Você está na página 1de 3

Field Operation Guide Videocon Mobile Services

Field Operation
Guide

Field Operational Guide Videocon Mobile Services

INTERNAL

Cluster requirement checklist:


S.
N0
1
2
3
4
5
6
7
8
9
10
11
12
13
14

15
16
17
18
19
20
21
22
23
24

BSS
Huawei BSS HED
BSC Engineer /Cluster lead/BSS manager should have
proper login in BSC
dat file updated
SAMA Backup should be stored Minimum last 3 Week
Dat file restoration procedure should be available at
BSC location
BSC6000 License software, Linux CDs and any other
associated documents
BSS SP27 Upgrade files at all the BSCs

Cluster

BSC Backup of software as well as dat files in the BSC


desktops as well as in the Engineers laptops
BSC License files
BSC Commissioning latest document, BSC SP27
update document
BSC Troubleshooting guide
Team viewer in all the laptops and BSC Desktops
BSC User IDs
BSC Installed BoQ and BoM card level with serial
number
Cluster level inventory details be maintained and
should be updated in terms of Spares (Faulty and
good), their location, their IN OUT details be captured
in the BSC location register
Cluster level inventory details of all the Transmission
equipment
Cluster level inventory details of project material
Cluster level details of the consumables
Cluster level details of tools and test equipment
Port details of all the transmission equipment
NW level details of the transmission connectivity with
details of each site
Each BSC should have the connectivity details
DDF and ODF connection details
NOC numbers
NOC numbers, Cluster Lead Number ,FLEs details and
number , Riggers Details and number, PI responsible

Videocon Mobile Services

Contents..................................................................1

Site Restoration

1
2
3
4

Site
Claiming
Occurrence
restoration
ofof
by
theft
Assessment
Insurance
Lodging
of FIRof
own
Rigger
&
Site Visit
damage
Technician

Cluster requirement checklist.....................................3


VTL Network Manpower information list.....................7
Cluster BSS activity dasboard.....................................8
Network Daigram......................................................10

Field Operational Guide Videocon Mobile Services

INTERNAL

Cluster requirement checklist:


S.
N0
1
2
3
4
5
6
7
8
9
10
11
12
13
14

15
16
17
18
19
20
21
22
23
24

Site Restoration

BSS
Huawei BSS HED
BSC Engineer /Cluster lead/BSS manager should have
proper login in BSC
dat file updated
SAMA Backup should be stored Minimum last 3 Week
Dat file restoration procedure should be available at
BSC location
BSC6000 License software, Linux CDs and any other
associated documents
BSS SP27 Upgrade files at all the BSCs

Cluster

BSC Backup of software as well as dat files in the BSC


desktops as well as in the Engineers laptops
BSC License files
BSC Commissioning latest document, BSC SP27
update document
BSC Troubleshooting guide
Team viewer in all the laptops and BSC Desktops
BSC User IDs
BSC Installed BoQ and BoM card level with serial
number
Cluster level inventory details be maintained and
should be updated in terms of Spares (Faulty and
good), their location, their IN OUT details be captured
in the BSC location register
Cluster level inventory details of all the Transmission
equipment
Cluster level inventory details of project material
Cluster level details of the consumables
Cluster level details of tools and test equipment
Port details of all the transmission equipment
NW level details of the transmission connectivity with
details of each site
Each BSC should have the connectivity details
DDF and ODF connection details
NOC numbers
NOC numbers, Cluster Lead Number ,FLEs details and
number
Riggers
Details
and number,
PI responsible
5 BTS, and
BSC
Product
discription...............................12

Site
Claiming
Occurrence
restoration
ofof
by
theft
Assessment
Insurance
Lodging
of FIRof
own
Rigger
&
Site Visit
damage
Technician

Você também pode gostar