DETAILED REPORT
PROJECT NAME
PROJECT AREA
: 1 (first) Month
Page 2 of 31
Version:
V1.0
Created by:
Catur Joko
Martono
Contents
1. EXECUTIVE
SUMMARIES
4
2. SCOPE OF WORK
PROJECTS
5
3. PROJECT
ACTIVITIES
.8
4. OSS PERFORMANCE
TREND
10
5. DRIVE TEST PERFORMANCE
RESULT.13
6. ACHIEVEMENT AND PROGRESS
SUMMARIES.18
7. PENDING ITEMS &
RECOMMENDATIONS
.24
Page 3 of 31
Version:
19 November
2014
V1.0
Created by:
Catur Joko
Martono
1. Executive Summaries
During 3 months duration project from October 1st to , We provide
RF Optimization Engineer level SQA and NSA include Drivetest dan Rigger
Team every region. Project during the period of 3 months, from 7th October
to 7th January 2014, TelkomInfra and Telkomsel agreed final achievement as
follow :
a. Jabodetabek and WJ activity Achivement
N
o
Region
Jabotabe
1 k
West
2 Java
AREA 2
TOTAL
Target
Activity Progress
100 %
Daily Optimization
Support
33 %
Daily Optimization Support
100 %
33 %
Page 4 of 31
Version:
Created by:
V1.0
Catur Joko
Martono
B. Project Goal
This project have goal as described in Picture below
- Focus achivement REDCluster Jabodetabek Area.
- Less Churn # Provide strategy to improvement network
performance and subcriber perceived call quality to helps to avoid
losing subcriber to competitors.
- BadSpot Improvement refer to baseline target agreeement in the
begining / KOM.
- Delivery some optimization activities to region, like support
customer satisfaction, VIP Complaint, Event Support etc.
White
Clusters
High
Revenue
Customer
Satisfication
Guaranteed
GOALS
High
# BTS
Integration
Availability
Bad
Spot
Page 5 of 31
Version:
19 November
2014
V1.0
Created by:
Catur Joko
Martono
C. Cluster/RNC/BSC/Site
Program Optimization NPI NSA TelkomInfra Jabodetabek, consists of
some areas, namely region Jabodetabek level NSA and SQI every region.
Project during the period of 3 months (Batch#2), according to the minutes
of the meeting in Jabodetabek this project has been running from
October1st, 2014.
Regional
WEST JAVA
Regional
JABODETABEK
19 Cluster sales
18 RNC
2545 Node B
3G
Page 6 of 31
25 Cluster sales
22 RNC
5945 Node B
18 Cluster sales
54 BSC
3476 BTS
3G
2G
25 Cluster sales
62 BSC
6325 BTS
2G
Version:
V1.0
Created by:
Catur Joko
Martono
D. Scope of Work
D.1 Preventive Activity
Version:
Created by:
V1.0
Catur Joko
Martono
Neighbour Optimization
Neighbour discrepancy check
Parameter related discrepancy check
Neighbour optimization
Strategic Activities by Consultant
Paging parameters Audit
Standardization 2G/3G BSS Parameters
Capacity Optimization
Layering 2G-3G
RAN Productivity
Peak Season and event Preparation
Bad Spot Optimization
Page 8 of 31
Version:
V1.0
Created by:
Catur Joko
Martono
Page 9 of 31
Version:
19 November
2014
Created by:
Catur Joko
Martono
V1.0
Region
Jabodetab
ek
West Java
# Consultant
Engineer
#
SQA
# NSA
Engineer
#
OSS
DT
Rigge
r
3
1
0
0
2
0
3
0
3
0
3. Project Activities
During 3 months project ( 1st October 1st November 2014),
TelkomInfra have finishing activities as targeted before, with summaries
as follow :
# Regular Optim Activities Jabodetabek W46.
Page 10 of 31
Version:
19 November
2014
V1.0
Created by:
Catur Joko
Martono
Page 11 of 31
Version:
V1.0
Created by:
Catur Joko
Martono
Page 12 of 31
Version:
V1.0
Created by:
Catur Joko
Martono
Page 13 of 31
Version:
V1.0
Created by:
Catur Joko
Martono
Page 14 of 31
Version:
V1.0
Created by:
Catur Joko
Martono
Page 15 of 31
Version:
V1.0
Created by:
Catur Joko
Martono
Page 16 of 31
Version:
V1.0
Created by:
Catur Joko
Martono
Page 17 of 31
Version:
V1.0
Created by:
Catur Joko
Martono
Page 18 of 31
Version:
V1.0
Created by:
Catur Joko
Martono
Page 19 of 31
Version:
V1.0
Created by:
Catur Joko
Martono
Version:
V1.0
Created by:
Catur Joko
Martono
Page 21 of 31
Version:
V1.0
Created by:
Catur Joko
Martono
Version:
V1.0
Created by:
Catur Joko
Martono
Page 23 of 31
Version:
V1.0
Created by:
Catur Joko
Martono
Page 24 of 31
Version:
V1.0
Created by:
Catur Joko
Martono
Page 25 of 31
Version:
Created by:
V1.0
Catur Joko
Martono
Version:
19 November
2014
V1.0
Created by:
Catur Joko
Martono
Page 27 of 31
Version:
V1.0
Created by:
Catur Joko
Martono
Page 28 of 31
Version:
V1.0
Created by:
Catur Joko
Martono
Version:
V1.0
Created by:
Catur Joko
Martono
Red Sales Cluster in JAKUT due to most red cells location are facing sea.
TCH Drop & SDSR give big contribution for 2G red cells. Identified 37
(GSM/DCS : 23/14) 2G cells have TA2 more than 80% and have high drop.
3G Accessibility is degraded during weekend due to capacity issue.
Red Sales Cluster in TASIK UTARA due to bad TA, high SDCCH Utilization
> 90% , high TCH utilization > 90%, and big delta imbalance > 8 dB. 10
cells indicated hardware issue due to imbalance DL/UL too high and DL
ratio < UL ratio
CONCLUSION
Page 30 of 31
Version:
19 November
2014
V1.0
Created by:
Catur Joko
Martono
PT.
TelkomInfra
Nurdianto
Manager Jabo Jabar
Network Quality
Access
Project Manager
Page 31 of 31