Escolar Documentos
Profissional Documentos
Cultura Documentos
Project
Shell Project No: HP-3000-QAT
Project Document Number: T- 4.250.922
2MH127
Tag/Item Number(s):
N/A
Unit(s):
ASU
PCWBS:
LINDE ENGINEERING
Page 2 of 27
5887
21.10.08
SK
EO
AG
IFR
16.09.08
SK
EO
AG
IFR
06.03.08
BR
UA
ZG
ICC
03.02.08
BR
UA
ZG
IFR
31.01.08
BR
UA
ZG
IIR
Date
Description
GAMA
Rev.
No.
Project
Rev
No.
Status
Document Title:
Contractor
LOC470
GAM
ITP
QAC
GTL
035
Org.
Code
Doc.
Type
Disc.
Code
Geogr.
Area
Seq.
No
Rev.
No
Vendor Code
Rev No: A
X. CONTRACTOR QC
C. COMPANY
DATE: 21.10.08-REV.E
A. THIRD PARTY (TPI)
I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item
Activity
Test
Frequency
Reference Document
Responsible
Party
Verifying Documents
TECHINICAL
OFFICE
HSSE
STORE
INCHARGE
GAM-QCR-QAC-GTL-080
STORE
INCHARGE
GAM-QCR-QAC-GTL-080
QCI
GAM-QCR-QAC-GTL-069
QCI
GAM-QCR-QAC-GTL-073
QCI
Calibration certificate
Acceptance Criteria
1.0
DOCUMENTATION
1.1
100%
1.2
100%
T.4.234.084
2.0
EQUIPMENT
2.1
100%
T-4.250.945
Approved drawing,
DEP 31.10.03.10; DEP
31.29.00.10
2.2
Receiving inspection
100%
T-4.250.945
2.3
100%
T.13.377.360E;T.4.250.932
2.4
Periodic Preventive
maintenance
100%
T-4.250.945;T.4.250.932
100%
T.4.250.915
2.5
3.0
INSTALLATION
T-4.250-922 REV-A
Approved drawing,
DEP 31.29.00.10;DEP
70.10.70.11 T.13.377.454E;
Vendor instruction,
DEP 70.10.70.11;
T.13.377.454E DEP
31.29.00.10 Vendor
instruction,
-
Page 4
X. CONTRACTOR QC
C. COMPANY
DATE: 21.10.08-REV.E
A. THIRD PARTY (TPI)
I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item
3.1
3.2
3.3
3.4
Activity
Test
Frequency
Reference Document
Acceptance Criteria
Responsible
Party
Verifying Documents
100%
T-4.250.945
Approved drawing,
DEP 34.19.20.31;
T.13.376.358 DEP
31.29.00.10
QCI
GAM-QCR-QAC-GTL-120;
GAM-QCR-QAC-GTL-113
100%
T-4.250.945
QCI
100%
T-4.250.945
QCI
100%
T-4.250.945
Approved drawing,
T.13.376.358
DEP 31.29.00.10
QCI
100%
T-4.250.945 T.13.377.360E
QCI
GAM-QCR-QAC-GTL-120
GAM-QCR-QAC-GTL-115
100%
T-4.250.945
QCI
GAM-QCR-QAC-GTL-116
100%
T-4.250.945
Vendor specifications,
Approved drawings, DEP
31.29.00.10 SEC-3.9.4.7
QCI
GAM-QCR-QAC-GTL-120
100%
T-4.250.945; T.13.377.360E
QCI
GAM-QCR-QAC-GTL-120
GAM-QCR-QAC-GTL-041
3.6
3.7
3.8
Settlement monitoring(FSI)
Checking and recording of
soft foot
Bolts Tightening(FSI)
T-4.250-922 REV-A
Approved drawing,
DEP 31.29.00.10,
GAM-QCR-QAC-GTL-120;
GAM-QCR-QAC-GTL-113
GAM-QCR-QAC-GTL-120;
GAM-QCR-QAC-GTL-113
GAM-QCR-QAC-GTL-120
Page 5
X. CONTRACTOR QC
C. COMPANY
DATE: 21.10.08-REV.E
A. THIRD PARTY (TPI)
I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item
Activity
Test
Frequency
Reference Document
Acceptance Criteria
Responsible
Party
Verifying Documents
DEP34.19.20.31;
T.13.376.358 ;Manufactures
Instruction
QCI
GAM-QCR-QAC-GTL-025
