SPECIFIC ACTIVITIES
TIME
FRAME
PERFORMANCE
INDICATORS
MEANS OF
VERIFICATION
Through
out the year
Number of
seminars
attended
Attendance/
certificates
Fieldtrips/retreat
Attendance
a. attendance to seminars to
update the personnels of the
current trends in field of
construction & hazardous
chemicals
Recommendation
of the President &
PPPDMO Head
PPPDMO staff
personnels
Every end of
the year
PPPDMO Head
Through
out the
semesters
PPPDMO Head
and/or Technical
Services
Supervisor
PPPDMO Head
and/or Technical
Services
Supervisor
Through
out the
semesters
PPPDMO Head
PPPDMO Head,
LREMU and all
service
Supervisors
PERSON/S
RESPONSIBLE
Through
out the
semesters
Number of multiEmployment
skilled contractual contract
employees hired
executed at
HRDO
Different
classification of
Accomplishment
skills needed in
Report
each project
Number of
projects finished
Accomplishment
Report
Through
out the year
Monthly meetings
Accomplishment
report
Throughout
the year
No. of issued
facilities
Accomplishment
report
BUDGET
PPPDMO staff
personnels
PPPDMO Head
and/or Building &
Technical
Services
Supervisor
PPPDMO Head
and/or Technical
Services
Supervisor
Through
out the year
Every end of
the year
Fire Safety
protection month
Bureau of Fire
Safety
Protection report
Through
out the year
Ground breaking
celebration
Narrative report
PPPDMO Head
and/or LREMU
Through
out the year
CHSF
re-launching
Narrative report
PERFORMANCE
INDICATORS
MEANS OF
VERIFICATION
End of the
semesters
Number of
facilities repaired
Accomplishment
Report
Through
out the year
Number of
projects finished
Accomplishment (see
Report
attached
copy)
End of the
semesters
Number of
lighting fixtures
repaired/replaced
and chairs &
Inventory report
& written
request from
different offices
Accomplishment
report
ACTIVITIES
a. Implement the repair and
maintenance of physical facilities
identified through inspection or
reports/requests received from
members of the school community
b. Implement the execution of
projects requested by offices
and approved by the President
(Includes yearly development
plan projects)
c. Implement the periodic repair
and replacement of defective
lighting fixtures (starters, ballast &
busted bulbs) and repair of
classrooms chairs and tables
PERSON/S
RESPONSIBLE
PPPDMO Head
and/or Technical
Services
Supervisor
PPPDMO Head
and/or Technical
Supervisor and
LREMU
PPPDMO Head
and/or Building
Supervisor
TIME
FRAME
BUDGET
tables repaired
PPPDMO Head
and/or Technical
Services
Supervisor
PPPDMO Head
and/or Building
Services
Supervisor
PPPDMO head
and/or LREMU
PPPDMO Head
and/or Equipment
Services
Supervisor
Through out
the
semesters
Through out
the
semesters
Through out
the
semesters
Every end of
the year
Number of items
per projects
finished
Steady supply of
power during
power cut-off from
NUVELCO by
means of the
Power Generator
Implemented zero
plastic/styro
policy, reduction
of waste
generated,
Amount of sales
derived from
garbage materials
No. of functional
& non-functional
equipments
Accomplishment
Report
Weekly/monthly
observation
report &
Accomplishment
Report
LREMU monthly
report
Inventory report
(see
attached
copy)
CREATIVITY
Program: Multidisciplinary Research and Creativity Development Program
Project: Literary, Visual and Performing Arts Project
PERSON/S
OBJECTIVES
ACTIVITIES
RESPONSIBLE
To provide technical support a. Assist in the project requested
PPPDMO Head
to Performing Arts Project
and preparation of materials
and/or Technical
needed in the presentation of
Services
performing artists
Supervisor
TIME
FRAME
PERFORMANCE
INDICATORS
MEANS OF
VERIFICATION
Through out
the semester
Needed materials
used during the
presentation
Approved
written request
of material
BUDGET
LREMU and
PPPDMO head
Second
semester
Accomplish
research paper
Approved
research
proposal
PERFORMANCE
INDICATORS
MEANS OF
VERIFICATION
COMMUNITY-SUPPORT
Program: CESP and Environment Development Program
OBJECTIVES
1. To fully support the
program of the CESP and
the LREMU office
ACTIVITIES
a. Provide materials and manpower
needed in the implementation of
projects
PERSON/S
RESPONSIBLE
PPPDMO Head
and/or Technical
Services
Supervisor and
staff.
