Você está na página 1de 6

Svetislav Ristic, P.

Eng SENIOR PROCESS ENGINEER


2090 W.Arrow Rte. #1236, UPLAND /Los Angeles California, 91786, USA
Phone : 403-237-7399, 209-589-1036, Cell 416-417-7791; E-mail: sristic@telus.net

OBJECTIVE
Senior/Principal Process/Systems Engineer

SUMMARY
A process engineer with more than 20 years process engineer experience, in the
following areas:
• Oil and Gas Onshore/Offshore, Thermal Power, Chemical Plants, Environmental
• More than 20 year experience in Oil and Gas EPCM Companies.
• Practical site work of 5 years in Refinery and Ethylene Petrochemical Complex.

Experienced in Basic Process Design and Detail Engineering Design:


• Material and Heat Balances Calculation and Process Simulation
• DBMs, PFDs, P&IDs, LDTs, SATs, SAFE Tables and C&E Diagrams Development
• Economical Pipe Sizing, Multi-Phase Flow, Pump Selection and Preliminary Equipment
Sizing
• Control and Safety Valves Calculation and Specification and HP, LP and AP Flare
Design
• Knowledge of ASME B31.1, B31.3, API Codes, Standards and Practices, besides of
usage Suncor, Shell and NORSK, Aker and Maersk Standards

Good Experience with HYSYS and PRO II Simulations, Bantrel Hydraulic Calculators, FLO-
SERIES Hydraulic and STX , ACX, , Flarenet, SizeMaster (PSV Calc), Smart Plant Model
Review, INtools.
Computer skills: Excel, VBA, Access, WinXP/Vista, Win9X and Novell Network…

WORK HISTORY

Nov. 2008- TECHNIP USA, INC., CLAREMONT, Principal Process


Present CALIFORNIA Engineer
• Aramco / Dow Chemical , Ras Tanura Integrated Project
- The project for Gas Cracking and Liquid Cracking Ethylene Production. Work on the
FEED Phase of the project.
- Primarily work on P&ID development of Process Units common for the both Creaking
Plants.
- Work on Polished Steam Condensate Unit with associated facilities; Work on
Methanol, Wash Oil, DMDS and Caustic Storages, Treatment and Distribution and the
Low Pressure Flare.
- Calculating and specifying Pumps and Control and Safety Valves.

1-6
Svetislav Ristic, P.Eng SENIOR PROCESS ENGINEER
2090 W.Arrow Rte. #1236, UPLAND /Los Angeles California, 91786, USA
Phone : 403-237-7399, 209-589-1036, Cell 416-417-7791; E-mail: sristic@telus.net

Oct. 2007-Nov. COLT WORLEYPARSONS, Senior Process Engineer


2008 CALGARY AB, CANADA

• Nexen, Long Lake South Phase 1, SAGD Project


- Utility Group, responsible for Cooling/Heating Glycol System.
- Building up Glycol System Hydraulic Model and Calculations.
- Working on P&IDs and Datasheets of relevant equipment.

• Shell Canada, Albian Sands Exp. 2 & 3 Project, ( 9 months)


- Open Pit Oil Sands Mine Upstream Processing Plant, of 7,00 tph. consisting of Ore
Slurry Preparation, Bitumen Extraction, Froth Treatment, Tailings, Solvent Recovery,
Product Storage, CoGen and U&O (Utilities and Offsites ) Units.
- As a Tim Member with Process Expertise, performing review of all existing Exp-1
Phase POs (Purchase Orders), Shell Code and Standards ( ESTGs, DEPs and SSs), SPs
(Process Specs), DSs (Equip. Datasheets), TDNs (Tech. Deviation Notes) and COs
(Change Orders) to consolidate Exp-2 & 3 POs and to initiate changes or
amendments of Code and Standards specific for Oil Sands Upstream Production,
where applicable.