3.9
Grouting
100%
T-4.234.545
3.10
100%
T-4.250.945
3.11
Temporary earthing
100%
T-4.250.945
Approved drawing,
DEP 31.29.00.10,
QCI
GAM-QCR-QAC-GTL-120
100%
T-4.250.945; T.13.377.360E
QCI
GAM-QCR-QAC-GTL-120
100%
T-4.250.945; T-4.250.936;
T.13.377.360E
Approved drawing,
DEP 31.29.00.10 DEP
31.38.01.11;T.13.376.815E
QCI
GAM-QCR-QAC-GTL-120
GAM-QCR-QAC-GTL-058
100%
T-4.250.936
Approved drawing,
DEP 31.29.00.10, DEP
31.38.01.11;T.13.376.815E
QCI
GAM-QCR-QAC-GTL-120
T-4.250.936; T.13.377.360E
Approved drawing,
DEP 31.29.00.10, DEP
61.10.08.11; T.13.377.455E
Vendor specification
QCI
GAM-QCR-QAC-GTL-120
T-4.250.936
QCI
GAM-QCR-QAC-GTL-132
3.12
3.13
3.14
3.15
3.16
T-4.250-922 REV-A
100%
100%
QCI
GAM-QCR-QAC-GTL-120
Page 6
X. CONTRACTOR QC
C. COMPANY
DATE: 21.10.08-REV.E
A. THIRD PARTY (TPI)
I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item
3.17
3.18
Activity
Mechanical seal/packing
installation check(FSI)
Test
Frequency
100%
100%
Reference Document
Acceptance Criteria
Responsible
Party
Verifying Documents
T-4.250.945; T.13.377.360E
Approved drawing,
DEP 31.29.00.10, DEP
61.10.08.11; T.13.377.455E
Vendor specification
QCI
GAM-QCR-QAC-GTL-120
QCI
GAM-QCR-QAC-GTL-120
GAM-QCR-QAC-GTL-070
QCI
GAM-QCR-QAC-GTL-120
T-4.250.930;T.13.377.360E
Vendor specification,
3.19
Approved drawing,
DEP 31.29.00.10 DEP
31.38.01.11;T.13.376.815E
100%
T-4.250.936; T-4.250.945
100%
T-4.251.035
QCI
GAM-QCR-QAC-GTL-127
100%
T-4.250.945:T.13.377.360E
Approved drawings,DEP
31.29.00.10
QCI
GAM-QCR-QAC-GTL-115
100%
T-4.250.945
QCI
GAM-QCR-QAC-GTL-120
100%
T-4.250.945
DEP 61.10.08.11;
T.13.377.455EApproved
drawings, DEP 31.29.00.10
QCI
GAM-QCR-QAC-GTL-120
installation check
3.20
4.0
FINAL INSPECTION
4.1
Final alignment(FSI)
Checking and recording of
4.2
4.3
T-4.250-922 REV-A
Page 7
X. CONTRACTOR QC
C. COMPANY
DATE: 21.10.08-REV.E
A. THIRD PARTY (TPI)
I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item
Activity
Test
Frequency
Reference Document
100%
T-4.250.930;T.13.377.360E
system(FSI)
4.5
Responsible
Party
Verifying Documents
QCI
GAM-QCR-QAC-GTL-120
GAM-QCR-QAC-GTL-070
QCI
GAM-QCR-QAC-GTL-120
Vendor specifications
Acceptance Criteria
DEP 61.10.08.11Approved
drawings, DEP 31.29.00.10
DEP 70.10.80.11
100%
T-4.250.945
Vendor specifications
Approved drawings, DEP
31.29.00.10
DEP 61.10.08.11
4.6
4.7
4.8
4.9
4.10
T-4.250.945; T-4.250.908
T.13.377.360E
QCI
GAM-QCR-QAC-GTL-065
100%
T-4.250.945
QCI
GAM-QCR-QAC-GTL-120
100%
T-4.250.945
QCI
GAM-QCR-QAC-GTL-128
100%
T-4.250.945
QCI
GAM-QCR-QAC-GTL-133
100%
T-4.250.945
T.13.377.555G
QCI
ALL REPORTS
T-4.250-922 REV-A
100%
Page 8
C2-ASU PROJECT
GAMA QATAR
GROUT POUR CARD(PRE/POST POUR)
Inspection Gr.:
ITP No.:
Laboratory:
Record No:
Date:
TAG NO.:
DESCRIPTION:
TYPE OF GROUT:
GAMA/T Const.
