GE ENERGY
PWP01
Purpose/Scope
This work package encompasses all
Contractor Representative
Customer Representative
GE Representative
Printed Name:
Printed Name:
Printed Name:
Printed Title:
Printed Title:
Printed Title:
GE Representative
Signature/Date:
Rev 0
Signature/Date:
Signature/Date:
Page 1 of 3
PWP01
TASKS
INITIALS
DATE
MECHANICAL CHECKS
1.
2.
Check instrument valves and supply shut off valves for full travel and correct
position. Secure where applicable.
3.
4.
Ensure drain valve is locked in closed position and blind flange is installed.
5.
Fill system with specified turbine lube oil. When finished, Lock fill cap, as
applicable.
6.
7.
8.
Flush system in accordance with flushing procedure (Field Flushing Turbine Lube
Oil System).
9.
Upon completion of flushing, verify system piping has been returned to normal
operation.
10.
11.
12.
13.
14.
Check for adequate distance between power, control, and instrument cables.
15.
16.
17.
Check means of cable protection against mechanical damage at points where cables
leave cable trays or enter package.
Rev 0
Page 2 of 3
18.
PWP01
19.
20.
21.
Verify ranges and set points for all instrumentation listed in attachment (TLO
Instrumentation Sheet). Mark each instrument as calibrated or verified in the
appropriate column.
22.
23.
Rev 0
Page 3 of 3