CONFIGURATION REL 670 (A31)

VERSION 1.2.3

Work Sheet

Description

OVERVIEW

List of contents

I_AI

Analog inputs for current circuits

U_AI

Analog inputs for voltage circuits

IMP_PROT

Distance Protection functions

IMP_COM

Distance Protection Communication logic

U_PROT

Voltage protection functions

CB_TR

Tripping logic

CB_AR

Autorecloser and synchrocheck circuits

CB_BF

Breaker failure protection

MEASURE

Measurement of power, current and voltage

DREP_AI

Disturbance report Analog inputs

DREP_BI

Disturbance report Binary inputs

COMMON

General IED functions

LED

Indication diodes

BIM

Binary inputs

BOM

Binary outputs

Main Application: OVERVIEW, Page: 1


1

Modification

Rel. date

Created by

Based on

5
Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Project

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

1 / 38

CURRENT CIRCUIT A FOR ZM AND BFP


LINE CT A
SMAI7

LINE_CT_IL1

BLOCK
IL1
GRP7L1
IL2
GRP7L2
IL3
GRP7L3
IN optional
GRP7N

TRM_6I_6U_31.CH1
LINE_CT_IL2
TRM_6I_6U_31.CH2

AI3P
AI1
AI2
AI3
AI4
AIN

LINE_CT_A_I3P
LINE_CT_A_IL1
LINE_CT_A_IL2
LINE_CT_A_IL3

LINE_CT_A_IN

LINE_CT_IL3
TRM_6I_6U_31.CH3

Note! If IN is not connected with SMT the residual current is calculated and used.

CURRENT CIRCUIT FOR MEASUREMENT


LineCTMeasure
SMAI7

LINE_CT_IL1

BLOCK
IL1
GRP7L1
IL2
GRP7L2
IL3
GRP7L3
IN optional
GRP7N

TRM_6I_6U_31.CH1
LINE_CT_IL2
TRM_6I_6U_31.CH2

AI3P
AI1
AI2
AI3
AI4
AIN

LINE_CT_MEASUREMENT_I3P

LINE_CT_IL3
TRM_6I_6U_31.CH3

Main Application: I_AI, Page: 1


1

Modification

Rel. date

Created by

Based on

5
Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Project

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

2 / 38

VOLTAGE CIRCUITS LINE VT CIRCUIT A FOR DISTANCE PROTECTION AND FUSE FAIL
LINE VT A

SMAI1
LINE_VT_UL1

REALZERO

TRM_6I_6U_31.CH7
LINE_VT_UL2
TRM_6I_6U_31.CH8

BLOCK
DFTSPFC
UL1
GRP1L1
UL2
GRP1L2
UL3
GRP1L3
UN optional
GRP1N

SPFCOUT
AI3P
AI1
AI2
AI3
AI4
AIN

LINE_VT_A_U3P
LINE_VT_A_UL1
LINE_VT_A_UL2
LINE_VT_A_UL3
LINE_VT_A_UN

LINE_VT_UL3
TRM_6I_6U_31.CH9

VOLTAGE CIRCUITS LINE VT CIRCUIT B FOR U<, U> AND SYNCROCHECK


B

LINE VT B
SMAI1
LINE_VT_UL1

REALZERO

TRM_6I_6U_31.CH7
LINE_VT_UL2
TRM_6I_6U_31.CH8

BLOCK
DFTSPFC
UL1
GRP1L1
UL2
GRP1L2
UL3
GRP1L3
Not used
GRP1N

SPFCOUT
AI3P
AI1
AI2
AI3
AI4
AIN

LINE_VT_B_U3P

LINE_VT_UL3
TRM_6I_6U_31.CH9

VOLTAGE CIRCUITS LINE VT FOR MEASUREMENT

MeasurementVT
SMAI9

LINE_VT_UL1

BLOCK
UL1
GRP9L1
UL2
GRP9L2
UL3
GRP9L3
Not used
GRP9N

TRM_6I_6U_31.CH7
LINE_VT_UL2
TRM_6I_6U_31.CH8

AI3P
AI1
AI2
AI3
AI4
AIN

LINE_VT_MEASUREMENT_U3P

LINE_VT_UL3
TRM_6I_6U_31.CH9

Main Application: U_AI, Page: 1


1

Modification

Rel. date

Created by

Based on

5
Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Project

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

3 / 38

VOLTAGE CIRCUITS BUS 1 VT CIRCUIT FOR SYNCROCHECK


Bus 1 1PhVT

SMAI2
BLOCK
UL1
GRP2L1
UL2
GRP2L2
UL3
GRP2L3
Not used
GRP2N

BUS_1_VT_UL2
TRM_6I_6U_31.CH10

AI3P
AI1
AI2
AI3
AI4
AIN

BUS_1_1PH_VT_U3P

Note! Connect the phase used for SC and set this phase in PST.

VOLTAGE CIRCUITS BUS 1 VT CIRCUIT FOR SYNCROCHECK


Bus 2 1PhVT
SMAI4
BLOCK
UL1
GRP4L1
UL2
GRP4L2
UL3
GRP4L3
Not used
GRP4N

BUS_2_VT_UL2
TRM_6I_6U_31.CH11

AI3P
AI1
AI2
AI3
AI4
AIN

BUS_2_1PH_VT_U3P

Note! Connect the phase used for SC and set this phase in PST.

Main Application: U_AI, Page: 2


1

Modification

Rel. date

Created by

Based on

5
Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Project

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

4 / 38

DIRECTIONAL MEASUREMENT FOR DISTANCE PROTECTION

ZDRDIR

LINE_VT_A_U3P
LINE_CT_A_I3P

U3P
I3P

STDIRCND

ZD-STDIR

PHASE SELECTOR, DISTANCE PROTECTION


FDPSPDIS
LINE_CT_A_I3P
LINE_VT_A_U3P
LINE_FUSE_FAILURE_FSD1-BLKZ
ZD-STDIR

I3P
U3P
BLOCK
DIRCND

TRIP
START
STFWL1
STFWL2
STFWL3
STFWPE
STRVL1
STRVL2
STRVL3
STRVPE
STNDL1
STNDL2
STNDL3
STNDPE
STFW1PH
STFW2PH
STFW3PH
STPE
STPP
STCNDZ
STCNDLE

PHS-STFWL1
PHS-STFWL2
PHS-STFWL3
PHS-STFWPE

PHS-STPE
PHS-STCNDZ
PHS-STCNDI

POWER SWING DETECTION


ZMRPSB
LINE_CT_A_I3P
LINE_VT_A_U3P
PHS-STPE

TRUE

I3P
U3P
BLOCK
BLKI01
BLKI02
BLK1PH
REL1PH
BLK2PH
REL2PH
I0CHECK
TRSP
EXTERNAL

START
ZOUT
ZIN

PSD1-START

Main Application: IMP_PROT, Page: 1


1

Modification

Rel. date

Created by

Based on

5
Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Project

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

5 / 38

LINE DISTANCE PROTECTION, 5 ZONES

ZMQPDIS

LINE_CT_A_I3P
LINE_VT_A_U3P
PSD1-START
LINE_FUSE_FAILURE_FSD1-BLKZ
PHS-STCNDZ
ZD-STDIR

I3P
U3P
BLOCK
VTSZ
BLKTR
STCND
DIRCND

TRIP
TRL1
TRL2
TRL3
START
STL1
STL2
STL3
STND

ZM01-TRIP

TRIP
TRL1
TRL2
TRL3
START
STL1
STL2
STL3
STND

ZM02-TRIP

TRIP
TRL1
TRL2
TRL3
START
STL1
STL2
STL3
STND

ZM03-TRIP

TRIP
TRL1
TRL2
TRL3
START
STL1
STL2
STL3
STND

ZM04-TRIP

ZM01-START

ZMQAPDIS
LINE_CT_A_I3P
LINE_VT_A_U3P
PSD1-START
LINE_FUSE_FAILURE_FSD1-BLKZ

PHS-STCNDZ
ZD-STDIR

I3P
U3P
BLOCK
VTSZ
BLKTR
STCND
DIRCND

B
ZM02-START
ZM02-STL1
ZM02-STL2
ZM02-STL3
ZM02-STND

ZMQAPDIS
LINE_CT_A_I3P
LINE_VT_A_U3P
PSD1-START
LINE_FUSE_FAILURE_FSD1-BLKZ
PHS-STCNDI
ZD-STDIR

I3P
U3P
BLOCK
VTSZ
BLKTR
STCND
DIRCND

ZM03-START

ZMQAPDIS
LINE_CT_A_I3P
LINE_VT_A_U3P
PSD1-START
LINE_FUSE_FAILURE_FSD1-BLKZ
PHS-STCNDI
ZD-STDIR

I3P
U3P
BLOCK
VTSZ
BLKTR
STCND
DIRCND

ZM04-START

ZM05 SET IN REVERSE DIRECTION, USED IN BLOCKING SCHEME AND CURRENT REVERSAL LOGIC.

