LIST OF BUMIPUTERA CONTRACTORS


HOME | BUMI PARTICIPATION | LIST OF BUMIPUTERA MAIN WORK CONTRACTORS

List of Bumiputera Main Work Contractors


No

Package Name

LOA Date

Contractor

PART A : ADVANCE WORKS


1

AW2 - Package C1
Construction and completion of working platform including Earthworks, Access Road, Drainage
Works,TNB Substation, Retaining Walls, Utilities Protection and Ancillary Works for Semantan
launching shaft

03/06/2011

Menta Construction Sdn Bhd

AW5 - Package D2
Relocation of existing sewerage and water mains for Cochrane launching shaft

24/06/2011

Puncak Niaga (M) Sdn Bhd

AW12 - Package SYB1


Relocation of existing water pipe line and traffic management for utilities relocation for KL Sentral

31/1/2012

Hatimuda Sdn Bhd

AW13 - Package TEL1


The relocation of existing telecommunication lines for KL Sentral

14/12/2011

Sri Communication Sdn Bhd

AW14 - Package TCO1


The relocation of existing fibre optic lines for KL Sentral

14/12/2011

Tenaga Nirwana (M) Sdn Bhd

AW15 - Package TNB1


The relocation of existing power supply cables for KL Sentral and Merdeka

14/12/2011

Worktime Engineering Sdn


Bhd

AW16 - Package TEL2


The relocation of existing telecommunication lines for Merdeka

14/12/2011

Sri Communication Sdn Bhd

AW18 - Package TEL3


Relocation of existing telecommunication lines for Maluri

19/1/2012

Sri Communication Sdn Bhd

AW19 - Package TCO2


Relocation of existing fibre optic lines for Maluri

19/1/2012

Fastpro Sdn Bhd

10

AW20 - Package TNB2


Relocation of existing power supply cables for Maluri

6/3/2012

Huls Transmission Sdn Bhd

PART B : VIADUCT GUIDEWAY


11

Elevated Section V1 - Viaduct


Construction and completion of viaduct guideway and other associated works from Sungai Buloh
to Kota Damansara Station

18/5/2012

Syarikat Muhibah &


Perniagaan & Pembinaan Sdn
Bhd

12

Elevated Section V6 - Viaduct


Construction and completion of viaduct guideway and other associated works from Plaza Phoenix
station to Bandar Tun Hussein Onn Station

16/2/2012

Ahmad Zaki Sdn Bhd

13

Elevated Section V7 - Viaduct


Construction and completion of viaduct guideway and other associated works from Bandar Tun
Hussein Onn to Taman Mesra

18/5/2012

MTD Construction Sdn Bhd

PART C : DEPOTS
14

Package Dpt1: Construction And Completion Of Sungai Buloh Maintenance Depot, Administration
Building, External Works And Other Associated Works

18/5/2012

Trans Resources Corporation


Sdn Bhd

15

Package Dpt2: Construction And Completion Of Kajang Maintenance Depot, External Works And
Other Associated Works

24/7/2012

TSR Bina Sdn Bhd

30/3/2012

MMC Gamuda KVMRT (T) Sdn


Bhd

PART D : UNDERGROUND WORKS


16

Underground works (Tunnel stations & associated structures) between Semantan north portal and
Maluri south portal

PART E : MULTISTOREY CAR PARKS


17

Elev 1 - Package MSPR1 : Construction And Completion Of Multi Storey Car Park Building, External
Works And Other Associated Works At Sungai Buloh Station

24/7/2012

TSR Bina Sdn Bhd

18

Elev 8 - Package MSPR9 : Construction And Completion Of Multi Storey Car Park Building, External
Works And Other Associated Works at Kajang Station

18/3/2013

SMPP-IBWANI JOINT
VENTURE

PART E : MULTISTOREY CAR PARKS


19

Elevated Section ST1 - Stations


Package S1: Construction And Completion Of Elevated Stations And Other Associated Works At
Sungai Buloh, Kg. Baru Sungai Buloh And Kota Damansara

28/8/2012

Trans Resources Corporation


Sdn Bhd

20

Elevated Section ST2 - Stations


Package S2 : Construction And Completion Of Elevated Stations And Other Associated Works At
Taman Industrial Sungai Buloh, PJU 5 And Dataran Sunway

03/10/2012

Naim Engineering Sdn Bhd

http://www.mymrt.com.my/en/bumiputera-main-work-contractor

9/15/2013

MYMRT | MRT Corp - Official webpage for the Klang Valley My Rapid Transit.

No

Package Name

Page 2 of 2

LOA Date

Contractor

21

Elevated Section ST4 - Stations


Package S4 : Construction And Completion Of Elevated Stations And Other Associated Works At
Section 16, Bandar Damansara And Semantan

07/9/2012

Naim Engineering Sdn Bhd

22

Elevated Section ST6 - Stations


Package S6 : Construction And Completion Of Elevated Stations And Other Associated Works At
Taman Suntex, Taman Cuepacs And Bandar Tun Hussein Onn

28/8/2012

Ahmad Zaki Sdn Bhd

23

Elevated Section ST7 - Stations


Package S7 : Construction And Completion Of Elevated Stations And Other Associated Works At
Balakong And Taman Koperasi

28/8/2012

Apex Communication Sdn


Bhd

24

Elevated Section ST8 - Stations


Package S8: Construction And Completion Of Elevated Stations And Other Associated Works At
Saujana Impian, Bandar Kajang And Kajang

03/10/2012

Apex Communication Sdn


Bhd

PART E : MULTISTOREY CAR PARKS


25

Package ECS1: Supply, Procurement, Installation, Testing And Commissioning Of Environmental


Control System For Elevated Package V1 To V4 And Sungai Buloh Depot

18/3/2013

Kejuruteraan Astra Sdn Bhd

26

Package ECS2: Supply, Procurement, Installation, Testing And Commissioning Of Environmental


Control System For Elevated Package V5 To V8 And Kajang Depot

18/3/2013

FastColl Corporation Sdn Bhd

27

Package FD3: Supply, Procurement, Installation, Testing And Commissioning Of Fire Detection and
Protection System For Elevated Package V5 To V6

18/3/2013

Zulfan (M) Sdn Bhd

28

Package SDDT-E: Supply, Delivery And Supervision Of Installation, Testing And Commissioning Of
Step Down Distribution Transformer For All Elevated Packages, Sungai Buloh and Kajang Depot

18/3/2013

PTIS Engineering Sdn Bhd

29

Package UPS-E: Supply, Delivery And Supervision Of Installation, Testing And Commissioning Of
Uninterruptible Power Supply For All Elevated Stations

18/3/2013

Info-Matic Power Sdn Bhd

Routemap

Stations

Project Updates

Traffic Announcements

C o p y ri gh t 20 13 Ma s s R a p i d T r a n si t Co rp o r a ti on S d n Bh d . ( 9028 84V ) Al l R i g h ts R e se r v e d .

Ho m e

Co n t a ct U s

http://www.mymrt.com.my/en/bumiputera-main-work-contractor

MRT Hotline 1800-82-6868

21

9/15/2013

Você também pode gostar