Você está na página 1de 75

ARCI Extension/Construction of PMD Building

VOL-IIIA-PART 1 Civil Architectural

COST ESTIMATE
NAME OF THE WORK: EXTENTION/CONSTRUCTION OF BUILDING AT ARCI
NAME OF THE BUILDING: SOLAR CELL BUILDING
ARCHITECTS - VASTUKALA Design Build Solutions Pvt. Ltd.
Sec. S.No.
Description of Item
AMOUNT (RS)
No.
PART I - CIVIL AND ARCHITECTURE
SITE CLEARENCE
438247
A
DEMOLITION
6079
B
STRUCTURAL
7745154
C
BRICK WORK
2370556
D
PLASTER WORK
907920
E
WATER PROOFING
673070
F
PAINTING
713520
G
FLOORING AND SKIRTING
1941125
H
DOORS AND WINDOWS
1056120
I
MISCELLANEOUS
J
324160
PARTITION
K
277500
FALSE CEILING
L
59000
VERTICAL BLINDS
85000
M
ALUMINIUM FINS
130000
N
ALUMINIUM
PARTITION
320000
O
TOTAL COST OF PART I

17047451

PART II - SANITARY, WATER SUPPY AND STROM WATER DRAINAGE SYSTEM


TOTAL COST OF PART II
346315.93

PART III - ELECTRICAL


TOTAL COST OF PART III

1188042.00

PART IV - HVAC SYSTEM


TOTAL COST OF PART IV

TOTAL ESTIMATED COST OF THE SOLAR CELL BUILDING

VASTUKALA Design Build Solutions PVT LTD.

1704100

20285908.80

ARCI Extension/Construction of PMD Building


VOL-IIIA-PART 1 Civil Architectural

VASTUKALA Design Build Solutions PVT LTD.

ARCI Extension/Construction of PMD building


VOL-IIIA-PART 1 Civil Architectural

COST ESTIMATE
NAME OF THE WORK: EXTENTION/CONSTRUCTION OF BUILDING AT ARCI
NAME OF THE BUILDING: PMD
ARCHITECTS - VASTUKALA Design Build Solutions Pvt. Ltd.
VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE
Sec.
No.

S.No.

Description of Item

Local
Rate

Unit

Quantity

Amount

sqm

1025.00

10

10250

812.00

118

95816

SITE
1

Site clearance of work spot including removing of


trees upto bottom level, removing of bushes,
disposal of surplus unserviceable soil / trees /
bushes of debris up to 500m or site chosen by
Engineer-in-Charge including labour etc., complete
for finished item of work.

Earthwork in excavation of foundations for


buildings,
structures,
drains,
manholes,
chambers,pavements,, basements, etc.,including all
lifts in both wet and dry condition, bailing out
water,
shoring,
strutting(if
required),
stacking/disposal of surplus and unserviciable soil
within a lead of 500m & spreading in layers and as
per specifications and direction Engineer. In all
soils including soft rock/distintegrated rock but
including hard rock requiring blasting.
The
excavated earth which is to be used for backfilling
shall also be disposed and stacked separately at
locations indicated by the Engineer within a lead of
500mt

For depth upto 3.0 m

cum

VASTUKALA Design Build Solutions PVT LTD.


3

ARCI Extension/Construction of PMD building


VOL-IIIA-PART 1 Civil Architectural

VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE


Sec.
No.

S.No.

Description of Item

Controlled filling / back filling with special


compaction to achieve dry density of 95% modified
proctor density in all positions under floors,
foundations and other places as required by the
engineer with approved earth or approved fill
material brought from elsewhere from spoil heaps,
if approved by the engineer, with lead upto 500mtrs
at all heights / depths including transporting,
depositing, compacting, dressing, trimming etc.,
complete as desired in layers not exceeding 150mm
including watering, consolidating by meachanical
needs as per specifications and instructions of the
engineer. (The theoritical valume multiplied by 0.95
shall be considered for payment.).

Unit

Quantity

Local
Rate

Amount

a) with same soil


cum
Controlled filling / back filling with special
compaction to achieve dry density of 95% modified
proctor density in all positions under floors,
foundations and other places as required by the
engineer with approved earth or approved fill
material brought from elsewhere from spoil heaps,
if approved by the engineer, at all heights / depths
including transporting, depositing, compacting,
dressing, trimming etc., complete as desired in
layers not exceeding 150mm including watering,
consolidating by meachanical needs as per
specifications and instructions of the engineer. (The
theoritical valume multiplied by 0.95 shall be
considered for payment.).

691.00

75

51825

cum

691.00

300

207300

a) with outside soil

VASTUKALA Design Build Solutions PVT LTD.


4

ARCI Extension/Construction of PMD building


VOL-IIIA-PART 1 Civil Architectural

VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE


Sec.
No.

S.No.
5

Description of Item

Local
Rate

Unit

Quantity

sqm

200.00

300

60000

litre

54.50

209.16

11400

Along the external wall below concrete or masonry


apron using chemical emulsion @2.25 litres per
linear meter including drilling and plugging holes sqm
etc. With Chlorpyriphos/ Lindane E.C. 20% with
1% concentration

66.02

25.08

1656

PLINTH PROTECTION

Amount

Providing plinth protection with a bed of 100mm


thick PCC (1:5:10) using 40mm size HB Trap metal
and on top of PCC, 20mm thick granolithic concrete
flooring with CC ( 1:1:2)prop, using 6mm to 12mm
size graded hard granite machine crushed metal laid
monolithically already laid, in alternate panels of
size not exceeding 1.5 x 1.5 mts. and providing
5mm thick glass strips between the panels and
finishing the top surface to required smoothness and
slopes including grooves, thread lining as directed
by the engineer in charge including cost and
conveyance of all materials to site including
seigniorage charges, sales & other taxes on all
materials and operational & incidental and labour
charges like mixing of cement concrete, laying
curing, lift charges etc,. complete including cost of
CC bed for finished item of work. (APSS No. 701
& 710)

6
a

ANTI TERMITE TREATMENT


Supplying chemical emulsion in sealed containers
including delivery as specified.
Chlorpyriphos/
concentration

Lindane

E.C.

20% with 1%

Diluting and injecting chemical emulsion for POSTConstructional anti-termite treatment (excluding the
cost of chemical emulsion)

VASTUKALA Design Build Solutions PVT LTD.


5

ARCI Extension/Construction of PMD building


VOL-IIIA-PART 1 Civil Architectural

VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE


Sec.
No.

S.No.

Description of Item

Unit

Quantity

Local
Rate
Total

Amount
438247

VASTUKALA Design Build Solutions PVT LTD.


6

ARCI Extension/Construction of PMD building


VOL-IIIA-PART 1 Civil Architectural

VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE


Sec.
No.

S.No.

B
1

Description of Item
DEMOLITION WORK
Demolish wall

Local
Rate

Unit

Quantity

Amount

cum

5.00

400

2000

each

1.00

200

200

cum

5.00

645.06

3225.3

sqm

50.00

Demolishing brick work in cement mortar


manually/by mechanical means including stacking
of serviceable material and disposal of
unserviceable material within 50 metres lead as per
direction of engineer-in-charge. Prepare the surface
to receive new finish as per drawings and
specifications.

Dismantling doors/windows
Dismantling doors, windows and clerestory
windows (steel or wood) shutter including
chowkhats, architrave, holdfasts etc. complete and
stacking within 50 metres lead of area 3 sq. metres
and below. Prepare the surface to receive new finish
as per drawings and specifications.

Demolish RCC
Demolishing R.C.C. work manually/by mechanical
means including stacking of steel bars and disposal
of unserviceable material within 50 metres lead as
per direction of engineer - in - charge. Prepare the
surface to receive new finish as per drawings and
specifications.

Demolish existing flooring

13.08

654

Total

6079

Remove existing ceramic tile / vitrified / any other


type of flooring and disposal of unserviceable
material including sand bed within 50 metres lead
as per direction of engineer-in-charge. Prepare the
surface to receive new floor finish as per drawings
and specifications.

VASTUKALA Design Build Solutions PVT LTD.


7

ARCI Extension/Construction of PMD building


VOL-IIIA-PART 1 Civil Architectural

VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE


Sec.
No.

Unit

Quantity

Local
Rate

RCC(1:2:4) proportion
using
20mm cum
nominal size well graded HBG metal at
RC coping and other areas as per
drawings including centering / shuttering
cost and confveyance of all materials
approved source to site mixing concrete,
laying, tamping and curing etc., complete
for finished item of work.

15.00

5000

75000

PCC(1:4:8) proportion using 40mm nominal size cum


well graded HBG metal all leveling courses under
foundations, of strom water drain gutter including
centering / shuttering cost and confveyance of all
materials approved source to site mixing
concrete, laying, tamping and curing etc., complete
for finished item of work.

150.00

3910

586500

S.No.

Description of Item

Amount

Structural work

3
V.R.C.C(1:1.5:3) prop. (Ready Mix) Fletcher
Poineer / Birla / L & Tusing 6 to 20mm size well
graded HBG machine crushed chips at all depths
and heights in all types of foundations, footings,
plinth beams,Tie beams, Roof Slabs, and any other
super structures including
centering / shuttering using Acro span, adjustable
props and steel plates charges cost and conveyance
of all materials to site, labour charges,
vibrating charges, curing, and all other incidental
and operational charges etc. complete but excluding
cost of steel and its fabrication charges)

RCC M-20 Floor slab and beam at 3.6 m above cum


plinth or slab

272.81

7350

2005186.58

RCC M-20 in footing, pedestals, plinth beams, cum


columns, column pedestals above terrace
M-20 RCC Lintel, Sill, Projection,
cum

229.42

7000

1605960.79

32.72

7000

229006.68

VASTUKALA Design Build Solutions PVT LTD.


8

ARCI Extension/Construction of PMD building


VOL-IIIA-PART 1 Civil Architectural

VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE


Sec.
No.

S.No.

Description of Item

Unit

Quantity

Local
Rate

Amount

MT

52.73 60,000

3163500

Providing and Fixing Structural Steel including, MT


transportation, fabricating, welding, painting etc. all
complete.

1.00 80,000

80000

6.00

5,000

30000

Total

7745154.05

Fabricating and fixing in position HYSD Steel


reinforcements of various diameters at all levels and
positions including cost of straightening, cutting,
laying, bending, cranking and tying them after
placing in positions directed by the Engineer-incharge including cost and conveyance of steel and
GI wires or Tack welding, lifting, labour charges
and concrete cover blocks etc.
5

PRECAST SLAB(1:2:4)
Providing and laying Precast concret slab of
mixture (1:2:4) over Strom water drain at the cum
entrance

D
1

BRICK WORK
Super structure (230 mm thk wall)

cum

200.00

3300

660000

cum

235.00

3300

775500

Brick Mansonry for super structures of 230 mm


thickness in cement mortar (1:4) Prop. using best
quality bricks from approved source including cost
and conveyance of all materials to site scaffolding,
labour charges curing, cement etc. complete for all
heights.
2

Internal wall (115 mm thk wall)

VASTUKALA Design Build Solutions PVT LTD.


9

ARCI Extension/Construction of PMD building


VOL-IIIA-PART 1 Civil Architectural

VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE


Sec.
No.

S.No.

Description of Item

Local
Rate

Amount

cum 230.00

3000

690000

cum

547

245056

Unit

Quantity

Providing brick work of half-brick thickness using


best quality bricks with frog/indent, conforming to
sub-class A as per IS:1077 having crushing strength
of not less than 35 kg/cm2 in cement mortar 1:4
using 2 MS bars (6 mm ) embedded in CM at every
fourth layer in partition walls, chambers, other
workds of all shapes, plinths and super structure at
all depths and heights as per specifications
including scaffolding, curing, etc., all complete as
per specifications, and directions of Engineer.

