Escolar Documentos
Profissional Documentos
Cultura Documentos
TM
First Name
Middle Name
Mario
Last Name
Suffix
Ticona
Preferred Phone Number
51 1 5348439
mario.ticona1@hotmail.com
Distrito: Independencia
Address Line 3
City
State/Providence/Territory
Zip/Postal Code
Lima
Lima
Lima 28
Country
Peru
Address Line 3
City
State/Providence/Territory
Zip/Postal Code
Lima
Lima
Lima 14
Country
Peru
Page 1 of 7
Attained Education:
Highest level of education attained
PMI Accredited?
Bachelors
2002
No
Address Line 1
Dtto. Rimac
Address Line 3
City
State/Providence/Territory
Zip/Postal Code
Lima
Lima
Lima 25
Country
Peru
FieldOfStudy
Engineering
Through
May 2007
Sep 2009
Project Role
Primary Industry
Supervisor
Construction
Page 2 of 7
Address Line 3
City
State/Providence/Territory
Zip/Postal Code
Lima
Lima
Lima 27
Country
Peru
Phone Number
51 1 4229000 x2405
Contact Name
Yuri Mansilla
Contact Relationship
Primary Stakeholder
Contact E-mail
yuri.mansilla@pe.bureauveritas.com
51 1 4229000 x2509
Planning Domain
Executing Domain
Controlling Domain
Closing Domain
0.00
450.00
1,370.00
730.00
240.00
Description
Page 3 of 7
Through
Mar 2010
Jul 2010
Project Role
Primary Industry
Supervisor
Construction
Address Line 3
City
State/Providence/Territory
Zip/Postal Code
Cajamarca
Cajamarca
caja 01
Country
Peru
Phone Number
51 76 362304
Contact Name
Client
Contact E-mail
administracion@gu.com.pe
51 76 976229609
Page 4 of 7
Planning Domain
Executing Domain
Controlling Domain
Closing Domain
0.00
100.00
270.00
100.00
0.00
Description
Through
Aug 2010
Dec 2011
Project Role
Primary Industry
Construction
Page 5 of 7
Haug S.A.
Address Line 1
Address Line 3
City
State/Providence/Territory
Zip/Postal Code
Lima-Callao
Callao
Callao 1
Country
Peru
Phone Number
51 1 634545
Contact Name
Marco Jaico
Contact Relationship
Manager/Director
Contact E-mail
marco.jaico@haug.com.pe
51 1 6134500
Planning Domain
Executing Domain
Controlling Domain
Closing Domain
10.00
400.00
1,140.00
250.00
30.00
Description
Proyecto: fabricacin y Montaje de electrofiltro, para cliente Cementos en Lima-Per, elaboracin del
Plan de Gestin del proyecto para montaje del electrofiltro, organizacin de los WBS, planificacin de la
procura y personal para la obra, elaboracin del cronograma, ejecucin de la obra fabricacin y montaje
control del avance de obra segn alcance, aseguramiento y control de calidad, pruebas y ensayos finales.
Page 6 of 7
Ended
Hours
Nov 2010
Dec 2010
35.00
Page 7 of 7