GENERAL GUIDELINES
Purpose/Scope
References
General Arrangement Main Unit xxx200
Lift Arrangement xxx225
Site specific sub skids engineering drawings
Suggested Manpower and Duration
1 Rigger
1 Electrician
1 Millwright
1 Crane Operator
1 Helper
Duration One Day
Contractor Representative
Customer Representative
GE Representative
Printed Name:
Printed Name:
Printed Name:
Printed Title:
Printed Title:
Printed Title:
GE Representative
Signature/Date:
Rev 0
Signature/Date:
Signature/Date:
Page 1 of 2
LM2X Installation
GE ENERGY
PREREQUISITES
1.
INITIALS
DATE
INITIALS
DATE
2.
IWP15
3.
Remove dust, oil, and foreign materials by sanding and/or wire brushing.
4.
Set shims to level skid prior to setting. Height of shim must be in accordance with
engineering drawings.
5.
6.
7.
Secure skid with foundation bolts and tighten nuts in accordance with engineering
drawings.
8.
Install piping.
9.
10.
Rev 0