Technical Associates

Limited
An ISO 9001:2008 Company
Energising India since 1969

About Us
Manufacturers of
Power and Distribution
Transformers
Turnkey Transmission &
Distribution EPC Projects

We offer solutions spanning the full length of


Transmission & Distribution Opportunities
2

About Us

Currently manufacturing transformers from 5 KVA,


11 kV up to 200 MVA 220 kV class.

Planned production of Power Transformers upto


765 kV at new plant in India.

Manufacturing Capacity 18,000 MVA Per Annum.

Turnkey Projects for building electrical substations,


transmission & distribution lines upto 400 kV.

Aggressive Targets, Confidence to grow


3

About Us: Milestones


1967: Technical Associates was founded as a partnership firm.
1973: Present manufacturing location at Lucknow established
1985: Indian Transformer Manufacturers Association (ITMA) set up with TAL as a founder member
1991: TA gets ISO 9000 certification for complete transformer manufacturing process
2001: TA becomes regular manufacturer of 40.0 MVA, 132 kV Power Transformers
2006: Turnkey Power Projects division set up for executing Transmission & Distribution EPC projects.
2007: Work commences on setting up a state of the art manufacturing plant in Sitarganj, Uttarakhand
for manufacture of Extra High Voltage Power transformers up to 765 kV class.
2008: State of the art plant commissioned at Sitarganj (Uttarakhand). It will enlarge TALs transformer
product portfolio to include EHV Transformers up to 765 kV; a quantum leap in manufacturing
and technology.
2009: TAL Sitarganj Unit raised first Invoice.
2009: TAL commissions Vapour Phase Drying Plants and Impulse Generators (HAEFELY,
Switzerland).
2010: Both plants of TAL certified for compliance with ISO 9001:2008 standard.
2011: TAL delivers it's first 100 MVA 220/132 kV Auto Transformer to APTRANSCO.
2011: TAL executes it's first export order for Power Transformers for ZESCO, Zambia.
2011: TAL manufactured 160 MVA, 220/132 kV voltage class Power Transformer and successfully
Impulse tested by ERDA Vadodra.
2012: TAL executes export order for Power Transformers for Tokai Power Products Ltd., Bangladesh
and Distribution Transformation for ABERME, Republic of Benin, West Africa.
2012: TAL installed UP's first 2 MWp Solar Photovoltaic Power plant in District Barabanki Inaugurated
by Honorable Chief Minister of Uttar Pradesh.
2013: TAL executes export order for Power & Distribution Transformers for Energie du Mali, Africa.
2013: TAL received approval from RDSO for manufacturing and supply of Traction Transformers
upto 30MVA, 220 KV.
2013: TAL Sitarganj unit approved by Power Grid corporation of India Ltd. (PGCIL) & NTPC.
2013: TAL testing facilities duly approved and accredited to NABL.
2013: TAL approved for repair of 400/220/132 KV Power Transformers by Power Grid corporation
of India Ltd. (PGCIL).

