Você está na página 1de 67

April 1999

Process Industry Practices


Process Control

PIP PCIPR000
Pressure Installation Details

PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES


In an effort to minimize the cost of process industry facilities, this Practice has
been prepared from the technical requirements in the existing standards of major
industrial users, contractors, or standards organizations. By harmonizing these technical
requirements into a single set of Practices, administrative, application, and engineering
costs to both the purchaser and the manufacturer should be reduced. While this Practice
is expected to incorporate the majority of requirements of most users, individual
applications may involve requirements that will be appended to and take precedence over
this Practice. Determinations concerning fitness for purpose and particular matters or
application of the Practice to particular project or engineering situations should not be
made solely on information contained in these materials. The use of trade names from
time to time should not be viewed as an expression of preference but rather recognized as
normal usage in the trade. Other brands having the same specifications are equally
correct and may be substituted for those named. All practices or guidelines are intended
to be consistent with applicable laws and regulations including OSHA requirements. To
the extent these practices or guidelines should conflict with OSHA or other applicable
laws or regulations, such laws or regulations must be followed. Consult an appropriate
professional before applying or acting on any material contained in or suggested by the
Practice.

Process Industry Practices (PIP), Construction Industry Institute, The


University of Texas at Austin, 3208 Red River Street, Suite 300, Austin,
Texas 78705. PIP member companies may copy this practice for their internal
use.

Not printed with State funds

April 1999

Process Industry Practices


Process Control

PIP PCIPR000
Pressure Installation Details
Table of Contents
1. Introduction ..................................2
1.1 Purpose..............................................2
1.2 Scope.................................................2

2. Index..............................................2

Process Industry Practices

Page 1 of 5

PIP PCIPR000
Pressure Installation Details

1.

April 1999

Introduction
1.1

Purpose
The purpose of this Practice is to provide pressure installation details.

1.2

Scope
This Practice includes an index for the pressure installation details. PCIPR100 series
details are 3/8" tubing impulse lines, PCIPR200 series details are 1/2" tubing impulse
lines, and PCIPR300 series details are 1/2" pipe impulse lines.

2.