PPPDMO staff
personnels
TIME
FRAME
Approved
written request
Attendance
PPPDMO head
and staff, LREMU Through out
and
the semester
NSTP Director
- No. of subjects
integrated with
environmental
education (3
levels)
-No of potted
seedings
produced &
planted
-no of hectares
reforested
-No of trainings
conducted
- No.of projects
Implementation
of Approved
policy
Attendance
BUDGET
implemented
CHRISTIAN DISCIPLESHIP
Program: Evangelization Program
OBJECTIVES
1. to strengthen the
Apostolic services of the
university
2. to deepen the Marian
spirituality in school
activities
3. Alay-Kapwa/Gift giving
activities to all PPPDMO
staffs and Personnels
ACTIVITIES
a. Assist in the preparation of
Eucharistic Celebration and other
activities
a. To join with the administrators,
faculty, personnels and students to
institutional Christian-related
activities
Conduct christmas program activity
for all Maintenance staff and
Personnel
PERFORMANCE
MEANS OF
INDICATORS
VERIFICATION
No of requested
Materials
activities
needed during
implemented
the activities
PPPDMO staff
personnels
Through out
the semester
PPPDMO staff
Personnels
Every end of
the year
Annual retreat
Attendance
PPPDMO staff
Personnels
Every
Christmas
season
Annual activity
Attendance
BUDGET
Prepared by:
Engr. Pascual B. Cabatic
PPPDMO Head
Submitted to:
Rev. Fr. Renillo H. Sta Ana, CICM
SMU President
university
c. manages & coorinates all activities of the PPMPO & recomends to the President or VP for Adminostration allocation of manpower and other resources as needed
d. proposes, in coordination with the physical plant committee needed reforms in the systems being followed as well as suggests plans needed for total quality control
programs including CHSF guidelines and compliance
e. evalutes the performance of the maintenance personnel directly under his supervision
f. coordinates with and recieves reports from the university housekeeper
g..performs such other duties & functions that are connected with or relation to or arising from the performance of any of the above , and does such other duties and
functions as the President or Vice President for Administration may require him to do from time to time
h. prepares and submits the budget and annual report & other needed reports and plans to the President or Vice President for Administration
2. Mr. Eduardo T. Abungan (Supervisor, Technical Services)
Functions:
a. receives all requests/complaints for repairs, etc and to keep them on file
b. does inspections if directed/requested
c. receives instructions about the work to be done from the head
d. assigns construction workers to their job & monitors performance of the workers especially in the execution in their assigned work.
e. coordinate with the custodian for ordering of materials to be used
f. performs other works that maybe assigned to him by the head
g. submits semestral accomplishment report to the head
1. Mr. Andres T. Tubaran (Supervisor, Materials/Equipment Services)
Functions:
a. custodian of the materials and facilities in the warehouse
b. monitors warehouse stock before requesting materials
c. coordinate with the head & technical supervisor for ordering of materials
d. does housekeeping of the warehouse regularly
e. performs other works that maybe assigned to him by the head
f. submits semestral inventory report of equipments/materials to the head
1. Mr Edilberto A. Suarez ( Supervisor, Housekeeping Services)
Functions:
a. receives all requests/complaints for the cleanliness of the ground & comfort rooms and to keep them on file
b.assigns housekeeping scholars to their job and ensures the cleanliness of the school grounds , classrooms , laboratories, offices and comfort rooms for healthy and
safe campus.