Coarsed Rubble Masonary Below Plinth


Providing coarsed rubblestone masonry in cement
mortar of the following proportion in all types of
works at all heights and depths with curing, etc., all
complete as per specifications and directions of the
Engineer. Cement Mortar ratio of (1:6)

Rubble soling

448.00

Providing dry trap/rubble soling 230 mm thick


below grade slab and plinth protection including
hand packing and compacting etc. complete.
Total
E
1

PLASTER WORK
EXTERNAL PLASTER

sqm

1926.00

220

2370556
423720

VASTUKALA Design Build Solutions PVT LTD.


10

ARCI Extension/Construction of PMD building


VOL-IIIA-PART 1 Civil Architectural

VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE


Sec.
No.

S.No.

Description of Item

Unit

Quantity

sqm

2690.00

Local
Rate

Amount

180

484200

Providing 20mm thick cement-sand plaster in two


coats, backing coat 15mm thick and finishing coat
5mm thick, finished smooth at all depths and
heights in 1:6 proportion including mixing of
approved water proofing compound ("CICO /
IMPERMO / CCOPROOF" or approved equivalent)
as per manufactuer's specifications in backing coat
as well as finishing coat, raking out joints,
necessary dabbing, curing, 10x10mm Grooves
scaffolding complete as per specifications. (for all
heights )

INTERNAL PLASTER
Providing 15mm thick cement-sand plaster smooth
finish at all depths and heights in the following
proportion on walls, pillars, projection bands, cable
trench inner surfaces, cornices etc. including
10x10mm grooves, raking out joints, necessary
dabbing, curing, scaffolding complete for internal
walls & ceiling as per specifications.

Total
F
1

WATER PROFFING
TERRACE WATER PROFFING

sqm

595.00

800

907920
476000

Providing and laying integral cement based water


proofing treatment including preparation of surface
as required for treatment of roots, balconies terraces
etc. consisting of following operations.

a) Applying and grouting a slurry coat of neat


cement using 2.75kg/sqm of cement admixed with
propreitary water proofing compound conforming to
IS - 2645 over the RCC slab including cleaning the
sruface before treatment.

VASTUKALA Design Build Solutions PVT LTD.


11

ARCI Extension/Construction of PMD building


VOL-IIIA-PART 1 Civil Architectural

VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE


Sec.
No.

S.No.

Description of Item

Unit

Quantity

sqm

70.00

Local
Rate

Amount

500

35000

b) Laying cement concrete using broken


bricks/brick bats 25mm to 100mm size with 50% of
cement mortar 1:5 ( 1 cement : 5 coarse sand )
admixed with proprietary water proofing compound
conforming to IS 2645 over 20mm thick layer of
cement mortar of mix 1:5 ( 1 cement : 5 coarse
sand) admixed with proprietary water proofing
similarly the adjoining walls upto 300mm height
including rounding of junctions of walls and and
slabs.
c) After two days of proper curing applying a
second coat of cement slurry admixed with
proprietary water proofing compound conforming to
IS - 2645.
d) finishing the surface with 20mm thick joinless
cement mortar of mix 1:4 ( 1 cement : 4 coarse
sand) admixed with proprietary water proffing
compound conforming to IS - 2645 and finally
finishing the surface with trowel with neat cement
slurry and making 300 x 300mm squre.

e) The whole terrace so finished shall be flooded


with water for a minimum period of two weeks for
cruing and for final test. All above operations to be
done in order and as directed and specified by the
engineer in charge. (specification obtain from
CPWD)
2
A

TOILET WATERPROFFING
FLOOR
Providing and laying water proofing treatment to
vertical and horizontal surfaces of depressed
portions of W.C. , kitchen and the like consisting
of :

VASTUKALA Design Build Solutions PVT LTD.


12

ARCI Extension/Construction of PMD building


VOL-IIIA-PART 1 Civil Architectural

VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE


Sec.
No.

S.No.

Description of Item

Unit

Quantity

Local
Rate

Amount

i) 1st course of applying cement slurry @4.4 kg/sqm


mixed with water proofing compound conforming
to IS 2645 in recommended proportions including
rounding off junction of vertical and horizontal
surface.
ii) IInd course of 20mm cement plaster 1:3 (1
cement 3 coarse sand) mixed with water proofing
compound in recommended proportion including
rounding off juction of vertical and horizontal
surface.
iii) IIIrd course of applying blown or residual
bitumen applied hot at 1.7 kg. per sqm of area.
iv) IVth course of 90 micron thk bituminous
waterproofing felt of shalimar make or equivalent
(overlaps at joints should be 100mm wide and
pasted to each other as per manufacturers
instructions.)
v) top with a second layer of bitumen @1.2kg/sqm.
and finally finished with bituminous aluminum
paint.

vi) Fill the sunk slab with brick bat coba


Rate shall be paid on the basis of floor area of the
toilet.
WALL
sqm

270.00

341

92070

VASTUKALA Design Build Solutions PVT LTD.


13

ARCI Extension/Construction of PMD building


VOL-IIIA-PART 1 Civil Architectural

VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE


Sec.
No.

S.No.

Description of Item

Unit

Quantity

Local
Rate

cum

20.00

3500

70000

Total

673070

Amount

Providing waterproofing treatment


through
specialized agencies to the dado portion of the
R.C.C. side walls upto 2.1 m height from floor area
of water closets, bath-rooms, kitchens, washing
places, sanitary blocks etc by giving injection
treatment with waterproofing compound and cement
solution. The walls will then be plastered with
waterproof cement plaster in 1:4 c.s. 12 mm to 15
mm thk. Finally the walls shall be covered with
jointless waterproof plaster in 1:3 c.s. 12 to 15 mm
thick finished rough for receiving tiles. The average
thickness of complete treatment shall not be less
than 25 mm. (The actual treated area will be
measured and paid for).

Brick bat coba


Providing and laying Brick bat coba as a filler
materials, at ground, first and terrace level.

VASTUKALA Design Build Solutions PVT LTD.


14

ARCI Extension/Construction of PMD building


VOL-IIIA-PART 1 Civil Architectural

VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE


Sec.
No.

S.No.

G
1

Description of Item
PAINTING
INTERNAL PAINT ( wall & ceiling painting)

Local
Rate

Amount

2710.00

120

325200

sqm

2861.00

120

343320

sqm

150.00

Unit

Quantity

sqm

Providing and applying 3 coats of emulsion paint of


asain make or equivalent and shade over a coat of
primer as per specifications of the manufacturer.
The rate shall include the cost of the priming coat
and three coats of wall putty (birla make or
equivalent),
necessary
surface
preparation.
Including old surface scrapping, brushing, removing
paint marks over windows, doors, flooring etc.
complete.
2

EXTERNAL PAINT

Painting with weather proof emulsion paint, water


based, modified acrylic paint of Apex Ultima (asian
make or equivalent) to exterior faces of new walls
with three coats of approved make shade and color
including self prime coat including cost and
conveyance of materials like paint to site including
cost of brushes, scaffolding charges, lift charges and
labour charges such as preparing the wall, applying
three coats of paint etc. complete for finished item
of work in all floors, including old surface
scrapping and removing of old paints etc. complete.

EXTERIOR TEXTURE PLASTER

300

45000

Providing & applying cement based texured wall


finish Birla White & Textura equivatent as per
manufacters instructions with Trowel finish.
Selected by the Architect.
Total

713520

VASTUKALA Design Build Solutions PVT LTD.


15

ARCI Extension/Construction of PMD building


VOL-IIIA-PART 1 Civil Architectural

VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE


Sec.
No.

S.No.

H
1

Description of Item
FLOORING & SKIRTING
Vitrified flooring

Unit

Quantity

Local
Rate

sqm

790.00

1500

Amount

1185000

Providing and laying 12mm thick matt finished


colour Vitrified tiles Johnson,Nitco or approved
equivalent of
2x2 sizes in flooring, skirting, dado and in other
places as shown in tiles laid on 20mm thick cement
mortar bed
or backing of mix 1:3 with joints properly aligned,
filled with white cement slurry with matching
pigment OR LATICRETE PLATINUM with
joints properly aligned, filled with LATICRETE
PERMACOLOR GROUT OF COLOR TO
MATCH TILE, at all levels
and locations to different patterns as per
specifications,and direction of the Engineer all
complete (glossy or mat finish
as required). Tiles shall be levelled at the vertical
corner joints and horizontal edge joints. Top of
skirting/dado shall
be finished smooth to line and level.
Flooring &Skirting

VASTUKALA Design Build Solutions PVT LTD.


16

ARCI Extension/Construction of PMD building


VOL-IIIA-PART 1 Civil Architectural

VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE


Sec.
No.

S.No.
2

Description of Item
Ceramic tile flooring /dado

Local
Rate

Unit

Quantity

Amount

sqm

300.00

800

240000

sqm

80.00

3000

240000

sqm

235.00

1175

276125

Total

1941125

Providing and laying 300x300x7mm thick matt


finished White / colour Ceramic tiles( First quality)
of Johnson
SPARTEK/Nico or approved equivalent of specified
sizes in Toilet flooring,Daddooing and in other
places as shown in tiles laid on 12mm thick cement
mortar bed or backing of mix 1:3, with joints
properly aligned,
filled with white cement slurry with matching
pigment, at all levels and locations to different
patterns as per
specifications,and direction of the Engineer all
complete (glossy or mat finish as required). Tiles
shall be bevelled at
the vertical corner joints and horizontal edge joints.
Top of skirting/dado shall be finished smooth to line
and level.

granite flooring
Providing & laying polished granite syone flooring
of 25mmthk machine cut & mirror polished
treads/risers/sills/ledges 300-450mm wide in one or
two pieces (each piece not less than 5' length),
square cut nosing slightly softened by not rounded /
chamfered as required in one piece or long length as
directed, set in cement mortar (1:4) and fixed with
cement float etc. complete as directed

Pavior blocks
Providing &fixing 80mm thk. Lacker coated cement
concrete pavours.

VASTUKALA Design Build Solutions PVT LTD.


17

ARCI Extension/Construction of PMD building


VOL-IIIA-PART 1 Civil Architectural

VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE


Sec.
No.

S.No.

Description of Item

Unit

Quantity

Local
Rate

sqm

59.01

3000

177030

sqm

12.60

4000

50400

Amount

DOORS AND WINDOWS


1

Nova pan doors ( D2 - 0.90 x 2.10 )


Supplying and fixing of door shutters of 35 mm
thick NOVAPAN both sides lamination around first
class teak wood frame with sprit polish of single/
double door, including all types of standard
hardware fittings,godrej navotal 7 levers with 3 key
with each door, labour charges,trasportation etc.,
complete for finishef item of work.

PVC doors (D3 - 0.90 x 2.10) (D4 - 0.75 x 2.10)

Supply and fixing of PVC door frames made of


hollow PVC Section Supply and fixing of door
shutter made out of PVC Hollow extruded section
(SINTEX MAKE 105 SECTION) having
dimensions of 78mm x 28mm with wall thickness of
1.5mm with necessary tapering to house Bison Lam
thickness of 12mm. All the four corners are jointed
with PVC 'L' brackets of size 4" x 8" (101.6mm x
203.2mm) and the PVC lipping is filled with well
seasoned country wood to hold hinges. The
hardware consists of 250mm long aldrop 1 No.
150mm aluminium handles 2 Nos. 150mm long
tower bolt 1 No.. The cost is inclusive of all
incidental, labour, transportation charges.

VASTUKALA Design Build Solutions PVT LTD.


18

ARCI Extension/Construction of PMD building


VOL-IIIA-PART 1 Civil Architectural

VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE


Sec.
No.