Aug. 2003-Nov. BANTREL INC., CALGARY AB, Senior Process Engineer


2007 CANADA

• Shell Canada, Scotford Upgrader Expansion 1, A&V, (14 months)


- Atmospheric and Vacuum Upgrader Expasion, IFD and IFC Phases of Project.
- Process Flow Portion downstream of the 2nd Pre-flash Column to the Atmospheric
Distillation Column, which contains: Pre-flash Column Bottom Pumps, Train of Heat
Exchangers and Atmospheric Fired Heater of 51MW.
- The Heater is fired by Combination of two Fuels : Fuel Gas, Treated-off Gas and
Natural Gas for Start-up.
- Calculated the whole Black Oil Hydraulic Pressure Profile relevant to the former
Process Flow Portion.
- Sized all Control Valves around Heat Exchangers and Inlets to Atmospheric Fired
Heater.
- Sized Control Valves for Velocity Steam and Restriction Orifices at Inlets of Process
Streams Lines to the Heater.
- Calculate Relief Valves for Velocity Steam and Heater Superheated Stripping Steam.
- Specified Datasheets for all Steam Mixing Points, Sample Points, Flame Arrestors
and all Process Instrumentation along Process Lines and around Atmospheric Fired
Heater.
- Worked on all P&IDs and LDTs relevant to the former Process Flow Portion issuing
them in IFD, IFC and repeated IFC Versions.
- Performed Checking Calculation for Maximum Hydrotest Conditions for larger Pipe
Sizes which do not have defined Pipe Schedules in the Pipe Spec Specification.
- Worked on Utility P&ID for Low and Medium Pressure Steam, Instrument Air and
Utility Air.

• PetroCanada, Refinery Conversion Project, (7 months)


- Edmonton Refinery, Maintain the Reduced Sulphur Contents in Gas Oil and
Distillates.

2-6
Svetislav Ristic, P.Eng SENIOR PROCESS ENGINEER
2090 W.Arrow Rte. #1236, UPLAND /Los Angeles California, 91786, USA
Phone : 403-237-7399, 209-589-1036, Cell 416-417-7791; E-mail: sristic@telus.net

- Bulk Desulphurization Plant, Saturate Gas Plant and Unionfining Plant.


- HAZOP Action Closing and Coordination.
- Squad Check Activities.
- PSV Relief Loads Calculation Preparing and Checking.
- Distillation Column Tray-Load Checking.
- Process Instrumentation Datasheet Preparing and Checking.
- Hydraulic Calculation Checking.
- Utility P&ID Preparing and Checking.
- Line Sizing, Pump and Equipment Calculation and Datasheet Specification. Preparing
and Checking.

• Encana, Christina Lake-1 Debottleneck, SAGD Project, (9 months)


- Christina Lake, Phase-1 Debottleneck, DBM Development.
- Glycol Cooling/Heating System Calculation.
Line Sizing, Pump and Equipment Calculation and Datasheet Specification.

• Suncor, Firebag Oilsands Upgrading , Coker, (12 months)


- New Cooling Tower Design, Cooling Water Balance, Cooling Water Pumps, Cooling
Water Piping, Cooling Water Hydraulic Model.
- Existing Millennium Cooling/Utility Water System Simulation
- Distillation Column Overhead Wet Gas Centrifugal Compressor Unit
- Existing Unit Capacity Upgrade and New Unit Installation.
- P&ID Modification and Checking and issued for Construction.
- Dry Gas Sealing System. Lube Oil Cooling System. VFD Cabinet Glycol Cooling
System. Compressor Anti-Surge Control. Compressor Start-up Failure
Blowdown.Vendor Information. Performed HAZOP Close-offs
- Glycol Cooling/Heating System PFD and P&ID development.
- Process Instrumentation Datasheets ( PIDS ) Specification.

One month site work on Hydraulic Testing Packages

• Encana, Christina Lake-2, SAGD Project,(6 mths).


