SNUBBING
RIG UP SNUBBING UNIT/HWU 225K/340K
Doc. :
Rev : 0
Date :
24/09/2014
Notes
Prepared by
HSE Check by
Tanggal:
/
/
Hadi Kusnaryono
Rig Superintendent
Tanggal:
/
/
Bambang Kasiyanto
Head of QHSSE
Reviewed by
Approved by
Reviewed by
Dokumen awal.
Initial document.
Reviewed by
Tanggal:
/
/
Hariyono
Tanggal:
/
/
Estadi Budiatman
Tanggal:
/
/
Budhi N.
Pangaribuan
Div. Head of DOS
Tanggal:
/
/
Saptomudito
Sect. Head of HWU
& SL
Approved by
Tanggal:
/
/
Agus R. Sutiawan
Mgmt. Rep
Rev : 0
Date :
24/09/2014
I. TUJUAN
Dokumen ini bertujuan untuk
menjelaskan
langkah-langkah
proses rig up snubbing unit/HWU
225K/340K
untuk
meyaknikan
keselamatan kerja bagi semua
personil yang terlibat.
III. DEFINISI
SITP = Shut In Tubing Pressure
SICP = Shut In Casing Pressure
BPV = Back Pressure Valve
SCSSV
=
Surface
Controlled
Subsurface Safety Valve
BOP = Blow Out Preventer
IV. REFERENSI DOKUMEN
1. Hydra Rig user manual
2. Hydra Rig manufacture data
record
V. KESELAMATAN KERJA
Personil yang terlibat harus telah
memiliki
sertifikasi
pesawat
angkat
dari
lembaga
yang
berwenang.
Penggunaan alat pelindung diri
standar
diwajibkan
dalam
pekerjaan ini, ditambah dengan
alat pelindung diri untuk bekerja di
ketinggian.
Gunakan radio untuk komunikasi
yang efektif.
III. DEFINITION
SITP = Shut In Tubing Pressure
SICP = Shut In Casing Pressure
BPV = Back Pressure Valve
SCSSV
=
Surface
Controlled
Subsurface Safety Valve
BOP = Blow Out Prevente
IV. REFERENCED DOCUMENT
1. Hydra Rig user manual
2. Hydra Rig manufacture
record
data
V. SAFETY
All personnel involved should held
rigging certification from authorities.
Standard PPE should be used on this
job, with addition PPE for working at
height.
Use handy talkie for effective
communication.
VI. RESPONSIBILITIES
Rev : 0
Date :
24/09/2014
Operator
along
with
assistant
operator is responsible for leading
the rig up activities. Roughneck
responsible for assisting the the rig
up activities.
Supervisor and the Superintendent is
responsible for supervising the rig up
activities.
VII. PROCEDURE
1. Ensure the work permit has been
made and approved by the
authority of the work site.
2. Make sure that the condition of
wells that will be worked has been
isolated from the production
pipeline.
3. Check and record tubing and
casing pressure (SITP and SICP)
4. Open ball valve and SCSSV
5. Bleed off casing and tubing
pressure to atmosphere
6. If the well is still under pressure,
check and
record well flow
pressure
7. Perform killing well
8. Observe well pressure for 15
minutes and make sure the well
are
not
in
under
pressure
condition
9. Bleed off pressure on the control
line to close SCSSV
10.Set BPV on tubing hanger
11.Nipple down wing valve and choke
body, install the blind flange on
the surface of the production
pipeline.
12.Nipple down x-mastree
13.Install test plug according to the
type of tubing hanger installed
14.Nipple up mud cross on top of the
wellhead.
15.Nipple up BOP stack on top of mud
cross, BOP installation is according
Rev : 0
Date :
24/09/2014
VIII. FLOWCHART
DIAGRAM ALIR
Rev : 0
Date :
24/09/2014
X. APPENDIX
X. LAMPIRAN