S.No.
3

Unit

Quantity

Local
Rate

D1 - 0.90 x 2.10

sqm

1.89

3500

6615

Aluminium framed glazed Door window system

sqm

25.00

4000

100000

Description of Item

Amount

Aluminium doors
Providing and fixing of glazed aluminum doors as
per drawing of standard aluminium anodized
sections 3 horizontal and 2 verticals and fixed with
5 mm thk sheet glass and shall be provided with
floor mounted door spring, 2 nos.of tower bolts of
250 mm long, door stoppers, push and pull handles,
godrej locking system, including sliding door
materials etc., complete

Supply and fixing fully glazed aluminium partition


wall with heavy duty aluminium sections 101.6 x
44.45 x 2.00 mm in four rows of section one each
at bottom and middle two numbers of horizontal
sections and vertical number at maximum 90 .00 cm
c/c equal distance and shall be firmly secured to
floor and walls and glazed with 5mm thk sheet
glass/rough glass as per site condition/direction of
engineer , panels fixed with aluminium glazed chips
and rubber gasket, including provision of doors as
per drawing of standard aluminium anodized
sections 3 horizontal and 2 verticals and glazed with
5 mm thk sheet glass and shall be provided with
floor mounted door spring 2 nos.of tower bolts of
250 mm long, door stoppers push and pull plates,
godrej locking system, including sliding door
materials etc., complete

VASTUKALA Design Build Solutions PVT LTD.


19

ARCI Extension/Construction of PMD building


VOL-IIIA-PART 1 Civil Architectural

VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE


Sec.
No.

S.No.
5

Description of Item

Unit

Quantity

Local
Rate

sqm
sqm
sqm
sqm
sqm

111.00
13.72
11.07
18.63
6.46

5000
5000
5000
5000
5000

555000
68585
55363
93163
32280

sqm

4.86

5000

24300

Total

1056120

Amount

WINDOW
Providing and fixing in position extruded modular
(Heady duty aluminium in Jindal make or
equivalent) alluminium window system consisting
of fixed and sliding/openable shutters as design
approved by the architect including anodising, float
glass, sun control film, and Anodised Aluminum
grill.

W1 - 2.00 x 1.85
W2 - 6.38 x 2.45
W3 - 5.15 x 2.45
W4 - 2.57 x 7.25
W5 - 5.38 x 1.20
VENTILATOR
Providing and fixing anodized Aluminium louvered
windows consisting of vertical arm (40 x 12 mm
with holders, lever and locking arrangement
weighing at 0.91 kg/rmt. With 3mm thick sheet
glass louvers etc. Provide opening for exhaust fan
in the ventilator and M.S Grill. M.S Grill to be
finished with enamel paint (1 coat primer and 2
coats of paint)Complete
Ventilator size ( .6 x .9 )

VASTUKALA Design Build Solutions PVT LTD.


20

ARCI Extension/Construction of PMD building


VOL-IIIA-PART 1 Civil Architectural

VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE


Sec.
No.

Unit

Quantity

Local
Rate

Providing &fixing 20mm thick polished Granite


slabs of approved shade at wash basin counter,
including cutting, rounding of the edges, providing
75 mm high apron with half round moulding, sqm
finishing, other necessary bye-works all complete as
per direction of the engineer. The granite slabs shall
be of single piece

4.00

3000

12000

Supplying, fitting and fixing heavy type anodised


aluminium hexagonal towel rail of size 600 x 20mm
each
dia with brackets of approved quality fixed on
wooden plugs with CP screws, all complete.

4.00

500

2000

S.No.

Description of Item

Amount

MISCELLANEOUS
1

Providing Expansion joints in RCC framed


structure with plain premoulded filler 25 mm thick
including 3 mm aluminium plate, fixing teak wood
battens on both faces and finishing as directed etc,
complete.
c) for floor level

sqm

RC Jali

sqm

1.80 2421.96
47.00

1400

4360
65800

Providing and fixing prefabricated RC Jali of 50mm


thickness
5

SS railing system

VASTUKALA Design Build Solutions PVT LTD.


21

ARCI Extension/Construction of PMD building


VOL-IIIA-PART 1 Civil Architectural

VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE


Sec.
No.

S.No.

Unit

Quantity

Local
Rate

Providing and fixing modular Stainless steel (grade


SS 304) railing system of 42 inches high consisting
of 1.5 inch diameter hand rail and assist rail. The
maximum post spacing to be 5 feet. The finish to be
#6 (380 Grit) Brushed Satin. The entire system to be
engineered and installed by the manufracturer.
RM
Basis of Design - VIVA Railings Pvt. Ltd., Model
- CUBE Multiline
3 Shroff Bldg.,
Dr. Masceranhas Road
Mazagaon, Mumbai 400 010.
www.vivarailings.com

40.00

6000

240000

Total

324160

Description of Item

Amount

VASTUKALA Design Build Solutions PVT LTD.


22

ARCI Extension/Construction of PMD building


VOL-IIIA-PART 1 Civil Architectural

VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE


Sec.
No.
K

S.No.

Description of Item
PARTITION (gypsum board )

Unit

Quantity

Local
Rate

sqm

185.00

1500

Amount
277500

Supply and fixing gypsum board partition


consisting of 25 gauge steel studs at maximum 400
mm center to center and top and bottom track
secured to the structure. The steel studs to be
covered with 1/2"thick and moisture resistant
gypsum board by India Gypsum or equivalent on
both sides of the steel studs. The gypsum board
joints to be taped and filled with joint filling
compound of India Gypsum or equivalent. The
entire gypsum board surface to be finished with
birla cement wall putty or equivalent to match the
finish on adjoining walls. Provide acoustical sealant
at the joint between structure and gypsum board.
The rate to include all accessories like angles, clips,
screws etc. to secure the studs with tracks and
attach gypsum board to steel studs.

VASTUKALA Design Build Solutions PVT LTD.


23

ARCI Extension/Construction of PMD building


VOL-IIIA-PART 1 Civil Architectural

VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE


Sec.
No.

S.No.

Description of Item

Unit

Quantity

sqm

20.00

Local
Rate

Amount

FALSE CEILING
1

FALSE CEILING (Gypsum board)

700

14000

Providing and fixing thk. Gypsum India board


false ceiling at levels as shown in the drg. From
FFL. Rate shall be inclusive of all Gypsum India
components contained G.I. perimeter channels of
size 0.55 thick having one flange of 20mm and
another flange of 30mm and a web of 27mm
alongwith perimeter of ceiling, screw fixed to
brickwall/partition with the help of nylon sleeves
and screws, at 610mm centres. The suspending
G.I.intermediate channels of size 45mm, 0.9mm
thick with two flanges of 15mm each from the
soffite at 1220mm centres with ceiling angle of
width 25mm x 10mm x 0.55 thick fixed to soffite
with G.I. cleat and steel expansion fastners at every
610mm c/c.

Ceiling sections of 0.55mm thickness having


knurled web of 51.5mm and two flanges of 26mm
each with lips of 10.5mm are then fixed to
intermediate channel with the help of connecting
clip and in direction perpendicular to the
intermediate channel at 457mm centres. 12.5mm
tapered edge Gypboard is then screw fixed to
ceiling section with 25mm drywall screws driver or
drilling machine with suitable attachment. The
boards are to be jointed and finished so as to have a
flush look which includes filling and finishing the
tapered and squre edge of the boards with jointing
compound & joint paper tape. .

VASTUKALA Design Build Solutions PVT LTD.


24

ARCI Extension/Construction of PMD building


VOL-IIIA-PART 1 Civil Architectural

VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE


Sec.
No.

S.No.

Description of Item

Unit

Quantity

sqm

50.00

Local
Rate

Amount

Rate shall be inclusive of any vertical ceiling part,


spot, tube light, a. C. Grills, fire and security
systems cut outs, All Sections should adhere to the
manufacturers guidelines and contractor has to
submit the Gypsum India certificate on using the
India Gypsum sections & boards. Refer attached
sheet along with drawings for details
2

Armstrong Ceiling

900

45000

Providing and fixing Armstrong (Fine Fissured


Micro Look with Tegular Edge using 15mm Grid
sections) false ceiling of size 24x24 at levels as
shown in the drg. From FFL. Rate shall be inclusive
of providing the total sysem with installation etc..
The contractor has to maintain all tiles in good
order and replace the defected tiles (at his own cost)
before handing over the site for Branch Operations
(till Inauguration).
Total
M

Vertical blinds

sqm

85.00

1000.00

59000
85000

Supplying and Fixing of vertical Venetian blinds


100 mm wide with all accsserorries including cost
and conveyance of all materials and fixing charges
etc., complete for finished item of work.at all
heights
N

Aluminium Faade
Providing and fixing ornamental clear anodized
aluminum work consisting of horizontal and
vertical Aluminuim tube sections of 100 x 50 mm KG
and 50 x 50 mm of zindal / Hindalco or equivalent
make

400.00

325

130000

VASTUKALA Design Build Solutions PVT LTD.


25

ARCI Extension/Construction of PMD building


VOL-IIIA-PART 1 Civil Architectural

VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE


Sec.
No.
O

S.No.

Description of Item
Aluminium Partition (fixed glass)

Unit

Quantity

Local
Rate

sqm

80.00

4000

Amount
320000

Supply and fixing fully glazed aluminium partition


wall with heavy duty aluminium sections 101.6 x
44.45 x 2.0 mm in four rows of section one each at
bottom and middle two numbers of horizontal
sections and vertical number at maximum 90 .00 cm
c/c equal distance and shall be firmly secured to
floor and walls and 5mm thk sheet glass/rough glass
as per site condition/direction of engineer , panels
fixed with aluminium glazed chips and rubber
gasket, including provision of doors. Aluminim
sections shall be filled with sal wood for fixing of
Nova pan door.The aluminium sections to be
finished with 0.3 micron powder coating the colour
to be finalized by the architect. the contractor to
provide glass to ARCI for coating before fixing.

GRAND TOTAL

17041372

VASTUKALA Design Build Solutions PVT LTD.


26

ARCI Extension/Construction of PMD building


VOL-IIIA-PART 1 Civil Architectural

VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE


Sec.
No.

S.No.

Description of Item

Unit

Quantity

Local
Rate

Amount

The Following Tests are Conducted by Contractor.


Tests on Concrete
Concrete Cube Strength
Rebound Hammer Test
Tests on Aggregates/Bricks/Sand
Impact Test
Crushing Strength
Brick test (Soak test)
Sand test
Cement Certificates
Fineness of Cement
Initial and Final Setting Time
Specific Gravity of Cement
Soundness of Cement
Compressive Strength of Cement

VASTUKALA Design Build Solutions PVT LTD.


27

COST ESTIMATE
NAME OF THE WORK: EXTENTION/CONSTRUCTION OF BUILDING AT ARCI
NAME OF THE BUILDING: SOLAR GEL
ARCHITECTS - VASTUKALA Design Build Solutions Pvt. Ltd.
PART I - C) STRUCTURAL
Sr. No
1

Description
CONCRETE-PLAIN & REINFORCED
Note : 1) The items given below shall be as per
Section B" Concrete-Plain & Reinforced" of the
specifications
2)Water used shall be clean and free from alkaline
and acid matters and suitable for all purpose.
3) For all small concrete, weigh batched concrete as
per design mix ,in manually or mechanical type
operated weigh batcher dial type or mechanical type
of minimum capacity 650 Kgs shall be used. Weigh
batcher shall be calibrated regularly
4) Concrete mix proportion will be based on 50 kg.
weight of cement bags delivered at the mixer.
5) The Contractor is entirely responsible for the
design of concrete mixes. The design is however,
to be approved by the Engineer.
6)During laying, compacting the concrete steel
reinforcement bar should not move from their
position and bars of laid portions should not be
disturbed.
7) The rate for RCC work shall be for complete
work excluding steel but including centering,
shuttering and all tools,and plants.
8) when concrete has begun to get harden,
(after,about 2 hoursof laying)it shall be kept wet by
covering wet gunny bags then cured by flooding
with water making by mortar watta, 75mm high for
15 days. Curing compound may be permitted only
for inaccessible locations.
9) Only River Sand should be used. However
washing of sand in rotary screw type washing
machines is a must, if silt content is more than
permissible limit.

