
c
i
s
i
ont
owhom t
hewor
kha
sbe
e
na
l
l
oc
a
t
e
d
formal change control
49.
Cont
r
ol
l
i
ngaSt
a
g
e
dr
i
ve
swhi
c
hot
he
rpr
oc
e
s
sonaf
r
e
que
nt
,i
t
e
r
a
t
i
veba
s
i
s
?
a)
b)
c)
d)
Initiating a Project
Starting up a Project
Managing Stage Boundaries
Directing a Project
51. Wha
ta
r
ede
f
i
ne
da
s
pa
r
t
i
t
i
on
soft
hepr
oj
e
c
twi
t
hde
c
i
s
i
onpoi
nt
s
?
a)
b)
c)
d)
Work Packages
Product Descriptions
Quality Reviews
Stages
Reporting Highlights
Assessing Progress
Capturing Project Issues
Examining Project Issues
53. If a question arises on why a particular product was changed, which element of
PRINCE2 would be of most help in finding the information?
a)
b)
c)
d)
Issue Log
Quality Log
Configuration Management
Change Control
Assessing Progress
Reviewing Stage Status
Planning a Stage
Reporting Highlights
57. Thepr
oc
e
s
s
,
Di
r
e
c
t
i
ngaPr
oj
e
c
t
be
g
i
nswhe
n?
a)
b)
c)
d)
Fr
om
St
a
r
t
i
ngupaPr
oj
e
c
t
58. Apa
r
tf
r
om
I
ni
t
i
a
t
i
ngaPr
oj
e
c
t
i
nwhi
c
hpr
oc
e
s
si
st
heBus
i
ne
s
sCa
s
eupda
t
e
d?
a)
b)
c)
d)
59. Thee
xi
s
t
e
nc
eofwha
ti
nf
or
ma
t
i
oni
se
xpe
c
t
e
dbyt
hepr
oc
e
s
s
St
a
r
t
i
ngUpa
Pr
o
j
e
c
t
?
a)
b)
c)
d)
A Project Plan
A Project Mandate
An appointed organisation
Project Initiation Document
60. In the PRINCE2 document management structure, how many types of file are
recommended?
a)
b)
c)
d)
61. In a Quality Review which role does PRINCE2 suggest must ensure that all
reviewers are provided with the relevant review products?
a)
b)
c)
d)
Producer
Scribe
Review Chairperson
Configuration Librarian
63. The Project Board has three responsibilities towards the management of risk.
Which of the following options is the FALSE one?
a)
b)
c)
d)
Notifying the Project Manager of any external risk exposure to the project
Making decisions on recommended reactions to risk
Identifying, recording and regularly reviewing risks
Striking a balance between levels of risk and potential benefits
64. What function creates, maintains and monitors the use of a quality system?
a)
b)
c)
d)
Project Support
Quality Planning
Quality Control
Quality assurance
To identify products
To create products
To track products
To protect products
66. Whi
c
hs
t
e
pi
sNOTpa
r
tof
Ac
c
e
pt
i
ngaWor
kPa
c
ka
g
e
?
a)
b)
c)
d)
67. Which process provides the information needed for the Project Board to assess the
continuing viability of the project?
a)
b)
c)
d)
Starting up a Project
Closing a Project
Planning
Managing Stage Boundaries
68. In which process are choices made about planning tools and estimating methods?
a)
b)
c)
d)
Starting up a Project
Initiating a Project
Managing Stage Boundaries
Planning
70. Which process checks for changes to the project management team?
a)
b)
c)
d)
Starting up a Project
Managing Stage Boundaries
Closing a Project
Directing a Project
71. Fr
omt
hepr
oduc
t
sl
i
s
t
e
d,whi
c
honei
spr
oduc
e
ddur
i
ng
St
a
r
t
i
ngUpaPr
oj
e
c
t
?
a)
b)
c)
d)
72. Quality responsibilities, both within and external to the project, are defined in
which process?
a)
b)
c)
d)
Initiating a Project
Starting up a Project
Managing Stage Boundaries
Directing a Project
73. Acceptance for the completed products is obtained as part of which process?
a)
b)
c)
d)
Closing a Project
Managing Product Delivery
Managing Stage Boundaries
Controlling a Stage
75. Which is the missing section of the suggested Project File, if the others are
Organisation, Plans, Business Case, Communication Plan and Control?
a)
b)
c)
d)
Correspondence
Daily Log
Risk Log
Issue Log