Work Activity Risk Assessment
Work Activity
Assessed:
Function:

Track Inspections

Ref. No.

NR/L3/ MTC/ WARA/TK002

Maintenance

Discipline or
Department:

TRACK

Location/site of
work activity:

Generic

24/1/08

Groups at risk:

Maintenance staff

Date
Assessment
carried out:
Previous
assessments
superseded:

Various from former IMCs

Name:

Positions:

Persons carrying
out assessment:

John McCormick

AMWSAEA

Reviewed and
Approved by:

Robert Staughton

Safety Procedures Engineer

Date of acceptance
and publication:

Ron Cameron
31/01/2008

Head of Maintenance Workforce Safety


Planned review
31/01/2010
date:

Page 1 of 12

NR/SP/OHS/00102
03
June 2005

Ref:
Issue:
Date:

Network Rail
Work Activity Risk Assessment
Ref. No. TK002
1
Component
of Activity

2
Hazards

3
Consequences

Working on
or near the
line
Working on
or near the
line

Trains

Fatality
Major Injury

Electrocut
ion

Fatality
Major Injury

Working on
or near the
line

Wet weather
leading to:
Poor underfoot
conditions
Flooding

4
Existing Controls

Rule Book
RIMINI Plan
See GH1
See GH06 (OLE)
See GA20 (DC Areas)
Insulated tools and shields
must be used in vicinity of
conductor rails
NR RB Module M4 Floods &
Snow
Flood action procedure
(Including action plans)
CE/P/002 for structures

5
S

6
L

7
R

8
Additional Controls

9
S

10
L

11
R

12
Specialised
Risk
Assessment

Page 2 of 12

NR/SP/OHS/00102
03
June 2005

Ref:
Issue:
Date:

1
Component
of Activity
Working on
or near the
line

2
Hazards

3
Consequences

Biological

4
Existing Controls

INFORMATION SOURCES
Reference COSHH Manual
Legionella
Biological Hazards
Leptospirosis
Company procedure for
disposal of sharps
Other Controls
Pre-work briefing
Good personal hygiene
Cover any cuts/abrasions
Wash exposed skin prior to
eating, smoking or drinking
Adequate washing facilities
Local managers to run
showers at HOT FOR 5
MINUTES WEEKLY to
eliminate legionella
See GH07

5
S

6
L

7
R

8
Additional Controls

9
S

10
L

11
R

12
Specialised
Risk
Assessment

Page 3 of 12

NR/SP/OHS/00102
03
June 2005

Ref:
Issue:
Date:

1
Component
of Activity

2
Hazards

3
Consequences

Working on
railway
infrastructure

Underfoot
conditions:

On snow or icy
conditions

On track

On stairs

Over objects

On oil/grease
From vehicle
steps
On poor walking
routes

4
Existing Controls

Where snow covers lineside,


check proposed walking
route with a stick or
implement to ensure sound
footing ahead
Sand/grit to be used where
available
Extra caution to be taken
when walking on snow or icy
conditions
Do not walk on sleepers
(Rule Book Module G)
Approved safety footwear
Use appropriate lighting
Use non slip surfaces where
possible
Survey pegs to be painted
Good house keeping
Authorised walking routes
through work site/access
points
Take extra care in and
around S & C; Lubricators,
signals and stations
Do not step from moving
vehicles (Rule book module
G)
Group Standard GC/RSO
128-Specification for cess
walkways

5
S

6
L

7
R

8
Additional Controls

9
S

10
L

11
R

12
Specialised
Risk
Assessment

Page 4 of 12

NR/SP/OHS/00102
03
June 2005

Ref:
Issue:
Date:

1
Component
of Activity

2
Hazards

3
Consequences

Working on
or near the
line

Darkness

Hit by train by
darkness

Objects/debris
blown onto and
hanging from live
OLE

Paints /
Cleaner
/Lubricants

Fumes /
Skin
Contact

Inhalation
dermatitus

4
Existing Controls

GREEN ZONE WORKING


ONLY
INFORMATION SOURCES
Modular Rule Book Sec G
high visibility
Modular Rule Book sec G
Pee Wee/TOWS
Modular Rule Book sec G
Hand lamp (Working in
Darkness/Tunnel)
Temporary site lighting
broadsheets
Ensure adequate lighting
Caution to be taken following
and during windy conditions
Report any objects or debris
hanging from OLE to
electrical Control Room
immediately- DO NOT
APPROACH!!!

COSHH
Assessments
and controls shall be
briefed to team

5
S

6
L

7
R

8
Additional Controls

9
S

10
L

11
R

12
Specialised
Risk
Assessment

Page 5 of 12

NR/SP/OHS/00102
03
June 2005

Ref:
Issue:
Date:

1
Component
of Activity

2
Hazards

3
Consequences

Lone
Working

Accidents Death / Major


Incidents Injury
No
immediate
assistanc
e from
colleague

4
Existing Controls

5
S

6
L

7
R

See Risk Control Sheet


GA 10
Means of communication
shall be available at all
times, including the ability
to communicate with
emergency services, to
summon assistance
Lone
workers
shall
arrange to call their home
depot / Infrastructure
Fault Control / Signalbox
as applicable on a regular
basis when working alone
in remote locations and
whilst working trackside
Lone working shall not be
performed in areas of
known violence