Qty.

Unit

Rate

Amount (Rs.)

PART I - C) STRUCTURAL
Sr. No

Description
10) Rates shall be inclusive of providing pockets,
holes, inserts, pipes, etc.
11) Mechanical vibrators, internal and/ or external
to be used.
18) All joints in shuttering shall be sealed properly
as instructed.
19) Construction joint shall be minimum in
numbers and their location shall be approved by the
Consultant. Construction joints shall be treated
properly with bonding coat of approved material to
be applied at the old concrete before commencing
the fresh concreting operations.
20) In form finish surfaces the patterns to be
provided for the formwork shall be as per architects
suggestions
21) All concealed items like conduits, junction
boxes, fixtures etc. shall be located as per details
and locations to be approved before casting.
Notes for Formwork:
Note : 1) The items given below shall be as per
Section C : 'Formwork' of the specifications
2) Contractor should submit for the Consultant's
approval design and drawing for all formwork
showing sizes of member including props and its
foundation considering RMC by pumping
3) A mockup of formwork for columns, typical
column-beam junction, beams should be made and
only after obtaining approval of the mockup, the
contractor will be allowed to proceed with the work
4) All surfaces of concrete elements shall not be
treated in any way unless otherwise instructed.
5) All concrete surfaces shall have smooth and even
finish originally by themselves without any
finishing or rendering. In case the Engineer is not
satisfied with the finish obtained, remedial
measures for improving them shall be carried out by
the Contractor at his cost.

Qty.

Unit

Rate

Amount (Rs.)

PART I - C) STRUCTURAL
Sr. No

Description

Qty.

Unit

Rate

22.20

Cum

3909.60

Amount (Rs.)

6) Rates quoted shall be for straight formwork at all


levels unless otherwise specified.
7) Manual/mechanical cleaning of shutter plates
after every use is a must.
8) The rate shall include hacking of concrete
surface required to be plastered immediately after
removal of formwork.
9) Only new steel and plywood shuttering shall be
permitted for its first use at site, and its number of
uses will be solely with discretion of Engineer-incharge.
10) Providing cutouts, holes, slits, depression etc.
for electrical fixtures shall not be paid separately.
11) Size of the panels used for exposed concrete
finish areas shall be approved by the Engineer-incharge/ consultants.
12) For quick erection of shuttering and staging the
system should have suitable arrangement for
moving entire set in transverse as well as in
longitudinal directions and rails/wheels on any
suitable arrangement which will be approved by the
consultant.
1.1
a

CONCRETE WORK IN SUB-STRUCTURE


PCC below footing
Providing and laying Concrete M150 for all PCC
works below raft slab, plinth beams, foundations,
etc. including side forms if required. The rate shall
be inclusive of all taxes, towards plants &
machinery, labour, all leads & lifts, all floors all
charges required including transportation,
centering, formwork, compacting, roughening the
surface if special finish is to be provided and curing
etc complete 150mm Thick

86,793.12

PART I - C) STRUCTURAL
Sr. No

Description

1
2
3

Providing & laying M200 Concrete, Raft etc. The


rate shall be inclusive of all taxes, towards plants &
machinery, labour, all leads & lifts, transportation,
centering, formwork, compacting, roughening the
surface if special finish is to be provided and curing
etc complete
For RCC Footing, Raft etc.
For columns upto plinth
For Plinth Beams

1.2

CONCRETE WORK IN SUPER-STRUCTURE

Providing and laying Concrete M150 for all PCC

Qty.

Unit

Rate

Amount (Rs.)
-

78.30
19.00
45.80

Cu.m.
Cu.m.
Cu.m.

6400.00
6400.00
6400.00

Cu.m.

501,120.00
121,600.00
293,120.00

floring at plinth level above Rubble packing. The


rate shall be inclusive of all taxes, towards plants &
machinery, labour, form work wherever required
and all charges required including transportation etc
complete 150mm Thick.
d

1
2
3
4
5
6
7
8
9

Providing & laying M200 V. Concrete in Super


structure.etc complete.at all heights. The rate shall
be inclusive of all taxes, towards plants &
machinery, labour, all leads & lifts, transportation,
centering, formwork, compacting, roughening the
surface if special finish is to be provided and curing
etc complete.
For Columns at any level in super structure
RCC Plinth beams
RCC floor beams (USING RMC WITH PUMP)

27.7 Cu.m.
45.80
45.40 Cu.m.

For Slab up to 100mm Thick


For Slab up to 150mm Thick (USING RMC WITH 61.50
PUMP)
For Staircase Waist slab & Steps
For Chajja up to 125mm Thk.
For Fins / pardi up to 100mm Thk.
For 100 mm thk and 300 mm wide coping over
#REF!
parapet
SUB-TOTAL OF SECTION- 1

Sq.M.
Cu.m.
Cu.m.
Sq.M.
Sq.M.
Cu.m.

6400.00
6400.00
7350.00

7350.00

6400.00

293,120.00
333,690.00
452,025.00
#REF!
#REF!

PART I - C) STRUCTURAL
Sr. No
2

Description

Qty.

Unit

Rate

Amount (Rs.)

REINFORCEMENT
Note : 1) The items given below shall be as per
Section C : 'Reinforcement' of the specifications
2) Cover blocks shall be of approved quality
concrete and shall be vibrated on a table vibrator to
reduce the permeability.
3) Wherever welding of reinforcement is specified,
the same shall be carried out conforming to IS:9417
or IS:2751. Welding shall be carried out by
approved qualified welders only. One percent
testing of welds shall be carried for all types of
welds.
4) Overweight of the steel shall not be considered
for calculating consumption and payment purpose,
I.S. constant for weight of different dia. of bars
shall be considered for payment as well as
consumption purpose.
5) Column reinforcement bars are required to be
lapped in the middle portion of columns as per IS
13920. Proper arrangement shall be made to
support reinforcement projecting above floor level.
Similarly laps within a distance of 2 D (depth of
beam) or 1/4 span from the face of the column are
not allowed. The overhanging bars should be
properly supported. The cost of these works is
deemed to have been included in the rate.
Providing and fixing in position HYSD steel
reinforcement of various diameters for R.C.C.
footings, foundations, slabs, beams, columns,
canopies, staircases, dowels, chajjas, lintels, pardis,
copings, fins, arches etc. as per the detailed designs,
drawings and schedules including cutting, bending
hooking the bars binding with GI wires or tack
welding and concrete cover blocks etc. complete.

28.40 Mtonnes 56500.00

1,604,600.00

PART I - C) STRUCTURAL
Sr. No

Description
SUB-TOTAL OF SECTION -2
GRAND TOTAL

Qty.

Unit

Rate

Amount (Rs.)
Rs.1,604,600.00
#REF!

ARCI Extension/Construction of PMD building


VOL-IIIA-PART 1 Civil Architectural

COST ESTIMATE
NAME OF THE WORK: EXTENTION/CONSTRUCTION OF BUILDING AT ARCI
NAME OF THE BUILDING: PMD
ARCHITECTS - VASTUKALA Design Build Solutions Pvt. Ltd.
VOL IIIA-PART 2 - PLUMBING

VASTUKALA Design Build Solutions PVT LTD.


34

ARCI Extension/Construction of PMD building


VOL-IIIA-PART 1 Civil Architectural

COST ESTIMATE
NAME OF THE WORK: EXTENTION/CONSTRUCTION OF BUILDING AT ARCI
NAME OF THE BUILDING: PMD
ARCHITECTS - VASTUKALA Design Build Solutions Pvt. Ltd.
VOL IIIA-PART 2 - PLUMBING

VASTUKALA Design Build Solutions PVT LTD.


35

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural

COST ESTIMATE
NAME OF THE WORK: EXTENTION/CONSTRUCTION OF BUILDING AT ARCI
NAME OF THE BUILDING: PMD
ARCHITECTS - VASTUKALA Design Build Solutions Pvt. Ltd.
VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE

A.- SITE CLEARENCE- Measurement Sheet


Sr.nono. per Details/ Description
A

No. Unit

1 SITE CLEARENCE
1 sqm

43.02

22.02

2.65

3.1

Total
Say
A

EXCAVATION up to3.0 Mtr.


2 Column Footings
1.2.7.8.10.11.12.14
22,23,24,25,26,27,28
3,4,5,6,9,13,15,16,21
17,18,19.20,21,22,23,24,25,26,28

28 cum

TOTAL
A

3 Controlled Back Filling with Same Soil


Column Footings
1.2.7.8.10.11.12.14
22,23,24,25,26,27,28
3,4,5,6,9,13,15,16,21
17,18,19.20,21,22,23,24,25,26,27,28
Less volume of footings

28 cum

2.65

3.1

Total
A

4 Controlled back Filling with outside Murum


At plinth
Plinth

5 Plinth protection
toilet side faade (south side)
courtyard side facade (east side)
stair tower side facade (west side)
main entrance faade (north side)
Total Plinth protection
Say

VASTUKALA Design Build Solutions PVT LTD.

1 cum

1
1
1
1

sqm
sqm
sqm
sqm

15.7

32.4

15.7
43.13
33.58
8.75

3.22
1.5
1.5
1.5

1
Total

36

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural

QTY

947.30
947.30
1025

690.06

812.00

690.06

100
680

508.68
585.00

50.55
64.70
50.37
13.13
178.74
200

VASTUKALA Design Build Solutions PVT LTD.

37

ARCI Extension/Construction/Renovation of Solar Cell Building


VOL-IIIA-PART 1 Civil Architectural

COST ESTIMATE
NAME OF THE WORK: EXTENTION/CONSTRUCTION OF BUILDING AT ARCI
NAME OF THE BUILDING: PMD
ARCHITECTS - VASTUKALA Design Build Solutions Pvt. Ltd.
VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE

PART - I - C.- Structural Measur


PMD BUILDING
RCC QTY (CMT) RFT.STEEL (KG.)

RCC FOOTINGS
COLUMNS
PLINTH BEAMS
FIRST FLOOR BEAMS
FIRST FLOOR SLABS
SECOND FLOOR BEAMS
SECOND FLOOR SLABS
LINTEL, PROJECTIONS,SILL
COPPING
SLAB 1:2:4

114.00
82.54
32.88
47.35
89.06
47.35
89.06
26.72
6.00
6.00

2895.00
10071.00
2935.00
5719.00
6753.00
5719.00
6753.00
3280.00
625.00
625.00

534.95

45375.00
52725.00

38
VASTUKALA Design Build Solutions PVT LTD.

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural

COST ESTIMATE
NAME OF THE WORK: EXTENTION/CONSTRUCTION OF BUILDING AT ARCI
NAME OF THE BUILDING: PMD BUILDING
ARCHITECTS - VASTUKALA Design Build Solutions Pvt. Ltd.
VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE

PART - I - C.- Structural Measurement sheet


Sr No Item
Nos
1 PCC BELOW FOUNDATIONS

TYPE I
TYPE II
Below gutter
toilet side faade (south side)
courtyard side facade (east side)
stair tower side facade (west side)
main entrance faade (north side)
Below paver block
Below ground floor slab (Fl area)

Qty.