ZMQAPDIS
LINE_CT_A_I3P
LINE_VT_A_U3P
PSD1-START
LINE_FUSE_FAILURE_FSD1-BLKZ
PHS-STCNDZ
ZD-STDIR

I3P
U3P
BLOCK
VTSZ
BLKTR
STCND
DIRCND

TRIP
TRL1
TRL2
TRL3
START
STL1
STL2
STL3
STND

ZM05-TRIP

ZM05-START

ZM05-STND

Main Application: IMP_PROT, Page: 2


1

Modification

Rel. date

Created by

Based on

5
Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Project

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

6 / 38

SWITCH ON TO FAULT LOGIC


ZCVPSOF
LINE_CT_A_I3P
LINE_VT_A_U3P

B
ZM02-STND

I3P
U3P
BLOCK
BC
ZACC

TRIP

SOTF-TRIP

FAULT LOCATOR
LMBRFLO
ZM02-STL1
ZM02-STL2
ZM02-STL3

OR
AR01-START
SOTF-TRIP

INPUT1
INPUT2
INPUT3
INPUT4
INPUT5
INPUT6

OUT
NOUT

PHSELL1
PHSELL2
PHSELL3
CALCDIST

FLTDISTX
CALCMADE
BCD_80
BCD_40
BCD_20
BCD_10
BCD_8
BCD_4
BCD_2
BCD_1

Main Application: IMP_PROT, Page: 3


1

Modification

Rel. date

Created by

Based on

5
Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Project

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

7 / 38

COMMUNICATION LOGIC, DISTANCE PROTECTION

ZCPSCH

OR
INPUT1
INPUT2
INPUT3
INPUT4
INPUT5
INPUT6

ZM02-START

OUT
NOUT

ZM05-START
ZM02-START
ZM01-START
BI_ZCOM-CR

BLOCK
BLKTR
BLKCS
CSBLK
CACC
CSOR
CSUR
CR
CRG

TRIP
CS
CRL
LCG

OR

ZCOM-TRIP

INPUT1
INPUT2
INPUT3
INPUT4
INPUT5
INPUT6

BI_CS_TEST

OUT
NOUT

ZCOM-CS

CURRENT REVERSAL AND WEAK END INFEED LOGIC, DISTANCE PROTECTION

ZCRWPSCH
LINE_VT_A_U3P
ZM02-START
ZM05-START

OR
ZM02-START
ZM05-STND

U3P
BLOCK
IRVBLK
IRV
WEIBLK1
WEIBLK2
VTSZ
CBOPEN
CRL

INPUT1
INPUT2
INPUT3
INPUT4
INPUT5
INPUT6

OUT
NOUT

LINE_FUSE_FAILURE_FSD1-BLKZ
BI_CB_CLOSED

IRVL
TRWEI
TRWEIL1
TRWEIL2
TRWEIL3
ECHO

ZCAL-IRVL
ZCAL-TRWEI

Main Application: IMP_COM, Page: 1


1

Modification

Rel. date

Created by

Based on

5
Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Project

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

8 / 38

STAND BY NON DIRECTIONAL OVER CURRENT PROTECTION

PHPIOC
LINE_CT_A_I3P
LINE_FUSE_FAILURE_FSD1-BLKZ

I3P
BLOCK
ENMULT

TRIP
TRL1
TRL2
TRL3

PHPIOC-TRIP

STAND BY NON DIRECTIONAL EARTH FAULT PROTECTION

EFPIOC
LINE_CT_A_I3P
LINE_FUSE_FAILURE_FSD1-BLKZ

I3P
BLOCK
BLKAR
MULTEN

TRIP

EFPIOC-TRIP

Main Application: I_PROT, Page: 1


1

Modification

Rel. date

Created by

Based on

5
Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Project

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

9 / 38

FUSE FAILURE SUPERVISION


SDDRFUF
LINE_CT_A_I3P
LINE_VT_A_U3P

BI_CB_CLOSED
BI_LINE_MCB_OK
BI_LINE_DISC_OPEN
TRP1-TRIP

I3P
U3P
BLOCK
CBCLOSED
MCBOP
DISCPOS
BLKTRIP

BLKZ
BLKU
3PH
DLD1PH
DLD3PH

LINE_FUSE_FAILURE_FSD1-BLKZ
LINE_FUSE_FAILURE_FSD1-BLKU

DELAYED OVERVOLTAGE PROTECTION


OV2PTOV
LINE_VT_B_U3P

U3P
BLOCK
BLKTR1
BLKST1
BLKTR2
BLKST2

TRIP
TR1
TR1L1
TR1L2
TR1L3
TR2
TR2L1
TR2L2
TR2L3
START
ST1
ST1L1
ST1L2
ST1L3
ST2
ST2L1
ST2L2
ST2L3

TOV1-TRIP

B
TOV1-START
TOV1-ST1L1
TOV1-ST1L2
TOV1-ST1L3

DELAYED UNDERVOLTAGE PROTECTION


UV2PTUV

C
LINE_VT_B_U3P
LINE_FUSE_FAILURE_FSD1-BLKU
BI_CB_CLOSED
BI_CB_CLOSED

U3P
BLOCK
BLKTR1
BLKST1
BLKTR2
BLKST2

C
TRIP
TR1
TR1L1
TR1L2
TR1L3
TR2
TR2L1
TR2L2
TR2L3
START
ST1
ST1L1
ST1L2
ST1L3
ST2
ST2L1
ST2L2
ST2L3

TUV1-TRIP

TUV1-START
TUV1-ST1L1
TUV1-ST1L2
TUV1-ST1L3

LOVPTUV
LINE_VT_B_U3P
LINE_FUSE_FAILURE_FSD1-BLKU

U3P
BLOCK
CBOPEN
VTSU

TRIP
START

LOV1-START

Main Application: U_PROT, Page: 1


1

Modification

Rel. date

Created by

Based on

5
Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Project

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

10 / 38

FRONT LOGIC CB TRIPPING

TRIP CIRCUITS CB

TMAGGIO
ZM01-TRIP
ZCOM-TRIP
ZCAL-TRWEI
SOTF-TRIP
PHPIOC-TRIP
EFPIOC-TRIP
TOV1-TRIP
TUV1-TRIP

OR
INPUT1
INPUT2
INPUT3
INPUT4
INPUT5
INPUT6

ZM02-TRIP
ZM03-TRIP
ZM04-TRIP
ZM05-TRIP

OUT
NOUT

INPUT1
INPUT2
INPUT3
INPUT4
INPUT5
INPUT6
INPUT7
INPUT8
INPUT9
INPUT10
INPUT11
INPUT12
INPUT13
INPUT14
INPUT15
INPUT16
INPUT17
INPUT18
INPUT19
INPUT20
INPUT21
INPUT22
INPUT23
INPUT24
INPUT25
INPUT26
INPUT27
INPUT28
INPUT29
INPUT30
INPUT31
INPUT32