Index
Detail #

Page 2 of 5

Title

PCIPR101

Below Tap, 1/2" Connection, 3/8" Impulse

PCIPR102

Below Tap, 3/4" Connection, 3/8" Impulse

PCIPR103

Below Tap, Electric Traced Bundle, 1/2" Connection, 3/8" Impulse

PCIPR104

Below Tap, Electric Traced Bundle, 3/4" Connection, 3/8" Impulse

PCIPR105

Below Tap, Steam Traced Bundle, 1/2" Connection, 3/8" Impulse

PCIPR106

Below Tap, Steam Traced Bundle, 3/4" Connection, 3/8" Impulse

PCIPR107

Above Tap, 1/2" Connection, 3/8" Impulse

PCIPR108

Above Tap, 3/4" Connection, 3/8" Impulse

PCIPR109

Above Tap, Electric Traced Bundle, 1/2" Connection, 3/8" Impulse

PCIPR110

Above Tap, Electric Traced Bundle, 3/4" Connection, 3/8" Impulse

PCIPR111

Above Tap, Steam Traced Bundle, 1/2" Connection, 3/8" Impulse

PCIPR112

Above Tap, Steam Traced Bundle, 3/4" Connection, 3/8" Impulse

PCIPR113

Steam Service, Insulated Bundle, 1/2" Connection, 3/8" Impulse

PCIPR114

Steam Service Insulated Bundle, 3/4" Connection, 3/8" Impulse

PCIPR115

Steam Service, Electric Traced Bundle, 1/2" Connection, 3/8" Impulse

PCIPR116

Steam Service, Electric Traced Bundle, 3/4" Connection, 3/8" Impulse

Process Industry Practices

PIP PCIPR000
Pressure Installation Details

April 1999

Detail #

Title

PCIPR117

Steam Service, Steam Traced Bundle, 1/2" Connection, 3/8" Impulse

PCIPR118

Steam Service, Steam Traced Bundle, 3/4" Connection, 3/8" Impulse

PCIPR119

Steam Service, Insulated Bundle, 1/2" Connection, 3/8" Impulse


w/Blowdown

PCIPR120

Steam Service, Insulated Bundle, 3/4" Connection, 3/8" Impulse


w/Blowdown

PCIPR121

Steam Service, Electric Traced Bundle, 1/2" Connection, 3/8" Impulse


w/Blowdown

PCIPR122

Steam Service, Electric Traced Bundle, 3/4" Connection, 3/8" Impulse


w/Blowdown

PCIPR123

Steam Service, Steam Traced Bundle, 1/2" Connection, 3/8" Impulse


w/Blowdown

PCIPR124

Steam Service, Steam Traced Bundle, 3/4" Connection, 3/8" Impulse


w/Blowdown

PCIPR201

Below Tap, 1/2" Connection, 1/2" Impulse

PCIPR202

Below Tap, 3/4" Connection, 1/2" Impulse

PCIPR203

Below Tap, Electric Traced /Bundle, 1/2" Connection, 1/2" Impulse

PCIPR204

Below Tap, Electric Traced Bundle, 3/4" Connection, 1/2" Impulse

PCIPR205

Below Tap, Steam Traced Bundle, 1/2" Connection, 1/2" Impulse

PCIPR206

Below Tap, Steam Traced Bundle, 3/4" Connection, 1/2" Impulse

PCIPR207

Above Tap, 1/2" Connection, 1/2" Impulse

PCIPR208

Above Tap, 3/4" Connection, 1/2" Impulse

PCIPR209

Above Tap, Electric Traced Bundle, 1/2" Connection, 1/2" Impulse

PCIPR210

Above Tap, Electric Traced Bundle, 3/4" Connection, 1/2" Impulse

PCIPR211

Above Tap, Steam Traced Bundle, 1/2" Connection, 1/2" Impulse

PCIPR212

Above Tap, Steam Traced Bundle, 3/4" Connection, 1/2" Impulse

Process Industry Practices

Page 3 of 5

PIP PCIPR000
Pressure Installation Details

Detail #

Page 4 of 5

April 1999

Title

PCIPR213

Steam Service, Insulated Bundle, 1/2" Connection, 1/2" Impulse

PCIPR214

Steam Service, Insulated Bundle, 3/4" Connection, 1/2" Impulse

PCIPR215

Steam Service, Electric Traced Bundle, 1/2" Connection, 1/2" Impulse

PCIPR216

Steam Service, Electric Traced Bundle, 3/4" Connection, 1/2" Impulse

PCIPR217

Steam Service, Steam Traced Bundle, 1/2" Connection, 1/2" Impulse

PCIPR218

Steam Service, Steam Traced Bundle, 3/4" Connection, 1/2" Impulse

PCIPR219

Steam Service, Insulated Bundle, 1/2" Connection, 1/2" Impulse


w/Blowdown

PCIPR220

Steam Service, Insulated Bundle, 3/4" Connection, 1/2" Impulse


w/Blowdown

PCIPR221

Steam Service, Electric Traced Bundle, 1/2" Connection, 1/2" Impulse


w/Blowdown

PCIPR222

Steam Service, Electric Traced Bundle, 3/4" Connection, 1/2" Impulse


w/Blowdown

PCIPR223

Steam Service, Steam Traced Bundle, 1/2" Connection, 1/2" Impulse


w/Blowdown

PCIPR224

Steam Service, Steam Traced Bundle, 3/4" Connection, 1/2" Impulse


w/Blowdown

PCIPR313

Steam Service, Insulated Pipe, 1/2" Connection, 1/2" Impulse

PCIPR314

Steam Service, Insulated Pipe, 3/4" Connection, 1/2" Impulse

PCIPR315

Steam Service, Electric Traced Pipe, 1/2" Connection, 1/2" Impulse

PCIPR316

Steam Service, Electric Traced Pipe, 3/4" Connection, 1/2" Impulse

PCIPR317

Steam Service, Steam Traced Pipe, 1/2" Connection, 1/2" Impulse

PCIPR318

Steam Service, Steam Traced Pipe, 3/4" Connection, 1/2" Impulse

Process Industry Practices

PIP PCIPR000
Pressure Installation Details

April 1999

Detail #

Title

PCIPR319

Steam Service, Insulated Pipe, 1/2" Connection, 1/2" Impulse


w/Blowdown

PCIPR320

Steam Service, Insulated Pipe, 3/4" Connection, 1/2" Impulse


w/Blowdown

PCIPR321

Steam Service, Electric Traced Pipe, 1/2" Connection, 1/2" Impulse


w/Blowdown

PCIPR322

Steam Service, Electric Traced Pipe, 3/4" Connection, 1/2" Impulse


w/Blowdown

PCIPR323

Steam Service, Steam Traced Pipe, 1/2" Connection, 1/2" Impulse


w/Blowdown

PCIPR324

Steam Service, Steam Traced Pipe, 3/4" Connection, 1/2" Impulse


w/Blowdown

Note: The detail number is also the file number for the electronic version.

Process Industry Practices

Page 5 of 5

Você também pode gostar