Item
No.
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
LOCATION:
DRAWING:
QUANTITY OF GROUT:
TYPE OF ACTIVITY
Signature
Date
GAMA/T - QC
Signature
Date
CONTRACTOR
Signature
Date
Setting Out
Concrete Surface Preparation
Equipment / Surface Alignment
Formworks
Isolation Joint
Metal Surface Preparation
Mixing / Placing / Finishing of Grout (1)
Curing of Grout (1)
Removal of Shims
Mixing / Placing / Finishing of Grout (2)
Curing of Grout (2)
Sealant to Isolation Joint
Final Inspection
Remarks:
Full Name/Signature/Date
GAMA QATAR
CONTRACTOR
COMPANY
COMPANY(*)
Signature
Date
REMARKS
Subcontract Ref.:
Report No.:
Item Description:
Inspection Date:
Item Location /
Area:
Subsystem:
ITP No.:
Mark No./Joint No
Accepted By
ORGANIZATIONS
THIRD PARTY REP.
GAMA REP.
LINDE REP.
QSGTL OR its PMC REP.
GAM-QCR-QAC-GTL-041
Bolting
Grade
DATE
Size
NAME
Bolt Tightening
(Torque Value)
Inspectors
Signature
SIGNATURE
Subcontract Ref.:
Report No.:
Item Description:
Inspection Date:
Item Location /
Area:
Subsystem:
ITP No.:
Mark No./Joint No
Accepted By
ORGANIZATIONS
THIRD PARTY REP.
GAMA REP.
LINDE REP.
QSGTL OR its PMC REP.
GAM-QCR-QAC-GTL-058
Face Distance
DATE
Face parallelism
NAME
Centreline offset
Inspectors
Signature
SIGNATURE
Q A T A R
Company
Project No:
Project Title:
Location
PIPING FIELD
Priority System No:
TEST REPORT
S/C Prepared By:
Name:
Test Media:
Signature
Description Of Test
Date:
Line Number
Line
Size
Date:
Drawing or Isometric
Number
Rev
(At Time
of Test)
From
To
Paint
Code
Insul.
Code
Signature:
Date:
GAM-QCR-QAC-GTL-065
Signature:
LINDE Field
Signature:
Date::
LINDE Welding
Inspector: Name
Engineer: Name
Signature:
Date::
Inspector: Name
Signature
GAM-QCR-QAC-GTL-065
Line
Size
Drawing or Isometric
Number
(Continuation Sheet)
Rev
(At Time
of Test)
From
To
Paint
Code
Insul.
Code
Q A T A R
Isometric No:
Item Description:
sub system:
Form No:
sheet
Cleanliness
class
Spool
Cleaning
Method
GAM-QCR-QAC-GTL-070
Inspection
method
Inspection Result
Pre Fabrication
Erection
Report No:
Inspection Date
GAMA QATAR
Signature
Date
LINDE
Signature
Signature
Date
Q A T A R
Subcontract Ref.:
Report No.