Unit

15
13

2.25
2.35

2.55
2.80

0.15
0.15

12.91
12.83

1
1
1
1
1
1
1

15.7
43.13
33.58
8.75
18.7
13.01
478.06

3.5
1.5
1.5
1.5
4.36
3

0.15
0.15
0.15
0.15
0.15
0.15
0.15

8.24
9.70
7.56
1.97
12.23
5.85
71.71

143.00 CMT.
150.00
2 RCC FOOTINGS
TYPE I
TYPE II

15
13

2.10
2.20

2.40
2.65

0.60
0.70

45.36
53.05
0.00

98.41 CMT.
3 RCC COLUMNS BELOW PLINTH
TYPE I
TYPE II

15
13

0.35
0.35

0.90
0.90

1.50
1.50

7.09
6.14
0.00

13.23 CMT.
4 RCC COLUMNS IN SUPER STRUCTURE
Ground Floor
TYPE I
TYPE II
First Floor
TYPE I
TYPE II

15
13

0.30
0.30

0.85
0.85

3.60
3.60

13.77
11.93

15
13

0.30
0.30

0.85
0.85

3.60
3.60

13.77
11.93
0.00

51.41 CMT.
5 RCC COLUMNS FOR PARAPET
TYPE I
TYPE II

15
13

0.30
0.30

0.85
0.85

1.00
1.00

3.83
3.32
0.00

7.14 CMT.
6 RCC PLINTH BEAMS
39
VASTUKALA Design Build Solutions PVT LTD.

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural

PART - I - C.- Structural Measurement sheet


Sr No Item

Nos

PB1,22,25,28
PB2,4,24,39
TB
Pb,38,29
P23,26
Pb3,
PB5
PB6
PB7
PB8
PB9,12
PB10,11
PB13,
PB14,15
PB16
PB17
PB18,19,20
Pb21
PB27,33
PB30,31,32
PB34,36
PB35
PB37

L
4
4
1
2
2
1
1
1
1
1
2
2
1
2
1
1
3
1
2
5
2
2
1

B
6.70
6.70
3.05
2.00
6.10
3.00
6.20
6.20
3.10
6.20
6.20
3.10
6.20
6.20
4.15
6.00
6.40
6.25
6.25
6.25
6.25
1.50
6.25

H
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.30
0.23
0.23
0.23
0.23
0.15
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.15
0.23

Qty.
0.60
0.60
0.30
0.60
0.60
0.60
0.60
0.60
0.40
0.50
0.50
0.50
0.50
0.45
0.50
0.50
0.50
0.50
0.60
0.50
0.50
0.30
0.60

Unit
3.70
3.70
0.21
0.55
1.68
0.41
0.86
0.86
0.37
0.71
1.43
0.71
0.71
0.84
0.48
0.69
2.21
0.72
1.73
3.59
1.44
0.14
0.86
0.00

28.59 CMT.

40
VASTUKALA Design Build Solutions PVT LTD.

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural

PART - I - C.- Structural Measurement sheet


Sr No Item
7 RCC FLOOR BEAMS

Nos

B1,11,23,26,29
B2,5,27,46
MB
B3,13,14,24
B30.45
B4
B5
B6
B7,8,9,10
B12,15,19,20,21
B17
B18
B16,22
B16X,22X
B28,31,32,34,35,37,38,39,41
B33,36
B40.
B43
B44

L
5
4
1
4
2
1
1
1
2
5
1
1
2
2
10
4
1
1
1

B
6.25
6.25
3.10
3.10
2.00
6.25
6.25
6.25
6.25
6.25
4.35
6.00
6.25
1.80
6.10
1.00
6.25
6.00
6.25

H
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23

Qty.
0.75
0.75
0.75
0.75
0.75
0.75
0.45
0.75
0.40
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.60
0.75

Unit
5.39
4.31
0.53
2.14
0.69
1.08
0.65
1.08
1.15
5.39
0.75
1.04
2.16
0.62
10.52
0.69
1.08
0.83
1.08
0.00

41.17 CMT.
7 RCC FLOOR SLABS
S1
S2
S3
S4
S5
S6

6
1
1
1
1
2

6.00
3.00
5.60
2.10
6.25
7.85

6.25
6.25
6.25
34.30
11.00
3.00

0.170
0.125
0.100
0.125
0.200
0.225

0.00
38.25
2.34
3.50
9.00
13.75
10.60
0.00

77.45 CMT.
Ground floor
Lintel Level at ground floor and first flo

Horizontal projection

14
2
2
2
2

12
2
2

6.10
3.78
8.00
4.68
2.68
6.10
3.78
6.10

0.23
0.23
0.23
0.23
0.23
0.62
0.62
0.23

0.300
0.300
0.300
0.300
0.300
0.100
0.100
0.300

5.89
0.52
1.10
0.65
0.37
4.54
0.47
0.84

14.38 CMT
sill Level

7
1
1

6.10
3.78
8.00

0.23
0.23
0.23

0.300
0.300
0.300

2.95
0.26
0.55
41

VASTUKALA Design Build Solutions PVT LTD.

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural

PART - I - C.- Structural Measurement sheet


Sr No Item

Nos

L
1
1

Horizontal projection

6
1
1

B
4.68
2.68
6.10
3.78
2.68

H
0.23
0.23
0.62
0.62
0.23

Qty.
0.300
0.300
0.100
0.100
0.300

Unit
0.32
0.18
2.27
0.23
0.18

6.96 CMT
Horizontal projection at 1st slab level

6.10

0.62

0.100

2.27

3.78

0.62

0.100

0.23

2.68

0.23

0.300

0.18

2.69 CMT

42
VASTUKALA Design Build Solutions PVT LTD.

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural

PART - I - C.- Structural Measurement sheet


Sr No Item

Nos

Horizontal projection at 2nd slab level

Qty.

Unit

6.10

0.62

0.100

2.27

3.78

0.62

0.100

0.23

2.68

0.23

0.300

0.18

2.69 CMT
Copping
Courtyard side wall (east side)
Toilet side wall ( south side)
Stair tower side wall ( west side)
Main entrance side (north side)
Stair tower
North and south side wall
East and west side wall

1
1
1
1

45.45
14.75
33.58
17.42

0.3
0.3
0.3
0.3

0.12
0.12
0.12
0.12

1.57
0.51
1.16
0.60

2
2

7.43
3.7

0.3
0.3

0.12
0.12

0.51
0.26

4.60 CMT
10.00 CMT

Provissional quantity
Slab Over Entrance paving
1

20.95

1.2

0.15

3.77

43
VASTUKALA Design Build Solutions PVT LTD.

ARCI Extension/Construction/Renovation of Solar Cell Building


VOL-IIIA-PART 1 Civil Architectural

COST ESTIMATE
NAME OF THE WORK: EXTENTION/CONSTRUCTION OF BUILDING AT ARCI
NAME OF THE BUILDING: PMD
ARCHITECTS - VASTUKALA Design Build Solutions Pvt. Ltd.
VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE

C.5- Structural Steel-Measurement sheet


Sec.no.

S.no.

Details/ Description

No.

Unit

L/ area

Weight/M
or
weight/sm

Total
Weight

QTY

44
VASTUKALA Design Build Solutions PVT LTD.

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural

COST ESTIMATE
NAME OF THE WORK: EXTENTION/CONSTRUCTION OF BUILDING AT ARCI
NAME OF THE BUILDING: PMD Building
ARCHITECTS - VASTUKALA Design Build Solutions Pvt. Ltd.
VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE

D-BRICK WORK - Measurement Sheet


Sec.noS.no. p Details/ Description

No. Unit

External Brick Wall - 230 MM Thk.


Courtyard side wall (east side)
Toilet side wall ( south side)
Stair tower side wall ( west side)
Main entrance side (north side)

1
1
1
1

cum
cum
cum
cum

45.45
14.75
33.58
17.42

0.23
0.23
0.23
0.23

6.50
6.50
6.50
6.50

Stair tower
North and South side wall
West and east side wall

2 cum
2 cum

7.3
3.53

0.23
0.23

3.00
3.00

1 cum
2 cum

17.27
7.000

0.23
0.23

3.75
2.90

Conference room
Connector between new and old building
Total
Deduct
Main entrance door (4.27 x 2.10 )
Less window - 2.00 x 1.20
Less window - 4.87 x 1.90
Less Ventilator- 0.60 x 0.90
Less stair tower window - 2.75 x 8.23
Less conference room Window
Connector window - 5.38 x 1.20 m
Total Deductions
Total Exterior brick work
Contingency at 15%
Internal Brick Wall - 115 MM Thk.
Wall between (P-002 & P-003) (P-102 & P-103)
Wall between (P-006 & P-007) (P-106 & P-107)
Wall between (P-009 & P-0010) (P-109 & P-110)
Wall between (P-011 & P-ST1) (P-111 & P-ST1)
Wall between (P-012 & P-ST1) (P-112 & P-ST1)
Wall between (P-012 & P-013) (P-112 & P-113)
Wall between (P-014 & P-015) (P-114 & P-115)
Wall between (P-015 & P-016) (P-115 & P-116)
Wall between (P-005 & P-ST1) (P-105 & P-ST1)
Wall between (P-015,P-016 & P-005)
(P-115,P-116 & P-105)
Deduct
Door - 0.90 x 2.10
Total Internal brick work
Internal Brick Wall - 115 MM Thk. On ground floor
Partition between (P-003 & P-004 & corridor)

1
30
2
8
1
1
1

cum
cum
cum
cum
cum
cum
cum

4.27
2
4.87
0.6
2.75
5.25
5.380

0.23
0.23
0.23
0.23
0.23
0.23
0.23

2.10
1.20
1.90
0.90
8.23
2.75
1.20

2
2
2
2
2
2
2
2
2

cum
cum
cum
cum
cum
cum
cum
cum
cum

5.240
5.240
5.240
5.240
5.240
5.240
5.240
5.240
2.930

0.115
0.115
0.115
0.115
0.115
0.115
0.115
0.115
0.115

2.90
2.90
2.90
2.90
2.90
2.90
2.90
2.90
2.90

2 cum

6.100

0.115

2.90

15 cum

0.9

0.115

2.10

1 sqm

6.1

0.115

2.9
45

VASTUKALA Design Build Solutions PVT LTD.