SMPPTRC
OUTPUT1
OUTPUT2
OUTPUT3

TR01-INPUT 1-21 = CB TRIP

TRUE

BLOCK
BLKLKOUT
TRIN
TRINL1
TRINL2
TRINL3
PSL1
PSL2
PSL3
1PTRZ
1PTREF
P3PTR
SETLKOUT
RSTLKOUT

TRIP
TRL1
TRL2
TRL3
TR1P
TR2P
TR3P
CLLKOUT

TRP1-TRIP

TRP1-TR3P

ZM_DELAYED_TRIP

Main Application: CB_TR, Page: 1


1

Modification

Rel. date

Created by

Based on

5
Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Project

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

11 / 38

FRONT LOGIC CB AUTORECLOSE


A

A
TMAGGIO
ZM01-TRIP
ZCOM-TRIP
ZCAL-TRWEI

TOV1-TRIP
TUV1-TRIP
BFP1-TRBU
BI_LINE_DIT_REC
ZM_DELAYED_TRIP
PHPIOC-TRIP
EFPIOC-TRIP

INPUT1
INPUT2
INPUT3
INPUT4
INPUT5
INPUT6
INPUT7
INPUT8
INPUT9
INPUT10
INPUT11
INPUT12
INPUT13
INPUT14
INPUT15
INPUT16
INPUT17
INPUT18
INPUT19
INPUT20
INPUT21
INPUT22
INPUT23
INPUT24
INPUT25
INPUT26
INPUT27
INPUT28
INPUT29
INPUT30
INPUT31
INPUT32

OUTPUT1
OUTPUT2
OUTPUT3

AR01-START
AR01-INHBIT

TR03-INPUT 1-16 =START AR

TR03-INPUT 17-32 =INHIBIT AR

Main Application: CB_AR, Page: 1


1

Modification

Rel. date

Created by

Based on

5
Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Project

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

12 / 38

CB AUTORECLOSE
INV
INPUT

SMBRREC

B
BI_AR01-ON
BI_AR01-OFF

ON
OFF
BLKON
BLKOFF
RESET
INHIBIT
START
STARTHS
TRSOTF
SKIPHS
ZONESTEP
TR2P
TR3P
THOLHOLD
CBREADY
CBPOS
PLCLOST
SYNC
WAIT
RSTCOUNT
MODEINT

AR01-INHBIT
AR01-START
SOTF-TRIP

TRP1-TR3P

OR

GATE
TRUE

INPUT

BI_CB_NOT_READY
BI_CB_CLOSED

AUTO_SC_OK

OUT

INPUT1
INPUT2
INPUT3
INPUT4
INPUT5
INPUT6

OUT
NOUT
INTZERO

BLOCKED
SETON
READY
ACTIVE
SUCCL
UNSUCCL
INPROGR
1PT1
2PT1
3PT1
3PT2
3PT3
3PT4
3PT5
PERMIT1P
PREP3P
CLOSECB
WFMASTER
COUNT1P
COUNT2P
COUNT3P1
COUNT3P2
COUNT3P3
COUNT3P4
COUNT3P5
COUNTAR
MODE

OUT

AR01_SETOFF

AR01-SETON
AR01-READY
AR01-ACTIVE
AR01-SUCCL
AR01-UNSUCCL
AR01-INPROGR

OR
INPUT1
INPUT2
INPUT3
INPUT4
INPUT5
INPUT6

OUT
NOUT

AR01_3 PHASE_START

AR01-CLOSECB

Main Application: CB_AR, Page: 2


1

Modification

Rel. date

Created by

Based on

5
Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Project

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

13 / 38

SYNCHRO CHECK AND ENERGIZING CHECK CB

OR

SESRSYN
BUS_1_1PH_VT_U3P
BUS_2_1PH_VT_U3P
LINE_VT_B_U3P
GRP_OFF

B
BI_BUS_1_DISC_CLOSED
BI_BUS_2_DISC_CLOSED
TRUE
TRUE
BI_BUS_MCB_OK
BI_BUS_MCB_OK
BI_LINE_MCB_OK
TRUE
AR01_3 PHASE_START

C
INTZERO
INTZERO

U3PBB1
U3PBB2
U3PLN1
U3PLN2
BLOCK
BLKSYNCH
BLKSC
BLKENERG
B1QOPEN
B1QCLD
B2QOPEN
B2QCLD
LN1QOPEN
LN1QCLD
LN2QOPEN
LN2QCLD
UB1OK
UB1FF
UB2OK
UB2FF
ULN1OK
ULN1FF
ULN2OK
ULN2FF
STARTSYN
TSTSYNCH
TSTSC
TSTENERG
AENMODE
MENMODE

INPUT1
INPUT2
INPUT3
INPUT4
INPUT5
INPUT6

SYNOK
AUTOSYOK
AUTOENOK
MANSYOK
MANENOK
TSTSYNOK
TSTAUTSY
TSTMANSY
TSTENOK
USELFAIL
B1SEL
B2SEL
LN1SEL
LN2SEL
SYNPROGR
SYNFAIL
UOKSYN
UDIFFSYN
FRDIFSYN
FRDIFFOK
FRDERIVA
UOKSC
UDIFFSC
FRDIFFA
PHDIFFA
FRDIFFM
PHDIFFM
INADVCLS
UDIFFME
FRDIFFME
PHDIFFME
UBUS
ULINE
MODEAEN
MODEMEN

OUT
NOUT

AUTO_SC_OK

OR
INPUT1
INPUT2
INPUT3
INPUT4
INPUT5
INPUT6

OUT
NOUT

MAN_SC_OK

Main Application: CB_AR, Page: 3


1

Modification

Rel. date

Created by

Based on

5
Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Project

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

14 / 38

BREAKER FAILURE PROTECTION CB

CCRBRF
LINE_CT_A_I3P

OR
INPUT1
INPUT2
INPUT3
INPUT4
INPUT5
INPUT6

TRP1-TRIP
BI_START_BF

OUT
NOUT

I3P
BLOCK
START
STL1
STL2
STL3
CBCLDL1
CBCLDL2
CBCLDL3
CBFLT

TRBU
TRBU2
TRRET
TRRETL1
TRRETL2
TRRETL3
CBALARM

BFP1-TRBU

Main Application: CB_BF, Page: 1


1

Modification

Rel. date

Created by

Based on

5
Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Project

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

15 / 38

MEASUREMENTS
CVMMXN
LINE_CT_MEASUREMENT_I3P
LINE_VT_MEASUREMENT_U3P

I3P
U3P

S
S_RANGE
P_INST
P
P_RANGE
Q_INST
Q
Q_RANGE
PF
PF_RANGE
ILAG
ILEAD
U
U_RANGE
I
I_RANGE
F
F_RANGE

VNMMXU
LINE_VT_MEASUREMENT_U3P

U3P

UL1
UL1RANG
UL1ANGL
UL2
UL2RANG
UL2ANGL
UL3
UL3RANG
UL3ANGL

CMSQI
LINE_CT_MEASUREMENT_I3P

I3P

LINE_CT_MEASUREMENT_I3P

I3P

3I0
3I0RANG
3I0ANGL
I1
I1RANG
I1ANGL
I2
I2RANG
I2ANGL

VMMXU
LINE_VT_MEASUREMENT_U3P

U3P

UL12
UL12RANG
UL12ANGL
UL23
UL23RANG
UL23ANGL
UL31
UL31RANG
UL31ANGL

CMMXU

IL1
IL1RANG
IL1ANGL
IL2
IL2RANG
IL2ANGL
IL3
IL3RANG
IL3ANGL

VMSQI
LINE_VT_MEASUREMENT_U3P

U3P

3U0
3U0RANG
3U0ANGL
U1
U1RANG
U1ANGL
U2
U2RANG
U2ANGL

Main Application: MEASURE, Page: 1


1

Modification

Rel. date

Created by

Based on

5
Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Project

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

16 / 38

A1RADR
LINE_CT_A_IL1
LINE_CT_A_IL2
LINE_CT_A_IL3
LINE_CT_A_IN
LINE_VT_A_UL1

LINE_VT_A_UL2
LINE_VT_A_UL3
LINE_VT_A_UN

LINE_A_IL1
INPUT1
LINE_A_IL2
INPUT2
LINE_A_IL3
INPUT3
LINE_A_IN
INPUT4
LINE_UL1
INPUT5
LINE_UL2
INPUT6
LINE_UL3
INPUT7
LINE_UN
INPUT8
Not used
INPUT9
Not used
INPUT10