8
Additional Controls

9
S

10
L

11
R

12
Specialised
Risk
Assessment

Page 6 of 12

NR/SP/OHS/00102
03
June 2005

Ref:
Issue:
Date:

1
Component
of Activity

2
Hazards

3
Consequences

Manual
handling

lifting
moving or
carrying
tools/mtls/
equipment

1. insufficient
employees/cont
ractors to
lift/move/carry
2. insufficient
lighting
3. adverse
weather
conditions
4. poor ground
conditions
5. contents likely
to move during
transit
6. unknown
weight
7. sharp edges
material may be
hot/cold

4
Existing Controls

Manual Handling Operations


Regs 1992
Management of Health and
Safety at Work Regs 1999
Trained and competent
personnel
Use of mechanical lifting
equipment
Manual Handling training for
employees
Method statements & site
specific briefing outlining
hazards which may effect
employees carrying, moving,
and carrying including:
Provide suitable lighting during
periods of darkness
Route to be taken is free from
hazards were reasonably
practicable
Sharp edges are protected or
staff have suitable PPE
(gloves)
Assess the load, weight
contents likely to shift all to be
known prior to lifting or a trial
lift is carried out with sufficient
resources to undertake the lift
safely.

5
S

6
L

7
R

8
Additional Controls

9
S

10
L

11
R

12
Specialised
Risk
Assessment

Page 7 of 12

NR/SP/OHS/00102
03
June 2005

Ref:
Issue:
Date:

1
Component
of Activity

2
Hazards

3
Consequences

All Tasks

Young
person (16
18 years
old)

Inexperience
Lack of
awareness
Immaturity

All Tasks

Lone
workers
New and
expectant
mothers

All Tasks

4
Existing Controls

5
S

6
L

7
R

8
Additional Controls

9
S

10
L

11
R

12
Specialised
Risk
Assessment

See GA42

See GA10

Fainting
Miscarriage

See GA43

Page 8 of 12

Ref:
Issue:
Date:

NR/SP/OHS/00102
03
June 2005

Network Rail
Work Activity Risk Assessment
Ref. No. TK0002
Additional
local
condition
factors that
should be
considered

Page 9 of 12

Ref:
Issue:
Date:

NR/SP/OHS/00102
03
June 2005

Manual Handling Operations Risk Assessment Filter


Work Activity Risk Assessment Reference No. ..
Activity Assessed Assessed by ..
Component of
Activity
1

WARA risk
classification
3
Further controls identified
(carry back to WARA)

4
Specialist
MHO risk
assessment
required

Y/N

Y/N

Weight outside guidelines


according to body zone?

Y/N

Y/N

Repetitive lifting/lowering more than twice per minute?

Y/N

Y/N

Twisting motion more than 45 degrees?

Y/N

Y/N

Load supported some distance


away from the body?

Y/N

Y/N

Load carried more than 10m


distance?
Hands below knuckle height or
above elbow height when
carrying/lifting.?

Y/N

Y/N

Y/N

Y/N

Y/N

Y/N

Y/N

Y/N

Lifting and Lowering

Carrying

Pushing and Pulling


Excessive force required to
move load?
Excessive force required to
keep load in motion?

Refer to Appendix D of NR/SP/OHS/00102 for guidance on completing this form

Page 10 of 12

Ref:
Issue:
Date:

NR/SP/OHS/00102
03
June 2005

Noise Risk Assessment Filter


Work Activity Risk Assessment Reference No. ..
Activity Assessed . Assessed by ..
1

Component(s) of Activity

WARA risk classification

Manufacturers/Measurement
Data (where available)
3

Name of
Tool/Equipment/Noise
source

Suppliers/Manufacturers/
Measurement Information
available Y/N
Continuous Noise Level
dBA.

Y/N

Y/N

Y/N

Y/N

Impact Noise Level dB(C)


(if applicable)
Listening Checks (where
manufacturers/measurement
data is not available)
7

Difficulty being heard at 2m


(85dB(A))

Difficulty being heard at 1m


(90dB(A))

Estimation of Noise Exposure


9

Estimated usage time (hrs.)

10

Noise exposure points


(from Table 1)

11

Total noise exposure points

12

Estimated Noise Exposure


(dB) (from Table 2)

Refer to Appendix D of NR/SP/OHS/00102 for guidance on completing this form

Page 11 of 12

Ref:
Issue:
Date:

NR/SP/OHS/00102
03
June 2005

Hand-Arm Vibration Risk Assessment Filter


Work Activity Risk Assessment Reference No. ..
Activity Assessed . Assessed by ..
1

Component(s) of Activity

WARA risk classification

Manufacturers/Measurement
Data (where available)
3

Name of
Tool/Equipment/Vibration
source

Suppliers/Manufacturers/
Field Measurement
Information available Y/N
Vibration Level
2
(m/s ) from available
information

Y/N

Y/N

Y/N

Y/N

Source of information

Estimation of Hand-Arm
Vibration Exposure
7

Estimated usage time


(hrs.)

HAV exposure points


(from Table 1)

Total HAV exposure


points

10

Estimated HAV Exposure


(m/s2 A(8)) (from Table
2)

Refer to Appendix D of NR/SP/OHS/00102 for guidance on completing this form