Item Description:
Inspection Date:
Subsystem:
Equipt.Tag No
Date of Inspection
PRESERVATION REQUIREMENTS
(ROTATIC EQUIPMENT)
1.General Inspection-Weather Protection/Painting
Accepted By
ORGANIZATIONS
THIRD PARTY REP.
GAMA REP.
LINDE REP.
QSGTL REP.
GAM-QCR-QAC-GTL-073
DATE
NAME
SIGNATURE
Q A T A R
Subcontract Ref.:
Report No.
001
Item Description:
Inspection Date:
COLD BOX - FC
Subsystem:
RFI NO : 1850
08.06.08
Equipt.Tag No
T.4.115.028 , T.4.250.501
Signature
LINDE
GAM-QCR-QAC-GTL-074
DATE
NAME
SIGNATURE
ITEM No:
PO No:
UNIT No:
MANUFACTURER :
ITEMS TO BE CHECKED
REQ No:
INSPECTOR
INITIAL
REMARKS
1 Name Plate
2 Preparation and painting
3 Desiccant installed
4 Moisture present
5 Nozzle flange faces acceptable
6 Temporary nozzle protection
acceptable
7 Internals and accessories complete
and storage acceptable
8 Purge - pressure:
Purge monitoring date:
Date of initial inspection:
GAM-QCR-QAC-GTL-080
Pressure
Report No:
Date:
PROJECT:
Tag No:
Drg. No:
Area:
Unit:
ELEVATION
Plot Plan:
90
180
270
REQUIRED
ACTUAL
DEVIATION
TOLERANCE
REMARKS
ORIENTATION
ACCEPTED
REJECTED
REQUIRED
POCKET CLEANING
ACTUAL
DEVIATION
ACCEPTED
TOLERANCE
REJECTED
REMARKS
REQUIRED
NOT REQUIRED
IF REQUIRED THICKNESS
NOTE:
THE ABOVE MENTIONED FOUNDATION IS ACCEPTED AND RELEASED FOR ERECTION ACTIVITIES
GAMA
Name
Sign
Date
GAM-QCR-QAC-GTL-113
LINDE
Report No:
Date:
Tag No:
Manufacturer:
Drg. No:
Equip. Description
No. of reading
Orientation
ORIENTATION :
LEVELLING
GRADIENT / SLOPE
Elevation
Plumpness
ACCEPTED
Tolerance
Remarks
REJECTED
REQUIRED
ACTUAL
ACC
REJECTED
REQUIRED
ACTUAL
ACC
REJECTED
GAM-QCR-QAC-GTL-115
PAGE 1 OF 2
REMARKS:
..
GAMA
LINDE
Name
Sign
Date
GAM-QCR-QAC-GTL-115
PAGE 2 OF 2
REPORT NO:
DATE:
AREA:
ITEM NO:
WEIGHT:
NAME:
DATE
PLANNED
LEVEL
LEVEL/DIFFERENCE
0
90
180
PLUMB
270
BOTTOM
MIDDLE
ORIENTATION
TOP
SIGN
D
TCM
TSKJN
180
270
TOLERANCE
LEVEL:
: _________________
PLUMB:
: _________________
ORIENTATION:_________________
GAM-QCR-QAC-GTL-116
PAGE 1 OF 2
ORGANIZATIONS
NAME
DATE
SIGNATURE
GAMA
LINDE
GAM-QCR-QAC-GTL-116
PAGE 2 OF 2
Q A T A R
Item No:
Item Description:
Report No:
Date:
Drawing No:
Area:
Item
No
Description
1.
2.
3.
4.
Grouted
5.
7.
8.
9.
10.
Alignment complete
Jacking screws removed
Mechanical seals or packing installed
Shafts turn freely, by hand
Coupling lubed & closed
Accessories Installed & Ready for service, guards Vents, Drains,
sample connection, strainers, etc.)