- Surface Production Operation,
- Steam Assisted Gravity Derange (SAGD), Upstream Processing Facilities.
- Christina Lake, Phase 2, DBM Development.
- Wellhead Manifolds, Wellpad Distribution Pipeline and Metering System P&ID
development.
- Glycol Cooling/Heating System PFD and P&ID development.
- Oil and Gas Production Plant Line Sizing, P&ID Checking, Pump and Equipment
Calculation and Datasheet Specification.

Feb. 2002-Aug. AMKC, ST.JOHN’S, NEWFOUNDLAND, Senior Process Engineer


2003 CANADA

• FPSO - White Rose Project, Oil Production of 15,781 m3/d


- FPSO Topside Facilities for Surface Production.
- Designed Utilities, calculating and specifying Process Equipment and Module
Packages.

3-6
Svetislav Ristic, P.Eng SENIOR PROCESS ENGINEER
2090 W.Arrow Rte. #1236, UPLAND /Los Angeles California, 91786, USA
Phone : 403-237-7399, 209-589-1036, Cell 416-417-7791; E-mail: sristic@telus.net

- Worked on Seawater Deaeration and Distribution, Vacuum Package, Water Injection,


Cooling and Heating Media System Primarily and Chemical Injection System , Air and
Nitrogen Distribution Systems and LP/HP Flare System.
- Developed and upgraded PFDs, P&IDs, Line Lists and Control Valve and Pressure
Safety Valve Data Schedules.
- Participated in Process Control Philosophy. Sized and calculated CVs and PSVs.
- Contributed to HAZID, HAZOP sessions and performed HAZOP Close-offs.
- Elaborated SAT and SAFE Charts and Cause and Effects Diagrams.
- Applied Norsk, Maersk and Acker Standards and Code besides, ASME B31.1, B31.3,
API-14x Standard.

Oct. 2001-Feb. MACDONALD ENGINEERING GROUP, Senior Process Engineer


2002 CALGARY AB CANADA (temp. ass’t)

• Upstream Oil Processing Facilities for Qarn Alam, Oman.


- Worked on Design and Specification of Atmospheric Flare.
- (P&IDs, Datasheets, Vendor Contacting, Calculation).

Aug. 2000-Oct. BANTREL INC., CALGARY, AB, Senior System Engineer


2001 CANADA

• Suncor, Firebag Oilsands Upgrading , Coker


- Checked Hydraulic and other Calculations and Documents.
- Analyzed Changes of Upgraded Process Material Stream for Redesign.

• Shell, Athabasca Oils Sands DownstreamProject / Congeneration


- Re-issued P&ID for Construction, Detail Design.
- Steam Boiler, Steam Turbine and Gas Turbine Generator.
- Checked and Redesigned Relief Valves.
- Modified Instrument System. Redesigned Process Lines Conditions.

• Suncor, Firebag In–Situ Oil Sands Project


- Surface Production Operation, Oil Sands Upstream Processing Facilities.
- Steam, Produced Gas and Oil-Steam Processing Facility Detail Design.
- Calculated and Designed Steam Blowdown and Flare Blowdown System.
- Calculated and Designed Fuel Gas and Mixed Fuel System.
- Developed P&ID. Performed Hydraulic Calculation for Optimal Piping
- Sized Control Valve. Calculated PSVs and Made their Specifications
- Performed HAZOP Comments Resolution, Updating P&ID.
- Simulated and Designed Process Control Loops. Participated in Process Control
Philosophy.

- Applied ASTM, ASME B31.1, B31.3 and API Codes, Standards and Recommended
Practice.
- Made Piping Material Selection, Design and Test Condition and Steam Tracing
Specification, LDTs work-on.
- Checked Documents applying Document Quality Control Procedures.

4-6
Svetislav Ristic, P.Eng SENIOR PROCESS ENGINEER
2090 W.Arrow Rte. #1236, UPLAND /Los Angeles California, 91786, USA
Phone : 403-237-7399, 209-589-1036, Cell 416-417-7791; E-mail: sristic@telus.net

1999- DRILL BOSS TECHNOLOGIES INC. Senior Process Control and


2000 CALGARY, AB, CANADA Software Engineer
- Development of Drilling Rig Computer Measuring and Supervisory System. Prototype

- Created DBMs and P&IDs for real-time measuring system.


