I. Structural Shape
P
d1
M
H
d2
Dd
d2
d1
Temporaray Load
Axial
P = 8.85 Ton
Shear
H = 0.489 Ton
Moment
M = 1.275 Ton meter
d1 =
340 mm
d2 =
350 mm
Db =
16 mm
1072 x Kg
2051 Kg
H=
T=
IV. Analysis
a. Permanen Load
a.1 Check Tension Strength
- Tension anchor bolt due to moment external
M
d1
Kg
<
1976 Kg
Ok!
H
n
Kg
- Result :
<
allow
Ok!
b. Temporary Load
b.1 Check Tension Strength
- Tension anchor bolt due to moment external
M
d1
Kg
<
1875 Kg
Ok!
H
n
<
Kg
- Result :
Ok!
16
mm
450 mm
2400 Kg/cm2
Fy =
bk = 175 Kg/cm2
Analysis :
I. TENSION CAPACITY
a. Based on steel material :
- Netto Area.
An = 0.85 * Ag
An =
1.709 cm2
- Allowable tension of anchor
T = tr * An
Ag = 0.25 * * D2 =
2.01 cm2
d = Fy / 1.5
= 1600 Kg/cm2
tr = d
tr = 1200 Kg/cm2
T=
2051 Kg/cm2
Up = 0.1 Fc'
Up = 0.1 * 145.3
Up =
14.53 Kg/cm2
Anchor Length which buried by concrete can be calculate :
Lburied = Lanchor - PJTN - tcover - tgrouting
Where : PJTN = t baseplate + 2D + 20mm
tbs.pl. =
12 mm
Lburied =
PJTN =
tcover =
64
mm
40
mm
tgrout =
25
mm
321
mm
tgrouting
PJTN
tcover
Up x x D x L buried
2344 Kg
tbs. pl
2051 Kg
L buried
L anchor
2.01 cm2
= 0.58 d
(PPBBI 1984)
= 928 Kg/cm2
1866 Kg
Ab =
Ag =
201 mm
253 mm
H
c
c=
c=
253 mm
tcover + tgrout + 0.5 t bs. pl
71 mm
Ho
La
Hrz force
La =
0.85 Fc'
Ho = Volume of Diagram
Ho = 0.5 * (0.85 Fc') * La * D
Ho = 2501 Kg
Ho * (2/3 *La) = H * (La + c)
H = 1302 Kg
H=
bend x W
0.5*tbs.pl
W = /32 x D3 =
0.402 cm3
1072 Kg
H=
1072 Kg
Combine of
Equation
I. Structural Shape
P
d
M2
n
bf
0.80*bf
n
m
0.95*d
MW
M1
Temporaray Load
Axial
P = 8.85 Ton
Shear
H = 0.489 Ton
Moment
M = 1.275 Ton meter
19 mm
300 mm
200 mm
200 x 150 x
2400 Kg/cm2
225 Kg/cm2
P
M
2
BxN 1/6 BxN
- Allowable bearing stress for Concrete :
- Column Size
- Yield strength stress
- Concrete Grade
tp =
N=
B=
HFy =
bk
IV. Analysis
a. Permanen Load
a.1 Bearing Stress on Concrete
- Concrete bearing stress :
Kg/cm2
<
Fp
Ok!
5.5
cm
M2 =
### Kg cm
18036.56
1499 Kg/cm2
12.03
1/6xNxtp
14310.00
2
792.8 Kg/cm
18.05
1/6xBxtp
M2
1800 Kg/cm2
- Summary :
1
<
allow
Ok!
<
allow
Ok!
b. Temporary Load
b.1 Bearing Stress on Concrete
- Concrete bearing stress :
P
M
Kg/cm2
Fp =
- Result :
105 Kg/cm2
Fp
<
Ok!
n = 0.5 (B - 0.80d) =
17318.13
1439 Kg/cm2
12.03
1/6xNxtp2
13740.00
2
761.2 Kg/cm
18.05
1/6xBxtp
M2
2394 Kg/cm2
- Summary :
1
<
allow
Ok!
<
allow
Ok!
5.5
cm
4.00 cm