LETTER OF TRANSMITTAL FOR VENDOR DOCUMENTS

To,

JOB NO:

TCE.5370A

YOUR REF: E-mail

GVK Power (Goindwal Sahib)


Limited,

CLIENT:

GVK Power (Goindwal


Sahib) Limited

DATE:

Paigah House,

PROJECT: 2 x 270 MW GVK


Thermal Power Plant

156-159, Sardar Patel Road,


SECUNDERABAD 500 003
Attn.: Mr. M Ramamurthy,
Vice President (Projects)

16-12-2010

OUR REF: TCE.5370A /ME/-CO-540-04/12


DATE:

SUBJECT: Field Quality Plans

01-03-2011
SH 1 OF 1

IP Bus duct

We are herein conveying our approval/comments on the documents listed below. Approval/comments conveyed
herein neither relieves the vendor/contractor of his contractual obligations and his responsibilities for correctness of
dimensions, materials of construction, weights, quantities, design details, assembly fits, performance requirements
and conformity of the supplies with the Indian Statutory Laws as may be applicable, nor does it limit the purchasers
rights under the contract.
Yours faithfully
For TCE Consulting Engineers Limited
Sd /Bhaskar M Mahadikar
PROJECT MANAGER/ENGINEER
CODES
A:

Document approved as submitted; proceed with


fabrication/construction.

F:

Correct original of the document to reflect our


comments and resubmit for records.

B:

Document approved subject to comments noted;


proceed with fabrication/construction considering
our comments.

G:

Documents of this category are for information


only and not for approval. Information furnished
on the document is noted.

C:

Our comments are noted on the enclosed markedup print.

H:

Document reviewed only against our previous


comments and other revisions highlighted and
identified by the vendor.

D:

Our comments are noted in the memo attached to


this transmittal.

I:

Document returned without review.

E:

Correct original of the document to reflect our


comments and resubmit for approval.

J:

Print not enclosed.

SL.
NO.

VENDORS DOCUMENT
NO.

TCE NO.

PN-QPE-EL-091 (R.00)

---------

TITLE
FIELD QUALITY PLAN FOR BUSDUCT
ISOLATED PHASE CONTINUOUS TYPE

COPY TO :
cc: CDRL

with/without encl.

CODE

FIELD QUALITY PLAN


FOR

BUSDUCT
ISOLATED PHASE CONTINUOUS TYPE
(ERECTION)
FOR

GVK-GOVINDWAL SAHIB -2X270MW

BHARAT HEAVY ELECTRICALS LIMITED


POWER SECTOR - NORTHERN REGION
NOIDA

QP NO. : PN-QPE-EL-091
REV.No.: R00

FIELD QUALITY PLAN


FOR

BUSDUCT
ISOLATED PHASE CONTINUOUS TYPE
( ERECTION)
GVK-GOVINDWAL SAHIB -2X270MW
APPROVED BY

Sr.DGM/QLY
/PSNR
NOIDA

QUALITY PLAN NO.


ORIGINAL DATE OF ISSUE
REVISION NO. & DATE

(O.P.ROY)
PN-QPE-EL-091
13-12-2010
R00 Dt. 13-12-2010

COPY NO.
ISSUED TO
DATE OF ISSUE
CONTROLLED / INFORMATION COPY
ISSUED BY
(SIGNATURE &
DESIGNATION)

(Ms.Kusum Gautam/A.E./Quality)

BHARAT HEAVY ELECTRICALS LIMITED


POWER SECTOR NORTHERN REGION
FMT-QP-002 Rev. 00

QP NO. : PN-QPE-EL-091

CONTENTS
PSNR-Quality

Sl.No.

REV.No.:

R00

PAGE 1

OF

Description

1
No. of Pages

1.0

Status of amendments

01

2.0

Authorisation for different categories of checks

01

3.0

Field Quality Plan for

BUSDUCT
ISOLATED PHASE CONTINUOUS TYPE
(Erection) For

GVK-GOVINDWAL SAHIB -2X270MW

3.1

Statement of checks

05

3.2

Documents referred in Quality Plan

01

3.3

Log Sheets : L-00 to L-01

02

3.4

Feed Back

01

******

QP NO. : PN-QPE-EL-091
STATUS OF AMENDMENTS
PSNR Quality

Sl.No.

Reference of Sheet(s)
Amended

REV.No.:

R00

PAGE 1

OF

Amendment No. & Date

NIL

1
Remarks

PSNR-QUALITY

Classification of Check
-------------------------------Symbol
Description

AUTHORISATION FOR
DIFFERENT
CATEGORIES OF CHECKS
Inspection Agency

Clearing Agency

Critical

Customer

Major

Task Performer

Minor

Task Performer

Legend:

& QAE

HOS

Head of Section

QAE

Quality Assurance Engineer

HOS

HOS

Task Performer

NOTE :
1.