Pan India Presence


Plant Locations
Sales Network

Overseas Supplies

Products Portfolio

Power Transformers
100 MVA, 220/132/11 kV Power Transformer

S. No

Rating

Voltage Class

33 kV Power Transformer
1

3.15 MVA

33/11 kV

5 MVA

33/11 kV

6.3 MVA

33/11 kV

7.5 MVA

33/11.5 kV

8.0 MVA

33/11 kV

10 MVA

33/11 kV

20 MVA

33/11.5-6.25 kV

66 kV Power Transformer
1

12.5 MVA

66/11 kV

12.5/ 16 MVA

66/11 kV

20 MVA

66/11 kV

16/ 20 MVA

66/11 kV

25/ 31.5MVA

66/11 kV

132 kV Power Transformer


1

10/16 MVA

132/11 kV

12.5 MVA

132/11 kV

20 MVA

132/11 kV

20/25 MVA

132/33 kV

31.5 MVA

132/33 kV

40 MVA

132/33 kV

220 kV Power Transformer

12.5 MVA, 66/11 kV Power Transformer

60 MVA

220/132/11 kV

100 MVA

220/132/11 kV

160 MVA

220/132 kV

40 MVA, 132/33 kV Power Transformer

Distribution transformers Three phase

8 MVA, 33/11 kV Distribution Transformer

S. No

Rating

Voltage Class

10 kVA

11/0.433 kV

15 kVA

11/0.433 kV

16 kVA

11/0.433 kV

25 kVA

11/0.433 kV

40 kVA

11/0.433 kV

63 kVA

11/0.433 kV

100 kVA

11/0.433 kV

200 kVA

11/0.433 kV

250 kVA

11/0.433 kV

10

250 kVA

33/0.4 kV

11

300 kVA

11/0.433 kV

12

315 kVA

11/0.433 kV

13

400 kVA

11/0.433 kV

14

400 kVA

6/0.42 kV

15

400 kVA

11/0.42 kV

16

500 kVA

11/0.433 kV

17

630 kVA

11/0.433 kV

18

750 kVA

11/0.433 kV

19

1000 kVA

11/0.433 kV

20

1500 kVA

11/0.433 kV

21

2000 kVA

11/0.433 kV

All the above rating can also be manufactured for 33 kV or 22 kV voltage range
Transformers upto 300 kVA, 11/0.433 kV are generally manufactured with
aluminum winding, though copper wound transformers can be manufactured if
required
Distribution Transformers (11 kV)

Distribution Transformers (33 kV)

Transformers of 315 kVA and higher ratings are with copper winding

Distribution transformers Single phase wound core


S. No

Rating

Voltage Class

5 kVA

6.3/0.240 kV

5 kVA

25/0.240 kV

5 kVA

11/3 kV/240 kV

10 kVA

6.3/0.240 kV

10 kVA

25/0.240 kV

10 kVA

11/0.250 kV

16 kVA

6.3/0.240 kV

25 kVA

6.3/0.240 kV

50 kVA

6.3/0.240 kV

Transformer of 10 kVA are copper / aluminum wound

Transformer of 16 kVA and higher rating can be made either with copper or
aluminum or composite windings

Transformer with primary voltage of 11 kV and intermediate ratings are also


manufactured

10

Manufacturing Facilities

11

Manufacturing process
Core

Conductor

Insulation

Aluminum / Copper rod

Press Board, Insulating


paper, Permawood

Bare Strip / Wire to size

Slit paper, blocks, spacers,


supports, strips

CRGO Coil

Tank fabrication

Fabricated Tank

Ready cut core


Paper covering for Strip /
Wire

Coil winding LV & HV

End frame
fabrication

Core assembly

Coil pre heating & pressing

Tanking

Oil filling

Core coil assembly


Filtration
Ratio check
Testing
Main assembly connections
Inspection
Ratio Check

Vacuum Drying/ Vapour


Phase Drying

Dispatch

12

Manufacturing Facilities Lucknow

Spread out over 8 acre area with ~ 6,000 sq. meters of covered sheds

Shops are of adequate height with liberal floor area and are equipped with E.O.T cranes and other material handling facilities

Separate facilities have been earmarked for assembly of Distribution and Power Transformers

TAL has invested heavily in backward integration and does in-house production of major raw materials
Core processing (Slitting, Cutting and Annealing)
Conductor manufacturing (Drawing, Annealing and Paper covering)
Transformer oil processing
Tank fabrications
Winding
Assembly and tanking