Main Application: DREP_AI, Page: 1


1

Modification

Rel. date

Created by

Based on

5
Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Project

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

17 / 38

B1RBDR
TRIP
INPUT1
Not used
INPUT2
Not used
INPUT3
Not used
INPUT4
Not used
INPUT5
Not used
INPUT6
ZM01 TRIP
INPUT7
ZM01 START
INPUT8
ZM02 TRIP
INPUT9
ZM02 START
INPUT10
ZM03 TRIP
INPUT11
ZM03 START
INPUT12
ZM04 TRIP
INPUT13
ZM04 START
INPUT14
ZM05 TRIP
INPUT15
ZM05 START
INPUT16

TRP1-TRIP

ZM01-TRIP
ZM01-START
ZM02-TRIP
ZM02-START
ZM03-TRIP
ZM03-START

ZM04-TRIP
ZM04-START
ZM05-TRIP
ZM05-START

B3RBDR
ZCAL-IRVL
ZCAL-TRWEI

BI_START_BF
BFP1-TRBU
BI_CS_TEST
BI_DIT_SEND_TEST

BI_CB_CLOSED
BI_LINE_DISC_OPEN
TEST-ACTIVE

B5RBDR

CURR REV Z
INPUT33
TRVEI Z
INPUT34
Not used
INPUT35
BI START BFP
INPUT36
BFP TRBU
INPUT37
CS TEST
INPUT38
DIT SEND TEST
INPUT39
Not used
INPUT40
Not used
INPUT41
Not used
INPUT42
Not used
INPUT43
Not used
INPUT44
Not used
INPUT45
CB CLOSED
INPUT46
LINE DS OPEN
INPUT47
TEST MODE ON
INPUT48

TUV1-TRIP
TUV1-START
TOV1-TRIP
TOV1-START
TUV1-ST1L1
TUV1-ST1L2
TUV1-ST1L3
TOV1-ST1L1
TOV1-ST1L2
TOV1-ST1L3
PHPIOC-TRIP
EFPIOC-TRIP

UV2 TRIP
INPUT65
UV2 START
INPUT66
OV2 TRIP
INPUT67
OV2 START
INPUT68
UV2 STL1
INPUT69
UV2 STL2
INPUT70
UV2 STL3
INPUT71
OV2 STL1
INPUT72
OV2 STL2
INPUT73
OV2 STL3
INPUT74
PHPIOC TRIP
INPUT75
EFPIOC TRIP
INPUT76
Not used
INPUT77
Not used
INPUT78
Not used
INPUT79
Not used
INPUT80

C
B2RBDR
SOTF TRIP
INPUT17
ZCOM TRIP
INPUT18
CR
INPUT19
CS
INPUT20
Not used
INPUT21
PHS STFWL1
INPUT22
PHS STFWL2
INPUT23
PHS STFWL3
INPUT24
PHS STFWPE
INPUT25
PSD1 START
INPUT26
Not used
INPUT27
Not used
INPUT28
DIT RECEIVE
INPUT29
Not used
INPUT30
Not used
INPUT31
FUSE FAIL
INPUT32

SOTF-TRIP
ZCOM-TRIP
BI_ZCOM-CR
ZCOM-CS

PHS-STFWL1
PHS-STFWL2
PHS-STFWL3
PHS-STFWPE

B4RBDR

PSD1-START

BI_LINE_DIT_REC

LINE_FUSE_FAILURE_FSD1-BLKU

AR01-CLOSECB
BI_CB_NOT_READY
AR01-UNSUCCL
AR01-INPROGR
AR01-READY
AR01-ACTIVE
AR01-SUCCL

CB CLOSE
INPUT49
CB READY
INPUT50
AR UNSUCCL
INPUT51
AR INPROGR
INPUT52
AR READY
INPUT53
AR ACTIVE
INPUT54
AR SUCCL
INPUT55
Not used
INPUT56
Not used
INPUT57
Not used
INPUT58
Not used
INPUT59
Not used
INPUT60
Not used
INPUT61
Not used
INPUT62
Not used
INPUT63
PD TRIP
INPUT64