Quantum of check shall be 100% for all characteristics unless otherwise


mentioned in reference documents.

2.

QAE is also authorized to carry out Surveillance in any of the B and C


Category of checks at his discretion.

3.

In case of non-conformity, before accepting, clearing agency shall ensure dispositioning


and the same shall be reflected in log sheets / protocols.

4.

All Critical checks shall be witness by customer.

5.

Customer reserves the right to witness any stage in the FQP other than already
Specified.

QP NO. : PN-QPE-EL-091
STATEMENT OF CHECKS
PSNR Quality

REV.No.:

R00

Page

of 5

Capacity / Type

Isolated Phase Continuous Type

System

BUSDUCT

Sub-System

Area

ERECTION

For checks where log sheets are not called for, suitable records shall be maintained in
the form of log book / protocols.

As an evidence of having carried out the work satisfactorily, a general purpose log
sheet L-00 shall be maintained for all the checks.

Abbreviations used in the column Type of Check are :

: Measurement

Record Verification

Visual

DOC. NO.

STATEMENT OF CHECKS

REV. NO.
SHEET

Power Sector - Quality

SYSTEM : IP BUSDUCT SUB-SYSTEM :


S.NO.

CHARACTERISTICS / ITEM

TYPE OF
CHECK

PN-QPE-EL-091

R00
2

/ 5 SHEETS

AREA : ERECTION
INSTRUMENT

CLASS

QUANTUM /
FREQUENCY OF
CHECK

REF. DOC../
ACCEPT. STD.

1.

Material Receipt at Site

1.1

Visual inspection of packages for any transit damage


etc on receipt at site.

100%

1.2

Verification of material as per the packing list.

100%

1.3

Review of instruction manual with schedule of erection


drawing.

100%

1.4

Check for storage condition.

100%

1.5

Check availability of documents w.r.t carrying out FQA


activities.

100%

2.

Dimensional checking of foundation

Tape

100%

Drawing

3.

Layout of Bus Ducts.

Tape

100%

Drawing

4.

Verticality of structure.

Plumb Bob

100%

Drawing

5.

Ensure that bus duct should not be laid directly on


ground.

During erection

Instruction
manual

Packing list

FORMAT OF
RECORD

REMARKS

DOC. NO.

STATEMENT OF CHECKS

REV. NO.
SHEET

Power Sector - Quality

SYSTEM : IP BUSDUCT SUB-SYSTEM :


S.NO.

CHARACTERISTICS / ITEM

PN-QPE-EL-091

R00
3

/ 5 SHEETS

AREA : ERECTION

TYPE OF
CHECK

INSTRUMENT

CLASS OF
CHECK

QUANTUM /
FREQUENCY OF
CHECK

REF. DOC../
ACCEPT. STD.

6.

Ensure that eye-bolts are used for lifting of cubicles.

During erection

Instruction manual

7.

Proper tightening of clamps used for lifting of bus bars while


assembling them inside enclosures.

During erection

8.

Proper care should be taken while inserting and mounting of


bus bars in enclosures.

During erection

Instruction manual

9.

Ensure enclosures / cubicles are properly aligned.

During erection

Instruction manual

10.

Check physically insulators after fixing bus bars in the


enclosures.

After fixing
busbars

11.

Continuity of bus bars after welding.

Multimeter

100%

Drawing

12.

Clearance between phase conductor and enclosure before


welding.

Tape

100%

Drawing

Crack free clean


insulator surface

FORMAT OF
RECORD

REMARKS

DOC. NO.

STATEMENT OF CHECKS

REV. NO
SHEET

Power Sector - Quality

SYSTEM: IP BUSDUCT SUB-SYSTEM :


QUANTUM /
FREQUENC
Y OF
CHECK

REF. DOC../
ACCEPT. STD.

Once

WPS

Welding and NDT: RT 10% and DPT 100% to be done for


conductors.

Once

Welding manual

14.

Sealing rings at split corner and are at least 20 mm from the


ends.

100%

Drawing

15.

Tightening of Bus bar bolted joints to specified torque.

100%

Instruction manual

16.

Clamping /Welding of make up piece.

100%

Drawing

17.

Positioning of shuts and welding.

100%

Drawing

18.

Clearance between phases conductors and enclosures after


welding.

Tape

100%

Drawing

19.

Polarity and ratio test of CTs, PTs and their placement.