Manufacturing capacity of ~ 4,000 MVA per annum of mixed transformer ratings

Distribution Transformer Bay

Power Transformer Bay

Power Transformer Test Station

13

Lucknow plant

Winding Machines for handling heavy weight coil winding


at variable speeds upto 10.0 MT capacity

Core Cradles designed especially for high quality large


Core Assembly

14

Lucknow plant

Complete facilities for Insulation cutting/ processing

15

Lucknow plant

Complete facilities for Drawing of Round/


Rectangular Copper/ Aluminium conductor for
use in Transformer windings

Multi Layer Paper strip covering machines for


Winding conductor

16

Lucknow plant

Cranes of 5, 10, 25, 35, 150 MT lifting capacity

17

New manufacturing facility at Sitarganj

T2: 33 kV
transformer
assembly

T9: Impulse
Test Area

T8:
Fabrication

T9: 220/ 400


kV
Assembly

T7: Core
Slitting,
cutting,
annealing

T1: 11 kV
transformer
assembly

EHV Test
Area

T6: 66/ 132


kV
Assembly &
Testing
T5: 66/ 132/
220/ 400 kV
Winding
T4:
Insulation
Processing
T3: Central
Store

New Plant in Uttarakhand, North India


18

Manufacturing facilities Sitarganj

Spread out over 12.5-acre area and is fully equipped to manufacture EHV power transformers upto 765 kV voltage class

The manufacturing sheds occupy a total covered area of ~ 23,000 sq.m. ranging from 4 m to 24 m in height, and spans of 12 m to 24 m

The plant has been designed for optimal material and work flow, and integrated manufacturing operations with separate bays planned for:
Single phase and Three phase 11 kV distributions transformer
Three phase 33 kV distribution transformer
Three phase 66 & 132 kV power transformer
Single phase and three phase 220 to 765 kV power transformer

Coil winding

Insulation processing

Mild steel fabrication

Impulse testing set-up

Manufacturing capacity of 14,000 MVA per annum of mixed transformer ratings. Would be able to manufacture and deliver one 132 kV
transformer per day

Distribution Transformer Bay

Material Handling Facility up to 300MT (2 X 150)

Power Transformer Bay

Power Transformer Test Station

19

New manufacturing facility at Sitarganj

20

New manufacturing facility at Sitarganj

21

66/132 kV Winding Area

22

66/132 kV Winding Area

23

66/132 kV Winding Area

24

66/ 132 kV - Assembly

25

66/ 132 kV - Assembly

26

100 MVA 220/132/11 kV Auto Transformer CCA

27

Autoclave & Vapour Phase Drying Oven (VPD)

28

132 kV transformers under test

29

132 kV transformers under test

30

66/132 kV test station

31

220/ 400 kV assembly with 2x150 MT EOT cranes

32

Impulse Test area: 1600 kVP, 160 KJ Impulse Generator

33

Design & engineering and R&D

EXPERT DESIGN & ENGINEERING TEAM

TALs GM and senior consultant are both Ex GMs of BHEL


The director of the design & engineering has been working with TAL for last 41 years
Years of
Experience

S.No

Designation

Qualification

1
2
3
4
5

GM (Technical)

M.E. (Elect)

Sr. Consultant

B.Sc. (Elect. Eng.)

45

Director

B.E. (Elect. Eng.)

42

38

Plant Head

B.E. (Elect.)

39

General Manager

B.E. (Mechanical)

37

Deputy General Manager

BE (Electrical Engg.)

14

Deputy General Manager

Diploma in Electrical

15

Deputy General Manager

B.Tech (Electrical)

18

9
10

Manager

B.Tech (Mechanical)

20

Sr. Engineer

B.Tech (Elect)

11

Sr. Engineer

B.Tech (Elect)+Pursuing M.Tech

12
13
14

Sr. Draftsman

B.A.+ ITI

Sr. Draftsman

B.A.+ ITI

Engineer

BE(Power Electronics)

15

Engineer

B. Tech (Electrical & E.)

16

Engineer

Diploma in Mechanical

17

Trainee Engineer

B.Tech (Mech)+Pursuing MBA

18
19
20
21

Trainee Engineer

B. Tech (Mech.)

Trainee Engineer

M.E. (High Voltage)

0.1

Trainee Engineer

M.E. (High Voltage)

