This procedure covers controls to be carried out during
construction of underground sewerage and surface
water drainage works.
2.
PROCEDURE
.1
Request
for
Informatio
n
.3
.4
keeper/Sit
Storekeeper/Sit
e
Engineer
Method
Statement
WORK PROCEDURE
PROJECT: PROJECT NAME
SECTION:
FOUNDATIONS
SUBJECT:
CONTROL OF SEWERAGE AND SURFACE WATER
DRAINAGE
VERIFY
.5
.6
.7
.8
Site
Engineer/
Safety
Officer
Site
Engineer
Site
Engr/Gen.
Foreman
FOUN/06/A,
Records/
Drawings
obtained
from local
department
s
FOUN/06/A
Site
Engr/Gen.
Foreman
.9
Test Plan
Site
.10
.11
3.
DOCUMENTATION
.1
Check
sheets
SITE NO.:
Sheet No.
CLIENT
STAGE
PIPEWORK OR
CHANNEL
Checke
d
by
ITEM
1. Set line and level.
2. Check location of underground services
before
commencement of excavation.
DATE
SU
SE
GULLEY
CONNECTION
SE
GF
GF
8. Backfill to specification
material/compaction.
9. Ensure protection of laid pipeline from
damage by construction traffic.
10. Pipe run rodded and tested.
SE
APPROVAL TO PROCEED
QA/QC
1.
2.
3.
4.
5.
SE
SE/SU
GF
GF
GF
Check
Check
Check
Check
Check
SE
PE/MEP
APPROVAL TO PROCEED
QA/QC
SITE NO.:
Sheet No.
STAGE
PREPARATION
ITEM
Checke
d
by
SE/SU
GF
SE
SE
SE
GF
GF
GF
GF
DATE
APPROVAL TO PROCEED
QA/QC