processing times at each station it can be seen that the hold up in processing is at station 9 during
the software load (Jacobs and Chase, 2010). If we add the 31 seconds for inserting the memory
card for hardware test to the 71 seconds for the test DVD process we get 102 seconds. There is a
total of 208 seconds for software load but this step is conducted at the same time on three
separate products. Therefore we divide 208 second by 3 and get 69 seconds. Adding 69 to 102
gives us 171 seconds total and this total time needed to finish at station 9 can be used to help
with calculating capacity time.
Toshiba needs to focus on maximizing its capacity. If the organization maintained the
proper number of staff members and continued to have 10 employees running an efficient
assembly line for 24 hours a day 7 days a week with each employee working 7.5 hours a day, the
company can continue to perform at its maximum capacity. The goal to increase toward 300
units a day is not beneficial for the company. In order to reach this goal, employees will have to
work overtime, which could lead to lower employee morale and under performance.
References
DeCenzo, D. A., & Robbins, S. P. (2010). Fundamentals of human resource management, 10th
Ed. Hoboken, NJ: John Wiley and Sons.
Jacobs, F. R., & Chase, R. B. (2010). Operations and supply chain management (13th ed). New
York, NY: McGraw-Hill.
Working longer hours could lead to employees being more tired while on the line and
they may not have anyone available to relieve them. As the performance of the employees begins
to suffer so the quality of work they are putting out. Toshiba should consider relying more on
computers and machines and less on increasing the work load of human employees if the
company wants to successfully redesign its assembly line system.