Main Application: DREP_BI, Page: 1


1

Modification

Rel. date

Created by

Based on

5
Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Project

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

18 / 38

FIXED SIGNALS

FXDSIGN
OFF
ON
INTZERO
INTONE
INTALONE
REALZERO
STRNULL
ZEROSMPL
GRP_OFF

FALSE
TRUE
INTZERO

REALZERO
GRP_OFF

LED MONITOR
LEDGEN

B
BLOCK
RESET
LEDTEST

NEWIND
ACK

LocalHMI
CLRLEDS

HMI-ON
RED-S
YELLOW-S
YELLOW-F
CLRPULSE
LEDSCLRD

TEST MODE ON/OFF


TIMER
BI_ACTIVATE_TESTMODE

INPUT

ON
OFF

TESTMODE
INPUT

ACTIVE
OUTPUT
SETTING
NOEVENT

TEST-ACTIVE

Main Application: COMMON, Page: 1


1

Modification

Rel. date

Created by

Based on

5
Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Project

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

19 / 38

RED LEDs
A

A
ZM01-TRIP

LED.RED1

OR
ZM_DELAYED_TRIP
ZCOM-TRIP
ZCAL-TRWEI
PHPIOC-TRIP
EFPIOC-TRIP
SOTF-TRIP

INPUT1
INPUT2
INPUT3
INPUT4
INPUT5
INPUT6

OUT
NOUT

LED.RED2

ZCOM-CS

LED.RED3

DIT_SEND

LED.RED4

OR
TOV1-TRIP
TUV1-TRIP

INPUT1
INPUT2
INPUT3
INPUT4
INPUT5
INPUT6

OUT
NOUT

LED.RED5

C
BFP1-TRBU

LED.RED6

Main Application: LED, Page: 1


1

Modification

Rel. date

Created by

Based on

5
Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Project

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

20 / 38

YELLOW LEDs
A

A
BI_CB_LOCKED_OUT

LED.YELLOW7

AR01-CLOSECB

LED.YELLOW8

AR01-UNSUCCL

LED.YELLOW9

BI_LINE_DIT_REC

LED.YELLOW10

BI_ZCOM-CR

LED.YELLOW11

C
AR01-SETON

LED.YELLOW12

AR01_SETOFF

LED.YELLOW13

OR
ZM01-START
ZM02-START
ZM03-START
ZM04-START
ZM05-START

INPUT1
INPUT2
INPUT3
INPUT4
INPUT5
INPUT6

OUT
NOUT

LED.YELLOW14

PSD1-START

LED.YELLOW15

Main Application: LED, Page: 2


1

Modification

Rel. date

Created by

Based on

5
Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Project

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

21 / 38

QB1 CLOSED

BIM 3

BI_BUS_1_DISC_CLOSED

BIM_3.BI1
QB2 CLOSED

BI_BUS_2_DISC_CLOSED

BIM_3.BI2
QB9 OPEN
BI_LINE_DISC_OPEN

BIM_3.BI3

QA1 ON
BI_CB_CLOSED

BIM_3.BI5

CB NOT READY
BI_CB_NOT_READY

BIM_3.BI6
LINE MCB OK
BI_LINE_MCB_OK

BIM_3.BI7
CB L-O
BI_CB_LOCKED_OUT

BIM_3.BI8
AR ON
BI_AR01-ON

BIM_3.BI9
AR OFF
BI_AR01-OFF

BIM_3.BI10
RTXP INSERTED
BI_ACTIVATE_TESTMODE

BIM_3.BI11
WA MCB OK
BI_BUS_MCB_OK

BIM_3.BI12

Main Application: BIM, Page: 1


1

Modification

Rel. date

Created by

Based on

5
Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Project

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

22 / 38

BIM 5
CS TEST

BI_CS_TEST

BIM_5.BI2
DIT SEND TEST
BI_DIT_SEND_TEST

BIM_5.BI3

B
START BFP
BI_START_BF

BIM_5.BI6

CR
BI_ZCOM-CR

BIM_5.BI9
DIT RECEIVE
BI_LINE_DIT_REC

BIM_5.BI10

Main Application: BIM, Page: 2


1

Modification

Rel. date

Created by

Based on

5
Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Project

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

23 / 38

MAN SC OK

BOM 4

TEST ACTIVE

MAN_SC_OK

TEST-ACTIVE

BOM_4.BO1

BOM_4.BO17

CBF TRIP
FALSE

BFP1-TRBU

BOM_4.BO2

BOM_4.BO18

BFP TRIP BU

AR SET OFF

BFP1-TRBU

AR01_SETOFF

BOM_4.BO3

BOM_4.BO19

BFP TRIP BU

AR SET ON

BFP1-TRBU

AR01-SETON

BOM_4.BO4

BOM_4.BO20

AR CLOSE CB

AR CLOSE CB

AR01-CLOSECB

AR01-CLOSECB

BOM_4.BO5

BOM_4.BO21
AR UNSUCCL

FALSE

AR01-UNSUCCL

BOM_4.BO6

BOM_4.BO22

LINE ZERO U

ZM TRIP

LOV1-START

ZM_TRIP

BOM_4.BO7

BOM_4.BO23
CBF TRIP

FALSE

BFP1-TRBU

BOM_4.BO8

BOM_4.BO24

AR CLOSE CB
AR01-CLOSECB

BOM_4.BO9
AR UNSUCCL
AR01-UNSUCCL

BOM_4.BO10

OR
ZM01-TRIP
ZM_DELAYED_TRIP
SOTF-TRIP
FALSE
FALSE
FALSE

INPUT1
INPUT2
INPUT3
INPUT4
INPUT5
INPUT6

ZM TRIP
OUT
NOUT

ZM_TRIP

ZM_TRIP

BOM_4.BO11

FALSE

BOM_4.BO12
TRIP
TRP1-TRIP

BOM_4.BO13
TRIP
TRP1-TRIP

BOM_4.BO14
DIT_SEND

CS

OR
BFP1-TRBU
BI_DIT_SEND_TEST

INPUT1
INPUT2
INPUT3
INPUT4
INPUT5
INPUT6

ZCOM-CS

OUT
NOUT

BOM_4.BO15

DIT
BOM_4.BO16

Modification

Rel. date

Created by

Based on

Project

Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Main Application: BOM, Page: 1


