Você está na página 1de 1

APPLICATION FOR ANNUAL RENEWABLE ENERGY ADVANTAGE

PROGRAM

ACCOUNT INFORMATION
This application if for electricity generated between July 1,       to June 30,      .
Program renewals will be processed annually on a separate Puget Sound Energy (PSE) form provided with each annual
Renewable Energy Advantage Program (REAP) payment.
NAME PSE ACCOUNT NUMBER DATE OF APPLICATION
                 
SERVICE ADDRESS (Location of equipment) PRIMARY PHONE NUMBER
           
CITY STATE ZIP CODE
                 
EMAIL (This is only used to provide technical or program updates.) Are you the property owner?
      YES NO
Is there an interconnection agreement with PSE? System includes battery backup?
YES NO YES NO
PRODUCTION METER INSTALLATION FEES*
Standard production meter $165.00 Fees are only charged once, regardless of the
(required for all non-battery backup systems) number of subsequent annual renewals. The
Advanced meter $525.00 installation fee will appear on your next regularly
scheduled invoice.
(required for most battery backup systems)
Additional standards meter (per system) $70.00
Additional advanced meter (per system) $430.00
Please note that some battery backup systems may require more than one meter to measure the total system output.
Production Meter Guidelines are available by calling 800-562-1482 or email EnergyEfficiency@pse.com.
AUTHORIZATION
By completing and returning this application, you authorize Puget Sound Energy (PSE) to begin production metering
installation processes necessary to accurately and fairly measure the total output of your renewable energy system. PSE
will contact you to evaluate the system and provide the necessary Production Metering Guidelines for PSE-owned and
installed meters.
Costs associated with installing a PSE-approved meter bases are paid by the customer; it is recommended that
you speak with PSE’s Metering Department before making any system modifications to clearly understand the
metering requirements. You may reach the Metering Department by calling 800-562-1482.
All items must be included with this application in order to expedite payment. PSE will process your application within
sixty (60) days of receipt and will notify you in writing as to the results.
Please include a copy of your Washington State renewable energy system certification, if not already on file with PSE.
NAME (Print) SIGNATURE DATE
           
*Production Meter Installation fees are subject to change, upon approval of the Washington Utilities and Transportation
Commission (WUTC).

Please mail this completed application to:


Puget Sound Energy
Renewable Energy Advantage Program
P.O. Box 90868 EST-09E
Bellevue, WA 98009-0868

4001 11/06

Você também pode gostar