Oil rings in & free
6.
11.
12.
13.
14.
15.
16.
17.
18.
DATE
NAME
SIGNATURE
REPORT NO.:
DATE:
Originator
Date of observation:
Location / Area:
Unit No :
Discipline:
SYSTEM NUMBER:
Corrective Action:
YES
NO
(Circle one)
YES
NO
(Circle one)
Remarks if any:
Site Engineer:
Name:
Discrepancy Corrected/Remarks:
GAMA Representative:
Name: ____________________
Site Engineer:
Name:
Signature:
___________________
QA/QC Manager
Site Manager
Site Engineer
Project Manager
Construction Manager
Originator
GAM-QCR-QAC-GTL-127
QATAR
Report No:
Item Description:
Inspection Date:
SYSTEM NUMBER:
Sub System:
TAG NUMBER:
Ref Dwg/Documents:
LOOP FOLDER:
EQUIPMENT
ITEM NO
CIVIL
STRUCTURAL
DESCRIPTION OF WORK
PAINTING
COMPLETED(Date/Initials)
PRIORITY/
CATEGORY
(A,B,C,D,E)
(X,Y,Z)
INSULATION
GAMA
LINDE
QSGTL or
its PMC
ALL PRIORITY A ITEMS SHOWN ABOVE HAVE BEEN VERIFIED AND ARE COMPLETED .INCOMPLETE PRIORITY B ITEMS
WILL BE TRANSFERRED TO THE MECHANICAL COMPLETION PUNCH LIST
PRIORITY A : ITEMS SHALL BE COMPLETED BEFORE MECHANICAL COMPLETION (MC)
PRIORITY B : ITEMS MAY BE COMPLETED AFTER MC
PRIORITY C : ITEMS WILL BE COMPLETED BEFORE SYSTEM RFSU (READY FOR START UP UNIT) IS ACHIEVED
PRIORITY D : ITEMS SHALL BE COMPLETED BEFORE RFSU IS ACHIEVED
PRIORITY E : ITEMS SHALL BE COMPLETED BEFORE ACCEPTENCE IS ACHIEVED
CATEGORY X: CONSTRUCTION GROUP IS RESPONSIBLE FOR COMPLETION OF ITEM.
CATEGORY Y: ENGINEERING INPUT IS REQUIRED FOR COMPLETION OF ITEM.
ACCEBTED BY
ORGANIZATIONS
GAMA REP
LINDE REP
QSGTL or its PMC
GAM-QCR-QAC-GTL-128
DATE
NAME
SIGNATURE
Q A T A R
ITEM NO
REPORT NO
COUPLING
MANUFACTURER
DATE:
COUPLING TYPE
AREA
COUPLING GAP
UNIT NO
DRIVEN
AXIAL
DATE:
TEMP:
SIGNED :
GAMA
NAME
DATE:
LINDE
NAME
DATE:
NAME
DATE:
SIGNED :
SIGNED :
AXIAL
DATE:
DRIVEN
TEMP:
SIGNED :
GAMA
NAME
DATE:
LINDE
NAME
DATE:
NAME
DATE:
SIGNED :
SIGNED :
GAM-QCR-QAC-GTL-132
Q A T A R
Report No:
Date:
Area:
It is hereby certified that the Equipment referenced has been mechanically completed in accordance with
Drawings, Specifications, Inspection and Test Records. The referenced Equipment is ready for box-up.
Equipment No
Equipment Designation
Vendor / Manufacturer
PID No
Checklist
Name Plate,
CE-marking (if applicable)
Internals installed
Fillings completed
Refractory completed
10
11
12
13
Accepted
GAMA
Accepted
VENDOR
Accepted
LINDE
14
Remarks /
ORGANIZATIONS
GAMA
VENDOR
LINDE
QSGTL or its PMC
GAM-QCR-QAC-GTL-133
NAME
DATE
SIGNATURE
Accepted
QSGTL