Vendor's NAME
Owner Name
Purchaser
Plant Location:
Project name
P.O. NO.
G-V079-P-215B-101-A
sheets
Equipment/Material name :
Item number
SG-2501,SG-2502,H-2504
DOCUMENT TITLE :
FA
Submission
Date
14-Oct-2014
FA:
For Approval
FC
07-Nov-2014
FI:
For Information
FC
13-Feb-2015
FC:
For Construction
AB
23-Feb-2015
AB:
As-Built
Rev
Issue Purpose
AB
RESULT CODE :
A, B, R, N
NEXT STATUS :
(by Vendor)
(by JVC)
(by JVC)
RESUBMISSION DATE :
(by JVC)
(by JVC)
(by JVC)
(by JVC)
G-V079-P-215B-101-A
G-V079-10-0000
JOB. NO.
CONTRACTO
R
DOC.NO.
OWNER
DOC. NO.
A
R
D
15
0
2
N
B
I 28-FE
ORIG
SERIAL
REV.
V-
215B-101-A-
018
BSR1301-
025-A1312-0100-001-
001
Operating
253
HOLD
38/hr
40/hr
(Cooling Down)
HOLD
120
53 Manhole Open
40/hr
(Natural Cooling)
Around (0)
3
Temp()
8.5
Time(hr)
* TEMPERATURE CONTROL METHOD
No
TIME
METHOD
3 Hr
2 Hr
3.5 Hr
6 Hr
5 Hr
A
R
D
1
0
2
N
I 28-FEB 5
14.5
20
ATTACHMENT 1
First heat-up curve at site of Incinerator H-2504 (Note 1)
800
760
8
700
7
600
540
540
Temperature, deg-C
500
5
9
400
350
350
300
3
200
150
150
100
60
20
0
0
10
15
20
25
30
35
40
45
50
55
60
Time, hours
Step
0
1
2
3
4
5
6
7
8
9
A
R
D
1
0
2
N
I 28-FEB 5
20
150
150
350
350
540
540
760
760
60
20
Hold
30
Hold
40
Hold
40
Hold
40
Time,
h
0
6.5
7.5
6.7
7.5
4.7
4
5.5
4
17.4
Sub total
time, Remarks
h
0
6.5
14
20.7
28.2
32.9
36.9
42.4
46.4 Note 2
59.8 Note 3
NOTES
1. This curve is for first heat-up at site. For subsequent start-up, it is not necessary to follow this curve but the temperature
raise-up and cool-down can be continuous with the heat-up/ cool down rate NOT greater than 60 deg-C/ h.
2. Holding time is for leak check/ inspection around the equipment. Approximately four (4) hours.
3. When temperature is down to 60 deg-C, manhole can be open for inspection.
4. Vender have no objection about this curve JGC process team made
65
ATTACHMENT 2
FirstheatupcurveatsiteofThermalReactorH2502(Note1)
1400
1200
1200
1000
Temperature,degC
5
800
600
540
540
400
230
230
200
1
60
20
0
0
10
15
20
25
30
35
40
45
50
55
60
65
Time,hours
Step
A
R
D
1
0
2
N
I 28-FEB 5
20
230
230
3
4
5
6
7
Sub total
time,
Remarks
h
Time,
h
NOTES
40
5.3
5.3
raise-up and cool-down can be continuous with the heat-up/ cool down rate NOT greater than 60 deg-C/ h.
Hold
9.3
2. Holding time is for leak check/ inspection around the equipment. Approximately four (4) hours.
540
40
7.8
17.1
3. Vendor recommends to hold at the working temperature of 1200 deg-C. But holding at 1350 deg-C is also acceptable.
540
Hold
21.1
1200
40
16.5
37.6
5. Vender have no objection about this curve JGC process team made.
1200
Hold
60
40
28.5
41.6 Note 2, 3
66.1 Note 4
1. This curve is for first heat-up at site. For subsequent start-up, it is not necessary to follow this curve but the temperature
70