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural
Sec.noS.no. p Details/ Description
Partition between (P-005 & P-006 & corridor)
Partition between (P-010 & P-011 & corridor)
Partition between (P-013 & P-014 & corridor)
Partition between ( P-007 & corridor)
Partition between ( P-009 & corridor)
Partition between ( P-012 & corridor)
Toilets Room no. (P-015, P-016)
Partition wall
handicap toilet
For WC.
Deduct
Door - 0.90 x 2.10
Door - 0.75 x 2.10
Total Internal brick work at grond floor-115thk

Internal Brick Wall - 115 MM Thk. On first floor


Partition between (P-003 & P-004 & corridor)
Partition between (P-005 & P-006 & corridor)
Partition between (P-010 & P-011 & corridor)
Partition between (P-013 & P-014 & corridor)
Partition between ( P-007 & corridor)
Partition between ( P-009 & corridor)
Partition between ( P-012 & corridor)
Toilets Room no. (P-015, P-016)
Partition wall
handicap toilet
For WC.
Deduct
Door - 0.90 x 2.10
Door - 0.75 x 2.10
Total Internal brick work at first floor-115thk
Boxing around windows-115thk
Type - 1
Type - 2
Type - 3
Total Boxing - 115 thk
Total 115 thk brick wall
Say

No. Unit

1
1
1
1
1
1

sqm
sqm
sqm
sqm
sqm
sqm

6.1
6.1
6.1
6.1
6.1
2.86

0.115
0.115
0.115
0.115
0.115
0.115

2.9
2.9
2.9
2.9
2.9
2.9

2
2
1
1

cum
cum
cum
cum

2.930
3.550
2.930
1.500

0.115
0.115
0.115
0.115

2.10
3.35
2.10
2.10

15 cum
2 cum

0.9
0.75

0.115
0.23

2.10
2.10

1
1
1
1
1
1
1

sqm
sqm
sqm
sqm
sqm
sqm
sqm

6.1
6.1
6.1
6.1
6.1
6.1
2.86

0.115
0.115
0.115
0.115
0.115
0.115
0.115

2.9
2.9
2.9
2.9
2.9
2.9
2.9

2
2
1
1

cum
cum
cum
cum

2.930
3.550
2.930
1.500

0.115
0.115
0.115
0.115

2.10
3.35
2.10
2.10

15 cum
2 cum

0.9
0.75

0.115
0.23

2.10
2.10

10
8
2

2.4
1
3.12

0.115
0.115
0.115

7.6
7.6
7.6

45.45
14.75
33.58
17.42
12

0.45
0.45
0.45
0.45
0.45

2.50
2.50
2.50
2.50
2.50

cum
cum
cum

Coarsed Rubble Masonary (CRM)


Courtyard side wall (east side)
Toilet side wall ( south side)
Stair tower side wall ( west side)
Main entrance side (north side)
Ramp side
For Guttter

1
1
1
1
1

cum
cum
cum
cum
cum

46
VASTUKALA Design Build Solutions PVT LTD.

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural
Sec.noS.no. p Details/ Description

No. Unit

toilet side faade (south side)


courtyard side facade (east side)
stair tower side facade (west side)
main entrance faade (north side)
Below projection
Total new CRM masonary below plinth level
Say
Rubble Soling Below Plinth
Floor area
Below connector (floor area)
Courtyard side wall (east side)
Toilet side wall ( south side)
Stair tower side wall ( west side)
Main entrance side (north side)
Paver at entrance
Plinth protection
toilet side faade (south side)
courtyard side facade (east side)
stair tower side facade (west side)
main entrance faade (north side)

2
2
2
2
18

1
1
1
1
1
1

sqm
sqm
sqm
sqm
cum

cum
cum
cum
cum
cum
cum

1
1
1
1
1

sqm
sqm
sqm
sqm

L
15.7
43.13
33.58
8.75
0.43

464.19
22.2
45.45
14.75
33.58
17.42
18.7
15.7
43.13
33.58
8.75

D
0.3
0.3
0.3
0.3

0.75
0.75
0.75
0.75
1.50

1.50
1.50
1.50
1.50

0.230
0.230
0.230
0.230
0.230
0.230

4.36
3.22
1.5
1.5
1.5

Total
say

47
VASTUKALA Design Build Solutions PVT LTD.

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural

QTY

67.95
22.05
50.20
26.04

10.07
4.87
14.90
9.34
205.42
2.06
16.56
4.26
0.99
5.21
3.32
1.48
33.88
171.54
200.00
3.50
3.50
3.50
3.50
3.50
3.50
3.50
3.50
1.95
4.07

3.26
30.72
10.12
48
VASTUKALA Design Build Solutions PVT LTD.

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural
QTY
10.12
10.12
10.12
10.12
10.12
6.88
1.42
2.74
0.71
0.36
3.26
0.72
69.33

10.12
10.12
10.12
10.12
10.12
10.12
6.88
1.42
2.74
0.71
0.36
3.26
0.72
69.33
20.98
6.99
5.45
33.42
202.80
235.00

51.13
16.59
37.78
19.60
13.50

49
VASTUKALA Design Build Solutions PVT LTD.

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural
QTY
7.07
19.41
15.11
3.94
11.61
195.73
230.00

106.76
5.11
15.68
5.09
11.59
6.01
81.53
50.55
64.70
50.37
13.13

410.51
448.00

50
VASTUKALA Design Build Solutions PVT LTD.

ARCI Extension/Construction of PMD Building


VOL-IIIA-PART 1 Civil Architectural

COST ESTIMATE
NAME OF THE WORK: EXTENTION/CONSTRUCTION OF BUILDINGS AT ARCI
NAME OF THE BUILDING: PMD BUILDING
ARCHITECTS - VASTUKALA Design Build Solutions Pvt. Ltd.
VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE

E-1 PLASTER WORK - Measurement Sheet


Sec S.no.
.no. per
Details/ Description
E

No. Unit

QTY

External Plaster
Courtyard side wall (east side)
Toilet side wall ( south side)
Stair tower side wall ( west side)
Main entrance side (north side)

1
1
1
1

sqm
sqm
sqm
sqm

45.45
14.75
33.58
17.42

10.00
10.00
10.00
10.00

454.50
147.50
335.80
174.20

Stair tower
North and South side wall
West and east side wall

2 sqm
2 sqm

7.3
3.53

4.30
4.30

62.78
30.36

Conference room

1 sqm

17.27

7.60

131.25

Connector (Existing to New building)

2 sqm

6.40

89.60

Main entrance door jambs (4.27 x 2.10 )


Window jambs - 2.00 x 1.20
Ventilator jambs - 0.60 x 0.90
Stair tower window jambs - 2.75 x 8.23
Conference room window jambs - 5.25 x 2.45
Conference room window jambs - 6.38 x 2.45

Connector window - (5.38 x 1.2m)

2
1
60
60
16
16
2
2
2
2
2
2

sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm

4.27
2.1
2
1.2
0.6
0.90
2.75
8.23
5.25
2.45
6.38
2.45

0.115
0.115
0.115
0.115
0.115
0.115
0.115
0.115
0.115
0.115
0.115
0.115

2 sqm
2 sqm

5.38
1.2

0.115

0.98
0.24
13.80
8.28
1.10
1.66
0.63
1.89
1.21
0.56
1.47
0.56

0.12

1.24
0.28
1459.89

2.10
1.20
1.90
0.90
8.23
2.45
2.45

8.97
72.00
18.51
4.32
22.63
12.86
15.63

Total
Deduct
Main entrance door (4.27 x 2.10 )
Less window - 2.00 x 1.20
Less window- 4.87 x 1.90
Less Ventilator- 0.60 x 0.90
Less stair tower window - 2.75 x 8.23
Less conference room Window - 5.25 x 2.45
Less conference room Window - 6.38 x 2.45

VASTUKALA Design Build Solutions PVT LTD.

1
30
2
8
1
1
1

sqm
sqm
sqm
sqm
sqm
sqm
sqm

4.27
2
4.87
0.6
2.75
5.25
6.38

51

ARCI Extension/Construction of PMD Building


VOL-IIIA-PART 1 Civil Architectural

E-1 PLASTER WORK - Measurement Sheet


Sec S.no.
.no. per
Details/ Description

No. Unit

Less Connector window (5.38 x 1.20m)

QTY

1 sqm

5.38

1.20

6.46
161.38

6 sqm
14 sqm
2 sqm

2.03
1.02
1.25

8.60
8.60
8.60

104.75
122.81
21.50
249.06

Total
External Plaster for Boxing
Type - 1
Type - 2
Type - 3
Total
External Plaster for horizontal projection
East Side Faade
West Side Faade
Total

64.48
60.75
125.23

Total External Plaster


Say

1672.80
1926.00

VASTUKALA Design Build Solutions PVT LTD.

2
2

23.88
22.5

1.35
1.35

52

ARCI
of Solar Cell Building
COSTExtension/Construction/Renovation
ESTIMATE

VOL-IIIA-PART 1 Civil Architectural

NAME OF THE WORK: EXTENTION/CONSTRUCTION OF BUILDING AT ARCI


NAME OF THE BUILDING: SOLAR CELL
ARCHITECTS - VASTUKALA Design Build Solutions Pvt. Ltd.
VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE

E-2. INTERNAL PLASTER - Measurement Sheet


Sr.no. S.no. p Details/ Description

No. Unit

Internal Ceiling Plaster in ground floor


Entrance lobby - Room no. P-002
Scientist - Room no. P-003, P-004, P-005, P-006
Scientist - Room no. P-010, P-011
Scientist - Room no. P-013, P-014
Sr. Scientist - Room no. P-007,P-009
Corridor - 008
Toilet - Room no. P-015, P-016
Below Conference room
Electrical Room - Room no. P-012
Stair Case - ST-1
Internal Ceiling Plaster in first floor
Conference room - P-101
Scientist - Room no. P-102, P-103, P-104, P-105
Scientist - Room no. P-110, P-111
Scientist - Room no. P-113, P-114
Sr. Scientist - Room no. P-106,P-109
Corridor - 108
Toilet - Room no. P-115, P-116
Electrical Room - Room no. P-012
Stair Case - ST-1
Total Internal Plaster

QTY

1
4
2
2
2
1
2
1
1
1

sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm

3.85
3.08
3.03
3.04
6.20
31.97
2.93
6.38
3.03
3.07

5.99
5.92
5.92
5.92
5.92
2.00
5.14
6.24
5.92
6.87

23.06
72.93
35.88
35.99
73.41
63.94
30.12
39.81
17.94
21.09

1
4
2
2
2
1
2
1
1

sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm

10.53
3.08
3.03
3.04
6.20
27.80
2.93
3.03
3.07

5.69
5.92
5.92
5.92
5.92
2.00
5.14
5.92
6.87

59.92
72.93
35.88
35.99
73.41
55.60
30.12
17.94
21.09
817.05

2 sqm
1 sqm

5.99
3.85

3.350
3.350

40.13
12.90
53.03

4 sqm
2 sqm
4 sqm

5.99
6.24
6.10

3.350
3.350
3.350

80.27
41.81
81.74
203.81

4 sqm
2 sqm

5.99
6.24

3.350
3.350

80.27
41.81

Internal Plaster in Ground Floor


E

Entrance lobby - Room no. P-002


Northside, Southside wall
East side wall
Total
Scientist - Room no. P-003, P-004, P-005, P-006
Northside, Southside wall
East side wall
corridor side wall
Total
Scientist - Room no. P-007, P-009
Northside, Southside wall
East side wall

VASTUKALA Design Build Solutions PVT LTD.

53

ARCI Extension/Construction/Renovation
of Solar- Cell
Building
E-2. INTERNAL PLASTER
Measurement
Sr.no. S.no. p Details/ Description

Sheet

No. Unit

corridor side wall

VOL-IIIA-PART 1 Civil Architectural


L

4 sqm

6.10

3.350

81.74
203.81

4 sqm
2 sqm
4 sqm

5.99
6.24
6.10

3.350
3.350
3.350

80.27
41.81
81.74
203.81

2 sqm
1 sqm
2 sqm

6.00
6.24
2.86

3.350
3.350
3.350

40.20
20.90
19.16
80.27

2
2
2
3
2

sqm
sqm
sqm
sqm
sqm

1.90
5.14
1.73
2.93
1.50

3.35
3.350
3.350
2.100
2.100

12.73
34.44
11.59
18.46
6.30
83.52

2
2
2
4
2

sqm
sqm
sqm
sqm
sqm

3.55
5.14
2.93
2.93
1.50

3.35
3.350
3.350
2.100
2.100

23.79
34.44
19.63
24.61
6.30
108.77

2 sqm

7.00

3.35

46.90

2.00
1.50
4.87
1.90
0.60
0.90
2.75
5.50
4.27
2.10
0.90
2.10
0.75
2.10
5.38
1.2

0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.23
0.23
0.23
0.115

6.90
5.18
1.12
0.44
0.69
1.04
0.63
1.27
0.98
0.48
1.55
14.49
0.69
3.86
1.24
0.28

Total
Scientist - Room no. P-010, P-011, P-013, P-014
Northside, Southside wall
Eastside wall / Westside wall
corridor side wall
Total
Electrical room - Room no. P-012
Northside, Southside wall
Westside wall
corridor side wall
Total
Gents Toilet - Room no. P-015
water cooler area
Northside Wall, Southside Wall
Eastside wall
Westside wall
Total
Gents Toilet - Room no. P-016
handicap toilet
Northside Wall, Southside Wall
Eastside wall, Westside wall

Total
connector
Window Jambs - (2.0 x 1.50m)
Window Jambs - 4.87 x 1.90m
.
Ventilator jambs- 0.60 x 0.90
Stair tower window jambs - 2.75 x 5.50
Main entrance door - 4.27 x 2.10
Internal Door - 0.90 x 2.10
Toilet Door - 0.75 x 2.1
Connector window - (5.38 x 1.2m)

VASTUKALA Design Build Solutions PVT LTD.