6

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

24 / 38

BOM 6
ZM01 TRIP

ZM01 TRIP

ZM01-TRIP

ZM01-TRIP

BOM_6.BO1

BOM_6.BO13

ZM02 TRIP

ZM02 TRIP

ZM02-TRIP

ZM02-TRIP

BOM_6.BO2

BOM_6.BO14

ZM03 TRIP

ZM03 TRIP

ZM03-TRIP

ZM03-TRIP

BOM_6.BO3

BOM_6.BO15

FUSE FAILURE
LINE_FUSE_FAILURE_FSD1-BLKU

BOM_6.BO4

BOM_6.BO16

BOM_6.BO5

BOM_6.BO17

BOM_6.BO6

BOM_6.BO18

BOM_6.BO7

BOM_6.BO19

BOM_6.BO8

BOM_6.BO20

BOM_6.BO9

BOM_6.BO21

BOM_6.BO10

BOM_6.BO22

BOM_6.BO11

BOM_6.BO23

BOM_6.BO12

BOM_6.BO24

Main Application: BOM, Page: 2


1

Modification

Rel. date

Created by

Based on

5
Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Project

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

25 / 38

Output Variable Information Present in I_AI Page 1


Name
LINE_CT_A_I3P

Page
1

Partner Location
IMP_PROT

Partner Page
1

IMP_PROT
IMP_PROT

1
1

IMP_PROT
IMP_PROT

2
2

IMP_PROT

IMP_PROT
IMP_PROT

2
2

IMP_PROT
I_PROT

3
1

I_PROT

U_PROT
CB_BF

1
1

LINE_CT_A_IL1
LINE_CT_A_IL2

1
1

DREP_AI
DREP_AI

1
1

LINE_CT_A_IL3
LINE_CT_A_IN

1
1

DREP_AI
DREP_AI

1
1

LINE_CT_MEASUREMENT_I3P

MEASURE

MEASURE
MEASURE

1
1

Input Variable Information Present in U_AI Page 1


Name
REALZERO

Page
1

Partner Location
COMMON

Partner Page
1

REALZERO

COMMON

Page
1

Partner Location
IMP_PROT

Partner Page
1

IMP_PROT
IMP_PROT

1
1

IMP_PROT

IMP_PROT
IMP_PROT

2
2

IMP_PROT
IMP_PROT

2
2

IMP_PROT

IMP_COM
U_PROT

1
1

Output Variable Information Present in U_AI Page 1


Name
LINE_VT_A_U3P

LINE_VT_A_UL1
LINE_VT_A_UL2

1
1

DREP_AI
DREP_AI

1
1

LINE_VT_A_UL3
LINE_VT_A_UN

1
1

DREP_AI
DREP_AI

1
1

LINE_VT_B_U3P

U_PROT

U_PROT
U_PROT

1
1

CB_AR
MEASURE

3
1

MEASURE

LINE_VT_MEASUREMENT_U3P

MEASURE
Project

Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Modification

Rel. date

Created by

Based on

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

1
Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

26 / 38

Name

Page

Partner Location
MEASURE

Partner Page
1

Name
BUS_1_1PH_VT_U3P

Page
2

Partner Location
CB_AR

Partner Page
3

BUS_2_1PH_VT_U3P

CB_AR

Name
LINE_CT_A_I3P
LINE_VT_A_U3P

Page
1
1

Partner Location
I_AI
U_AI

Partner Page
1
1

LINE_CT_A_I3P
LINE_VT_A_U3P

1
1

I_AI
U_AI

1
1

LINE_FUSE_FAILURE_FSD1-BLKZ

U_PROT

ZD-STDIR
LINE_CT_A_I3P

1
1

IMP_PROT
I_AI

1
1

LINE_VT_A_U3P
PHS-STPE

1
1

U_AI
IMP_PROT

1
1

TRUE

COMMON

Page
1

Partner Location
IMP_PROT
IMP_PROT

Partner Page
1
2

IMP_PROT
IMP_PROT

2
2

IMP_PROT

2
2
1

Output Variable Information Present in U_AI Page 2

Input Variable Information Present in IMP_PROT Page 1

Output Variable Information Present in IMP_PROT Page 1


Name
ZD-STDIR

PHS-STFWL1

IMP_PROT
DREP_BI

PHS-STFWL2
PHS-STFWL3

1
1

DREP_BI
DREP_BI

1
1

PHS-STFWPE
PHS-STPE

1
1

DREP_BI
IMP_PROT

1
1

PHS-STCNDZ

IMP_PROT

IMP_PROT
IMP_PROT

2
2

PHS-STCNDI

IMP_PROT
IMP_PROT

2
2

PSD1-START

IMP_PROT

IMP_PROT
IMP_PROT

2
2

IMP_PROT
IMP_PROT

2
2

DREP_BI
LED

1
2

Input Variable Information Present in IMP_PROT Page 2


Name
LINE_CT_A_I3P

Page
2

Partner Location
I_AI

Partner Page
1

LINE_VT_A_U3P
PSD1-START

2
2

U_AI
IMP_PROT

1
1

LINE_FUSE_FAILURE_FSD1-BLKZ

U_PROT

PHS-STCNDZ

IMP_PROT

Project

Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Modification

Rel. date

Created by

Based on

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

1
Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

27 / 38

Name
ZD-STDIR
LINE_CT_A_I3P

Page
2
2

Partner Location
IMP_PROT
I_AI

Partner Page
1
1

LINE_VT_A_U3P
PSD1-START

2
2

U_AI
IMP_PROT

1
1

LINE_FUSE_FAILURE_FSD1-BLKZ
PHS-STCNDZ

2
2

U_PROT
IMP_PROT

1
1

ZD-STDIR

IMP_PROT

LINE_CT_A_I3P
LINE_VT_A_U3P

2
2

I_AI
U_AI

1
1

PSD1-START
LINE_FUSE_FAILURE_FSD1-BLKZ

2
2

IMP_PROT
U_PROT

1
1

PHS-STCNDI

IMP_PROT

ZD-STDIR
LINE_CT_A_I3P

2
2

IMP_PROT
I_AI

1
1

LINE_VT_A_U3P
PSD1-START

2
2

U_AI
IMP_PROT

1
1

LINE_FUSE_FAILURE_FSD1-BLKZ
PHS-STCNDI

2
2

U_PROT
IMP_PROT

1
1

ZD-STDIR

IMP_PROT

LINE_CT_A_I3P
LINE_VT_A_U3P

2
2

I_AI
U_AI

1
1

PSD1-START
LINE_FUSE_FAILURE_FSD1-BLKZ

2
2

IMP_PROT
U_PROT

1
1

PHS-STCNDZ

IMP_PROT

ZD-STDIR

IMP_PROT

Page
2

Partner Location
CB_TR

Partner Page
1

CB_AR
DREP_BI

1
1

LED

BOM
BOM

1
2

BOM
IMP_COM

2
1

DREP_BI

LED
CB_TR

2
1

DREP_BI
BOM

1
2

BOM
IMP_COM

2
1

IMP_COM

IMP_COM
IMP_COM

1
1

DREP_BI
LED

1
2
3

Output Variable Information Present in IMP_PROT Page 2


Name
ZM01-TRIP

ZM01-START

ZM02-TRIP

ZM02-START

ZM02-STL1

IMP_PROT

ZM02-STL2

IMP_PROT

Project

Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Modification

Rel. date

Created by

Based on

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

3
Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

28 / 38

Name
ZM02-STL3
ZM02-STND

Page
2
2

Partner Location
IMP_PROT
IMP_PROT

Partner Page
3
3

ZM03-TRIP

CB_TR
DREP_BI

1
1

BOM
BOM

2
2

ZM03-START

DREP_BI

ZM04-TRIP

LED
CB_TR

2
1

ZM04-START

DREP_BI
DREP_BI

1
1

LED

ZM05-TRIP

CB_TR
DREP_BI

1
1

ZM05-START

IMP_COM
IMP_COM

1
1

DREP_BI
LED

1
2

IMP_COM

Name
LINE_CT_A_I3P
LINE_VT_A_U3P

Page
3
3

Partner Location
I_AI
U_AI

Partner Page
1
1

ZM02-STND

IMP_PROT

ZM02-STL1
ZM02-STL2

3
3

IMP_PROT
IMP_PROT

2
2

ZM02-STL3
AR01-START

3
3

IMP_PROT
CB_AR

2
1

SOTF-TRIP

IMP_PROT

Page
3

Partner Location
IMP_PROT
CB_TR

Partner Page
3
1

CB_AR
DREP_BI

2
1

LED

BOM

ZM05-STND
Input Variable Information Present in IMP_PROT Page 3

Output Variable Information Present in IMP_PROT Page 3


Name
SOTF-TRIP

Input Variable Information Present in IMP_COM Page 1


Name
ZM02-START

Page
1

Partner Location
IMP_PROT

Partner Page
2

BI_ZCOM-CR
ZM01-START

1
1

BIM
IMP_PROT

2
2

BI_CS_TEST

BIM

LINE_FUSE_FAILURE_FSD1-BLKZ
LINE_VT_A_U3P

1
1

U_PROT
U_AI

1
1

ZM05-START
ZM02-START

1
1

IMP_PROT
IMP_PROT

2
2

ZM02-START

IMP_PROT

ZM05-STND

IMP_PROT

Project

Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Modification

Rel. date

Created by

Based on

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