- Designed electrical cable connections and path-ways.
- Selected and specified sensors and prepared RFQs for their purchase.
- Developed software for data acquisition, programming in G/LabVIEW.
- Configured and tested NI-Cards connected to equipment sensors.

1996- FLUOR DANIEL INC., CALGARY, AB, Process Engineer


1999

• Suncor Millennium Project


- Designed and Calculated Process Effluent Water System,
- Utility, Cooling Water Systems, Ethylene-Glycol Cooling System and Steam Boilers
and Steam Lines, worked on DBMs, PFDs and P&IDs.

- Worked on Plant Interconnecting Piping,


- Worked on auxiliary P&ID for GTG (Gas Turbine Generator)
- Issued Process Data Sheets for Pumps, Relief and Safety Valves, Process
Instrumentation, Process Vessels, Heat Exchangers and Storage Tanks.

• Husky Evergreen, Norcen Lindberg LACT Unit,


- Issued Proposal for Norcen Lindberg LUCT Unit capacity upgrade.
- Made a Feasibility Study for the 35% capacity increase and Back Pressure
modification at the destination Shipping Pumps Station.
- Modified PFD and Layout Drawings for pumps and instrumentation.
- Calculated hydraulics, pipe resizing and pump selection.
- Made Equipment Specification and Material and Labor Cost Estimation.

• Chevron China Polystyrene Project,


. FEED Phase of the project
- Design Hot Oil System, Cooling Water System, Chilled Water System, Steam Boilers,
Plant and Instrument Air and Nitrogen Distribution. Worked on Utility P&IDs, PDFs
and DBMs creation and development.

- Worked on Process Data Sheets for Pumps, Process Vessels, Heat Exchangers,
Storage Tanks, Silos and Process Package Units.
- Review of vendor drawings.

1989- RASCO, OIL AND GAS PROCESSING CO. Lead Process Engineer
1996 RAS LANUF, LIBYA
- Calculated Ethylene Cryogenic Storage Tank Insulation and performed simulation
and troubleshooting of associated UDEC-Cryogenic unit.

5-6
Svetislav Ristic, P.Eng SENIOR PROCESS ENGINEER
2090 W.Arrow Rte. #1236, UPLAND /Los Angeles California, 91786, USA
Phone : 403-237-7399, 209-589-1036, Cell 416-417-7791; E-mail: sristic@telus.net

- Debottleneck and designed an extension of Fire Water system.


- Monitored Heat Exchanger performances and fouling.
- Participated in Hysim Simulation like Atmospheric Crude Tower for debottleneck of
Overhead Stream Condenser.
- Checked capacity of the Ethylene Flare Systems using Hysim Simulator.
- Made different calculations for oil and gas combustion.

- Calculated balances for Desalinated/Demineralized Water and Water Steam and


Electricity Production for various oil and gas fuels.
- Provided Daily Operationl Reporting.

1982- PETROLINVEST (OIL & GAS EPCM CO.) SARAJEVO, Senior Process
1989 BOSNIA AND HERCEGOVINA Engineer
( Technip-Paris
Association Group
- Contributed to Process Design of Gas Treatment Plant, Refinery Tanks, NPK-Fertilizer
Plant, Tank Truck Loading Station etc.
- Design distillation columns, liquid- and gas-liquid separators, liquid-liquid extractors
and calculated heat exchangers.

EDUCATION
BSc. in Chemical Engineering, Faculty of Technology, University of Belgrade,
Belgrade, Serbia

SPECIAL TRAINING
Computer Application to Process Simulation and Project Design and Engineering,
Technip Paris, France

PROFESSIONAL ASSOCIATIONS
Member of Alberta Professional Engineer Association, APEGGA (from June 2000)

6-6

Você também pode gostar