QTY

30
30
2
2
10
10
2
2
2
2
15
30
4
8
2
2

sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm

0.12

54

ARCI Extension/Construction/Renovation
of Solar- Cell
Building
E-2. INTERNAL PLASTER
Measurement
Sr.no. S.no. p Details/ Description

Sheet

No. Unit

VOL-IIIA-PART 1 Civil Architectural


L

QTY

Total
Deduction
Less Window - 2.0 x 1.50m
Less Window - 4.87 x 1.90m
Less stair tower window - 2.75 x 5.50
Less Ventilator - 0.60 x 0.90
Less Main entrance door - 4.27 x 2.10
Less Internal Door - 0.90 x 2.10
Less Toilet Door - 0.75 x 2.1

40.83
`
30
1
1
4
1
15
4

sqm
sqm
sqm
sqm
sqm
sqm
sqm

2.00
4.87
2.75
0.60
4.27
0.90
0.75

1.500
1.900
5.500
0.900
2.100
2.100
2.100

Total
Total Internal Plaster in Ground Floor

90.00
9.25
15.13
2.16
8.97
28.35
6.30
160.16
864.60

Internal Plaster in First Floor


Conference room - Room no. P-101
Northside, Southside wall
East side wall

2 sqm
1 sqm

5.69
10.53

3.350
3.350

38.12
35.28
73.40

4 sqm
2 sqm
4 sqm

5.99
6.24
6.10

3.350
3.350
3.350

80.27
41.81
81.74
203.81

4 sqm
2 sqm
4 sqm

5.99
6.24
6.10

3.350
3.350
3.350

80.27
41.81
81.74
203.81

1 sqm

2.00

3.350

6.70

Total
Scientist - Room no. P-102, P-103, P-104, P-105
Northside, Southside wall
East side wall
corridor side wall
Total
Scientist - Room no. P-106, P-109
Northside, Southside wall
East side wall
corridor side wall
Total
Pantry- Room no. P-107
Northside wall
Total
Scientist - Room no. P-110, P-111, P-113, P-114
Northside, Southside wall
Eastside wall / Westside wall
corridor side wall
Total
Electrical room - Room no. P-112
Northside, Southside wall
Westside wall
corridor side wall
Total

6.70

4 sqm
2 sqm
4 sqm

5.99
6.24
6.10

3.350
3.350
3.350

80.27
41.81
81.74
203.81

2 sqm
1 sqm
2 sqm

6.00
6.24
2.86

3.350
3.350
3.350

40.20
20.90
19.16
80.27

Gents Toilet - Room no. P-115

VASTUKALA Design Build Solutions PVT LTD.

55

ARCI Extension/Construction/Renovation
of Solar- Cell
Building
E-2. INTERNAL PLASTER
Measurement
Sr.no. S.no. p Details/ Description

Sheet

No. Unit

water cooler area


Northside Wall, Southside Wall
Eastside wall
Westside wall

VOL-IIIA-PART 1 Civil Architectural


L

2
2
2
3
2

sqm
sqm
sqm
sqm
sqm

1.90
5.14
1.73
2.93
1.50

3.35
3.350
3.350
2.100
2.100

12.73
34.44
11.59
18.46
6.30
83.52

2
2
4
2

sqm
sqm
sqm
sqm

5.14
2.93
2.93
1.50

3.350
3.350
2.100
2.100

34.44
19.63
24.61
6.30
84.98

30
30
2
2
8
8
2
2
2
2
14
28
4
8
2
2
2
2

sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm

2.00
1.50
4.87
1.90
0.60
0.90
2.75
5.50
4.27
2.10
0.90
2.10
0.75
2.10
5.25
2.45
6.38
2.45

30
1
1
4
1
14
4
1
1

sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm

2.00
4.87
2.75
0.60
4.27
0.90
0.75
5.25
6.38

Total
Ladies Toilet - Room no. P-116
Northside Wall, Southside Wall
Eastside wall, Westside wall

Total

Window Jambs - (2.0 x 1.50m)


Window Jambs - 4.87 x 1.90m
.
Ventilator jambs- 0.60 x 0.90
Stair tower window jambs - 2.75 x 5.50
Main entrance door jambs - 4.27 x 2.10
Internal Door jambs - 0.90 x 2.10
Toilet Door jambs - 0.75 x 2.1
Conference room Window jambs - 5.25 x 2.45
Conference room Window jambs - 6.38 x 2.45

0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.23
0.23
0.23
0.12
0.12
0.12
0.12

6.90
5.18
1.12
0.44
0.55
0.83
0.63
1.27
0.98
0.48
1.45
13.52
0.69
3.86
1.21
0.56
1.47
0.56
41.70

Total
Deduction
Less Window - 2.0 x 1.50m
Less Window - 4.87 x 1.90m
Less stair tower window - 2.75 x 5.50
Less Ventilator - 0.60 x 0.90
Less Main entrance door - 4.27 x 2.10
Less Internal Door - 0.90 x 2.10
Less Toilet Door - 0.75 x 2.1
Less conference room Window - 5.25 x 2.45
Less conference room Window - 6.38 x 2.45
Total
Total Internal Plaster in First Floor
Total Internal Plaster
Say

VASTUKALA Design Build Solutions PVT LTD.

QTY

1.500
1.900
5.500
0.900
2.100
2.100
2.100
2.450
2.450

90.00
9.25
15.13
2.16
8.97
26.46
6.30
12.86
15.63
186.76
656.93
2338.57
2690.00

56

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural

COST ESTIMATE
NAME OF THE WORK: EXTENTION/CONSTRUCTION OF BUILDING AT ARCI
NAME OF THE BUILDING: PMD BUILDING
ARCHITECTS - VASTUKALA Design Build Solutions Pvt. Ltd.
VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE
F. WATERPROOFING - Measurement Sheet
Sr.no. S.no.

Details/ Description

No. Unit

Area of terrace
Area of terrace above stair tower
Area above connector
Total terrace water proofing
Say

QTY

467.43
26.47
22.25
516.15
595.00

Ground Floor Toilet Wall Water Proffing


Gents Toilet - Room no. P-015
Northside Wall, Southside Wall
Eastside wall, Westside wall

watercooler area
Less Ventilator - 0.60 x 0.90m
Less Door - 0.90 x 2.10
Less Door - 0.75 x 2.10

2
2
4
2
1
2
2
2

sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm

5.14
2.93
2.93
1.50
1.75
0.60
0.90
0.75

2.100
2.100
2.100
2.100
2.100
0.900
2.100
2.100

21.59
12.31
24.61
6.30
3.68
1.08
3.78
3.15
60.47

2
2
4
2
2
2
2

sqm
sqm
sqm
sqm
sqm
sqm
sqm

5.14
2.93
2.93
1.50
0.60
0.90
0.75

2.100
2.100
2.100
2.100
0.900
2.100
2.100

21.59
12.31
24.61
6.30
1.08
3.78
3.15
56.80

2
2
4
2
1
2
2
2

sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm

5.14
2.93
2.93
1.50
1.75
0.60
0.90
0.75

2.100
2.100
2.100
2.100
2.100
0.900
2.100
2.100

21.59
12.31
24.61
6.30
3.68
1.08
3.78
3.15

Total
Ladies Toilet - Room no. P-016
Northside Wall, Southside Wall
Eastside wall, Westside wall

Less Ventilator - 0.60 x 0.90m


Less Door - 0.90 x 2.10
Less Door - 0.75 x 2.10
Total

First Floor Toilet Wall Water Proffing


Gents Toilet - Room no. P-115
Northside Wall, Southside Wall
Eastside wall, Westside wall

watercooler area
Less Ventilator - 0.60 x 0.90m
Less Door - 0.90 x 2.10
Less Door - 0.75 x 2.10

VASTUKALA Design Build Solutions PVT LTD.

57

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural

F. WATERPROOFING - Measurement Sheet


Sr.no. S.no.

Details/ Description

No. Unit
Total

VASTUKALA Design Build Solutions PVT LTD.

QTY
60.47

58

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural

F. WATERPROOFING - Measurement Sheet


Sr.no. S.no.

Details/ Description

No. Unit

Ladies Toilet - Room no. P-116


Northside Wall, Southside Wall
Eastside wall, Westside wall

2
2
4
2
2
2
2

2.100
2.100
2.100
2.100
0.900
2.100
2.100

QTY

Total
Total Toilet Wall Water Proofing
Say

234.534
270

Brick Bat Coba


Ground floor Toilet
First Floor Toilet
Terrace Floor Slab

5.14
2.93
2.93
1.50
0.60
0.90
0.75

21.59
12.31
24.61
6.30
1.08
3.78
3.15
56.80

Less Ventilator - 0.60 x 0.90m


Less Door - 0.90 x 2.10
Less Door - 0.75 x 2.10

sqm
sqm
sqm
sqm
sqm
sqm
sqm

1 cum
1 cum
1 cum

6.17
6.17
6.17

1.5
1.5
1.5

2 sqm
2 sqm

2.93
2.93

5.14
5.14

Total
Say

0.45
0.45
0.45

4.16
4.16
4.16
12.49
20.00

Floor Toilet Floor Water Proofing


Toilet - Room no. P-015, P-016
Toilet - Room no. P-115, P-116
Total Toilet Floor Water Proofing
Say

VASTUKALA Design Build Solutions PVT LTD.

30.12
30.12
60.2408
70.00

59

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural

COST ESTIMATE
NAME OF THE WORK: EXTENTION/CONSTRUCTION OF BUILDING AT ARCI
NAME OF THE BUILDING: PMD BUILDING
ARCHITECTS - VASTUKALA Design Build Solutions Pvt. Ltd.
VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE
G. PAINTING - Measurement Sheet
Sr.no. S.no. per Details/ Description
FM (SOR)

No.

Unit

Interior Plastic emulsion paint


Quantity same as Wall plaster area

Ceiling painting
Quantity same as Ceiling plaster

sqm

Twice the quantity of gypsum board

sqm

sqm

Total internal paint


G

New addition External painting


Area same as external plaster of new
addition

Exterior Texture Paint

sqm

Conference room
Column 0.75 x 0.30 m
Stair Tower
West side Wall
North & South side wall
Window jambs - 2.57 x 8.23
Less Window - 2.57 x 8.23
In Boxing
on first floor
deducct
Window - 2.00 x 1.50 m

1 sqm
4 sqm
4 sqm

17.27
0.75
0.30

6.30
3.5
3.5

1 sqm
2 sqm

4.88
6.00

10.500

2 sqm
2 sqm
1 sqm

2.57
8.23
2.57

14 sqm

2.60

2.800

14 sqm

2.00

1.500

14 sqm
14 sqm

2.60
2.60

0.900
0.800

0.115
0.115
8.23

Total
On ground floor
Total
Total Texture Paint
Say

VASTUKALA Design Build Solutions PVT LTD.