2
Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

29 / 38

Name
BI_CB_CLOSED
ZM02-START

Page
1
1

Partner Location
BIM
IMP_PROT

Partner Page
1
2

ZM05-START

IMP_PROT

Page
1

Partner Location
CB_TR

Partner Page
1

CB_AR

DREP_BI
LED

1
1

DREP_BI
LED

1
1

BOM

DREP_BI
CB_TR

1
1

CB_AR
DREP_BI

1
1

LED

Output Variable Information Present in IMP_COM Page 1


Name
ZCOM-TRIP

ZCOM-CS

ZCAL-IRVL
ZCAL-TRWEI

1
1

Input Variable Information Present in I_PROT Page 1


Name
LINE_FUSE_FAILURE_FSD1-BLKZ
LINE_FUSE_FAILURE_FSD1-BLKZ

Page
1
1

Partner Location
U_PROT
U_PROT

Partner Page
1
1

LINE_CT_A_I3P
LINE_CT_A_I3P

1
1

I_AI
I_AI

1
1

Page
1

Partner Location
CB_TR

Partner Page
1

CB_AR
DREP_BI

1
1

LED
CB_TR

1
1

CB_AR

DREP_BI
LED

1
1

Output Variable Information Present in I_PROT Page 1


Name
PHPIOC-TRIP

EFPIOC-TRIP

Input Variable Information Present in U_PROT Page 1


Name
LINE_CT_A_I3P

Page
1

Partner Location
I_AI

Partner Page
1

LINE_VT_A_U3P
BI_CB_CLOSED

1
1

U_AI
BIM

1
1

BI_LINE_MCB_OK
BI_LINE_DISC_OPEN

1
1

BIM
BIM

1
1

TRP1-TRIP
LINE_VT_B_U3P

1
1

CB_TR
U_AI

1
1

LINE_VT_B_U3P

U_AI

LINE_FUSE_FAILURE_FSD1-BLKU
BI_CB_CLOSED

1
1

U_PROT
BIM

1
1

BI_CB_CLOSED
LINE_VT_B_U3P

1
1

BIM
U_AI

1
1

LINE_FUSE_FAILURE_FSD1-BLKU

U_PROT

Project

Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Modification

Rel. date

Created by

Based on

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

30 / 38

Output Variable Information Present in U_PROT Page 1


Name
LINE_FUSE_FAILURE_FSD1-BLKZ

Page
1

LINE_FUSE_FAILURE_FSD1-BLKU

TOV1-TRIP

Partner Location
IMP_PROT

Partner Page
1

IMP_PROT
IMP_PROT

2
2

IMP_PROT
IMP_PROT

2
2

IMP_PROT

IMP_COM
I_PROT

1
1

I_PROT
U_PROT

1
1

U_PROT

DREP_BI
BOM

1
2

CB_TR
CB_AR

1
1

DREP_BI
LED

1
1

TOV1-START

DREP_BI

TOV1-ST1L1
TOV1-ST1L2

1
1

DREP_BI
DREP_BI

1
1

TOV1-ST1L3
TUV1-TRIP

1
1

DREP_BI
CB_TR

1
1

CB_AR

DREP_BI
LED

1
1

TUV1-START
TUV1-ST1L1

1
1

DREP_BI
DREP_BI

1
1

TUV1-ST1L2
TUV1-ST1L3

1
1

DREP_BI
DREP_BI

1
1

LOV1-START

BOM

Name
SOTF-TRIP
TOV1-TRIP

Page
1
1

Partner Location
IMP_PROT
U_PROT

Partner Page
3
1

TUV1-TRIP

U_PROT

TRUE
ZM02-TRIP

1
1

COMMON
IMP_PROT

1
2

ZM03-TRIP
ZM04-TRIP

1
1

IMP_PROT
IMP_PROT

2
2

ZM05-TRIP
ZM01-TRIP

1
1

IMP_PROT
IMP_PROT

2
2

ZCOM-TRIP

IMP_COM

ZCAL-TRWEI
EFPIOC-TRIP

1
1

IMP_COM
I_PROT

1
1

PHPIOC-TRIP

I_PROT

Page
1

Partner Location
U_PROT

Partner Page
1

Input Variable Information Present in CB_TR Page 1

Output Variable Information Present in CB_TR Page 1


Name
TRP1-TRIP
Project

Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Modification

Rel. date

Created by

Based on

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

31 / 38

Name

Page

TRP1-TR3P
ZM_DELAYED_TRIP

1
1

Partner Location
CB_BF
DREP_BI

Partner Page
1
1

BOM
BOM

1
1

CB_AR
CB_AR

2
1

LED

BOM

Input Variable Information Present in CB_AR Page 1


Name
ZM01-TRIP

Page
1

Partner Location
IMP_PROT

Partner Page
2

ZCOM-TRIP

IMP_COM

TOV1-TRIP
TUV1-TRIP

1
1

U_PROT
U_PROT

1
1

BFP1-TRBU
BI_LINE_DIT_REC

1
1

CB_BF
BIM

1
2

ZM_DELAYED_TRIP
ZCAL-TRWEI

1
1

CB_TR
IMP_COM

1
1

PHPIOC-TRIP

I_PROT

EFPIOC-TRIP

I_PROT

Name
AR01-START

Page
1

Partner Location
IMP_PROT

Partner Page
3

CB_AR

AR01-INHBIT

CB_AR

Name
BI_AR01-ON

Page
2

Partner Location
BIM

Partner Page
1

BI_AR01-OFF
AR01-INHBIT

2
2

BIM
CB_AR

1
1

SOTF-TRIP

IMP_PROT

TRP1-TR3P
BI_CB_CLOSED

2
2

CB_TR
BIM

1
1

AUTO_SC_OK
INTZERO

2
2

CB_AR
COMMON

3
1

AR01-START

CB_AR

BI_CB_NOT_READY
TRUE

2
2

BIM
COMMON

1
1

Name
AR01-SETON

Page
2

Partner Location
LED
BOM

Partner Page
2
1

AR01-READY

DREP_BI

AR01-ACTIVE
AR01-SUCCL

2
2

DREP_BI
DREP_BI

1
1

AR01-UNSUCCL

DREP_BI
LED

1
2

BOM

Output Variable Information Present in CB_AR Page 1

Input Variable Information Present in CB_AR Page 2

Output Variable Information Present in CB_AR Page 2

BOM
Project

Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Modification

Rel. date

Created by

Based on

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

1
Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

32 / 38

Name
AR01-INPROGR
AR01-CLOSECB

Page
2
2

Partner Location
DREP_BI
DREP_BI

Partner Page
1
1

LED
BOM

2
1

BOM
BOM

1
1

AR01_3 PHASE_START

CB_AR

AR01_SETOFF

LED
BOM

2
1

Name
BUS_1_1PH_VT_U3P

Page
3

Partner Location
U_AI

Partner Page
2

BUS_2_1PH_VT_U3P
LINE_VT_B_U3P

3
3

U_AI
U_AI

2
1

GRP_OFF
BI_BUS_1_DISC_CLOSED

3
3

COMMON
BIM

1
1

BI_BUS_2_DISC_CLOSED
TRUE

3
3

BIM
COMMON

1
1

TRUE

COMMON

BI_BUS_MCB_OK
BI_BUS_MCB_OK

3
3

BIM
BIM

1
1

BI_LINE_MCB_OK
TRUE

3
3

BIM
COMMON

1
1

INTZERO

COMMON

INTZERO
AR01_3 PHASE_START

3
3

COMMON
CB_AR

1
2

Page
3
3

Partner Location
CB_AR
BOM

Partner Page
2
1

Name
LINE_CT_A_I3P

Page
1

Partner Location
I_AI

Partner Page
1

TRP1-TRIP
BI_START_BF

1
1

CB_TR
BIM

1
2

Page
1

Partner Location
CB_AR

Partner Page
1

DREP_BI
LED

1
1

BOM
BOM

1
1

BOM

BOM
BOM

1
1

Partner Location
I_AI

Partner Page
1

Input Variable Information Present in CB_AR Page 3

Output Variable Information Present in CB_AR Page 3


Name
AUTO_SC_OK
MAN_SC_OK
Input Variable Information Present in CB_BF Page 1

Output Variable Information Present in CB_BF Page 1


Name
BFP1-TRBU

Input Variable Information Present in MEASURE Page 1


Name
LINE_CT_MEASUREMENT_I3P

Page
1

LINE_VT_MEASUREMENT_U3P

Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Modification

Rel. date

Created by

Based on

U_AI

Project

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

1
Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

33 / 38

Name
LINE_VT_MEASUREMENT_U3P
LINE_VT_MEASUREMENT_U3P

Page
1
1

Partner Location
U_AI
U_AI

Partner Page
1
1

LINE_VT_MEASUREMENT_U3P
LINE_CT_MEASUREMENT_I3P

1
1

U_AI
I_AI

1
1

LINE_CT_MEASUREMENT_I3P

I_AI

Name
LINE_CT_A_IL1
LINE_CT_A_IL2

Page
1
1

Partner Location
I_AI
I_AI

Partner Page
1
1

LINE_CT_A_IL3
LINE_CT_A_IN

1
1

I_AI
I_AI

1
1

LINE_VT_A_UL1

U_AI

LINE_VT_A_UL2