Multimeter

100%

Layout
Drawing/Schematics

20.

Check CTs secondarys are kept shorted until connected to


respective instrument/ relays.

100%

Drawing

21.

Secondary wiring & clamping of CTs & PTs.

100%

CT & PT Wiring Diagrams

22.

Free movement of VT trolleys.

Once

Drawing

23.

Bus bar connections to NG Transformer.

100%

Drawing

CHARACTERISTICS / ITEM

13
13.1

WELDING
Review & approval of WPS & PQR for qualification of welders.

13.2

R00
4

/5 SHEETS

AREA : ERECTION
CLASS
OF
CHECK

S.NO.

PN-QPE-EL-091

TYPE
OF
CHECK

INSTRUMENT

Torque Wrench

FORMAT OF
RECORD

L-01

REMARKS

STATEMENT OF CHECKS

PN-QPE-EL-091

REV. NO.

R00

SHEET

Power Sector - Quality

SYSTEM : IP BUSDUCT SUB-SYSTEM :


S.NO.

DOC. NO.

INSTRUMENT

CLASS
OF
CHECK

QUANTUM /
FREQUENCY
OF CHECK

REF. DOC../
ACCEPT. STD.

24.

Positioning of rubber below.

100 %

Drawing

25.

Check that all wiring is done as per wiring diagram.

100%

Wiring diagram

26.

Earthing of bus duct structures, CTs, PTs, SP & NG cubicles.

100 %

Instruction manual

27.

Check the
cleanliness.

100%

28.

IR value of each bus conductor.

2.5KV
Megger

100%

Instruction Manual

29.

IR value of motors & heaters.

Megger

100 %

Instruction Manual

30.

Specified size of gaskets and used.

Once

Drawing

31.

Bus ducts wiring as per scheme.

Once

Drawing.

32.

Functioning of starters and isolating switches

100 %

Drawing

33.

Setting of thermostats.

100 %

Drawing.

34.

Trial Run and operation of motor & blowers.

Once

Drawing.

equipment

for

their

physical

condition

and

/ 5 SHEETS

AREA : ERECTION
TYPE OF
CHECK

CHARACTERISTICS / ITEM

FORMAT OF
RECORD

REMARKS

DOC.NO.: PN-QPE-EL-091
DOCUMENTS REFERRED IN
QUALITY PLAN
Power Sector - Northern Region

SL.NO.

1.

R00

SHEET 1 / 1 SHEET
Reference Document

Instruction Manual

FMT-QP-017 REV.00

REV.NO.:

Issuing Authority
BHEL, Rudrapur

RECORD OF QUALITY CHECKS


Power Sector - Northern Region

SHEET
NO. OF
QPI

CHECK
NO.

RESULTS
ACHIEVED
OK / NOT
OK

DRAWING /
DOCUMENT
REFERENCE

FORMAT OF
RECORD

INSPECTED BY
SIGN. & DATE

CLEARED BY
SIGN. & DATE

REMARKS

Note : Any protocol made is to be numbered & mentioned in Format of Record column.

SYSTEM

SUB-SYSTEM

AREA

DOC.NO. : PN-QPE-EL-091

PROJECT

REV. NO. : R00

UNIT NO.

LOG SHEET NO. : L-00

RATING

SHEET 1 / 1 SHEET

FMT-QP-007 REV. 01

INSTRUMENT REG. NO./TAG NO.


DATE OF INSPECTION
Power SectorNorthern Region

DRAWING / DOCUMENT REF.

TESTS ON INSTRUMENT TRANSFORMERS


Sl.
No.

CT/PT

Sl. No. of
CT/PT

IR value

NAME

Test details
Ratio Test

SIG./DATE

Polarity Test

DOC. NO. PN-QPE-EL-091

PROJECT

CHECKED BY

REV. NO. R 00

UNIT NO.

ACCEPTED BY

LOG SHEET NO. L-01

RATING
FMT-QP-008 REV.00

CUSTOMER

SHEET 1 / 1 SHEETS

FEEDBACK ON
QUALITY PLAN FOR INSTALLATION

In the Quality Plan for Installation (QPI), following checks / Logsheets may be added / rewritten
/ deleted
(can not be carried out / not required) due to reasons as mentioned below:
Sheet no.
of QPI

Check No. /
Logsheet No.

PROJECT
UNIT NO.
RATING
FMT-QP-018 Rev. 00

Proposed Change / Reasons / Remarks

From :

To
Head (Quality) -Northern
Region, BHEL- Sector-16A
Plot no 25 Noida
UP - 201301

DOC. NO. PN-QPE-EL-091


REV. NO. R00
SHEET

SHEETS