60

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural

VASTUKALA Design Build Solutions PVT LTD.

61

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural
External Wall - Existing building
1
1
18
2
1
2
1

Fins
canopy 1
For Ceiling
canopy 2
For Ceiling

sqm
sqm
sqm
sqm
sqm
sqm
sqm

20.17
46.71
1.77
17

4.2
10.5
4.2
0.75

20.69

0.75

Total
Say

VASTUKALA Design Build Solutions PVT LTD.

62

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural

QTY

1522.00

818.00

370
2710
1926.00

108.80
10.50
4.20
51.24

0.59
1.89
21.15

101.92
42.00
59.92
32.76
29.12
61.88
121.80
150

VASTUKALA Design Build Solutions PVT LTD.

63

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural

VASTUKALA Design Build Solutions PVT LTD.

64

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural

84.71
490.46
133.81
25.50
20.66
31.04
24.95
811.13
935.00

VASTUKALA Design Build Solutions PVT LTD.

65

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural

COST ESTIMATE
NAME OF THE WORK: EXTENTION/CONSTRUCTION OF BUILDING AT ARCI
NAME OF THE BUILDING: SOLAR CELL
ARCHITECTS - VASTUKALA Design Build Solutions Pvt. Ltd.
VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE
H. FLOORING - Measurement Sheet
Sr.no. S.no. pe Details/ Description
FM (SOR)
H

No. Unit

Vitrified tiles
Ground floor
Scientist ( P-003, P-004, P-005, P-006)
Scientist ( P-010, P-011, P-013, P-014)
Sr. Scientist ( P-007, P- 009)
Electrical room ( P-012)
corridor(P-008)
Stair case (P-ST1)
First floor
Conference room ( P-101)
Pantry (P-107)
Scientist ( P-102, P-103, P-104, P-105)
Scientist ( P-110, P-111, P-113, P-114)
Sr. Scientist ( P-106, P-109)
Electrical room ( P-112)
corridor(P-108)
Total Vitrified flooring
Say
Granite Stone Flooring
Ground Floor
Entrence (P-001)
Steps
Tread- 4.27 x 0.3m
Riser-4.27 x 0.15

sqm
sqm
sqm
sqm
sqm
sqm

3.08
3.04
6.20
3.03
31.97
3.07

5.92
5.92
5.92
5.92
2.00
6.97

72.93
71.99
73.41
17.94
63.94
21.40

1
1
4
4
2
1
1

sqm
sqm
sqm
sqm
sqm
sqm
sqm

10.53
2.22
3.08
3.04
6.20
3.03
27.80

5.89
4.09
5.92
5.92
5.92
5.92
2.00

62.02
9.08
72.93
71.99
73.41
17.94
55.60
684.57
790.00

1 sqm

1.55

4.27

6.62

3 sqm
4 sqm

4.27
4.27

0.30
0.15

3.84
2.56
13.02

3.07
3.07
1.50
1.50

1.30
2.40
0.30
0.15

7.98
14.74
21.60
11.70
56.02

2
2
48
52
Total

Total Granite stone flooring


Say

QTY

4
4
2
1
1
1

Total

Staircase ( P-ST1 )
Mid landing
First floor/ Terrace floor
Tread
Riser

sqm
sqm
sqm
sqm

69.04
80.00

Ceramic Tile

VASTUKALA Design Build Solutions PVT LTD.

66

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural

H. FLOORING - Measurement Sheet


Sr.no. S.no. pe Details/ Description
FM (SOR)
Ground Floor Toilet ( P-015, P-016)
Floor Area

No. Unit

Dado
handicap toilet
watercooler area
Deduct
Door - 0.75 x 2.1
Door - 0.90 x 2.1

5.14

2 sqm

2.93

30.12

7
4
2
1

sqm
sqm
sqm
sqm

2.93
5.14
3.55
1.75

2.1
2.1
2.1
2.1

43.07
43.18
14.91
3.68

4 sqm
3 sqm

0.75
0.90

2.1
2.1

6.30
5.67

Total
First Floor Toilet ( P-115, P-116)
Floor Area

QTY

122.98

2 sqm

2.93

12 sqm
4 sqm
1 sqm

2.93
5.14
1.75

2.1
2.1
2.1

73.84
43.18
3.68

4 sqm
4 sqm
4 sqm

0.75
0.90
0.60

2.1
2.1
0.9

Total

6.30
7.56
2.16
134.79

Total Ceramic Tiling


Say

257.77
300.00

Dado
watercooler area
Deduct
Door - 0.75 x 2.1
Door - 0.90 x 2.1
Ventilator - 0.60 x 0.90

Pavior
At the entrance
At the Connection between courtyard and ma
At the courtyard

VASTUKALA Design Build Solutions PVT LTD.

1
1
1
1

18.7
13.01

5.14

4.36
3

30.12

81.53
39.03
39.89
41.24
201.69
235.00

67

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural

COST ESTIMATE
NAME OF THE WORK: EXTENTION/CONSTRUCTION OF BUILDING AT ARCI
NAME OF THE BUILDING: PMD
ARCHITECTS - VASTUKALA Design Build Solutions Pvt. Ltd.
VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE

I. DOORS AND WINDOWS - Measurement Shee

Sr.no.S.no. perDetails/ Description


FM (SOR)

No. Unit

Doors and windows on ground floor


1
D1 - 0.90 x 2.10
At the courty yard
2

D2 - 0.90 X 2.10

D/H

1 sqm

0.9

2.1

15 sqm

0.9

2.1

4 sqm

0.75

2.1

1 sqm
1 sqm

5.77
2

2.75
2.75

15 sqm

1.85

Nova pan doors ( P-003, P-004, P-005, P-006,


P-007,P-009, P-010, P-011, P-ST-01, P-012, P013, P-014)

D4 - 0.75 x 2.10
PVC doors ( P-015, P-016)

Fixed glazing at main entrance


D1 - 2.00 x 2.10
Total
Say

W1 - 2.0 x 1.85 m
Aluminum glazed window (P-002, P-003, P004, P-005, P-006, P-007,P-009, P-010, P-011,
P-012, P-013, P-014)

W4 - 2.57 x 7.25 m
Aluminum fixed window (P-ST-01)

1 sqm

2.57

7.25

V1 - 0.60 x 0.90 m
Aluminium ventilator

5 sqm

0.6

0.9

1 sqm

2.1

Doors and windows on first floor


1
D1 - 2.00 x 2.10
Conference room (P-101)

68
VASTUKALA Design Build Solutions PVT LTD.

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural

I. DOORS AND WINDOWS - Measurement Shee

Sr.no.S.no. perDetails/ Description


I
2
D2 - 0.90 X 2.10

No. Unit
14 sqm

L
0.9

D/H
2.1

4 sqm

0.75

2.1

15 sqm

1.85

Nova pan doors ( P-102, P-103, P-104, P-105,


P-106,P-107, P-109, P-010, P-111, P-ST-101,
P-012, P-013, P-014)
I

D4 - 0.75 x 2.10
PVC doors ( P-015, P-016)

W1 - 2.0 x 1.85 m
Aluminum glazed window (P-102, P-103, P104, P-105, P-106, P-107,P-109, P-110, P-111,
P-112, P-113, P-114)

W2 - 6.38 x 2.15 m
Aluminum glazed window (P-101)

1 sqm

6.38

2.15

W3 - 5.15 x 2.15 m
Aluminum glazed window (P-101)

1 sqm

5.15

2.15

W4 - 5.38 x 1.20 m
Aluminum glazed window (P-101)

1 sqm

5.38

1.2

V1 - 0.60 x 0.90 m
Aluminium ventilator

4 sqm

0.6

0.9

69
VASTUKALA Design Build Solutions PVT LTD.

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural

QTY

1.89

28.35

6.30

15.8675
5.50
21.37
25.00

55.50

18.63

2.70

4.20

70
VASTUKALA Design Build Solutions PVT LTD.

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural

QTY
26.46

6.30

55.50

13.72

11.07

6.46

2.16

71
VASTUKALA Design Build Solutions PVT LTD.

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural

COST ESTIMATE
NAME OF THE WORK: EXTENTION/CONSTRUCTION OF BUILDING AT ARCI
NAME OF THE BUILDING: PMD BUILDING
ARCHITECTS - VASTUKALA Design Build Solutions Pvt. Ltd.
VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE

J. MISCLENIOUS - Measurement Sheet

Sr.no S.no. Details/ Description


FM (SOR)

No. Unit

D/H

GRANITE BASIN COUNTER TOP


4

sqm

1.2

0.6

2.88
2.88
4

TOTAL GRANITE BASIN COUNTER TOP


SAY

QTY

Expansion joint
at floor level

1 sqm

0.6

1.8

R.C. Jalli
toilet duct

1 sqm

5.9

6.9

40.71
47

15 sqm

1.5

45.00

Total

vertical blinds
W1 - 2.0 x 1.5 m
Aluminum glazed window (P-102, P-103,
P-104, P-105, P-106, P-107,P-109, P-110,
P-111, P-112, P-113, P-114)

W2 - 6.38 x 2.45 m
Aluminum glazed window (P-101)

1 sqm

6.38

2.45

15.63

W3 - 5.15 x 2.45 m
Aluminum glazed window (P-101)

1 sqm

5.15

2.45

12.62

W4 - 5.38 x 1.20 m
Aluminum glazed window (P-101)

1 sqm

5.38

1.2

6.46

Total
Say

79.70
85

Aluminum faade work

SS Railing
At the ramp

11 rm

14.67

161.37
180

1 rm

12.67

12.67

VASTUKALA Design Build Solutions PVT LTD.


72

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural
Staircase railing

4 rm
Total
Say

5.3

21.2
33.87
40

VASTUKALA Design Build Solutions PVT LTD.


73

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural

COST ESTIMATE
NAME OF THE WORK: EXTENTION/CONSTRUCTION OF BUILDING AT ARCI
NAME OF THE BUILDING: PMD BUILDING
ARCHITECTS - VASTUKALA Design Build Solutions Pvt. Ltd.
VOL IIIA-PART 1 - CIVIL AND ARCHITECTURE

K. PARTITION - Measurement Sheet

Sr.no. S.no. p Details/ Description


FM (SOR)

No. Unit

Aluminium partition at ground floor


Middle Partion
Between (P-002 & P-003), (P-005 & P-006), (P010 & P-011), (P-013 & P-014)

4 sqm

5.85

3.35

4 sqm

5.85

3.35

2 sqm

4.91

4 sqm

5.85

2 sqm

4.91

4 sqm

5.85

Total Aluminum partition at ground floor


Aluminium partition at first floor
Middle Partion
Between (P-002 & P-003), (P-005 & P-006), (P010 & P-011), (P-013 & P-014)
Total Aluminum partition at ground floor
Total Aluminium partition
Say
Inside the corridor
At the ground floor
Room no.- P-007, P-009 (Area of partition)
Room no.- P-003, P-004, P-005,P-006, P-010, P011, P-013, P-014 (Area of partition)
Total

At the first floor


Room no.- P-106, P-109 (Area of partition)
Room no.- P-102, P-103, P-104, P-105, P-110, P111, P-113, P-114 (Area of partition)
Total
Total Glass partition
Say

VASTUKALA Design Build Solutions PVT LTD.


74

ARCI Extension/Construction/Renovation of PMD Building


VOL-IIIA-PART 1 Civil Architectural

QTY

78.39

78.39

78.39
78.39
156.78
185.00

9.82
23.40
33.22

9.82
23.40
33.22
66.44
80.00

VASTUKALA Design Build Solutions PVT LTD.