0.1

Draftsman

ITI & Diploma (Mech)

3.6
6

STRONG R&D
TAL has strong R&D team having capabilities of
developing new products in house
All the products manufactured by the company
have been developed in-house including the 220
kV & 132 kV transformers
The company has a fully computerized design
office and all transformer designs are done on
the basis of in-house developed software
For mechanical design, Computer Aided Design
tools like AutoCad & Solidworks are used
extensively
Large number of TAL transformers have
successfully cleared Impulse Voltage Withstand
Capability tests at 3rd party, Government
accredited Laboratories like CPRI (Central
Power Research Institute)
TAL also has some of the largest no. of
transformers that have cleared 3rd party short
circuit tests, amongst companies of TALs size

TAL has a very strong, highly experienced design & engineering and R&D team capable of taking new challenges

34

Testing facilities
OVERVIEW
Independent testing facilities for Power and Disttibution transformers at both
Lucknow and Sitarganj plant.
TALs Test lab has been assessed and accredited in accordance with the
standard ISO/IEC 17025:2005 by National Accreditation Board for Testing
Calibration Laboratories (NABL).
All routine tests/Impulse test & Temperature rise tests as per IS2026/IEC60076
are performed in house using fully automated, computerized test benches &
advanced testing software. TAL can also conduct specialized advance tests
such as measurement of Partial Dischargge, SFRA etc. at its works.
Short circuit tests are conductted at CPRI (Indias leading, independent test
center).
Impulse voltage withstand ability tests are carried out through two impulse
generators (1600 kVp, 160 kJ and 900 kVp, 45 kJ) from Haefely, Switzerland
with expandable capacity to test transformers of 765 kV voltage class.

Impulse Testing
Facility

Testing with Yokogawa Power Analyzer

35

Our Quality Policy


We, at Technical Associates, are committed to achieve total
satisfaction of our customers by:
Effectively implementing and continually improving the
Quality System.
Delivering on time, products conforming to agreed
specifications at competitive prices.
Collectively and individually striving to do things right the
first time and every time - both in personal life as well as at
the workplace.
Continuous up-gradation of technology and active
involvement of all employees and associates in productivity
improvement.

36

Turnkey Projects

37

Turnkey Projects

TAL Engineering Projects Division (EPD) was established in 2006 to


enhance and capitalize Technical Associates strong presence in the power
T&D sector

It undertakes complete execution of turnkey electrification projects from


conceptualization , design, engineering, procurement, erection and
commissioning

The tasks taken up by TAL EPD include Rural Electrification Works,


Distribution & Transmission lines from LT (440 V) to 220 kV, and electrical
Substations from 11 kV to 220 kV

Scope of works undertaken include:

Complete design, engineering & planning


Procurement & project management
Erection / construction / commissioning / testing
Handing over to customer / training

Works undertaken include:

Planning, erection and commissioning of HVDS network


Rural electrification planning and commissioning
Setting up of LT lines for urban / Rural networks
Setting up of 11 kV distribution substations and lines
Setting up 33/66/132/220 kV switch-yards and lines
Energy auditing
Planning, erection and commissioning of intelligent rural load management systems

Main strengths :

Experienced engineers, technicians & support staff from the field of project
tendering, engineering, execution, erection, commissioning and testing
High level of quality control

66 kV Sub-station with TAL transformer

132 kV Sub-station under construction

66 kV Sub-station at Mohra, Haryana

38

Customers
CUSTOMER SEGMENTS

KEY CUSTOMERS

Key customer segments catered by TAL include:


State (regional) electricity utilities
Overseas electricity boards.
Government & private power companies
Government and private power equipment manufacturing
companies
Infrastructure companies
Other manufacturing companies

39

Partnering with us - the advanTAge


A proven track record
Historically proven capabilities in
engineering / design
State-of-the-art infrastructure
40 year old credibility
Close proximity

Your Partner in Progress


40