LINE_VT_A_UL3

1
1

U_AI
U_AI

1
1

LINE_VT_A_UN

U_AI

Name
TRP1-TRIP

Page
1

Partner Location
CB_TR

Partner Page
1

ZM01-TRIP

IMP_PROT

ZM01-START
ZM02-TRIP

1
1

IMP_PROT
IMP_PROT

2
2

ZM02-START
ZM03-TRIP

1
1

IMP_PROT
IMP_PROT

2
2

ZM03-START

IMP_PROT

ZM04-TRIP
ZM04-START

1
1

IMP_PROT
IMP_PROT

2
2

ZM05-TRIP
ZM05-START

1
1

IMP_PROT
IMP_PROT

2
2

SOTF-TRIP
ZCOM-TRIP

1
1

IMP_PROT
IMP_COM

3
1

BI_ZCOM-CR

BIM

PHS-STFWL1
PHS-STFWL2

1
1

IMP_PROT
IMP_PROT

1
1

PHS-STFWL3
PHS-STFWPE

1
1

IMP_PROT
IMP_PROT

1
1

PSD1-START

IMP_PROT

BI_LINE_DIT_REC
LINE_FUSE_FAILURE_FSD1-BLKU

1
1

BIM
U_PROT

2
1

BFP1-TRBU
BI_CB_CLOSED

1
1

CB_BF
BIM

1
1

TEST-ACTIVE
BI_START_BF

1
1

COMMON
BIM

1
2

BI_CS_TEST

BIM

BI_DIT_SEND_TEST
AR01-CLOSECB

1
1

BIM
CB_AR

2
2

AR01-UNSUCCL
AR01-INPROGR

1
1

CB_AR
CB_AR

2
2

BI_LINE_DISC_OPEN

BIM

ZCOM-CS

IMP_COM

Input Variable Information Present in DREP_AI Page 1

Input Variable Information Present in DREP_BI Page 1

Project

Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Modification

Rel. date

Created by

Based on

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

1
Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

34 / 38

Name
AR01-READY
AR01-ACTIVE

Page
1
1

Partner Location
CB_AR
CB_AR

Partner Page
2
2

AR01-SUCCL
BI_CB_NOT_READY

1
1

CB_AR
BIM

2
1

ZCAL-IRVL
ZCAL-TRWEI

1
1

IMP_COM
IMP_COM

1
1

TUV1-TRIP

U_PROT

TUV1-START
TOV1-TRIP

1
1

U_PROT
U_PROT

1
1

TOV1-START
TUV1-ST1L1

1
1

U_PROT
U_PROT

1
1

TUV1-ST1L2

U_PROT

TUV1-ST1L3
TOV1-ST1L1

1
1

U_PROT
U_PROT

1
1

TOV1-ST1L2
TOV1-ST1L3

1
1

U_PROT
U_PROT

1
1

PHPIOC-TRIP
EFPIOC-TRIP

1
1

I_PROT
I_PROT

1
1

Page
1

Partner Location
BIM

Partner Page
1

Page
1

Partner Location
DREP_BI

Partner Page
1

BOM
BOM

1
1

BOM
BOM

1
1

BOM
BOM

1
1

BOM

BOM
IMP_PROT

1
1

CB_TR
CB_AR

1
2

CB_AR

CB_AR
CB_AR

3
3

CB_AR
CB_AR

2
3

CB_AR
U_AI

3
1

U_AI

CB_AR

Name
ZM01-TRIP

Page
1

Partner Location
IMP_PROT

Partner Page
2

ZM_DELAYED_TRIP

CB_TR

ZCOM-CS

IMP_COM

Input Variable Information Present in COMMON Page 1


Name
BI_ACTIVATE_TESTMODE
Output Variable Information Present in COMMON Page 1
Name
TEST-ACTIVE
FALSE

TRUE

INTZERO

REALZERO

GRP_OFF
Input Variable Information Present in LED Page 1

Project

Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Modification

Rel. date

Created by

Based on

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

1
Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

35 / 38

Name
DIT_SEND
TOV1-TRIP

Page
1
1

Partner Location
BOM
U_PROT

Partner Page
1
1

TUV1-TRIP
BFP1-TRBU

1
1

U_PROT
CB_BF

1
1

ZCOM-TRIP
ZCAL-TRWEI

1
1

IMP_COM
IMP_COM

1
1

PHPIOC-TRIP

I_PROT

EFPIOC-TRIP
SOTF-TRIP

1
1

I_PROT
IMP_PROT

1
3

Name
BI_CB_LOCKED_OUT

Page
2

Partner Location
BIM

Partner Page
1

AR01-CLOSECB
BI_LINE_DIT_REC

2
2

CB_AR
BIM

2
2

BI_ZCOM-CR
AR01-SETON

2
2

BIM
CB_AR

2
2

AR01_SETOFF
PSD1-START

2
2

CB_AR
IMP_PROT

2
1

ZM01-START

IMP_PROT

ZM02-START
ZM03-START

2
2

IMP_PROT
IMP_PROT

2
2

ZM04-START
ZM05-START

2
2

IMP_PROT
IMP_PROT

2
2

AR01-UNSUCCL

CB_AR

Page
1

Partner Location
IMP_COM
U_PROT

Partner Page
1
1

U_PROT
U_PROT

1
1

CB_AR

Input Variable Information Present in LED Page 2

Output Variable Information Present in BIM Page 1


Name
BI_CB_CLOSED

BI_AR01-ON

DREP_BI
CB_AR

1
2

BI_AR01-OFF
BI_LINE_DISC_OPEN

1
1

CB_AR
U_PROT

2
1

DREP_BI

BI_LINE_MCB_OK

U_PROT
CB_AR

1
3

BI_BUS_1_DISC_CLOSED
BI_BUS_MCB_OK

1
1

CB_AR
CB_AR

3
3

BI_BUS_2_DISC_CLOSED

CB_AR
CB_AR

3
3

BI_ACTIVATE_TESTMODE

COMMON

BI_CB_LOCKED_OUT
BI_CB_NOT_READY

1
1

LED
CB_AR

2
2

DREP_BI

Partner Location
IMP_COM

Partner Page
1

Output Variable Information Present in BIM Page 2


Name
BI_ZCOM-CR

Page
2
Project

Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Modification

Rel. date

Created by

Based on

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

36 / 38

Name

Page

Partner Location
DREP_BI
LED

Partner Page
1
2

BI_LINE_DIT_REC

CB_AR
DREP_BI

1
1

BI_START_BF

LED
CB_BF

2
1

DREP_BI

BI_CS_TEST

IMP_COM
DREP_BI

1
1

BI_DIT_SEND_TEST

DREP_BI
BOM

1
1

Name
FALSE

Page
1

Partner Location
COMMON

Partner Page
1

FALSE
MAN_SC_OK

1
1

COMMON
CB_AR

1
3

BFP1-TRBU
BFP1-TRBU

1
1

CB_BF
CB_BF

1
1

AR01-CLOSECB

CB_AR

LOV1-START
AR01-CLOSECB

1
1

U_PROT
CB_AR

1
2

ZM01-TRIP
ZM_DELAYED_TRIP

1
1

IMP_PROT
CB_TR

2
1

SOTF-TRIP

IMP_PROT

FALSE
FALSE

1
1

COMMON
COMMON

1
1

FALSE
TRP1-TRIP

1
1

COMMON
CB_TR

1
1

TRP1-TRIP
ZCOM-CS

1
1

CB_TR
IMP_COM

1
1

BFP1-TRBU

CB_BF

BI_DIT_SEND_TEST
ZM_TRIP

1
1

BIM
BOM

2
1

FALSE
AR01-UNSUCCL

1
1

COMMON
CB_AR

1
2

TEST-ACTIVE

COMMON

AR01_SETOFF
AR01-SETON

1
1

CB_AR
CB_AR

2
2

AR01-CLOSECB
ZM_TRIP

1
1

CB_AR
BOM

2
1

BFP1-TRBU
FALSE

1
1

CB_BF
COMMON

1
1

AR01-UNSUCCL

CB_AR

BFP1-TRBU

CB_BF

Name
ZM_TRIP

Page
1

Partner Location
BOM

Partner Page
1

BOM

DIT_SEND

Input Variable Information Present in BOM Page 1

Output Variable Information Present in BOM Page 1

Project

Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Modification

Rel. date

Created by

Based on

LED

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

1
Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

37 / 38

Input Variable Information Present in BOM Page 2


Name
ZM01-TRIP

Page
2

Partner Location
IMP_PROT

Partner Page
2

ZM02-TRIP
ZM03-TRIP

2
2

IMP_PROT
IMP_PROT

2
2

ZM01-TRIP
ZM02-TRIP

2
2

IMP_PROT
IMP_PROT

2
2

ZM03-TRIP

IMP_PROT

LINE_FUSE_FAILURE_FSD1-BLKU

U_PROT

Project

Responsible department

Stage 5 New Rizgary

ABB ABB

Replacing

Rev.

Modification

Rel. date

Created by

Based on

Stage 5 New Rizgary.New Rizgary 132/33kV


S/S.132kV.=E1.Q5

Technical reference

Document kind

Doc. designation

Graphical Application Configuration

E1Q5_REL670

Created by

Title

Document id.

Application Development

=E1.Q5_REL670

1MRK007500_5

Approved by

Rev.

Rel. date

Lang.

Product Management

2010-05-31

en

38 / 38

Você também pode gostar