c.monitors defects/damages to fixtures & furnitures in classrooms for all the buildings & endorses the report to the head
d.monitors replacement of all building facilities like busted bulbs , fire extinguishers, electric fans, air conditions , broken windows and record date of replacement
e.monitors performance of regular housekeepers especially in maintaining cleanliness in their respective assigned work areas like comfort rooms , roof of buildings &
ground gardening
f. assists in the campus waste management
g. submits semestral inventory report of all building facilities to the head
5. Regular Employees
1. Rolando Romero , (painter)
2. Damdy Noberte (carpenter)
3. Pio Binwag (electrician)
4. Ventura Tayaban Jr. (electrician)
5. Demetrio Abungan Jr (carpenter)
6.Mrs. Me L. Galate (Unit head, Land Resources and Environmental Management Unit)
Functions:
PLEDGE OF SUPPORT
THIS IS TO CERTIFY THAT WE ARE SUPPORTING ALL ACTIVITIES INCORPORATED IN THE ACTION PLAN 2010-2011
NAME
EDUARDO T. ABUNGAN SR
ANDRES T. TUBARAN
EDILBERTO A. SUAREZ
ROLANDO ROMERO
DAMDY NORBERTE
PIO BINWAG
VENTURA TAYABAN JR
DEMETRIO ABUNGA JR
SIGNATURE
Materials
P 939,600.00
Labor
(30% of the cost of
materials)
P 281,880.00
2. Intercom System
activity:
a. check the main board by a qualified intercom technician
in order to revive the previous used numbers (dead
numbers) and make an additional spare dial numbers ready
for connection for future purposes
3. H-building power line
activity:
a. the existing power line supply be installed underground
to avoid power interruption due to falling debris
4. Electrical post
activity:
a. wooden post near the transformer should be removed to
avoid power interruption in case the post will bug down.
5. S building, UB building, & Old Library
Date Implemnted
Summer
SY 2010-2011
P 565,095.00
P 169,528.50
Remarks
Amount depends on
agreement with PLDT or
SMART telephone
technicians/consultants
Summer
SY 2010-2011
Estimated cost
Proposed Projects
Materials
activity:
a. painting of the buildings
6. A-building
activities:
a. repainting
b. renovation of the comfort rooms
7. Study area (Infront of the A-Building)
activities:
a. placing of concrete tiles infront of the A building's study
area
b. construction of study area extension from infront of the
A-bldg to S-bldg.
8. Elevate perimeter fence of the college campus (selected
areas )
a. Back of S-bldg
b. Side of Hantson bldg
c. Gym to coop
9. Construction of Proposed
Labor
(30% of the cost of
materials)
P 627,300.00
P 188,190.00
P 188,725.00
P 56,617.50
P 82,075.00
P 24,622.50
First semester
SY 2010-2011
P 118,020.00
P 35,406.00
Engineering Building
Remarks
First semester
SY 2010-2011
Within schoolyear
SY 2010-2011
P 283,175.00
P 84,952.50
Second semster
SY 2010-2011
P 27,925.00
P 8,377.50
First semester
SY 2010-2011
connecting Gate 3 ,
Date Implemnted
C/o Administration
Estimated cost
Proposed Projects
Materials
activity:
a. remove the composed pile constructed at the back of the Sbldg & near the CR of the D-bldg
Labor
(30% of the cost of
materials)
Remarks
First semester
SY 2010-2011
Second semster
SY 2010-2011
TOTAL
P 3,000.00
Date Implemnted
P 2,831,915.00
P 852,574.50
Note:
Activities reccommended by the PACUCOA are not included
Prepared by:
Engr. Pascual B. Cabatic
PPMPO Head
Submitted to:
Dr. John Octavios S. Palina
VP for Administration